Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
4 | 6 | 9.00 | 0.00 | NHPPVSZZ(054) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
Contract is in combination with 061-72K64. If a combination bid is submitted, an individual item bid must also be submitted for each individual item. Failure to include an individual bid for each of these items and a combination bid amount will cause the combination bid to be declared irregular. |
Project Labor Agreement |
35 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 60,466.000 | |||
40600372 | FOOT | LONGITUDINAL JOINT SEALANT, HALF-WIDTH | Base items | 127,297.000 | |||
40604164 | TON | POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N90 | Base items | 11,287.000 | |||
44000155 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" | Base items | 134,369.000 | |||
44200610 | SQ YD | CLASS A PATCHES, TYPE II, 13 INCH | Base items | 100.000 | |||
44200612 | SQ YD | CLASS A PATCHES, TYPE III, 13 INCH | Base items | 100.000 | |||
44200614 | SQ YD | CLASS A PATCHES, TYPE IV, 13 INCH | Base items | 100.000 | |||
44213000 | SQ YD | PATCHING REINFORCEMENT | Base items | 300.000 | |||
44213200 | FOOT | SAW CUTS | Base items | 1,356.000 | |||
44213204 | EACH | TIE BARS 3/4" | Base items | 200.000 | |||
67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 6.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100420 | EACH | TRAFFIC CONTROL AND PROTECTION, STANDARD 701411 | Base items | 1.000 | |||
70100800 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701401 | Base items | 1.000 | |||
70100815 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701446 | Base items | 1.000 | |||
70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 30.000 | |||
70200100 | L SUM | NIGHTTIME WORK ZONE LIGHTING | Base items | 1.000 | |||
70300100 | FOOT | SHORT TERM PAVEMENT MARKING | Base items | 8,911.000 | |||
70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 2,970.000 | |||
78009005 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 5" | Base items | 79,561.000 | |||
78011030 | FOOT | GROOVING FOR RECESSED PAVEMENT MARKING 6" | Base items | 79,561.000 | |||
78100100 | EACH | RAISED REFLECTIVE PAVEMENT MARKER | Base items | 1,592.000 | |||
78300200 | EACH | RAISED REFLECTIVE PAVEMENT MARKER REMOVAL | Base items | 1,592.000 | |||
X0300010 | POUND | BITUMINOUS MATERIALS (FOG SEAL) | Base items | 46,051.000 | |||
X0322279 | EACH | OUTLET MARKER | Base items | 128.000 | |||
X2503000 | ACRE | MAINTENANCE MOWING | Base items | 22.000 | |||
Z0034105 | TON | MATERIAL TRANSFER DEVICE | Base items | 11,287.000 | |||
Z0076600 | HOUR | TRAINEES | Base items | 1,500.000 | $0.80 | ||
Z0076604 | HOUR | TRAINEES TRAINING PROGRAM GRADUATE | Base items | 1,500.000 | $15.00 | ||
No More Pay Items |