| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 3 | 4 | 11.00 | 0.00 | N/A |
| County(s) | IL Project # | Airport | Sponsor | City |
|---|---|---|---|---|
|
PIA 4637 | Peoria International | Metropolitan Airport Authority of Peoria | Peoria |
| Contract Specifics |
|---|
| The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting. |
| 56 Calendar Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| AR108053 | FOOT | POWER CABLE, DIRECT BURY | Base items | 750.000 | |||
| AR109962 | L SUM | RELOCATE ELECTRICAL EQUIPMENT | Base items | 1.000 | |||
| AR125961 | EACH | RELOCATE STAKE MOUNTED LIGHT | Base items | 13.000 | |||
| AR152455 | CU YD | EMBANKMENT IN PLACE | Base items | 420.000 | |||
| AR152515 | CU YD | SUBGRADE UNDERCUT | Base items | 1,250.000 | |||
| AR152610 | L SUM | BUILDING DEMOLITION | Base items | 1.000 | |||
| AR162571 | EACH | DETECTOR LOOP | Base items | 2.000 | |||
| AR201660 | FOOT | BITUMINOUS CRACK REPAIR | Base items | 1,700.000 | |||
| AR201670 | SQ YD | CRACK CONTROL FABRIC | Base items | 2,000.000 | |||
| AR401610 | TON | BITUMINOUS SURFACE COURSE | Base items | 2,120.000 | |||
| AR401650 | SQ YD | BITUMINOUS PAVEMENT MILLING | Base items | 18,400.000 | |||
| AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 3,680.000 | |||
| AR620510 | SQ FT | PAVEMENT MARKING | Base items | 6,650.000 | |||
| AR620900 | SQ FT | PAVEMENT MARKING REMOVAL | Base items | 1,000.000 | |||
| AR901510 | ACRE | SEEDING | Base items | 0.300 | |||
| AR908520 | S.Y. | EXCELSIOR BLANKET | Base items | 1,560.000 | |||
| AS125901 | EACH | REMOVE STAKE MOUNTED LIGHT | Additive 1 | 13.000 | |||
| AS152410 | CU YD | UNCLASSIFIED EXCAVATION | Additive 1 | 180.000 | |||
| AS152511 | SQ YD | SUBGRADE REPAIR | Additive 1 | 160.000 | |||
| AS209606 | SQ YD | CRUSHED AGG. BASE COURSE - 6" | Additive 1 | 1,560.000 | |||
| AS401610 | TON | BITUMINOUS SURFACE COURSE | Additive 1 | 360.000 | |||
| AS602510 | GALLON | BITUMINOUS PRIME COAT | Additive 1 | 750.000 | |||
| AS603510 | GALLON | BITUMINOUS TACK COAT | Additive 1 | 300.000 | |||
| No More Pay Items | |||||||