001-62K77
|
Executed
|
02/15/2023
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
(1,254-Ft) Deck replacement, replacement of exterior beams, structural repairs to existing beams and substructure, guardrail replacement, and resurfacing from Woodland Ave. and Meadow Lane. The project includes a flush 5 ft sidewalk on both sides and traffic signal interconnect fiber will be replaced from St Charles Road to IL 64 (North Ave.)
|
002-62T89
|
Executed
|
02/15/2023
|
|
|
1
|
1
|
Various
|
|
Dead tree removal located within the right-of-way limits of state-maintained routes located in District One (counties of Cook, DuPage, Kane, Lake, McHenry, and Will).
|
003-64N68
|
Executed
|
03/28/2023
|
1 / 1 |
|
2
|
2
|
Rock Island
|
|
Replace highway lighting at the interchange of 1-280 with IL 92.
|
004-64N69
|
Executed
|
03/28/2023
|
|
|
2
|
2
|
Rock Island
|
|
Replace highway lighting at the interchange of IL 92/IL 5 with IL 84, near Carbon Cliff.
|
005-64P63
|
Withdrawn
|
01/05/2023
|
1 / 0 |
|
2
|
2
|
Whiteside
|
|
Expansion joint replacement, deck patching and concrete overlay, and other miscellaneous repairs on SN 098-0095 and 098-0096.
|
006-64R48
|
Executed
|
02/17/2023
|
|
|
2
|
2
|
Carroll
|
|
Deck repair, and installation of deck concrete wearing surface including approaches on SN 008-0042 carrying IL 78 over East Plum River, 3.4 miles South of JoDaviess County line.
|
007-64R49
|
Executed
|
02/17/2023
|
|
|
2
|
2
|
Boone
|
|
Deck repair, slope wall repair and microsilica overlay on SN 004-0016 carrying IL 76 over Beaver Creek, 2.5 mi South of IL 173.
|
008-64R54
|
Executed
|
02/15/2023
|
|
1 |
2
|
2
|
Lee
|
|
Expansion joint replacement, miscellaneous repairs and deck concrete wearing surface on SN 052-0031 carrying US 30 over UP RR, 0.9 miles East of Whiteside County line.
|
009-64R78
|
Executed
|
05/05/2023
|
|
|
2
|
2
|
Various
|
|
Guardrail and fence repairs along State maintained route in District 2.
|
010-66N02
|
Executed
|
03/14/2023
|
1 / 1 |
|
2
|
3
|
Iroquois
|
|
Bridge Painting at SN 038-0082, 2.62 miles South of IL 54 (Onarga).
|
011-66N03
|
Executed
|
02/24/2023
|
1 / 1 |
|
2
|
3
|
Iroquois
|
|
Bridge Painting at SN 038-0032, 2.1 mi. East of US 45 and SN 038-0033, 3.1 mi. East of US 45.
|
012-66N10
|
Withdrawn
|
01/31/2023
|
|
|
2
|
3
|
Various
|
|
This project is located along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. The work consists of weed spraying to aid in weed control.
|
013-68E42
|
Executed
|
02/22/2023
|
9 / 9 |
1 |
3
|
4
|
Tazewell
|
|
0.47 miles, Bridge Replacement on I-155 over Indian Creek near Hopedale.
|
014-68G91
|
Executed
|
02/24/2023
|
1 / 1 |
|
3
|
4
|
Knox
|
|
Bridge Preservation on S.N. 048-0080 over Spoon River, S .N. 048-0085 and S.N. 048-0086 over Cadwell Creek (2 locations) and S .N. 048-0089 over Branch of Brandywine creek.
|
015-68H37
|
Executed
|
03/17/2023
|
1 / 0 |
|
3
|
4
|
Various
|
|
Tree removal at various locations within District 4.
|
016-70G33
|
Executed
|
02/22/2023
|
|
|
3
|
5
|
Various
|
|
567.5 miles of spraying, approximately 2004 acres on state right-of-way along US 51 and interstate routes including interchanges in Champaign, Dewitt, Mclean, Piatt and Vermilion Counties.
|
017-72063
|
Executed
|
02/15/2023
|
|
|
4
|
6
|
Sangamon
|
|
Painting SN 084-0142 carrying County Highway 10 over I-72 at the New Berlin overhead.
|
018-72067
|
Executed
|
02/24/2023
|
|
|
4
|
6
|
Logan
|
|
Painting SN 054-0072 carrying Township Road 79 over I-155, 1.9 miles north of I-55.
|
019-72071
|
Executed
|
03/17/2023
|
|
|
4
|
6
|
Brown
|
|
6.8 miles of crack and joint sealing on IL 99 from 1.1 miles south of IL 107, south of Mount Sterling, to just south of Versailles northern city limits.
|
020-72120
|
Rejected
|
02/02/2023
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
0.8 miles of tree removal on IL 54 from TR 51 (Cass Road) to Sherman Road (along the southeast side).
