001-62G03
|
Executed
|
06/03/2022
|
|
1 |
1
|
1
|
Cook
|
|
Traffic Signal Modernization and ADA Sidewalk Ramps at the intersection of Western Ave@ 139th St located in the Village of Posen, Village of Dixmoor, and the City of Blue Island.
|
01X-76J90
|
Active
|
03/26/2022
|
18 / 18 |
|
5
|
8
|
Madison
|
Mandatory
|
Replacement of SN 060-0035 which carries I-270 over the Mississippi River.
|
002-62H62
|
Executed
|
06/07/2022
|
|
|
1
|
1
|
Will
|
|
Improvements located at the IDOT Birds Bridge Maintenance yard at 22608 S. Frontage Rd, Channahon includes pavement removal, sanitary manhole adjustments, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement markings.
|
003-62L68
|
Executed
|
06/03/2022
|
|
1 |
1
|
1
|
Lake
|
|
(3.42-Mile) Design overlay project on IL Route 137 from Buckley Road to Belvidere Road that includes ADA curb ramp improvements located in City of Waukegan and City of North Chicago in Lake County.
|
004-62M46
|
Executed
|
06/03/2022
|
1 / 1 |
2 |
1
|
1
|
Cook
|
|
(2.73-Mile) Designed and Standard Overlay Project on Oakton Street, begins Approx. 150 feet W. of Busse Highway and extends E. for 15,023 feet (2.85 miles ) to Waukegan Rd located in the City of Park Ridge and Village of Niles.
|
005-62M48
|
Executed
|
06/16/2022
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(4,688-Ft) Standard Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK. FAU 2772: Waukegan Road from IL 43 (Oakton St) to IL 21 (Milwaukee Ave) in the Village of Niles.
|
006-62N65
|
Executed
|
06/03/2022
|
|
|
1
|
1
|
Lake
|
|
(1.86-Mile) SMART overlay along IL 83 from Winchester Rd to IL 176/Maple St. This project is in the Village of Mundelein in Lake County.
|
007-62N70
|
Executed
|
06/09/2022
|
|
1 |
1
|
1
|
Lake
|
|
Smart overlay resurfacing on IL 173 (Rosecrans Road) Approximately 2000 feet east of 1-94 and extends in an easterly direction approximately 20,062 feet (3.80 miles) to approximately 130 feet west of IL 131 located in the Villages of Wadsworth and Zion.
|
008-62N75
|
Executed
|
06/09/2022
|
|
1 |
1
|
1
|
Cook
|
|
Standard overlay resurfacing on Hicks Road approx. 140 feet S. of Kirchoff Rd. and extends in a northerly direction approx. 2033 feet to approx. 20 feet north of Euclid Avenue located in the Village of Palatine.
|
009-62N77
|
Executed
|
06/09/2022
|
|
1 |
1
|
1
|
Cook
|
|
(2.41-Mile) Smart Overlay, ADA Improvements; Location: FAU 1332, Oakton St from IL 83 (Elmhurst Rd) to US 12/45 (Lee St/Mannheim Rd), in the City of Des Plaines in Cook County.
|
010-62P10
|
Executed
|
06/03/2022
|
5 / 5 |
1 |
1
|
1
|
Cook
|
|
(1320-Ft.) Bridge deck replacement to the structure carrying 175th Street Over 1-57. Scope of work includes bridge deck replacement, substructure repairs, steel repairs and steel cleaning and painting located in the City of Country Club Hills.
|
011-62R44
|
Executed
|
06/16/2022
|
|
|
1
|
1
|
Will
|
|
(216-Mile) Improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to Reed Road.
|
012-62R45
|
Executed
|
06/16/2022
|
|
|
1
|
1
|
Cook, DuPage
|
|
(180-Mile) Improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to IL 43 (Harlem Ave).
|
013-62R47
|
Executed
|
06/10/2022
|
|
|
1
|
1
|
Lake
|
|
(422.6-Mile) Improvement consists of cleaning(sweeping) various arterial highways in District One throughout Lake County.
|
014-64J47
|
Executed
|
06/03/2022
|
|
1 |
2
|
2
|
Whiteside
|
|
0.5 mile, Bridge repair and bridge painting on US 30 over the Mississippi River one mile West of IL 84.
|
015-64N37
|
Executed
|
06/09/2022
|
|
|
2
|
2
|
Rock Island
|
|
1.54 miles cold milling and HMA resurfacing and ADA on IL 192 from 0.3 miles West of 140th St W in Edgington to 123rd St W.
|
016-64N71
|
Executed
|
06/09/2022
|
|
1 |
2
|
2
|
Rock Island
|
|
The project includes steel repairs, hanger repairs, and other related items on the structure.
|
017-64R14
|
Executed
|
06/10/2022
|
1 / 1 |
|
2
|
2
|
Winnebago
|
|
Bridge deck overlay, expansion joint replacement and miscellaneous repairs on SN 101-0142 and 101-0143 carrying I-39/US 51 over Blackhawk Road.
|
018-64R44
|
Executed
|
06/03/2022
|
|
|
2
|
2
|
Winnebago
|
|
Pavement patching on the I-90 southbound off ramp at IL 75.
|
019-64R46
|
Executed
|
06/22/2022
|
3 / 3 |
|
2
|
2
|
Various
|
|
Maintain and service all intelligent Transportation System equipment located in the Department's Districts 2 and 3 to ensure the safety of the motoring public.
|
020-66D60
|
Executed
|
06/09/2022
|
4 / 4 |
2 |
2
|
3
|
Iroquois
|
|
7.71 miles,Milling and Resurfacing (Designed Overlay) and ADA Work begins 0.15 miles South of South St in Donovan and ends at US 24 in Sheldon.
|
021-66E51
|
Executed
|
06/03/2022
|
|
1 |
2
|
3
|
Grundy
|
|
0.7 MI OF MCCLINDON RD IN CHANNAHON TO 0.2 MI W OF WILL CO LINE. This work consists of HMA milling and resurfacing, ADA ramps, signals, pavement marking and Raised reflectors.
|
022-66K35
|
Executed
|
06/03/2022
|
|
|
2
|
3
|
Bureau
|
|
Spot improvement to remove and replace a box culvert located 0.2 mile South of IL 92 in Ohio IL.
|
023-66M10
|
Executed
|
06/07/2022
|
|
|
2
|
3
|
DeKalb, Iroquois
|
|
This project includes traffic signal improvements and railroad interconnect system upgrades at five intersections on US 24/IL 1 from Second St TO Eighth St in Watseka. This project also includes the aforementioned improvements at the intersection of US 30 and Elm St in Waterman.
|
024-66M27
|
Executed
|
06/03/2022
|
|
|
2
|
3
|
LaSalle
|
|
This work is located at the Illinois Department of Transportation District 3 LaSalle Maintenance Facility. This work consists of milling and resurfacing, preparation of base and aggregate base repairs.
|
025-66M29
|
Executed
|
06/07/2022
|
3 / 3 |
1 |
2
|
3
|
DeKalb
|
|
This work is located at the Illinois Department of Transportation District 3 Sycamore Maintenance Facility. This work consists of milling and resurfacing, preparation of base and aggregate base repairs.
