019-64P88

Bulletin Description

Bridge deck overlay, deck repairs and joint repairs on structure carrying IL 64 over I-39/US 51 (SN 071-0055).
Region District DBE % VBP % Federal Project #
2 2 0.00 0.00 NHPP1JF3(913)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Ogle
  • FAI 39
  • (141-2HB-1)BDR
  • C-92-035-21
  • 2-20296-0000
Contract Specifics
55 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (11 Submitted / 10 Answered ) Questions not accepted as of January 11, 2022 04:30 PM.

  • On sheet 7 it shows that Prime and Aggregate Wedge Shoulder are to be included in the HMA Shoulder, 9" pay item. What is being asked for in regards to Agg Shoulder (depth, width)?
    The pay item is 10’ wide HMA Shoulder, 9” per Standard 482006. The HMA shoulder is full width, no portion of the shoulder is to be aggregate. The standard requires a variable aggregate wedge from the edge of the full-width HMA shoulder to meet adjacent grade and eliminate any drop-off from the HMA. (01/12/2022)

  • Typical bridge joint repair projects the pay items 50102400 Conc Removal 11 cy and 50300255 Conc Superstructure 65 cy, are parallel, meaning the concrete that is removed is equal to the concrete replaced in the bridge joint. Can the department provide clarification on concrete removal qty & locations, as well as the Conc Superstructure qty & locations?
    The difference is the new superstructure concrete for the raised barrier. There is no concrete removal for the barrier. (01/12/2022)

  • What specification will control partial depth 2” median removal shown on plan 15 - “bridge deck scarification” (requiring hydro-scarification) or “50102400 concrete removal”?
    The median removal is under 44003510 Median Removal Partial Depth. (01/12/2022)

  • Plan sheet 13, Qty for the Micro Conc Ovly 2 1/2" was changed to 1,868 SY in Addendum 1, the bid qty description changed to 2 1/2" but the bid Qty remains 1,368 sy, which qty is correct?
    1,868 SY is correct. This will be corrected by addendum. (01/11/2022)

  • Will 50102400 Concrete Removal be used to pay for the median curb removal shown on plan 15?
    Yes. (01/04/2022)

  • Item # 019 01-21-2022 What pay items will be used to pay for: • curb repair shown on plan sheet 15? • 2” depth microsilica overlay on the median, plan sheet 15? • 2” depth median concrete removal, plan sheet 15?
    The curb repair shown on plan sheet 15 will be paid for with 50300255 Concrete Superstructure. The median concrete removal on plan sheet 15 will be paid for with 44003510 Median Removal Partial Depth. An addendum will be issued to address the microsilica overlay on the median. (12/28/2021)

  • There are two pay items for lead base paint removal - X0326961 REM & DISP LEAD PAINT and Z0007101 C&D LEAD PT CL RS N1 ? Is the cost to be distributed between these two items?
    An addendum will be issued to address this. (12/28/2021)

  • Is it the intent of the contract to require SSPC certification for the prime contractor? It appears that painting does not control 50% of the project cost.
    The certification will be required for the painters and will be removed from the advertisement for the prime contractor. (12/21/2021)

  • Why are you requiring the prime to be SSPC-QP1 certified, wouldn't that simply be a requirement that would need to be met by a subcontractor?
    The certification will be required for the painters and will be removed from the advertisement for the prime contractor. (12/21/2021)

  • Are plans of the existing bridge available to be published for our use?
    The existing structure plans will be placed in the ADDITIONAL INFORMATION folder online with the Plans and Special Provisions for the contract. (12/17/2021)

Authorized Bidders

  • 3706 Martin & Company Excavating
    2456 E. Pleasant Grove Road
    Oregon, IL 61061
    P.O. Box 443
    Oregon, IL 61061
    Phone: (815) 732-2422 Fax: (815) 732-2092 Email: info@martincoinc.net
    $782,870.59

  • 0103 Alliance Contractors, Inc.
    1166 Lake Avenue
    Woodstock, IL 60098
    Phone: (815) 338-5900 Fax: (815) 338-9109 Email: estimating@alliancecontractors.com
    $1,294,839.54

