| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 2 | 2 | 2.00 | 0.00 | HHX6(218) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 65 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 20400800 | CU YD | FURNISHED EXCAVATION | Base items | 50.000 | |||
| 20900110 | CU YD | POROUS GRANULAR BACKFILL | Base items | 236.000 | |||
| 21101600 | SQ YD | TOPSOIL FURNISH AND PLACE, VARIABLE DEPTH | Base items | 381.000 | |||
| 25100630 | SQ YD | EROSION CONTROL BLANKET | Base items | 6,501.000 | |||
| 28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 42.000 | |||
| 28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 557.000 | |||
| 28200200 | SQ YD | FILTER FABRIC | Base items | 381.000 | |||
| 40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 207.000 | |||
| 40604050 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 | Base items | 52.000 | |||
| 44000157 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 2" | Base items | 459.000 | |||
| 48101200 | TON | AGGREGATE SHOULDERS, TYPE B | Base items | 43.000 | |||
| 50100100 | EACH | REMOVAL OF EXISTING STRUCTURES | Base items | 1.000 | |||
| 50200100 | CU YD | STRUCTURE EXCAVATION | Base items | 135.000 | |||
| 50300225 | CU YD | CONCRETE STRUCTURES | Base items | 78.700 | |||
| 50800105 | POUND | REINFORCEMENT BARS | Base items | 77,410.000 | |||
| 51603000 | CU YD | DRILLED SHAFT IN SOIL | Base items | 186.000 | |||
| 51604000 | CU YD | DRILLED SHAFT IN ROCK | Base items | 134.000 | |||
| 59100100 | SQ YD | GEOCOMPOSITE WALL DRAIN | Base items | 344.000 | |||
| 60108200 | FOOT | PIPE UNDERDRAINS 6" (SPECIAL) | Base items | 366.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70106500 | EACH | TEMPORARY BRIDGE TRAFFIC SIGNALS | Base items | 1.000 | |||
| 70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 303.000 | |||
| 70307120 | FOOT | TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE | Base items | 789.000 | |||
| 70307210 | FOOT | TEMPORARY PAVEMENT MARKING - LINE 24"- TYPE IV TAPE | Base items | 20.000 | |||
| 78001110 | FOOT | PAINT PAVEMENT MARKING - LINE 4" | Base items | 1,500.000 | |||
| 78300202 | SQ FT | PAVEMENT MARKING REMOVAL - WATER BLASTING | Base items | 240.000 | |||
| X2020410 | CU YD | EARTH EXCAVATION (SPECIAL) | Base items | 446.000 | |||
| X2501020 | ACRE | SEEDING, CLASS 2A (SPECIAL) | Base items | 1.400 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
| No More Pay Items | |||||||