|
026-66M34
|
Executed
|
10/14/2022
|
|
|
2
|
3
|
Ford
|
|
This work is located on FAP Route 71 (IL 54) beginning at the Ford/Iroquois County line (L.M. 0.00) and ending at the South Intersection of IL Route 54 and and IL Route 115 (L.M. 4.90) in Roberts. This work consists of Class B pavement patching and other related construction work.
|
027-66M41
|
Executed
|
06/03/2022
|
|
|
2
|
3
|
Kendall
|
|
Work begin at US 30/IL 47 intersection and ends 0.3 mile North of Waterpark Way in Yorkville. The project is an interim improvement to address poor pavement condition which include milling 2.25" and replacing in kind.
|
028-66M43
|
Rejected
|
05/16/2022
|
|
|
2
|
3
|
Iroquois
|
|
This work is located on FAP Route 317 (US 24) beginning at the intersection of US 45/24 (L.M. 0.00) in Gilman and ending at the intersection of US 24 and IL 1 (L.M. 12.34) in Watseka. This work consists of Class B pavement patching and related construction work.
|
029-66M45
|
Rejected
|
09/08/2022
|
|
|
2
|
3
|
Ford
|
|
This work is located on FAS Route 340 (IL 115) beginning at the intersection of IL 115 and IL 54 in Roberts (Log Mile 0.00) and ending at the intersection of IL 115 and IL 9 (Log Mile 10.57). This work consists of Class B pavement patching and related construction work.
|
030-66M49
|
Rejected
|
05/16/2022
|
|
|
2
|
3
|
Iroquois
|
|
This project is located on F.A.I. Route 57 (I-57) beginning at the Ford County Line and ending approximately 4.5 miles North of US 24 (Gilman). This work consists of intermittent milling 2" and resurfacing, pavement striping, raised reflective pavement marker removal and replacement.
|
031-68F44
|
Executed
|
06/10/2022
|
|
|
3
|
4
|
Mercer
|
|
Resurfacing IL 17 from 1st Street in New Boston to Bryant Rd in Mercer County. Total Length 5.4 miles.
|
032-68G30
|
Executed
|
06/03/2022
|
1 / 1 |
|
3
|
4
|
Woodford
|
|
Cape Seal on Il 116/117 from IL 117(N) to 1-39.
|
033-68G31
|
Executed
|
06/03/2022
|
|
|
3
|
4
|
McDonough
|
|
Cape Seal on US 67/IL 11 O from IL 9 to N of IL 336.
|
034-68G32
|
Executed
|
06/10/2022
|
|
|
3
|
4
|
Mercer
|
|
Microsurfacing (1-Pass) on IL 17 from E of IL 94(N) in Aledo to 2201h St.
|
035-68G33
|
Executed
|
06/16/2022
|
|
|
3
|
4
|
Henderson, Warren
|
|
Chip seal A-1 and fog coat on IL 116 from 950 N near Media to US 67.
|
036-68G34
|
Executed
|
06/10/2022
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
Microsurfacing (1-pass)on IL 116 from IL 78(N) in Farmington to Eden Road.
|
037-68G73
|
Executed
|
06/09/2022
|
3 / 3 |
1 |
3
|
4
|
Tazewell
|
|
Lighting upgrades at IL 29/1-474 interchange in Creve Coeur, I-155/IL 98 and I-155/Queenwood Rd. interchanges in Morton.
|
038-68G78
|
Executed
|
06/10/2022
|
|
|
3
|
4
|
Woodford
|
|
Bridge Painting on structures carrying Roanoke Road (SN 102-0054) and TR 605 (SN 102-0057) over 1-39.
|
039-68G88
|
Executed
|
06/10/2022
|
2 / 2 |
1 |
3
|
4
|
McDonough
|
|
Intersection improvement at IL 336/IL 11 0 and E 600th St near Colchester.
|
040-70778
|
Executed
|
06/16/2022
|
1 / 1 |
|
3
|
5
|
McLean
|
|
3P resurfacing (standard overlay) of FAP 701 (ILL 122) from Tazewell Co Line to ILL 9.
|
041-70994
|
Executed
|
06/16/2022
|
|
|
3
|
5
|
McLean
|
|
3P Resurfacing Standard overlay from S Main St. in McLean to US 51 in Heyworth. Project length 9.44 miles.
|
042-70A57
|
Executed
|
06/07/2022
|
|
|
3
|
5
|
DeWitt, Piatt
|
|
3P Resurfacing - Designed Overlay of FAP 721 (ILL 10) from ILL 48 at Weldon to I-72.
|
043-70C20
|
Executed
|
06/14/2022
|
1 / 1 |
|
3
|
5
|
Vermilion
|
|
3P Resurfacing Standard overlay, from US 136(W) to US 150 W of Fithian. Project length 14.5 miles.
|
044-70F34
|
Executed
|
06/03/2022
|
3 / 3 |
1 |
3
|
5
|
McLean
|
|
Bridge preservation - pier repairs.
|
045-70F44
|
Executed
|
06/03/2022
|
3 / 3 |
1 |
3
|
5
|
Edgar
|
|
Patching and Parking Improvements at the Paris Headquarters Complex-East Parking Lot with ADA Improvements.
|
046-70F45
|
Executed
|
06/07/2022
|
|
|
3
|
5
|
DeWitt, Piatt
|
|
884.93 ft/ 0.168 miles of Patching and Parking Improvements at the Clinton and Monticello Complex with Drainage Improvements.
|
047-70F56
|
Executed
|
06/14/2022
|
|
|
3
|
5
|
Champaign
|
|
3.504 Miles, New Shoulders Milled Rumble Strip, Saline Branch Ditch to 0.3 Mi N of Olympian Rd.
|
048-70F62
|
Executed
|
06/07/2022
|
|
1 |
3
|
5
|
Vermilion
|
|
CM (Standard Overlay) Resurfacing from Chicago Ave. to Holloway St. at Bismark.
|
049-70F65
|
Executed
|
06/10/2022
|
|
|
3
|
5
|
DeWitt
|
|
0.930 Mile of Standard Overlay on IL 54 from 1450E at Birkbeck to 1 Mile East.
|
050-70F69
|
Rejected
|
05/16/2022
|
|
|
3
|
5
|
Piatt
|
|
ILL 105 South of Cerro Gordo: 1.5" HMA Inlay for 700 FT; ILL 105 at Monticello near 1-72 ramps: 1.5" HMA Inlay for 1,100 FT.
|
051-70F80
|
Executed
|
06/03/2022
|
2 / 2 |
2 |
3
|
5
|
Douglas
|
|
CM Shoulder Repair from Vine St in Arthur to CR 100 E of Arthur.
|
052-72809
|
Executed
|
06/14/2022
|
|
|
4
|
6
|
Montgomery
|
|
ITS improvements at various locations in District 6.
|
053-72856
|
Executed
|
06/03/2022
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of surveillance cameras, vehicle detection, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet network and all peripheral equipment throughout District 6.
|
054-72A34
|
Executed
|
06/03/2022
|
|
|
4
|
6
|
Adams
|
|
Bridge beam repairs on SN 001-0045 carrying TR 423 (St. Anthony Road) over I-172, 2.1 miles south of IL 104.
|
055-72M22
|
Executed
|
06/10/2022
|
|
|
4
|
6
|
Cass, Sangamon
|
|
4.8 miles of overlay and ADA improvements on IL 125 from 0.1 miles west of the Sangamon County line to Richland Creek, east of Pleasant Plains.