|
021-72550
|
Executed
|
02/22/2023
|
|
|
4
|
6
|
Pike
|
|
2.5 miles of standard overlay, drainage improvements, patching and guardrail replacement on IL 106 from 1.1 miles east of East Branch Kiser Creek to US 54 west of Pittsfield.
|
022-72881
|
Executed
|
02/17/2023
|
|
|
4
|
6
|
Hancock
|
|
Expansion joint replacement on SN 034-0054 carrying IL 96 over Tyson Creek, 1.7 miles south of IL 9 in Niota.
|
023-72G17
|
Executed
|
02/22/2023
|
|
|
4
|
6
|
Logan
|
|
Pavement patching, HMA surface removal, HMA resurfacing, fog sealing and shoulder work on I-55 from the Sangamon County line to 0.5 miles south of County Highway 10.
|
024-72L78
|
Executed
|
02/17/2023
|
2 / 2 |
1 |
4
|
6
|
Scott
|
|
Slope stabilization on IL 106 east of Hillview Blacktop.
|
025-72N14
|
Executed
|
03/24/2023
|
|
|
4
|
6
|
Morgan
|
|
2.4 miles of cold milling and standard overlay on IL 104 from 0.4 miles west of IL 78 to 0.1 miles north of Morton Avenue in Jacksonville.
|
026-72N32
|
Executed
|
02/22/2023
|
|
|
4
|
6
|
Montgomery
|
|
8.7 miles of milling and cape seal IL 185 from east of Chapman T Trail in Coffeen to the Fayette County line.
|
027-74987
|
Executed
|
03/03/2023
|
|
1 |
4
|
7
|
Wayne
|
|
12.8 miles of standard overlay, resurfacing and ramp repair on I-64 from the Jefferson County line to 7 miles west of US 45.
|
028-74A91
|
Executed
|
03/03/2023
|
|
1 |
4
|
7
|
Fayette
|
|
Abutment modification, bridge deck scarification, full depth deck patching, curb repair, bridge deck overlay, deck drain replacement, new approach slab and pavement connectors on SN 026-0036 carrying US 51 over Old Hickory Creek, 2.5 miles south of US 40.
|
029-74B83
|
Executed
|
02/22/2023
|
|
|
4
|
7
|
Various
|
|
47.3 miles of weed control on I-57 from the Marion County line to the Shelby County line and on I-70 from the Fayette County line to the Cumberland County line.
|
030-76P70
|
Executed
|
02/17/2023
|
|
|
5
|
8
|
Madison
|
|
Painting of SN 060-0185 carrying Meridian Road over I-270 in Glen Carbon.
|
031-76R66
|
Executed
|
02/22/2023
|
|
|
5
|
8
|
St. Clair
|
|
Pavement patching on IL 157 at Lake Drive / Foley Drive.
|
032-76R86
|
Executed
|
02/22/2023
|
|
|
5
|
8
|
Clinton
|
|
160- of HMA surface removal and overlay on eastbound I-64 over Sugar Creek Overflow and Sugar Creek, west of Damiansville. (SN 014-0040 and SN 014-0042)
|
033-76R88
|
Deleted
|
12/09/2022
|
|
|
5
|
8
|
Various
|
|
Highway lighting and traffic signal repair and maintenance at various locations throughout District 8.
|
034-78682
|
Executed
|
03/03/2023
|
|
|
5
|
9
|
White
|
|
Replacement of SN 097-0013 carrying US 45 over Bear Creek and SN 097-0014 carrying US 45 over TR 381, approximately 2 miles south of Norris City.
|
035-78716
|
Executed
|
03/03/2023
|
7 / 7 |
3 |
5
|
9
|
Saline
|
|
Remove and replace SN 083-0001 and 083-0002 carrying US 45 over North Fork of Saline River and overflow, 1 mile and 0.5 miles north of Texas City.
|
036-78778
|
Executed
|
02/22/2023
|
|
|
5
|
9
|
Franklin
|
|
1.5 miles of milling, rubbilizing and resurfacing on IL 148 from Ziegler-Royalton School to north of Yellow Banks Road.
|
037-78866
|
Executed
|
02/24/2023
|
1 / 1 |
|
5
|
9
|
Alexander
|
|
Surface preparation and application of bridge deck concrete sealer at SN 002-0022 carrying I-57 over the Mississippi River.
|
038-78909
|
Executed
|
02/24/2023
|
|
|
5
|
9
|
Saline
|
|
Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg. , Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg.
|
039-78963
|
Executed
|
03/03/2023
|
1 / 1 |
|
5
|
9
|
Jefferson
|
|
Joint reconstruction with strip seals, bridge deck and structure repair, crack sealer, and waterproofing with HMA overlay on SN 041-0096 carrying IL 148 over Big Muddy River.
