Bulletin Description

884.93 ft/ 0.168 miles of Patching and Parking Improvements at the Clinton and Monticello Complex with Drainage Improvements.
Region District DBE % VBP % Federal Project #
3 5 2.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Piatt
  • DeWitt
  • STORAGE
  • FAC. AT
  • CLINTON &
  • MONTICELL
  • STORAGE FACILITIES
  • CLINTON/MONTICELLO IMP 2022-1
  • C-95-055-21
  • N/A
Contract Specifics
30 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of April 19, 2022 04:30 PM.

Authorized Bidders

  • 2770 Illiana Construction Co., Inc., A Div. of Champaign Asphalt Company
    1414 West Anthony Drive
    Urbana, IL 61801
    PO Box 1730
    Champaign, IL 61824
    Phone: (217) 367-8303 Fax: (217) 356-1539 Email: cuppinghouse@champaignasphalt.com
    $626,069.94

  • 1770 Feutz Contractors, Inc.
    1120 N. Main St.
    Paris, IL 61944
    PO Box 130
    Paris, IL 61944
    Phone: (217) 465-8402 Fax: (217) 463-2256 Email: feutz.shared@feutzcontractors.com

  • 2825 Illinois Valley Paving, a div of UCM, Inc.
    3151 Robbins Road
    Springfield, IL 62704
    P.O. Box 13420
    Springfield, IL 62791
    Phone: (217) 546-6192 Fax: (217) 546-1904 Email: IVP@ucm.biz

  • 0335 Otto Baum Company, Inc.
    866 N. Main Street
    Morton, IL 61550
    Phone: (309) 266-7114 Fax: (309) 263-1050 Email: johnbasham@ottobaum.com
    $850,915.53

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20200100 CU YD EARTH EXCAVATION Base items 1,200.000
28100805 TON STONE DUMPED RIPRAP, CLASS A3 Base items 4.000
28200200 SQ YD FILTER FABRIC Base items 6.000
35100500 SQ YD AGGREGATE BASE COURSE, TYPE A 6" Base items 3,551.000
35100700 SQ YD AGGREGATE BASE COURSE, TYPE A 8" Base items 920.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 7,983.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 802.000
40603230 TON POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 Base items 500.000
40604150 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 301.000
44004000 FOOT PAVED DITCH REMOVAL Base items 57.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 31.000
54213657 EACH PRECAST REINFORCED CONCRETE FLARED END SECTIONS 12" Base items 1.000
542A0217 FOOT PIPE CULVERTS, CLASS A, TYPE 1 12" Base items 110.000
60236200 EACH INLETS, TYPE A, TYPE 8 GRATE Base items 1.000
60500060 EACH REMOVING INLETS Base items 1.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 92.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 2.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
66901006 CAL DA REGULATED SUBSTANCES MONITORING Base items 5.000
67100100 L SUM MOBILIZATION Base items 1.000
X0300010 POUND BITUMINOUS MATERIALS (FOG SEAL) Base items 5,855.000
X1500005 SQ YD BITUMINOUS SURFACE TREATMENT, A2 Base items 13,011.000
X6061460 FOOT PAVED DITCH (SPECIAL) Base items 336.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
No More Pay Items