|
056-72M31
|
Executed
|
06/10/2022
|
2 / 2 |
|
4
|
6
|
Sangamon
|
|
Bridge deck overlay on SN 084-0210 and 084-0211 carrying I-55 over the Lost Bridge Trail in Springfield.
|
057-72N29
|
Executed
|
06/14/2022
|
|
|
4
|
6
|
Adams
|
|
HMA surface removal and replacement at the I-172 and IL 57 interchange ramps.
|
058-72N34
|
Executed
|
06/03/2022
|
1 / 1 |
|
4
|
6
|
Hancock
|
|
Bridge rail repairs on SN 034-0062 carrying US 136 over the Mississippi River in Keokuk, IA.
|
059-72N36
|
Executed
|
06/09/2022
|
1 / 1 |
|
4
|
6
|
Logan
|
|
Repairing and replacing bridge deck drains on SN 054-0041 and 054-0042 carrying I-55 over Salt Creek, 2.2 miles south of IL 10.
|
060-74965
|
Executed
|
06/03/2022
|
1 / 1 |
1 |
4
|
7
|
Fayette
|
|
8.8 miles of standard overlay on IL 185 from the Montgomery County line to north of US 40 in Vandalia.
|
061-74A07
|
Executed
|
06/03/2022
|
2 / 2 |
2 |
4
|
7
|
Clay
|
|
6.3 miles of patching, milling and resurfacing on US 50 from US 45 west of Flora to 2.5 miles east of the US 50 / US 45 South intersection.
|
062-74A21
|
Executed
|
06/10/2022
|
|
|
4
|
7
|
Coles
|
|
4.4 miles of resurfacing on IL 49 from the Clark County line to IL 16.
|
063-74A23
|
Executed
|
06/10/2022
|
1 / 1 |
|
4
|
7
|
Coles
|
|
2.3 miles of patching, milling and resurfacing on Dewitt Avenue from Logan Avenue to Lerna Road in Mattoon.
|
064-74A75
|
Executed
|
06/10/2022
|
2 / 2 |
1 |
4
|
7
|
Effingham
|
|
0.6 miles of milling, patching and resurfacing on I-57 at the I-70 interchange.
|
065-74A78
|
Executed
|
06/14/2022
|
1 / 1 |
|
4
|
7
|
Coles
|
|
14.5 miles of patching on I-57 from mile post 181 to mile post 195.5.
|
066-74A81
|
Executed
|
06/07/2022
|
|
|
4
|
7
|
Effingham
|
|
1.3 miles of patching on IL 37 from Eastwood Street to 700th Avenue in Watson and 0.9 miles of patching on the connector road between and I-57 and IL 37 in Edgewood.
|
067-74B12
|
Executed
|
06/09/2022
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems in good operating condition throughout District 7.
|
068-74B13
|
Executed
|
06/10/2022
|
|
1 |
4
|
7
|
Lawrence
|
|
12.5 miles of resurfacing, aggregate wedge shoulders, and patching on IL 33 from the Crawford County line to Old US 50.
|
069-76P22
|
Executed
|
06/03/2022
|
2 / 2 |
1 |
5
|
8
|
St. Clair
|
|
5.7 miles of milling and resurfacing on IL 13 / IL 15 from 0.4 miles east of IL 159 to Rogers Drive in Freeburg.
|
070-76P24
|
Executed
|
06/10/2022
|
|
|
5
|
8
|
Madison
|
|
3.9 miles of milling, resurfacing, ADA upgrades and guardrail upgrades on IL 143 / IL 160 / US 40 in Highland.
|
071-76P59
|
Executed
|
06/22/2022
|
1 / 1 |
|
5
|
8
|
Clinton
|
|
Box culvert replacement on US 50 over a drainage ditch, 0.5 miles east of Huey Road.
|
072-66L50
|
Executed
|
06/07/2022
|
4 / 4 |
1 |
2
|
3
|
DeKalb
|
|
Project consists of milling and resurfacing 3.75" on IL 38 from W. of John Huber Huber Pkwy to 5th St in Dekalb, Dekalb County. The omission area is from 1st St to W of 4th St. Milling and resurfacing at IL23/IL 38 shall be 2.5". The paving work shall be done at night. Some ADA work and traffic signal improvements are proposed. Project length is 2.52 miles.
|
073-76P86
|
Executed
|
06/03/2022
|
|
|
5
|
8
|
Madison
|
|
Pavement patching on IL 4 from I-55 to Blue Spruce Lane.
|
074-76P92
|
Executed
|
07/07/2022
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Patching turn lanes on IL 3 (Lewis-Clark Boulevard) at St. Louis Avenue in East Alton.
|
075-78824
|
Deleted
|
03/17/2022
|
|
|
5
|
9
|
Johnson
|
|
Embankment stabilization on IL 146, 0.3 miles west of the Pope County line. , Embankment stabilization on IL 146, 0.3 miles west of the Pope County line.
|
076-78841
|
Executed
|
06/07/2022
|
|
|
5
|
9
|
Jefferson
|
|
145 feet of slope repair on the outside slope of northbound I-57, just north of IL 148.
|
077-78857
|
Executed
|
07/15/2022
|
|
|
5
|
9
|
Massac
|
|
Installation of flashing yellow arrows, replacement of all signal cabinets and connectivity improvements along the US 45 corridor; intersection of US 45 and Devers Road as well as both ramp locations at the I-24 interchange.
|
078-78880
|
Executed
|
07/15/2022
|
|
|
5
|
9
|
Jackson
|
|
Signal modifications and ADA accommodations at the intersection of IL 13 and Giant City Road.
|
079-78896
|
Executed
|
06/07/2022
|
1 / 1 |
1 |
5
|
9
|
Williamson
|
|
3.2 miles of pavement patching on IL 166 from Tune Road to Kinnel Orchard Road.
|
080-78907
|
Executed
|
06/03/2022
|
|
|
5
|
9
|
Various
|
|
Installing retroreflective backplates on traffic signals throughout District 9.
|
081-78914
|
Executed
|
06/03/2022
|
|
|
5
|
9
|
Jackson, Williamson
|
|
2.4 miles of HMA surface removal, resurfacing and patching on Old IL 13 from Giant City Road to Spillway Road.
|
082-78923
|
Executed
|
06/03/2022
|
|
|
5
|
9
|
Williamson
|
|
3.7 miles of surface removal and HMA surfacing on IL 13 from 0.9 miles east of Crab Orchard Road to the Saline County line.
|
083-78925
|
Executed
|
06/03/2022
|
|
|
5
|
9
|
Jackson
|
|
1 mile of patching and resurfacing on IL 13 in Carbondale.
|
084-78938
|
Executed
|
06/09/2022
|
|
|
5
|
9
|
Jackson
|
|
1.9 miles of resurfacing on IL 13/127 from AVA Road to IL 149 in Murphysboro.
|
085-62P53
|
Rejected
|
05/16/2022
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(200-Ft) Wingwall replacement and culvert repairs of the culvert carrying Wolf Road over Addition Creek in the City of Northlake, Cook County.
|
086-62R39
|
Executed
|
06/03/2022
|
1 / 1 |
1 |
1
|
1
|
Various
|
|
This improvement consists of repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in Cook, various Counties.