|
040-78966
|
Executed
|
03/03/2023
|
|
1 |
5
|
9
|
Union
|
|
New bridge deck overlay on SN 091-0060 carrying IL 146 over Clear Creek, 2 miles east of IL 3.
|
041-78980
|
Executed
|
02/22/2023
|
|
|
5
|
9
|
Various
|
|
Weed spraying for the control of Johnson Grass along I-57 at various locations.
|
042-78981
|
Executed
|
02/22/2023
|
|
|
5
|
9
|
Various
|
|
Weed spraying for the control of broadleaf weeds at various locations along I-24 and I-57.
|
043-61H84
|
Executed
|
02/28/2023
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Construction of a shared-use path, includes a reinforced slope system, drainage improvements, culvert headwall modifications, guardrail installation and pavement markings on the east side of 104th Avenue to 159th Street to 163rd Place in Orland Park.
|
044-61H91
|
Executed
|
04/04/2023
|
5 / 5 |
1 |
1
|
1
|
DuPage
|
|
HMA surface removal and replacement along North York Street from Crestview Avenue to Grand Avenue, with widening and traffic signal modernization at the Belden Avenue/Idustrial Drive intersection. Work includes raised medians, ADA improvements, Curb and Gutter removal and reconstruction, storm sewers, landscaping, and pavement markings all in the city of Elmhurst.
|
045-61J10
|
Executed
|
02/22/2023
|
7 / 5 |
2 |
1
|
1
|
Cook
|
|
Replace the Clearmont pedestrian bridge over Salt Creek in Elk Grove Village.
|
046-61J11
|
Executed
|
02/15/2023
|
|
|
1
|
1
|
DuPage
|
|
Resurface Montgomery Road from Frontenac Street to IL 59 in Aurora
|
047-61J12
|
Executed
|
02/24/2023
|
2 / 2 |
|
1
|
1
|
DuPage
|
|
Widening and resurfacing the intersection of Devon Avenue and Park Boulevard and the intersection of Park Boulevard and Pierce Road in Itasca.
|
048-61J13
|
Executed
|
02/15/2023
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Liberty Street from Commons Drive to IL 59 in Aurora.
|
049-61J17
|
Executed
|
02/17/2023
|
|
|
1
|
1
|
Cook
|
|
HMA removal and replacement with patching, minor utility structure repairs, curb and gutter, sidewalk, ADA improvements and striping along Wilmetter Ave. from Ridge Road to Green Bay Road in Willmette.
|
050-61J19
|
Executed
|
02/24/2023
|
4 / 4 |
|
1
|
1
|
Cook
|
|
HMA resurfacing and contruction of HMA shared-use path with pavement narrowing and widening, sidewalks, concrete curb and gutter, landscaping, retaining wall, and traffic signal enhancements along Oakton Street in Des Plaines.
|
051-61J20
|
Executed
|
03/03/2023
|
|
|
1
|
1
|
Cook
|
|
HMA removal and resurfacing with pavement patching, curb and gutter, sidewalks, and landscaping on Harrison Street from Bellwood Avenue to 25th Street in Bellwood.
|
052-61J21
|
Executed
|
03/07/2023
|
2 / 2 |
3 |
1
|
1
|
Cook
|
|
HMA resurfacing, curb and gutter, sidewalk repair, drainage structure adjustments, parkway restoration along Shabbona Drive from Sauk Trail to Indianwood Boulevard, in Park Forest.
|
053-61J24
|
Executed
|
02/22/2023
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing with Class D Patches, driveway removal and replacement, curb and gutter, sidewalk, drainage and utility structure reconstruction, and detector loop replacement on state street from US 6 to Sibley Boulevard in South Holland.
|
054-62T54
|
Executed
|
02/17/2023
|
|
1 |
1
|
1
|
Cook
|
|
Installation of new fiber optic cable, network switches, PTZ cameras, at 82 signalized intersections located along Barrington Rd from IL-72 to US-20, US-20 from Bartlett Rd to Springfield Dr, IL-19 from Bartlett Rd to Wright Blvd, IL-62 from Penny Rd to East of New Wilke Rd, and Meacham Rd from IL-62 to IL-72
|
055-64R79
|
Executed
|
02/22/2023
|
1 / 0 |
|
2
|
2
|
Various
|
|
Roadside restoration of Right-of-Way turf damage caused by motorists along State maintained routes within District 2.
|
056-70B79
|
Executed
|
02/22/2023
|
|
|
3
|
5
|
Champaign
|
|
Bridge deck overlay, Saline Branch 1 mile West of St. Joseph.
|
057-72043
|
Executed
|
02/24/2023
|
|
|
4
|
6
|
Various
|
|
Bridge washing at various major river crossings on various routes in District 6.
|
058-72069
|
Executed
|
02/24/2023
|
|
|
4
|
6
|
Sangamon
|
|
Patching on I-55 from the Montgomery County line to the Logan County line and on I-72 from the Morgan County line to the Macon County line.
