| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 1 | 1 | 0.00 | 0.00 | NHPPJU5G(295) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| Completion Date: October 31, 2026 Plus 10 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 50102400 | CU YD | CONCRETE REMOVAL | Base items | 20.000 | |||
| 50157300 | SQ YD | PROTECTIVE SHIELD | Base items | 2,808.000 | |||
| 50200100 | CU YD | STRUCTURE EXCAVATION | Base items | 118.000 | |||
| 50200450 | CU YD | REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL FOR STRUCTURES | Base items | 160.000 | |||
| 50300225 | CU YD | CONCRETE STRUCTURES | Base items | 27.500 | |||
| 50300255 | CU YD | CONCRETE SUPERSTRUCTURE | Base items | 24.000 | |||
| 50500405 | POUND | FURNISHING AND ERECTING STRUCTURAL STEEL | Base items | 86,490.000 | |||
| 50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 6,670.000 | |||
| 53016000 | SQ YD | DECK SLAB REPAIR (PARTIAL) | Base items | 10.000 | |||
| 53016001 | SQ YD | DECK SLAB REPAIR (FULL DEPTH, TYPE I) | Base items | 5.000 | |||
| 53212754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 15.000 | |||
| 58600101 | CU YD | GRANULAR BACKFILL FOR STRUCTURES | Base items | 110.000 | |||
| 59000200 | FOOT | EPOXY CRACK INJECTION | Base items | 18.000 | |||
| 66900200 | CU YD | NON-SPECIAL WASTE DISPOSAL | Base items | 300.000 | |||
| 66900530 | EACH | SOIL DISPOSAL ANALYSIS | Base items | 2.000 | |||
| 66901001 | L SUM | REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN | Base items | 1.000 | |||
| 66901003 | L SUM | REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT | Base items | 1.000 | |||
| 66901006 | CAL DA | REGULATED SUBSTANCES MONITORING | Base items | 20.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 60.000 | |||
| 70400100 | FOOT | TEMPORARY CONCRETE BARRIER | Base items | 1,913.000 | |||
| 70600235 | EACH | IMPACT ATTENUATORS, TEMPORARY (FULLY REDIRECTIVE), TEST LEVEL 2 | Base items | 4.000 | |||
| 72000100 | SQ FT | SIGN PANEL - TYPE 1 | Base items | 27.000 | |||
| 78000200 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 4" | Base items | 2,228.000 | |||
| 78009004 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 4" | Base items | 2,597.000 | |||
| X0322785 | FOOT | PRE-CONSTRUCTION CLEANING AND TELEVISING | Base items | 340.000 | |||
| X0327682 | L SUM | CITY OF CHICAGO DEPARTMENT OF WATER MANAGEMENT ENGINEERING SERVICES | Base items | 1.000 | |||
| X5051203 | L SUM | STRUCTURAL STEEL REMOVAL | Base items | 1.000 | |||
| X5051206 | POUND | STRUCTURAL STEEL REPAIR | Base items | 320.000 | |||
| X6700407 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A (D1) | Base items | 2.000 | |||
| X7200061 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 51.400 | |||
| X7200203 | L SUM | DETOUR SIGNING | Base items | 1.000 | |||
| X8900104 | EACH | TEMPORARY TRAFFIC SIGNAL TIMING | Base items | 2.000 | |||
| Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
| Z0021908 | FOOT | SILICONE JOINT SEALER, 2" | Base items | 77.000 | |||
| Z0048665 | L SUM | RAILROAD PROTECTIVE LIABILITY INSURANCE | Base items | 1.000 | |||
| Z0073100 | EACH | TEMPORARY SHORING | Base items | 1.000 | |||
| Z0073200 | EACH | TEMPORARY SHORING AND CRIBBING | Base items | 9.000 | |||
| No More Pay Items | |||||||