Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
1 | 1 | 16.00 | 0.00 | N/A |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
80 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20200100 | CU YD | EARTH EXCAVATION | Base items | 14.000 | |||
21101505 | CU YD | TOPSOIL EXCAVATION AND PLACEMENT | Base items | 8.000 | |||
25000210 | ACRE | SEEDING, CLASS 2A | Base items | 0.010 | |||
28001100 | SQ YD | TEMPORARY EROSION CONTROL BLANKET | Base items | 45.000 | |||
44213200 | FOOT | SAW CUTS | Base items | 120.000 | |||
44213202 | EACH | TIE BARS 1" | Base items | 179.000 | |||
50102400 | CU YD | CONCRETE REMOVAL | Base items | 31.000 | |||
50300225 | CU YD | CONCRETE STRUCTURES | Base items | 28.000 | |||
50300255 | CU YD | CONCRETE SUPERSTRUCTURE | Base items | 3.000 | |||
50300300 | SQ YD | PROTECTIVE COAT | Base items | 197.000 | |||
50606710 | L SUM | CLEANING AND PAINTING STRUCTURAL STEEL, LOCATION 10 | Base items | 1.000 | |||
50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 565.000 | |||
50800530 | EACH | MECHANICAL SPLICERS | Base items | 56.000 | |||
66900200 | CU YD | NON-SPECIAL WASTE DISPOSAL | Base items | 6.000 | |||
66900530 | EACH | SOIL DISPOSAL ANALYSIS | Base items | 1.000 | |||
66901001 | L SUM | REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN | Base items | 1.000 | |||
66901003 | L SUM | REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT | Base items | 1.000 | |||
66901006 | CAL DA | REGULATED SUBSTANCES MONITORING | Base items | 2.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100310 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701421 | Base items | 1.000 | |||
70102625 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701606 | Base items | 1.000 | |||
70102630 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701601 | Base items | 1.000 | |||
70200100 | L SUM | NIGHTTIME WORK ZONE LIGHTING | Base items | 1.000 | |||
X0323902 | FOOT | CTA FENCE | Base items | 130.000 | |||
X0326791 | L SUM | NOISE ABATEMENT WALL REPAIRS | Base items | 1.000 | |||
X0327890 | SQ YD | DRIVEWAY REMOVAL AND REPLACEMENT | Base items | 14.000 | |||
X6700407 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A (D1) | Base items | 12.000 | |||
X7011015 | L SUM | TRAFFIC CONTROL AND PROTECTION (EXPRESSWAYS) | Base items | 1.000 | |||
Z0007122 | FOOT | REMOVING AND RE-ERECTING EXISTING RAILING | Base items | 42.000 | |||
Z0012754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 30.000 | |||
Z0030850 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 411.200 | |||
Z0048665 | L SUM | RAILROAD PROTECTIVE LIABILITY INSURANCE | Base items | 1.000 | |||
Z0050100 | FOOT | REMOVE AND RE-ERECT EXISTING HANDRAIL | Base items | 139.000 | |||
Z0076604 | HOUR | TRAINEES TRAINING PROGRAM GRADUATE | Base items | 500.000 | $15.00 | ||
No More Pay Items |