|
059-72073
|
Executed
|
03/17/2023
|
|
|
4
|
6
|
Various
|
|
Crack and joint sealing on various routes at various locations throughout District 6.
|
060-72H24
|
Executed
|
02/22/2023
|
|
|
4
|
6
|
Mason
|
|
4.4 miles of standard overlay and bridge overlay on IL 97 from 0.3 miles north of East County Road 800 to the Menard County line and at Pecan Creek, 0.8 miles north of the Menard County line.
|
061-72K64
|
Executed
|
02/22/2023
|
1 / 1 |
|
4
|
6
|
Logan
|
|
4.3 miles of milling, resurfacing and new deck on I-55 from 0.5 miles south to 1.7 miles north of County Highway 10 at the Elkhart Interchange.
|
062-74212
|
Deleted
|
12/01/2022
|
|
|
4
|
7
|
Effingham
|
|
PCC pavement, pavement removal, earthwork, curb and gutter, storm sewer, traffic signals, highway lighting and sidewalks on US 40 and IL 33 from west of Raney Street to East of Walnut Street in Effingham.
|
063-74B70
|
Executed
|
02/22/2023
|
|
|
4
|
7
|
Macon, Shelby
|
|
42 miles of weed control on US 51 from the Christian County line and on I-72 from US 51 to the Piatt County line.
|
064-76M87
|
Executed
|
02/17/2023
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
5.7 miles of resurfacing and ADA upgrades on IL 159 / Troy Road from Center Grove Road to West Country Lane.
|
065-76P99
|
Rejected
|
02/02/2023
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Chemical treatment of deep wells at various locations in East St. Louis and Venice.
|
066-76R68
|
Executed
|
02/17/2023
|
2 / 2 |
|
5
|
8
|
Madison
|
|
Pavement patching on the ramps at I-255 and I-55/70 interchange.
|
067-76R70
|
Executed
|
02/17/2023
|
|
|
5
|
8
|
Madison
|
|
Partial and full depth patching on IL 160 from John Street in Grantfork to US 4.
|
068-76R71
|
Executed
|
03/14/2023
|
|
|
5
|
8
|
Madison
|
|
Partial and full depth patching on IL 3 from McKinley Bridge to New Poag Road.
|
069-85731
|
Executed
|
02/17/2023
|
1 / 1 |
1 |
2
|
2
|
Ogle
|
|
Remove 3 span steel girder bridge and replace with 3-span I-beam bridge with HMA approach, and raised roadway profile on Milledgeville Road over Buffalo Creek.
|
070-87799
|
Executed
|
03/14/2023
|
|
|
2
|
3
|
Kankakee
|
|
Resurfacing CH 18 from IL 17 to IL 115.
|
071-87807
|
Rejected
|
02/02/2023
|
|
|
2
|
3
|
LaSalle
|
|
Resurface Chartres Street from Raccuglia Drive to Pershing Road in LaSalle.
|
072-89817
|
Executed
|
03/17/2023
|
|
|
3
|
4
|
Woodford
|
|
Resurface Santa Fe Trail from IL 26/Spring Bay Road to Ch 19/Lourdes Road.
|
073-89821
|
Executed
|
03/03/2023
|
1 / 1 |
1 |
3
|
4
|
Peoria
|
|
Rehabilitate the bridge carrying CH 23R over Timber Creek, 0.7 mile north of IL 8.
|
074-91609
|
Executed
|
02/28/2023
|
|
|
3
|
5
|
Champaign
|
|
Resurface Main Street from 0.1 mile west of Division Street to east of Lincoln Street, North Division Street from north of State Street to north of US 150, and State Street from 0.1 mile west of Division Street to 0.1 mile east of Division Street in Mahomet.
|
075-91616
|
Executed
|
02/22/2023
|
2 / 2 |
1 |
3
|
5
|
Champaign
|
|
Construct a shared use PCC path with prefabricated pedestrian truss superstructure, eathwork, seeding and erosion control, along Crystal Lake park and west of Broadway Avenue in Urbana.
|
076-91623
|
Executed
|
02/24/2023
|
1 / 1 |
1 |
3
|
5
|
Douglas
|
|
Resurface Oakland Road from 5 miles south of US 36 to Township Road 2100 N.
|
077-93793
|
Executed
|
02/22/2023
|
|
|
4
|
6
|
Logan
|
|
Replace the bridge carrying CH 15 over the Sugar Creek Overflow, 1.5 miles South of New Holland.
|
078-93798
|
Executed
|
03/14/2023
|
1 / 1 |
|
4
|
6
|
Pike
|
|
Full Depth Reclamation and resurfacing with aggregate wedge shoulders, sidewalk, storm sewer, and pavement markings on CH 2 from CH 3 in New Salem to IL 107.
|
079-95927
|
Rejected
|
02/02/2023
|
8 / 8 |
|
4
|
7
|
Clark
|
|
Curb and Gutter, Sidewalks, ADA Ramps, Storm Sewers, and Street Lights, at various locations in Marshall.