|
087-66A79
|
Executed
|
06/03/2022
|
|
|
2
|
3
|
Bureau
|
|
This work is located at FAS 1247 (US 6), approximately 1.0 miles East of Henry County Line to US 34 (S) in Sheffield in Bureau County (+/-5.74 miles). This work consists of 3P milling and resurfacing.
|
088-66K57
|
Executed
|
06/03/2022
|
|
|
2
|
3
|
Bureau
|
|
Work begin at IL 92/IL 89 intersection just North of Lamoille and end 0.2 mile South of Plank Road in Cherry. The project is a 3P milling and resurfacing of IL 89 including drainage and ADA improvements.
|
089-60T46
|
Withdrawn
|
04/28/2022
|
87 / 87 |
3 |
1
|
1
|
Cook
|
|
(5.45-Mile) Kennedy Expressway Reversible lanes. REVLAC System rehabilitation. The REVLAC system consists of 115 swing gates, 6 arresting barriers and 4 nodal buildings ComCenter controls. Fiber optic cables, and Programmable Logic Controllers (PLC) , (5.45-Mile) Kennedy Expressway Reversible lanes. REVLAC System rehabilitation. The REVLAC system consists of 115 swing gates, 6 arresting barriers and 4 nodal buildings ComCenter controls. Fiber optic cables, and Programmable Logic Controllers (PLC)
|
090-61H18
|
Executed
|
06/28/2022
|
|
|
1
|
1
|
DuPage
|
|
Trailhead improvements including new sidewalk, landscaping, signing and construction of a restroom building and shelter. Project is located at the south corner of IL 56 at Batavia Road in Warrenville.
|
091-61H38
|
Executed
|
07/06/2022
|
3 / 3 |
|
1
|
1
|
Cook
|
|
Resurfacing Jackson Boulevard from Madison Street to Des Plaines Avenue in Forest Park.
|
092-61H57
|
Executed
|
06/16/2022
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Resurfacing Meacham Road from IL 58 to IL 72 in Schaumburg.
|
093-61H60
|
Executed
|
06/22/2022
|
2 / 2 |
2 |
1
|
1
|
Kane
|
|
Pavement reclamation, resurfacing and aggregate should improvements on Anderson Road from IL 64 to IL 38 in Compton Township.
|
094-61H63
|
Executed
|
07/06/2022
|
2 / 2 |
1 |
1
|
1
|
Lake
|
|
Resurfacing 27th Street from Galilee Avenue to Emmaus Avenue in Zion.
|
095-61H64
|
Executed
|
06/16/2022
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Lawndale Avenue from Touhy Avenue to Central Park Avenue, Central Park Avenue from Lawndale Avenue to Northeast Parkway, and Northeast Parkway from Central park Avenue to McCormick Boulevard in Lincolnwood.
|
096-61H66
|
Executed
|
06/03/2022
|
|
1 |
1
|
1
|
Lake
|
|
Construction of a pedestrian path along Hart road from Field of Dreams to Lake Cook Road, and along Lake Cook Road from Hart Road to the high school entrance, in Barrington.
|
097-61H67
|
Executed
|
06/16/2022
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Shields Avenue from Maple Avenue to Custer Avenue in Broofield.
|
098-61H71
|
Executed
|
07/15/2022
|
|
|
1
|
1
|
Cook
|
|
Roadway widening and resurfacing, and construction of a multi-use path along Chestnut Avenue from Lehigh Avenue to Waukegan Road in Glenview.
|
099-62N98
|
Executed
|
06/09/2022
|
|
|
1
|
1
|
Cook
|
|
(2.51-Mile) Standard Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK. FAU 2845: Western Avenue from US 30/ Lincoln Hwy to Steger Rd in the Villages of Chicago Height, Park Forest.
|
100-62N99
|
Executed
|
06/09/2022
|
|
1 |
1
|
1
|
Cook
|
|
(2.4-Mile) Standard overlay and ADA improvements on Grand Ave. from Elm St to East of 77th Ct and 74th Ct to IL 43 located in the Villages of Franklin Park, River Grove, and Elmwood Park in Cook County.
|
101-62P17
|
Executed
|
06/03/2022
|
|
|
1
|
1
|
Cook
|
|
Designed overlay resurfacing with ADA improvements on River Oaks Drive, beginning at Price Ave. and continuing in the southeasterly direction for approx. 3,500 ft., ending at State Line Rd located in the City of Calumet City.
|
102-62P30
|
Executed
|
06/09/2022
|
|
|
1
|
1
|
Cook
|
|
(1.04-Mile) Designed Overlay on Lehigh Avenue from Oakton St. to Lehigh Ave. The project is located within the Villages of Morton Grove and Niles.
|
103-62P32
|
Executed
|
06/09/2022
|
|
1 |
1
|
1
|
Cook
|
|
(2.056-Mile) Designed Overlay, ADA Improvements: HMA removal, pavement patching , HMA resurfacing, curb ramps improvements, PMK. FAU 1332: Oakton St, from Waukegan Rd to Long Ave in the Villages of Niles, Morton Grove and Skokie.
|
104-62R48
|
Deleted
|
03/25/2022
|
|
|
1
|
1
|
Various
|
|
(332.1-Mile) Improvement consists of cleaning (nighttime sweeping) various expressways throughout District One in various counties. , (332.1-Mile) Improvement consists of cleaning (nighttime sweeping) various expressways throughout District One in various counties.
|
105-62R49
|
Deleted
|
03/25/2022
|
|
|
1
|
1
|
Various
|
|
(116.5-Mile) Improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties. , (116.5-Mile) Improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties.
|
106-66F91
|
Executed
|
06/14/2022
|
1 / 1 |
1 |
2
|
3
|
Bureau
|
|
The project consists on the removal and replacement of six concrete box culverts on IL 29 (DePue Spur) in Bureau County. The scope of work includes milling and resurfacing the area in between culverts and guardrail upgrades. Traffic control shall be achieved by detour. The project length is 0.6 miles.
|
107-66K73
|
Executed
|
06/03/2022
|
2 / 2 |
1 |
2
|
3
|
Bureau
|
|
Bridge Replacements SN 006-0117 and SN 006-0121 under TR 60B 4.8 miles East of Henry County Line; under TR 82C, 1.5 miles north of Sheffield.
|
108-66L03
|
Executed
|
06/10/2022
|
4 / 4 |
1 |
2
|
3
|
Ford
|
|
This work is located on FAP 326 (IL 47) from the Livingston County line to 8th Street in Gibson City in Ford County (+/-10.58 miles). This work consists of a SMART overlay with 1.5" milling, as well as drainage improvements.
|
109-66L90
|
Executed
|
06/09/2022
|
1 / 1 |
1 |
2
|
3
|
Livingston
|
|
This work is located at FAP 317 (US 24) 0.3 miles East of IL 47 in Forrest to Ford County Line in Livingston County (+/- 8.75 miles). This work consists of 3P milling and resurfacing (designed overlay).
|
110-66M01
|
Executed
|
06/07/2022
|
|
|
2
|
3
|
Grundy
|
|
This work is located at the intersections of IL 47 and Pine Bluff Road and at the intersection of IL 47 and Southmor Road South of Morris in Grundy County. This work consists off the removal of existing traffic signal equipment, signal heads, concrete foundations, controller cabinets, UPS and other related traffic signal equipment.
