Home > Notice of Letting > Contract Detail

April 29, 2022 Letting 12:00 PM
044-70F34

Bulletin Description

Bridge preservation - pier repairs.
Region District DBE % VBP % Federal Project #
3 5 0.00 0.00 NHPPMQ6Y(810)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • McLean
  • FAI 39
  • I-39
  • MBPM 2022-1
  • C-95-044-21
  • 0-01270-5001
Contract Specifics
60 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 3 Answered ) Questions not accepted as of April 19, 2022 04:30 PM.

  • It appears you want to prep the repair areas at the exposed steel piles per SP10. Is the faying surface to be primed? What paint system goes on the new steel? It appears you want to prep the remainder of the exposed steel piles per SP3. Do these areas paint? if so, what paint system?
    Surfaces of the prepared steel cleaned to bare metal shall be painted with either one coat of epoxy mastic between 5 or 7 mils (125 microns to 180 microns) in thickness or one coat of an organic zinc rich primer between 3.5 and 5.0 mils (90 and 125 microns) in thickness. Areas not cleaned to bare metal need not be painted. (04/22/2022)

  • In the Special Provisions, under the 'Traffic Control Plan' heading, it states no live traffic directly over the work areas. Later in the Special Provisions, under the 'Traffic Control Removal' heading, it states all lanes shall be open to traffic and all lane closure traffic control shall be removed during non-working hours. Can lane closures be left in place during non-working hours?
    Yes, lane closures should remain in place as described in TC&P 701401 Special until repairs to the abutment piles are made. This is for both working and non-working hours to minimize the traffic vibrations directly over the work areas. As stated in the special provision, the Traffic Control Removal Special is used unless required by the Contractor’s operation or authorized by the Engineer. (04/19/2022)

  • What is the reason for all the duplicate sheets?
    An addendum will be issued to address this. (04/18/2022)

Authorized Bidders

  • 5672 Stark Excavating, Inc.
    1805 W Washington St.
    Bloomington, IL 61701
    Phone: (309) 828-5034 Fax: (309) 829-3897 Email: estimating@starkcompanies.com
    $656,697.50

  • 1690 H. J. Eppel & Co.
    1400 Tuesburg Court
    Pontiac, IL 61764
    Phone: (815) 844-7269 Fax: (815) 844-5359 Email: hjeco@eppel.com

  • 3574 MYS, Incorporated
    12416 S. Harlem Ave
    Palos Heights, IL 60463
    Phone: (708) 448-0983 Fax: (708) 448-8098 Email: tyelnick@mysincorporated.com

  • 6450 White Construction LLC
    3900 E. White Ave.
    Clinton, IN 47842
    PO Box 249
    Clinton, IN 47842
    Phone: (765) 828-2593 Fax: (765) 832-1860 Email: civilestimating@whiteconstruction.com

Non Bidders

  • 1604 Era-Valdivia Contractors, Inc.
    (Pending Authorization)
    11909 S. Avenue O
    Chicago, IL 60617
    Phone: (773) 721-9350 Fax: (773) 721-8027 Email: estimating@eravaldivia.com

Pay Item # UOM Description Type Quantity Unit Price
50200100 CU YD STRUCTURE EXCAVATION Base items 540.000
50300225 CU YD CONCRETE STRUCTURES Base items 47.000
50500505 EACH STUD SHEAR CONNECTORS Base items 544.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 5,290.000
59300100 CU YD CONTROLLED LOW-STRENGTH MATERIAL Base items 200.000
67100100 L SUM MOBILIZATION Base items 1.000
70100800 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701401 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 28.000
X2810208 TON STONE RIPRAP, CLASS A4 (SPECIAL) Base items 340.000
X7200201 L SUM WIDTH RESTRICTION SIGNING Base items 1.000
Z0001905 POUND STRUCTURAL STEEL REPAIR Base items 4,160.000
Z0010501 L SUM CLEANING AND PAINTING STEEL BRIDGE NO. 1 Base items 1.000
Z0010502 L SUM CLEANING AND PAINTING STEEL BRIDGE NO. 2 Base items 1.000
Z0010503 L SUM CLEANING AND PAINTING STEEL BRIDGE NO. 3 Base items 1.000
Z0010504 L SUM CLEANING AND PAINTING STEEL BRIDGE NO. 4 Base items 1.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.