|
080-62A53
|
Executed
|
02/15/2023
|
11 / 11 |
1 |
1
|
1
|
Lake
|
|
(2,811-Ft) The proposed improvement consists of Dry Land Bridge reconstruction, roadway widening, resurfacing and ADA improvement for IL 132 (Grand Avenue) at East of Cedar Lake Road located in the Village of Lake Villa in Lake County.
|
081-62H02
|
Executed
|
02/17/2023
|
3 / 3 |
1 |
1
|
1
|
Kane
|
|
(300-Ft) Culvert replacement, retaining wall construction, railroad track re-alignment, roadway resurfacing, pavement marking and ADA ramp reconstruction for IL 31 Culvert over Ditch located in the Village of South Elgin in Kane Co.
|
082-62R59
|
Withdrawn
|
01/31/2023
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Applying a high-friction surface treatment (HFST) along the ramp from I-290/ IL53 northbound to I-90 eastbound and the ramp from I-90 westbound to I-290/ IL 53 northbound. Applying a high-friction surface treatment (HFST) along I-290 eastbound near I-88, Increase pavement friction by grooving the existing PCC Pavement.
|
083-62T92
|
Executed
|
02/22/2023
|
|
|
1
|
1
|
Various
|
|
The proposed improvement is located along various expressways and arterial routes at various locations in District One.
|
084-62U04
|
Executed
|
02/28/2023
|
|
|
1
|
1
|
Cook
|
|
(2100-Ft) SMART overlay project on IL Route 43 from Sanitary and Ship Canal to Hanover Street, located in Village of Summit, Village of Forest View, and City of Chicago in Cook County.
|
085-62U15
|
Executed
|
02/22/2023
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of a full bridge painting of 1-57 at the 1-80 Interchange in the City of Calumet City in Cook County.
|
086-62U16
|
Executed
|
02/22/2023
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of cleaning and painting existing steel on the structures No. 1: IL-394 under Glenwood Dyer Road; No. 2: IL-394 under Glenwood Lansing Road, in Villages of Glenwood and Lynwood, in Cook County.
|
087-64P43
|
Executed
|
02/24/2023
|
1 / 1 |
1 |
2
|
2
|
Rock Island
|
|
Pavement patching, cold milling, HMA resurfacing on IL 5 and expansion joint replacement, deck patching, HMA wearing surface with waterproofing membrane system and misc. other bridge repairs on: SN 081-0095 and 081-0096 carrying IL 5 over 27th Street, and SN 081-0097 and 081-0098 carrying IL 5 over I-74.
|
088-64S17
|
Executed
|
02/22/2023
|
|
|
2
|
2
|
Boone, Carroll
|
|
Bridge deck sealing of 3 structures in Boone County and 11 structures in Carroll County.
|
089-64S18
|
Executed
|
02/24/2023
|
|
|
2
|
2
|
Henry
|
|
Bridge deck sealing of 30 structures in Henry County.
|
090-66824
|
Executed
|
02/17/2023
|
2 / 2 |
|
2
|
3
|
DeKalb
|
|
This project is located in Clinton Township, approximately 40 feet north of the intersection with US 30 (2.0 mile east of Waterman) in DeKalb County.
|
091-66M73
|
Executed
|
03/17/2023
|
|
|
2
|
3
|
LaSalle
|
|
This project is located on FAP 68 (IL 23) and FAP 623 (US 6). It consists of crack routing and filling as well as pavement marking.
|
092-62L51
|
Withdrawn
|
01/13/2023
|
1 / 0 |
1 |
1
|
1
|
Cook
|
|
(1.51-Mile) Smart overlay resurfacing on Pulaski Road from 1-290 (Eisenhower Expressway) to Cermak Road (22nd Avenue) in the City of Chicago, Cook County.
|
093-62T96
|
Executed
|
03/21/2023
|
|
1 |
1
|
1
|
DuPage
|
|
(2546-Ft) Improvement consists of Bridge deck patching and bridge joint reconstruction on FAI 290 (WB) ramp to SB 1-355 located in the Village of Addison and Medinah in DuPage County.
|
094-62U02
|
Executed
|
02/17/2023
|
|
|
1
|
1
|
Various
|
|
The work to be completed under this contract consists of installing signs at new locations and repairing existing damaged signs on a work order basis throughout District 1.
|
095-62U24
|
Executed
|
03/07/2023
|
20 / 19 |
2 |
1
|
1
|
Cook
|
Mandatory
|
2,112-Ft) Bridge Painting and Lighting Replacement. This improvement consists of 3 locations along the eastbound direction of the Kennedy Expressway (I-90/94 EB) at the structures; Grand Ave - (SN 016-2048), Green St.- (SN 016-0136), Hubbard St.- (SN 016-2050) and Metra Railroad, Kinzie St and Wayman St (SN 016-2020). All are located within Chicago, Cook County, Illinois.