|
111-66M42
|
Rejected
|
09/08/2022
|
|
|
2
|
3
|
Iroquois
|
|
This work is located on FAP Route 840 (IL 49) beginning at the intersection of IL 49 and IL 24 (L.M. 0.00) and ending at the Vermilion County Line (L.M. 21.50) This work consists of Class B pavement patching and related construction work.
|
112-74A89
|
Executed
|
06/10/2022
|
|
|
4
|
7
|
Coles
|
|
6.7 miles of patching, milling and resurfacing on IL 130 from 1.8 miles south of IL 16 in Charleston to the Cumberland County line.
|
113-78910
|
Executed
|
06/03/2022
|
1 / 1 |
|
5
|
9
|
Massac, Pope, Saline
|
|
Pier and abutment repairs at SN 083-0038 on IL 34 over Middle Fork Ditch in Saline County; Pier and abutment repairs and new wearing surface at SN SN 076-0006 on IL 146 over Sugar Creek in Pope County; Partial depth joint reconstruction at SN 064-0003 on US 45 over Q Ditch in Massac County.
|
114-85716
|
Executed
|
06/10/2022
|
1 / 1 |
|
2
|
2
|
Rock Island
|
|
Reconstruct the intersection of Rock Island Parkway and 85th Avenue West in Rock Island.
|
115-89790
|
Executed
|
06/07/2022
|
1 / 1 |
|
3
|
4
|
Mercer
|
|
Cold-in-place recycling, aggregate shoulders and pipe underdrains on CH 9 from the Rock Island Countly line to 0.4 mile south of 155th Avenue.
|
116-91598
|
Executed
|
06/07/2022
|
1 / 1 |
|
3
|
5
|
Edgar
|
|
Resurfacing and HMA shoulders with rumble strips on CH 4, from 0.3 mile south of US 150 to 0.10 mile east of Ferrel Street.
|
117-91614
|
Executed
|
06/10/2022
|
5 / 5 |
1 |
3
|
5
|
Champaign
|
|
Construction of a multi-use path along Maplewood Drive from Clark Street to Crane Drive in Rantoul.
|
118-93782
|
Executed
|
06/14/2022
|
|
|
4
|
6
|
Morgan
|
|
Resurfacing CH 7 from US 67 to the Morgan/Cass County line.
|
119-93784
|
Executed
|
06/14/2022
|
|
|
4
|
6
|
Mason
|
|
Cape Seal resurfacing and aggregate shoulders on CH 4 from north of Havana to Forest City, on CH 4 from US 136 to Forsest City, and on CH 14 from CH 4 to the Mason/Tazewell county line.
|
120-99678
|
Rejected
|
05/16/2022
|
3 / 3 |
|
5
|
9
|
Pulaski
|
|
Replace the bridge carrying Tick Ridge Road over Post Creek Cut-off, 4 miles east of Grand Chain.
|
121-46590
|
Executed
|
06/03/2022
|
|
|
2
|
2
|
Various
|
|
This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on the plans.
|
122-61G89
|
Executed
|
06/09/2022
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
Constructon of PCC Sidewalk, curb and gutter replacement, storm sewer, Segmental concrete block wall, traffic signal improvements and pavement markings on Hobson Road from Woodside Drive to Janes Avenue in Woodridge and unincorporated DuPage County in Lisle Township.
|
123-61H47
|
Executed
|
06/14/2022
|
10 / 10 |
1 |
1
|
1
|
Cook
|
|
Roadway reconstruction on Central Avenue from 47th Street to Burlington Avenue and storm sewer construction with combined sewer separation on Central Avenue and Elm Street. Work along 47th Street from Central Avenue to Flagg Creek consists of storm sewer construction, ADA sidealks and traffic signal pedestrian upgrates. Project is located in Western Springs.
|
124-62G71
|
Executed
|
07/27/2022
|
2 / 2 |
2 |
1
|
1
|
Cook
|
|
(4,569 Ft) Designed Overlay and ADA Improvements located in the City of Chicago in Cook County. Addison Street from Avondale Ave to Sacramento Ave.
|
125-62N20
|
Executed
|
06/16/2022
|
8 / 8 |
3 |
1
|
1
|
Will
|
|
(2612-Ft) Bridge superstructure replacement and bridge widening of the two-lane structure over 1-80 at Wolf Road located in the Village of Mokena, Will County.
|
126-62P82
|
Executed
|
06/07/2022
|
|
|
1
|
1
|
Cook, DuPage
|
|
Improvement consists of cleaning and painting existing steel structures at 4 locations. Location 1 is at I-290 at IL 58 (SN 016-0980) in Rolling Meadows and Scahumburg. Location 2 is at 25th Ave at IHB RR (SN 016-1011) in Melrose Park and Franklin Park. Location 3 is at 1-290 and 1-355 (SN 022-0092) in Addison. Location 4 is at I-290 ramp to I-355 (SN022-0094) in Addison.
|
127-62R46
|
Executed
|
06/10/2022
|
1 / 1 |
|
1
|
1
|
Kane, McHenry
|
|
(299.5-Mile) The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties.
|
128-64R38
|
Executed
|
06/10/2022
|
1 / 1 |
|
2
|
2
|
Ogle
|
|
Full cleaning and painting of structural steel of SN 071-0040 carrying IL 72 over Rock River and partial cleaning and painting of SN 071-0022 carrying IL 2/72 over Mill Creek.
|
129-66J71
|
Deleted
|
03/23/2022
|
|
|
2
|
3
|
Kendall
|
|
LaSalle County Line to 0.2 MI W of IL 47 in Yorkville. This work consists of milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, raised reflectors, and ADA ramps. , LaSalle County Line to 0.2 MI W of IL 47 in Yorkville. This work consists of milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, raised reflectors, and ADA ramps.
|
130-66L72
|
Executed
|
06/03/2022
|
|
|
2
|
3
|
Bureau
|
|
Work begin 0.1 mile East of Lincoln Avenue in Depue and at IL 89 in Spring Valley. The project is a SMART overlay, shoulder widening and rumble strips.
|
131-66L73
|
Executed
|
06/10/2022
|
3 / 3 |
1 |
2
|
3
|
Kankakee
|
|
0.1 MI E of Lowe Rd E of Kankakee To 0.5 MI E of IL 1 in Sun River Terrace. This work shall consist of milling resurfacing 1 1/2", pavement marking, update traffic signals and guardrail replacement.
|
132-68G50
|
Executed
|
06/03/2022
|
|
|
3
|
4
|
Tazewell
|
|
Bridge deck sealing at various locations in Tazewell County.
|
133-70B04
|
Executed
|
06/07/2022
|
2 / 2 |
1 |
3
|
5
|
Champaign
|
|
4.799 Miles, 3P Resurfacing - Designed Overlay, Royal Road to E Grand Ave in St Joseph.
|
134-70E03
|
Executed
|
06/14/2022
|
|
|
3
|
5
|
McLean
|
|
Cape Seal from Woodford Co. Line to ILL 9 West of Bloomington.
|
135-72808
|
Executed
|
06/09/2022
|
|
|
4
|
6
|
Logan
|
|
ITS improvements at various locations in District 6.
