| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 3 | 4 | 0.00 | 0.00 | N/A |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 50 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 87301245 | FOOT | ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 5C | Base items | 11,948.500 | |||
| 87301255 | FOOT | ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 7C | Base items | 15,097.500 | |||
| 88040070 | EACH | SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 3-SECTION, BRACKET MOUNTED | Base items | 10.000 | |||
| 88040090 | EACH | SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 3-SECTION, MAST ARM MOUNTED | Base items | 52.000 | |||
| 88040110 | EACH | SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 4-SECTION, BRACKET MOUNTED | Base items | 30.000 | |||
| 88040120 | EACH | SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 4-SECTION, MAST ARM MOUNTED | Base items | 25.000 | |||
| 88102845 | EACH | PEDESTRIAN SIGNAL HEAD, POLYCARBONATE, LED, 2-FACE, BRACKET MOUNTED WITH COUNT DOWN TIMER | Base items | 28.000 | |||
| 88200100 | EACH | TRAFFIC SIGNAL BACKPLATE | Base items | 117.000 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| X8891202 | EACH | WIDE AREA VIDEO VEHICLE DETECTION SYSTEM COMPLETE | Base items | 7.000 | |||
| X8950114 | EACH | MODIFY EXISTING CONTROLLER AND CABINET | Base items | 2.000 | |||
| No More Pay Items | |||||||