|
096-64S19
|
Executed
|
02/24/2023
|
|
|
2
|
2
|
Various
|
|
Bridge deck sealing of 10 structures in Lee County, 5 structures in Ogle County and 4 structures in Winnebago County.
|
097-66M66
|
Executed
|
02/24/2023
|
|
1 |
2
|
3
|
LaSalle, Putnam
|
|
This project consists on performing Bridge Decks Concrete Sealing with the parapets/curbs on various routes at various location throughout LaSalle and Putnam Counties.
|
098-72G54
|
Executed
|
02/22/2023
|
1 / 1 |
|
4
|
6
|
Montgomery
|
|
5.45 miles of milling/resurfacing and deck replacements from 1.3 miles south of Waggoner to Macoupin Creek, 0.4 mile south of CH 17 at Farmersville.
|
099-72M49
|
Withdrawn
|
01/17/2023
|
1 / 1 |
|
4
|
6
|
Cass
|
|
Concrete microsilica overlay, bridge joint replacement and bridge repair on IL 125 over the BNSF Railroad in Beardstown.
|
100-72N23
|
Executed
|
02/24/2023
|
1 / 1 |
|
4
|
6
|
Various
|
|
On call repair of guardrail and impact attenuators throughout District 6 as needed.
|
101-74813
|
Executed
|
02/22/2023
|
1 / 1 |
1 |
4
|
7
|
Macon
|
|
9.9 miles of designed overlay, culvert replacement and ADA improvements on IL 48 from Bowman Road to the Christian County line.
|
102-74961
|
Executed
|
02/17/2023
|
2 / 2 |
1 |
4
|
7
|
Richland
|
|
11.7 miles of patching, milling, resurfacing, pavement replacement, median replacement and aggregate wedge shoulders on US 50 from 1.6 miles east of the Clay County line to 0.6 miles west of Ste. Marie Road.
|
103-74B69
|
Rejected
|
02/02/2023
|
1 / 1 |
|
4
|
7
|
Cumberland
|
|
Removal of dead trees along I-70 and US 40 in Cumberland County.
|
104-78604
|
Executed
|
02/28/2023
|
9 / 9 |
1 |
5
|
9
|
Jefferson
|
|
10.8 miles of reconstruction/rehabilitation on I-64 from 0.3 miles east of Shiloh Road to just east of the Washington County line.
|
105-61H95
|
Executed
|
02/22/2023
|
7 / 7 |
3 |
1
|
1
|
Kane
|
|
Widening, reconstruction, and extending Dauberman Road on new alignment south of US 30, construction of bridges for BNSF Railway and over US 30, reconstruction of US 30, roadway improvements to Granart Road, Construction of a connector road for the Dauberman/US 30 interchange, new traffic signals, and a bike trail from US 30 to Granart Road.
|
106-61H99
|
Executed
|
02/22/2023
|
3 / 3 |
2 |
1
|
1
|
Will
|
|
Reconstruction of Crete Road from Richton Road to Exchange Street in Crete.
|
107-61J18
|
Executed
|
02/28/2023
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Construct Des Plaines River Trail from north of Touhy Avenue to Devon Avenue in Park Ridge.
|
108-61J23
|
Executed
|
02/22/2023
|
1 / 1 |
|
1
|
1
|
Cook
|
|
HMA removal and replacement with Curb and gutter, sidewalks, structure adjustments, pipe culvert replacement, and landscaping on Oak Park Avenue in Chicago Ridge.
|
109-62G26
|
Executed
|
09/13/2024
|
|
|
1
|
1
|
Lake
|
|
(5.35-Mile) Design, Standard and Smart overlay resurfacing on IL Rte. 173 (Rosecrans Rd.) from Brown Ave. to Hunt Club Rd. in the Village of Antioch, Lake County.
|
110-62M43
|
Executed
|
02/22/2023
|
3 / 3 |
1 |
1
|
1
|
DuPage, Will
|
|
(4,199-Ft) Designed Overlay, New Shoulders on Joliet Rd from I-55 to Sherman Road. The project also includes Diamond Grooving on I-55 NB off ramp to I-355. This Project is in the Villages of Romeoville, Bollingbrook and Woodridge.
|
111-62N69
|
Executed
|
02/22/2023
|
2 / 2 |
|
1
|
1
|
Lake
|
|
(5.59-Mile) Smart overlay and ADA improvements, on IL 120 (0.2 Mile East of IL 60 0.1 Mile East of Alleghany Road) in the villages of Volo, Round Lake, Round Lake Park, Hainseville, Grayslake, and Mundelein in the townships of Avon, Grant, Wauconda, and Freemont in Lake County.
|
112-62N79
|
Executed
|
02/28/2023
|
|
1 |
1
|
1
|
Cook
|
|
(4.03 mi); Smart Overlay and ADA Improvements on Roosevelt Rd from Des Plaines Av to Belt Railway. This project is located in the Village of Forest Park, Village of Oak Park, City of Berwyn, Town of Cicero and the City of Chicago in Cook Co.