|
136-72L63
|
Executed
|
06/22/2022
|
|
|
4
|
6
|
Montgomery
|
|
3 miles of aggregate base course with bituminous surface treatment and guardrail replacement on I-55 East Frontage Road near Waggner; from Morrisonville Road to East Waggner Avenue.
|
137-72M29
|
Executed
|
06/10/2022
|
3 / 3 |
2 |
4
|
6
|
Sangamon
|
|
Bridge deck overlay on IL 97 (SN 084-0183) over Walnut Street in Springfield.
|
138-72M68
|
Executed
|
06/22/2022
|
1 / 1 |
|
4
|
6
|
Montgomery
|
|
Aggregate base course with bituminous surface treatment on I-55 East Frontage Road from the Sangamon County line at CR 3600N to Mine Avenue east of Farmersville.
|
139-72M83
|
Executed
|
06/16/2022
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
0.8 miles of milling, resurfacing and pavement patching on Business 55 (5th Street) from south of Ash Street to north of Stanford Avenue in Springfield.
|
140-72N33
|
Rejected
|
05/16/2022
|
|
1 |
4
|
6
|
Morgan
|
|
10 miles of ultra-thin bonded wearing course on top of jointed PCC pavement at various locations: US 67/IL 104 from Mauvaise Terre Creek, approximately 1.3 miles east of CH 7 (Concord / Arenzville Road), to east of the US 67/IL 104 Interchange; US 67/IL 104 Interchange to south of I-72 BUS Interchange; and on I-72 BUS at the US 67 Interchange.
|
141-74A76
|
Executed
|
06/14/2022
|
|
|
4
|
7
|
Effingham
|
|
3.6 miles of patching on IL 32/33 from 0.2 miles north of the I-57/70 interchange to Jefferson Avenue and on US 45 from Fayette Avenue to Jaycee Avenue.
|
142-74A83
|
Executed
|
06/14/2022
|
|
|
4
|
7
|
Cumberland, Jasper
|
|
20.2 miles of aggregate shoulder placement on IL 130 from the Coles County line to 0.3 miles north of I-70 at Greenup and from the Cumberland County line to 1030N, north of Newton.
|
143-76F79
|
Executed
|
06/07/2022
|
5 / 5 |
2 |
5
|
8
|
Marion
|
|
3.7 miles of pavement reconstruction and bridge repairs along I-57 from the from the Jefferson County line to 0.7 miles north of IL 161.
|
144-78901
|
Executed
|
06/03/2022
|
1 / 1 |
1 |
5
|
9
|
Saline
|
|
0.9 miles of resurfacing and pavement patching on IL 34 from Old IL 13 (Poplar Street) to the levee just north of Reservoir Road in Harrisburg.
|
145-85723
|
Executed
|
06/07/2022
|
|
|
2
|
2
|
Rock Island
|
|
Resurfacing and patchin on River Drive from 34th Street to 41st Street in Moline.
|
146-85724
|
Executed
|
06/10/2022
|
|
|
2
|
2
|
Whiteside
|
|
Cold-in-Place Recycling, resurfacing and aggregate shoulders on Spring Hill Road from Henry Road to the west city limits of Prophetstown, and on Star Road from the east city limits to Yorktown Road.
|
147-85725
|
Executed
|
06/09/2022
|
2 / 2 |
|
2
|
2
|
Winnebago
|
|
Replace 2 box culverts carrying Gleasman Road over unnamed creeks 0.80 mile west of IL2, and 1/70 miles east of IL 2.
|
148-87770
|
Executed
|
06/07/2022
|
1 / 1 |
1 |
2
|
3
|
DeKalb
|
|
Resurfacing Suydam Road from Rollo Road to Il 23.
|
149-87771
|
Executed
|
06/09/2022
|
|
|
2
|
3
|
Ford
|
|
Resurfacing Buckley Road from IL 54 to the Iroquois County line.
|
150-87787
|
Executed
|
06/10/2022
|
|
|
2
|
3
|
LaSalle
|
|
Reconstrution of 12th Street from IL 23 to Smith Douglass Road in Streator.
|
151-87788
|
Executed
|
06/07/2022
|
|
|
2
|
3
|
DeKalb
|
|
Resurfacing, HMA Shoulders and Pavement Markings on North First Street from Bethany Road to Old State Road.
|
152-91611
|
Executed
|
06/07/2022
|
1 / 1 |
1 |
3
|
5
|
Piatt
|
|
Construction of paved shoulders and rumble strips along CH 5 from 2.5 miles south of Deland to 1.00 mile north of I-72 at Monticello.
|
153-93781
|
Executed
|
06/10/2022
|
|
|
4
|
6
|
Christian
|
|
Replace the bridge carrying TR 302 over Beck's Creek, 1 mile southeast of Pana.
|
154-95882
|
Rejected
|
05/16/2022
|
|
|
4
|
7
|
Moultrie
|
|
Replace the bridge carrying TR 185A over Whitley Creek, 2.5 miles north of Gays .
|
155-95915
|
Rejected
|
07/01/2022
|
|
1 |
4
|
7
|
Macon
|
|
Sidewalk removal, new PCC sidewalks, pipe culverts, pavement markings at various locations in Warrensburg.
|
156-99672
|
Executed
|
06/09/2022
|
1 / 1 |
|
5
|
9
|
Williamson
|
|
Replace deck beams, modify existing abutments and pier cap to the structure carrying Spillway Road over Little Grassy Creek, 4 miles south of Carterville.
|
157-46587
|
Executed
|
06/10/2022
|
|
|
2
|
3
|
Various
|
|
This work is located on 1-39 and 1-80 in Various Counties. This work consists of removing existing raised reflective pavement markers, installing new raised reflective pavement markers and removing and replacing raised reflective pavement marker reflectors.
|
158-46588
|
Executed
|
06/10/2022
|
|
|
2
|
3
|
Various
|
|
This work is located on I-39 and I-80 in Livingston, Ford, Iroquois, and Kankakee Counties. This work consists of raised reflective pavement marker removal and replacement and replacement of raised reflective pavement marker reflectors.
|
159-46591
|
Executed
|
06/07/2022
|
|
|
2
|
2
|
Various
|
|
This work shall consist of removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each new guardrail delineators within the limits specified on each individual work order.
|
160-46931
|
Executed
|
06/10/2022
|
|
|
5
|
9
|
Franklin
|
|
Resurfacing the parking lot and drive, pavement widening, asphalt seal coating and pavement marking at the IDNR Region V Headquarters in Benton.
|
161-62N07
|
Executed
|
06/14/2022
|
2 / 2 |
2 |
1
|
1
|
Cook, DuPage, Lake
|
|
This is a drainage improvement on various State maintained routes within the Cities of Elmhurst and Waukegan and the Villages of Glendale Heights, Lemont, and Mount Prospect in Cook, DuPage and Lake Counties. The routes are Kensington Road, IL 137, I-290, IL 64, and McCarthy Road / 123rd Street.
|
162-62P47
|
Executed
|
06/16/2022
|
3 / 3 |
|
1
|
1
|
Cook, Lake, McHenry
|
|
Designed overlay resurfacing on County-Line Rd., beginning at E. of Haegers Bend Rd. and continuing in the easterly direction for approximately 23483 feet (4.44 miles) to 300 ft west of Hart Rd. located in the Village of Barrington Hills.
