| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 3 | 5 | 3.00 | 0.00 | PL10(830) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| Completion Date: September 15, 2023 |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 20100500 | ACRE | TREE REMOVAL, ACRES | Base items | 0.250 | |||
| 20101000 | FOOT | TEMPORARY FENCE | Base items | 487.000 | |||
| 20101200 | EACH | TREE ROOT PRUNING | Base items | 5.000 | |||
| 20101350 | EACH | TREE PRUNING (OVER 10 INCH DIAMETER) | Base items | 10.000 | |||
| 20101400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 5.000 | |||
| 20101500 | POUND | PHOSPHORUS FERTILIZER NUTRIENT | Base items | 5.000 | |||
| 20101600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 5.000 | |||
| 20101700 | UNIT | SUPPLEMENTAL WATERING | Base items | 1.000 | |||
| 20200100 | CU YD | EARTH EXCAVATION | Base items | 51.000 | |||
| 20400800 | CU YD | FURNISHED EXCAVATION | Base items | 77.000 | |||
| 21101505 | CU YD | TOPSOIL EXCAVATION AND PLACEMENT | Base items | 168.000 | |||
| 25000400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 45.000 | |||
| 25000500 | POUND | PHOSPHORUS FERTILIZER NUTRIENT | Base items | 45.000 | |||
| 25000600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 45.000 | |||
| 25100115 | ACRE | MULCH, METHOD 2 | Base items | 0.750 | |||
| 25100630 | SQ YD | EROSION CONTROL BLANKET | Base items | 762.000 | |||
| 28000250 | POUND | TEMPORARY EROSION CONTROL SEEDING | Base items | 50.000 | |||
| 28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 742.000 | |||
| 28000510 | EACH | INLET FILTERS | Base items | 2.000 | |||
| 28100107 | SQ YD | STONE RIPRAP, CLASS A4 | Base items | 360.000 | |||
| 28200200 | SQ YD | FILTER FABRIC | Base items | 360.000 | |||
| 30300112 | SQ YD | AGGREGATE SUBGRADE IMPROVEMENT 12" | Base items | 350.000 | |||
| 35101600 | SQ YD | AGGREGATE BASE COURSE, TYPE B 4" | Base items | 1,020.000 | |||
| 42400300 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH | Base items | 7,158.000 | |||
| 42400410 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 8 INCH | Base items | 501.000 | |||
| 42400800 | SQ FT | DETECTABLE WARNINGS | Base items | 30.000 | |||
| 44000500 | FOOT | COMBINATION CURB AND GUTTER REMOVAL | Base items | 56.000 | |||
| 44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 3,757.000 | |||
| 50200100 | CU YD | STRUCTURE EXCAVATION | Base items | 36.000 | |||
| 50300225 | CU YD | CONCRETE STRUCTURES | Base items | 14.600 | |||
| 50300255 | CU YD | CONCRETE SUPERSTRUCTURE | Base items | 15.000 | |||
| 50300300 | SQ YD | PROTECTIVE COAT | Base items | 90.000 | |||
| 50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 3,800.000 | |||
| 51200957 | FOOT | FURNISHING METAL SHELL PILES 12" X 0.250" | Base items | 94.000 | |||
| 51202305 | FOOT | DRIVING PILES | Base items | 94.000 | |||
| 51203200 | EACH | TEST PILE METAL SHELLS | Base items | 2.000 | |||
| 51500100 | EACH | NAME PLATES | Base items | 1.000 | |||
| 60300305 | EACH | FRAMES AND LIDS TO BE ADJUSTED | Base items | 2.000 | |||
| 60604400 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18 | Base items | 56.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 72000100 | SQ FT | SIGN PANEL - TYPE 1 | Base items | 60.500 | |||
| 72900200 | FOOT | METAL POST - TYPE B | Base items | 55.000 | |||
| 73000100 | FOOT | WOOD SIGN SUPPORT | Base items | 50.000 | |||
| 78000600 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 12" | Base items | 120.000 | |||
| K1004572 | ACRE | PRAIRIE SEEDING (SPECIAL) | Base items | 0.250 | |||
| X0322508 | SQ FT | PEDESTRIAN TRUSS SUPERSTRUCTURE | Base items | 918.000 | |||
| X2500910 | ACRE | SEEDING, CLASS 1 (MODIFIED) | Base items | 0.500 | |||
| X2502024 | ACRE | SEEDING, CLASS 4B (MODIFIED) | Base items | 0.250 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| Z0013797 | SQ YD | STABILIZED CONSTRUCTION ENTRANCE | Base items | 71.000 | |||
| Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
| No More Pay Items | |||||||