Home > Notice of Letting > Contract Detail

June 12, 2026 Letting 12:00 PM
059-66M80

Bulletin Description

Superstructure replacement of various structures on I-57 including SN 038-0003, SN 038-0004, SN 038-0005, SN 038-0006, SN 038-0009 and SN 038-0010. The project includes deck replacements of SN 038-0007 and SN 038-0008; structure repairs on SN 038-0001, SN 038-0002, SN 038-0031, which include bridge latex overlay; and repairs on SN 038-0086 and SN 038-0129. There are also two median crossovers and pavement marking replacement. Project is located along I-57 from 0.3 miles north of Prairie Creek to 0.7 miles south of N600E Rd in Iroquois County.
Region District DBE % VBP % Federal Project #
2 3 Pending Pending
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Iroquois
  • I-57
  • C-93-054-24
  • 3-05738-0190
  • 3-05738-0220
  • 3-05738-0230
Contract Specifics
No More Contract Specifics

Ask Subscribe Questions and Answers (16 Submitted / 16 Answered ) Questions not accepted as of June 02, 2026 04:30 PM.

  • Reference Sheet 247 & 248 Notes. The existing studs are to be removed and ground smooth. Does the grinded contact surface of the removed stud need to be cleaned and primed and/or painted as well?
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, plans, specifications, and addenda available online. (06/05/2026)

  • Reference Sheet 226 cleaning and painting existing steel structure. Are the exterior surfaces of the fascia beams to be cleaned and painted only 5’-0” at the deck joints? Or is the entire length of the bridge fascia beams to be cleaned and painted?
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, plans, specifications, and addenda available online. (06/05/2026)

  • Reference Sheet 226 cleaning and painting within 5’-0” of either side of the deck joints. Please confirm deck joint locations are only at the north and south abutments. Are there any additional deck joints at Pier 01 and Pier 02?
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, plans, specifications, and addenda available online. (06/05/2026)

  • Where are the box culverts to be cleaned located on plans? 60905305 BOX CUL TO BE CLEANED FOOT 544 66M80
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, plans, specifications, and addenda available online. (06/05/2026)

  • Reference Pay Item Z0007101. Structures 038-0007/8 and Structure 038-0031 are both listed under the same pay item for containment and disposal of lead paint cleaning residues no.1. However, pay item Z0007102 for containment and disposal of lead paint cleaning residues no.2 also includes structure 038-0007/8. Please clarify which structure is to paid under which pay item.
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, plans, specifications, and addenda available online. (06/05/2026)

  • Item X7010239 Changeable Message Sign Special, is this item supposed to be CAL WK or CAL Days?
    This is a CAL WK item. (06/05/2026)

  • Reference Sheet 186. Structure No. 038-0005 & 038-0006 are being built over two T.P. & W. Railway Tracks. Please clarify if hoisting equipment, with the potential to foul tracks, must satisfy a 150% factor of safety requirement for lifting capacities.
    This information must be coordinated with the railroad. (06/04/2026)

  • Reference Sheet 186. Structure No. 038-0005 & 038-0006 are being built over two T.P. & W. Railway Tracks. Please indicate duration and number of work windows in a 24-hour period with no trains.
    This information must be coordinated with the railroad. (06/04/2026)

  • Reference Sheet 136. Structure No. 038-0003 & 038-0004 are being built over a single Illinois Central Railroad (CNRR) Track. Please confirm flaggers will be available at all hours, or indicate if there are only certain work hours where flaggers are available.
    This information must be coordinated with the railroad. (06/04/2026)

  • Reference Sheet 136. Cranes and other hoisting equipment will be used that is adjacent and/or over the Illinois Central Railroad tracks. Please clarify if hoisting equipment, with the potential to foul tracks, must satisfy a 150% factor of safety requirement for lifting capacities.
    This information must be coordinated with the railroad. (06/04/2026)

  • Reference Sheet 186. Structure No. 038-0005 & 038-0006 are being built over two T.P. & W. Railway Tracks. Please confirm flaggers will be available at all hours, or indicate if there are only certain work hours where flaggers are available.
    This information must be coordinated with the railroad. (06/04/2026)

  • Reference Sheet 186. An existing aerial line is indicated above the proposed bridge. Please provide the minimum distance contractor must remain from existing aerial line during construction.
    This information must be coordinated with the utility company. (06/04/2026)

  • Reference Sheet 136. Structure No. 038-0003 & 038-0004 are being built over a single Illinois Central Railroad (CNRR) Track. Please indicate duration and number of work windows in a 24-hour period with no trains.
    This information is available in the RAILROAD PROTECTIVE LIABILITY INSURANCE special provision. (06/04/2026)

  • Reference Sheet 186. Structure No. 038-0005 & 038-0006 are being built over two T.P. & W. Railway Tracks. For bidding purposes, please provide approximate number of trains passing through per day.
    This information is available in the RAILROAD PROTECTIVE LIABILITY INSURANCE special provision. (06/04/2026)

  • Reference Sheet 136. Structure No. 038-0003 & 038-0004 are being built over a single Illinois Central Railroad (CNRR) Track. For bidding purposes, please provide approximate number of trains passing through per day.
    This information is available in the RAILROAD PROTECTIVE LIABILITY INSURANCE special provision. (06/04/2026)

  • Contract Specifics for this project state that: This contract requires, in addition to the normal IDOT prequalification requirements, that the Contractor be SSPC - QP1 and QP2 certified. Please confirm that in order for a GC to bid this project, they need to be SSPC QP1 and QP2 Certified.
    SSPC - QP1 and QP2 certification is only required of the contractor performing the work, per the specifications, on this project. The Transportation Bulletin will be revised to reflect this. (05/26/2026)

Authorized Bidders

  • 4657 F. H. Paschen, S.N. Nielsen & Associates LLC
    5515 N. East River Road
    Chicago, IL 60656
    Phone: (773) 444-3474 Fax: (773) 693-0064 Email: jvickers@fhpaschen.com

  • 2880 Iroquois Paving Corporation
    1889 E US Hwy 24
    PO Box 466
    Watseka, IL 60970
    PO Box 466
    Watseka, IL 60970
    Phone: (815) 432-5211 Fax: (815) 432-5234 Email: estimating@iroqpavcorp.com

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.