  • 1045 Civil Constructors, Inc. d/b/a/ Helm Civil
    2283 Bus Hwy 20 East
    Freeport, IL 61032
    PO Box 750
    Freeport, IL 61032
    Phone: (815) 235-2200 Fax: (815) 235-2219 Email: civilestimating@helmgroup.com
    $929,473.69

  • 1604 Era-Valdivia Contractors, Inc.
    11909 S. Avenue O
    Chicago, IL 60617
    Phone: (773) 721-9350 Fax: (773) 721-8027 Email: estimating@eravaldivia.com
    $969,693.55

  • 3702 Martam Construction Incorporated
    1200 Gasket Dr
    Elgin, IL 60120
    Phone: (847) 608-6800 Fax: (847) 608-6804 Email: No Record
    $1,037,752.29

  • 5570 Sjostrom & Sons, Inc.
    1129 Harrison Ave.
    Rockford, IL 61104
    Phone: (815) 226-0330 Fax: (815) 226-8868 Email: heavyhighway@sjostromconstruction.com
    $1,026,444.54

Non Bidders

  • 1305 Curran Contracting Company
    286 Memorial Court
    Crystal Lake, IL 60014
    Phone: (815) 455-5100 Fax: (815) 455-7894 Email: estimating@currancontracting.com

  • 4677 Path Construction Company, Inc.
    (Pending Authorization)
    125 E. Algonquin Road
    Arlington Heights, IL 60005
    Phone: (847) 997-9147 Fax: (847) 398-7101 Email: PSowa@pathcc.com

  • 0958 William Charles Construction Company, LLC
    833 Featherstone Road
    Rockford, IL 61107
    P.O. Box 2071
    Loves Park, IL 61130
    Phone: (815) 654-4700 Fax: (815) 654-4736 Email: bids@williamcharles.com

Pay Item # UOM Description Type Quantity Unit Price
20200600 UNIT EXCAVATING AND GRADING EXISTING SHOULDER Base items 25.000
44000500 FOOT COMBINATION CURB AND GUTTER REMOVAL Base items 1,326.000
44003100 SQ FT MEDIAN REMOVAL Base items 330.000
44003510 SQ FT MEDIAN REMOVAL PARTIAL DEPTH Base items 4,502.000
44004250 SQ YD PAVED SHOULDER REMOVAL Base items 172.000
48203033 SQ YD HOT-MIX ASPHALT SHOULDERS, 9" Base items 2,507.000
50102400 CU YD CONCRETE REMOVAL Base items 11.000
50104000 FOOT BRIDGE RAIL REMOVAL Base items 526.000
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 37.000
50300300 SQ YD PROTECTIVE COAT Base items 1,869.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 6,406.000
50800515 EACH BAR SPLICERS Base items 32.000
52000110 FOOT PREFORMED JOINT STRIP SEAL Base items 137.000
60608700 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE M-6.06 (ABUTTING EXISTING PAVEMENT) Base items 1,326.000
60625600 SQ YD ISLAND PAVEMENT (6") Base items 37.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 2.000
67100100 L SUM MOBILIZATION Base items 1.000
70100200 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701331 Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100500 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701326 Base items 1.000
70103815 CAL DA TRAFFIC CONTROL SURVEILLANCE Base items 14.000
70307120 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE Base items 11,176.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 94.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 6,482.000
78300202 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 1,459.000
X5030250 SQ YD BRIDGE DECK GROOVING (LONGITUDINAL) Base items 1,048.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 7,664.000
Z0007101 L SUM CONTAINMENT AND DISPOSAL OF LEAD PAINT CLEANING RESIDUES NO. 1 Base items 1.000
Z0010501 L SUM CLEANING AND PAINTING STEEL BRIDGE NO. 1 Base items 1.000
Z0012142 SQ YD BRIDGE DECK SCARIFICATION 2 1/4" Base items 1,368.000
Z0012164 SQ YD BRIDGE DECK MICROSILICA CONCRETE OVERLAY 2 1/2" Base items 1,868.000
Z0012754 SQ FT STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) Base items 262.000
Z0021904 FOOT SILICONE JOINT SEALER, 1" Base items 136.000
Z0029090 SQ YD DIAMOND GRINDING (BRIDGE SECTION) Base items 1,340.000
Z0041895 CU FT POLYMER CONCRETE Base items 25.000
No More Pay Items