|
113-62R80
|
Executed
|
02/22/2023
|
|
1 |
1
|
1
|
Cook
|
|
(1.04-Mile) Standard Overlay project on Des Plaines Ave from Madison St to Roosevelt Road located in the Village of Forest Park in Cook County.
|
114-62U50
|
Executed
|
02/22/2023
|
|
|
1
|
1
|
Various
|
|
The work to be completed under this contract consists of removal and replacement of impact attenuators and sand module replacement on a work order various State maintained expressway and arterial routes within the counties of Cook, DuPage, Will, Lake, McHenry, and Kane.
|
115-62U52
|
Deleted
|
12/08/2022
|
|
|
1
|
1
|
Cook, Will
|
|
Project consists of the pickup, removal and disposal of debris/litter on a work order basis located on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12 (95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island in Cook County.
|
116-76K46
|
Executed
|
02/22/2023
|
|
|
5
|
8
|
Bond
|
|
8.1 miles of resurfacing, patching, ADA improvements, guardrail improvements, detector loop replacement and earth excavation on US 40 from 0.3 miles west of IL 127 in Greenville to the Fayette County line. Includes bridge overlay and structural repairs on SN 003-0018 and SN 003-0019 in Smithboro.
|
117-78882
|
Withdrawn
|
01/11/2023
|
1 / 1 |
|
5
|
9
|
Alexander, Williamson
|
|
Painting of one bridge in Williamson County and two bridges in Alexander County. (SN 100-0003, SN 002-0025 and SN 002-0026)
|
118-78947
|
Executed
|
02/22/2023
|
|
|
5
|
9
|
Various
|
|
Upgrade railroad interconnected traffic signals in Carbondale, Herrin and Anna.
|
119-78958
|
Executed
|
02/22/2023
|
1 / 1 |
|
5
|
9
|
Franklin
|
|
Replacement of the pumps, piping, back-up and electrical controls of the pump station along I-57 at the West Frankfort interchange.
|
120-78962
|
Executed
|
03/14/2023
|
|
1 |
5
|
9
|
Franklin
|
|
Replacement of the sanitary sewer lift station and grinder, electrical service, alarm system, driveway pavement and water service at northbound I-57 Rend Lake Rest Area, 2.4 miles north of the IL 14 / Benton interchange.
|
121-85700
|
Executed
|
02/22/2023
|
15 / 15 |
1 |
2
|
2
|
Lee
|
|
Construction of a shared-use path, concrete curb and gutter, driveways, drainage adjustments, boardwalk structures, retaining walls, lighting, and landscaping along an abandoned railroad from South Peoria Avenue to Depot Avenue in Dixon.
|
122-87673
|
Executed
|
02/28/2023
|
1 / 1 |
2 |
2
|
3
|
LaSalle
|
|
Replace the bridge carrying CH 57 over the Vermilion River, 1.2 miles north of 18th Road.
|
123-87759
|
Executed
|
03/17/2023
|
2 / 2 |
2 |
2
|
3
|
Kankakee
|
|
HMA multi-use path with concrete sidewalk replacement, curb and gutter, concrete pavement replacement, HMA surface removal and replacement, erosion control, landscaping, lighting, on the north side of IL1/IL17 in Grant Park.
|
124-87783
|
Executed
|
02/22/2023
|
11 / 9 |
1 |
2
|
3
|
Kendall
|
|
Convert 4-way intersection to HMA roundabout with drainage improvements, lighting and a multi-use path with ADA ramps.
|
125-89822
|
Executed
|
02/24/2023
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
Replace existing box culvert on Graham Chapel Road at a Tributary of West Fork over Kickapoo Creek, 0.6 mile west of Stone School Road.
|
126-93778
|
Withdrawn
|
12/13/2022
|
|
|
4
|
6
|
Montgomery
|
|
Replace the bridge carrying CH 9 over Shoal Creek, 3 miles south of Coffeen.
|
127-93785
|
Executed
|
02/22/2023
|
2 / 2 |
1 |
4
|
6
|
Sangamon
|
|
Replace existing structure with a single span steel girder superstructure with concrete deck and aggregate approaches that carrys Irwin Bridge Road over Richland Creek, 1.5 miles east of Salisbury.
|
128-93795
|
Executed
|
02/28/2023
|
17 / 17 |
1 |
4
|
6
|
Macoupin
|
|
Reconstruction of Brighton Bunker Hill Road from Fostesburg Road to Shipman Cutoff Road. Includes Replacement of the bridge over Girdes Branch.
|
129-97787
|
Rejected
|
02/02/2023
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Reconstruction of clay Street from North Main Street to North Dewey Street in Troy.