|
163-66M46
|
Executed
|
06/03/2022
|
|
|
2
|
3
|
Livingston
|
|
This work is located on FAI Route 55 (I-55) beginning at the McLean County Line (Mile Marker 187.87) and ending at Wolf-s creek, Structure No. 053-2506 (Mile Marker 206.12). This work consists of Class A pavement patching and related construction work.
|
164-68A36
|
Executed
|
06/03/2022
|
|
2 |
3
|
4
|
Warren
|
|
Resurfacing on US 67 from N of jct US 34 to N of 901h Avenue, North of Roseville, including bridge deck overlays to SN 094-0045 and 094-0046 over S Henderson Creek and SN 094-0035 and 094-0042 over Picayune Creek.
|
165-68F87
|
Executed
|
06/03/2022
|
|
|
3
|
4
|
Marshall, Woodford
|
|
Resurface I-39 from 1 mile N of IL 116 to 2 miles S of IL 17.
|
166-68G74
|
Executed
|
06/14/2022
|
|
|
3
|
4
|
Various
|
|
Traffic signal mast arm replacement at various locations in Peoria, Tazewell, and McDonough Counties.
|
167-68G77
|
Executed
|
06/14/2022
|
|
1 |
3
|
4
|
Knox, Woodford
|
|
Installation of truck parking information management systems (TPIMS) at the Spoon River and Mackinaw Dells (EB and WB) rest areas.
|
168-70E79
|
Executed
|
06/28/2022
|
|
|
3
|
5
|
McLean
|
|
Bridge deck sealing of 63 structures on various routes in McLean County.
|
169-74797
|
Executed
|
06/03/2022
|
|
1 |
4
|
7
|
Effingham
|
|
1.6 miles of resurfacing, ADA improvements and new traffic signals on US 45 from south of the I-57/70 eastbound ramp to US 40.
|
170-46923
|
Withdrawn
|
04/28/2022
|
|
|
3
|
5
|
Vermilion
|
|
The project consists of bridge repairs to SN 092-9903 and removal of SN 092-9904 at Kickapoo State Park. The work includes bridge deck overlay, slope wall repairs, structure removal, and other miscellaneous improvement items at the Kickapoo State Park in Vermilion County, gross and net length 0.1 miles. , The project consists of bridge repairs to SN 092-9903 and removal of SN 092-9904 at Kickapoo State Park. The work includes bridge deck overlay, slope wall repairs, structure removal, and other miscellaneous improvement items at the Kickapoo State Park in Vermilion County, gross and net length 0.1 miles.
|
171-64M17
|
Executed
|
06/10/2022
|
1 / 1 |
|
2
|
2
|
Carroll
|
|
0.5 mile, culvert replacement, new shoulders, milled rumble strips, and safety improvements from 0.5 mile East of Grange Road located East of Lanark.
|
172-66J64
|
Executed
|
06/07/2022
|
3 / 3 |
2 |
2
|
3
|
DeKalb
|
|
Project consists of milling and resurfacing IL 38 (2.5" to 3.75") from 5th St in city of Dekalb to County Line Rd, Dekalb County. The length of the job is 7.96 miles. Work includes ADA improvements, Traffic signal upgrades and miscellaneous drainage improvements. Local participation from Dekalb is expected for parking lanes and ADA ramps.
|
173-70A89
|
Executed
|
06/07/2022
|
1 / 1 |
1 |
3
|
5
|
Champaign
|
|
Interstate Resurfacing (Designed Overlay) of FAI 57 (I 57) from 2 Mi S of Thomasboro to US 136 at Rantoul.
|
174-70C01
|
Executed
|
06/10/2022
|
17 / 17 |
1 |
3
|
5
|
Champaign
|
|
Interchange Reconstruction: I-57 improvements from south of Norfolk Southern RR to Olympian Dr. (+/-1.95 mi.); I-74 improvements from Duncan Rd. to Prospect Ave. (+/-2.66 mi.} and Bridge Replacement Reconstruction (I-74 over I-57).
|
175-70F78
|
Withdrawn
|
05/10/2022
|
|
|
3
|
5
|
Various
|
|
Upgrading and repairing 3 locations of cable median barrier on I 57 and I 74.
|
176-70F83
|
Executed
|
06/09/2022
|
2 / 2 |
|
3
|
5
|
Edgar
|
|
8.182 Miles, Guardrail Improvements. Lower Terre Haute Rd. to Indiana State.
|
177-72N02
|
Executed
|
06/10/2022
|
|
|
4
|
6
|
Morgan
|
|
2 miles of HMA overlay on I-72 Business / Old US 36 from 0.1 miles east of IL 104 to 0.2 miles east of I-72.
|
178-64J65
|
Executed
|
06/10/2022
|
|
|
2
|
2
|
Rock Island
|
|
Landscaping from Mississippi River to 0.9 mi S of Avenue of the Cities in Moline.
|
179-72E46
|
Executed
|
06/10/2022
|
|
|
4
|
6
|
Logan
|
|
Milling and resurfacing on IL 10 from 0.1 miles east of the Mason County line to 2.5 miles east of New Holland and culvert replacement at a ditch 0.8 miles east of the Mason County line. (SN 054-7009)
|
180-74B11
|
Executed
|
06/14/2022
|
|
|
4
|
7
|
Various
|
|
Applying a bituminous surface treatment to various District 7 maintenance yards: Charleston, Greenup, Mattoon, Shelbyville and Sullivan.
|
181-46592
|
Executed
|
06/07/2022
|
|
|
2
|
2
|
Various
|
|
This work shall consist of placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order.
|
182-61G32
|
Executed
|
06/16/2022
|
1 / 1 |
|
1
|
1
|
Kane
|
|
Replace the superstructure and the abutments of the existing bridge carrying Coombs Road over the DMandE Railroad in Elgin Township, Kane County.
|
183-87750
|
Executed
|
06/22/2022
|
6 / 5 |
2 |
2
|
3
|
DeKalb
|
|
Pavement widening, resurfacing, aggregate and HMA shoulders, curb and gutter, traffic signal modernization, pavement markings on Peace Road from the I-80 westbound exit ramp to IL 38 in the city of DeKalb.
|
184-87777
|
Executed
|
06/28/2022
|
|
|
2
|
3
|
LaSalle
|
|
Pavement removal, 7" PCC pavement, sidewalks, curb and gutter, storm sewer, and pavement markings on Autumnwood Drive from North 30th Road to Evans Street, and on Evans Street to west of Bluff Street in the city of Ottawa.
|
185-89789
|
Executed
|
06/14/2022
|
7 / 5 |
1 |
3
|
4
|
Peoria
|
|
Full Depth pavement removal, PCC Pavement, Curb and Gutter, Pipe Underdrains, Storm Sewer, HMA Multi-Use Path, PCC Sidewalks, Pavement Markings, and Landscaping on Gleen Avenue between Sheridan Road and Knoxville Avenue (IL-140) .
|
186-89819
|
Executed
|
06/10/2022
|
4 / 4 |
|
3
|
4
|
Knox
|
|
Rehabilitate the structure carrying CH 10 over the BNSF Rail Yard located east of Henderson Street in Galesburg.
