Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
4 | 6 | 2.00 | 0.00 | STPW22T(850) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
95 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20200100 | CU YD | EARTH EXCAVATION | Base items | 428.000 | |||
20400800 | CU YD | FURNISHED EXCAVATION | Base items | 682.000 | |||
20700110 | TON | POROUS GRANULAR EMBANKMENT | Base items | 112.000 | |||
25000200 | ACRE | SEEDING, CLASS 2 | Base items | 0.500 | |||
25000400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 45.000 | |||
25000500 | POUND | PHOSPHORUS FERTILIZER NUTRIENT | Base items | 45.000 | |||
25000600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 45.000 | |||
25100115 | ACRE | MULCH, METHOD 2 | Base items | 0.500 | |||
28100105 | SQ YD | STONE RIPRAP, CLASS A3 | Base items | 36.000 | |||
28200200 | SQ YD | FILTER FABRIC | Base items | 36.000 | |||
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 702.000 | |||
40604050 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 | Base items | 132.000 | |||
44000155 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" | Base items | 1,560.000 | |||
44000400 | FOOT | GUTTER REMOVAL | Base items | 450.000 | |||
50200100 | CU YD | STRUCTURE EXCAVATION | Base items | 54.000 | |||
50800105 | POUND | REINFORCEMENT BARS | Base items | 370,170.000 | |||
51603000 | CU YD | DRILLED SHAFT IN SOIL | Base items | 582.000 | |||
51604000 | CU YD | DRILLED SHAFT IN ROCK | Base items | 387.000 | |||
52200100 | FOOT | FURNISHING SOLDIER PILES (HP SECTION) | Base items | 857.000 | |||
52200200 | CU FT | DRILLING AND SETTING SOLDIER PILES (IN SOIL) | Base items | 195.000 | |||
52200205 | CU FT | DRILLING AND SETTING SOLDIER PILES (IN ROCK) | Base items | 3,199.000 | |||
52200255 | SQ FT | TREATED TIMBER LAGGING | Base items | 1,704.000 | |||
59100100 | SQ YD | GEOCOMPOSITE WALL DRAIN | Base items | 190.000 | |||
60100060 | EACH | CONCRETE HEADWALLS FOR PIPE DRAINS | Base items | 2.000 | |||
60146304 | FOOT | PIPE UNDERDRAINS FOR STRUCTURES 4" | Base items | 240.000 | |||
60602800 | FOOT | CONCRETE GUTTER, TYPE B | Base items | 450.000 | |||
67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 12.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100450 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 | Base items | 1.000 | |||
70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 14.000 | |||
78001120 | FOOT | PAINT PAVEMENT MARKING - LINE 5" | Base items | 2,200.000 | |||
X7011800 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21 | Base items | 1.000 | |||
Z0016702 | L SUM | DETOUR SIGNING | Base items | 1.000 | |||
Z0054500 | TON | ROCK FILL | Base items | 911.000 | |||
Z0076600 | HOUR | TRAINEES | Base items | 500.000 | $0.80 | ||
Z0076604 | HOUR | TRAINEES TRAINING PROGRAM GRADUATE | Base items | 500.000 | $15.00 | ||
No More Pay Items |