|
130-61J04
|
Executed
|
02/22/2023
|
|
|
1
|
1
|
Cook
|
|
Pavement reconstruction on National Parkway from Golf Road (IL58) to 0.1 mile south of American Lane, and the construction of a roundabout at American Lane, in schaumburg.
|
131-62K74
|
Executed
|
02/15/2023
|
32 / 32 |
1 |
1
|
1
|
Cook
|
|
This is a Bridge Deck overlay, bridge joint repair, pavement patching, overhead sign replacement, ITS loop detectors and lighting project along the inbound and inversible lanes on I-90 (Kennedy Expy from I-94 (Edens Expy) to Hubbard Street in the City of Chicago for a total of 40,320 Ft (7.63-Miles).
|
132-62R49
|
Withdrawn
|
01/31/2023
|
|
1 |
1
|
1
|
Various
|
|
The work to be completed under this contract consists expressway daytime sweeping throughout the southern half of District 1.
|
133-76N83
|
Withdrawn
|
01/18/2023
|
|
|
5
|
8
|
Madison
|
|
0.59 miles of standard overlay and ADA improvements on IL 140 from Monument Avenue to Terra Drive in Alton.
|
134-85730
|
Executed
|
02/22/2023
|
1 / 1 |
|
2
|
2
|
Lee
|
|
Resurfacing, sidewalks, curb and guttr, segmantal block wall, signing and pavement markings on various routes in Dixon.
|
135-85732
|
Executed
|
02/22/2023
|
14 / 10 |
2 |
2
|
2
|
Boone
|
|
Removal of a three-span concrete slab bridge and construction of a two-span PPC I-Beam bridge with integral abutments and approach roadway construction on Poplar Grove Road over Beaver Creek in Boone County.
|
136-89826
|
Executed
|
03/03/2023
|
7 / 6 |
|
3
|
4
|
Peoria
|
|
PCC pavement reconstruction, PCC Shoulders, curb and gutter, storm sewer replacement, traffic signal installation and lighting on Old Galena Road from IL 29 north to Neal Lane with a 0.26 mile omission north of IL 29 to south of Engine Drive.
|
137-97785
|
Executed
|
02/24/2023
|
|
|
5
|
8
|
Madison
|
|
Reconstruct North Buchanan Street from East Union Street to Hillsboro Avenue in Edwaardsville.
|
138-97791
|
Executed
|
03/07/2023
|
1 / 1 |
2 |
5
|
8
|
Marion
|
|
Pulverize and regarde existing pavement, aggregate base, HMA resurfacing, aggregate shoulders, pipe culverts, curb and gutter, and pavment markings on Gragg Street from Lincoln Boulevard to Country Club Road in Centralia.
|
139-87798
|
Executed
|
03/03/2023
|
|
|
2
|
3
|
Ford
|
|
Resurfacing and aggregate shoulders on Elliot Road from 12 North Road to IL 54.
|
140-97794
|
Executed
|
02/22/2023
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
Resurfacing, curb and gutter replacement, sidewalks, and pavement markings on State Street/Old Vincennes Trail from Smiley Street to Scott Troy Road in O'Fallon.
|
141-97796
|
Executed
|
02/22/2023
|
6 / 6 |
|
5
|
8
|
Jersey
|
|
Resurfcing, HMA shoulder widening, pipe under-drains, shoulder and centerline rumble strips, reshaping fore slopes, guardrail, and pavement markings on Otterville Road from IL 16 to Main Street in Otterville.
|
142-97797
|
Executed
|
02/22/2023
|
1 / 1 |
|
5
|
8
|
Monroe
|
|
Replace the bridge carrying CH 12 over a drainage canal located 0.10 mile west of the Valmeyer corporate limits.
|
143-62U54
|
Executed
|
03/03/2023
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
Project consists of the pickup, removal and disposal of debris/litter on a work order basis located on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12 (95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island in Cook County.
|
01A-KE019
|
Executed
|
07/20/2023
|
|
1 |
2
|
2
|
Henry
|
|
REPLACE RUNWAY AIRFIELD LIGHTING
|
02A-FL034
|
Rejected
|
03/06/2023
|
|
1 |
4
|
7
|
Clay
|
|
Maintain and Remark Runway 3-21 and other Airfield Pavements
|
03A-PA064
|
Deleted
|
12/10/2022
|
|
|
1
|
1
|
|
|
Rehabilitate Access Road at NW Quadrant Hangars
|
04A-FA008
|
Executed
|
06/08/2023
|
|
3 |
4
|
7
|
Wayne
|
|
Ramp Expansion and Airfield Drainage Improvements
|
05A-UN061
|
Executed
|
09/10/2024
|
|
2 |
3
|
5
|
Champaign
|
|
New Runway 4 and 22 FAA PAPIs - Phase 1 Electrical
|
06A-JA040
|
Rejected
|
03/06/2023
|
|
1 |
4
|
6
|
Morgan
|
|
Replace Medium Intensity Lights on Runway 13/31 and 4/22, All Taxiways, and Apron
|