|
187-91610
|
Executed
|
06/14/2022
|
1 / 1 |
|
3
|
5
|
Vermilion
|
|
HMA Shoulders and Rumble Strips, re-align the intersecion at State Line Road, Guardrail, and Pavement Markings on CH 14 from the corporate limits of Rossville to the Indiana State Line, for a total of 6.92 miles.
|
188-93780
|
Executed
|
06/03/2022
|
1 / 1 |
1 |
4
|
6
|
Cass
|
|
Remove the existing structure and construct a three span structure to carry CH 9 over Mud Creek, one mile west of Arenzville.
|
189-95905
|
Executed
|
06/07/2022
|
1 / 1 |
1 |
4
|
7
|
Richland
|
|
Sidewalk construction, reconstruct existing driveways, combination curb and gutter, pavement markings, and pedestrian traffic signal improvements on IL 130 from Parker Street to North Avenue in Olney.
|
190-97774
|
Executed
|
06/28/2022
|
|
|
5
|
8
|
Madison
|
|
Sidewalk removal, PCC sidewalks, curb and gutter, retaining wall, and pavement markings at various locations in Alton.
|
191-97779
|
Executed
|
06/03/2022
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
Add right-turn lanes on westbound Highway 50 and on southbound Old Collinsville Road with traffic signal modifications, sidewalks, curb and gutter, and pavement markings in O'Fallon.
|
192-99684
|
Executed
|
06/03/2022
|
|
|
5
|
9
|
Hardin
|
|
Resurface Garden of the Gods Road from the Gallatin County line to Karbers Ridge Road.
|
193-61H44
|
Withdrawn
|
03/31/2022
|
|
|
1
|
1
|
Cook
|
|
Reconstruct Rand Road from Isabella Street to Albany Lane, reconstruct Mount Prospect Road to Westgate Road, and reconstruct Mount Prospect Road from Central Road to Rand Road. , Reconstruct Rand Road from Isabella Street to Albany Lane, reconstruct Mount Prospect Road to Westgate Road, and reconstruct Mount Prospect Road from Central Road to Rand Road.
|
194-62H26
|
Executed
|
06/03/2022
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
(296-Ft) Removal and replacement of culvert located on Dixie Hwy over ditch (1 Mile N of US 6) located in the City of Harvey, Cook County.
|
195-62M58
|
Executed
|
06/03/2022
|
2 / 2 |
|
1
|
1
|
Lake
|
|
(1000-Ft) Bridge joint repairs, bridge deck overlay, guardrail, and asphalt shoulder reconstruction for the structures that carry US 41 over Mill Creek located in the Village of Wadsworth in Lake County.
|
196-62M59
|
Executed
|
06/16/2022
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(1032-Ft) Channelization and pavement widening to add a right turn lane, traffic signal modernization, bridge deck overlay and joint repair located on IL 53 (Biesterfield Rd.) at the I-290 northbound ramp within Elk Grove Village.
|
197-62N23
|
Executed
|
06/03/2022
|
4 / 4 |
3 |
1
|
1
|
Lake
|
|
(2535-Ft) Land bridge deck overlay and repairs to the structures at Fish Creek. Scope of work includes abandoning structure, grouting, concrete bridge deck overlays, and shoulder reconstruction located in the Village of Volo.
|
198-62N87
|
Executed
|
06/16/2022
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
This is a curb ramps for sidewalks ADA improvement project, consisting of sidewalk removal and replacement, comb. conc. curb and gutter removal and replacement and collateral and incidental work at various locations along US Route 6, 30, 52 and IL Routes 7 and 171 in the City of Joliet in Will County.
|
199-62P35
|
Executed
|
06/16/2022
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
This project is located at various locations along US Rte. 6, US Rte. 30, US Rte. 52 and IL Rte. 7 in the City of Joliet in Will County. The ADA improvement includes sidewalk removal, combination concrete curb and gutter removal and replacement and installation of concrete sidewalk.
|
200-62P45
|
Executed
|
06/07/2022
|
16 / 15 |
1 |
1
|
1
|
Cook
|
|
(3.05-Mile) Water main replacement, intersection reconstruction, roadway reconstruction of Wood St / Ashland Ave from north of Thornton Rd to 138th St, bridge rehabilitation, sidewalk, shared-use path roadway lighting, and aesthetic landscaping located in the City of Harvey, Villages of Dixmoor and Riverdale.
|
201-66K77
|
Executed
|
06/09/2022
|
|
1 |
2
|
3
|
Iroquois
|
|
This project is located on FAP 71/FAS 323 (IL 54) from 0.4 mile west of I-57 to US 45/52 in Onarga. The work consists of HMA milling and resurfacing, shoulder work, ADA ramps, pavement marking, and raised reflective markers.
|
202-66L75
|
Executed
|
06/10/2022
|
|
|
2
|
3
|
Livingston
|
|
Latex overlay, expansion joint replacement and deck repairs on the structures structures SN 053-0124 and SN 053-0125 carrying I-55 over Rooks creek, 3 miles southwest of Pontiac in Livingston County.
|
01A-CO069
|
Executed
|
08/25/2022
|
|
|
4
|
7
|
Coles
|
|
Maintain Runway 11-29: Apply asphalt preservation treatment and remark
|
02A-SD061
|
Executed
|
09/05/2022
|
7 / 7 |
1 |
5
|
8
|
St. Clair
|
Voluntary
|
Construct runup ramp and taxiway access from the airfield, including jet blast/ noise mitigation barrier
|
03A-BN019
|
Executed
|
04/20/2023
|
1 / 1 |
|
5
|
9
|
Franklin
|
|
Rehabilitation of the Main Ramp Area R-1
|
04A-CI008
|
Rejected
|
02/06/2023
|
2 / 2 |
|
5
|
9
|
Alexander
|
|
Install 8' Class E Fence and Gates, Phase 4
|
1LR-M2108
|
Active
|
03/26/2022
|
|
1 |
0
|
0
|
Fulton
|
Voluntary
|
The Red Ember Remedial Reclamation Project is for the restoration of burnout and eroded areas at the Red Ember abandoned mine site by the Illinois Department of Natural Resources using federal abandoned mined lands funds. The project site is located approximately ¾ mile south of Fiatt, Illinois approximately ¾ mile east of North State Route 97 off of East Tompkins Road in Sections 29, 32, and 33,Township 7 North, Range 3 East, Fulton County, Illinois. A voluntary pre-bid meeting is scheduled for this project at 10:30 a.m., Thursday, April 14, 2022. All interested potential bidders are to meet near the intersection of East Arrow Road and East Tompkins Road near the project site. A pre-bid meeting location map is attached.
|
2LR-M2106
|
Active
|
03/26/2022
|
|
|
0
|
0
|
Saline
|
|
The Saline County V.O. Group Reclamation Project is for the elimination of public health and safety hazards at three abandoned mine sites by the Illinois Department of Natural Resources using federal abandoned mined lands funds. The project sites are located near the town of Harrisburg, in Saline county, Illinois, at three separate locations. The Van Meter Brothers site is located in Sections 20 and 29, T9S, R6E. The Peabody C.C. #42 site is located in Section 36, T9S, R5E. The O’Gara site is located in Section 31, T9S, R6E, in Saline County, Illinois. A pre-bid meeting is not scheduled for this project.
|