April 29, 2022 Letting 12:00 PM
117-91614

Bulletin Description

Construction of a multi-use path along Maplewood Drive from Clark Street to Crane Drive in Rantoul.
Region District DBE % VBP % Federal Project #
3 5 2.00 0.00 BA04(565)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Champaign
  • FAU 7094
  • MAPLEWOOD DRIVE
  • 20-00115-00-BT (RANTOUL)
  • C-95-014-22
  • 0-01043-5006
  • 5-10502-0000
Contract Specifics
40 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (5 Submitted / 5 Answered ) Questions not accepted as of April 19, 2022 04:30 PM.

  • 4. Please confirm that the 5” PCC sidewalk will not receive an aggregate base. 5. Can the sidewalk expansion joints on 30’ centers be cut in? 6. The silt fence as shown on the plans greatly reduces options for pouring the concrete sidewalk could the silt fence be moved or eliminated. 7. Are there proposed graded or cross sections available for this project? If so please provide.
    4. PCC Sidewalk, 5” is to be constructed as specified in the Standard Specifications for Road and Bridge Construction and as specified in the contract documents. 5. Per the Specifications, all joints shall be hand tooled. 6. Temporary erosion control systems shall be constructed according to the Standard Specifications for Road and Bridge Construction and as shown in the applicable Highway Standard. 7. Cross sections are not available for this project. (04/20/2022)

  • i. All of these areas could be deducted from the sidewalk where they overlap with the driveway pavement, but then the sidewalk quantity would not match the plan quantity. If deducted from the sidewalk quantity the square yardage of these areas does not match the plan quantity in the Entrance Schedule, please advise.
    i. Per Section 424.04 of the Standard Specifications for Road and Bridge Construction, at locations where sidewalk is constructed at entrances, the sidewalk shall be thickened to the thickness of the adjacent entrance or driveway pavement. This work is paid for as sidewalk. As described in General Note 19 and as indicated by being an estimated quantity, the PCC Driveway Pavement quantity, and associated Driveway Pavement Removal quantity, in the Entrance Schedule (Estimated) are included to blend the proposed work into the existing driveway grades. The Driveway Pavement Removal quantity in the Removal Schedule is for Driveway Pavement Removal within the limits of the proposed sidewalk. (04/20/2022)

  • f. Station 152+42 – No proposed driveway pavement is shown. Please advise. g. Station 153+04 – No proposed driveway pavement is shown. Please advise. h. Station 157+20 - No proposed driveway pavement is shown. Please advise.
    f. Estimated PCC driveway pavement is shown in the entrance schedule. g. Estimated PCC driveway pavement is shown in the entrance schedule. h. Estimated PCC driveway pavement is shown in the entrance schedule. (04/20/2022)

  • 3. In regards to the Portland Cement Concrete Driveway Pavement; a. Station 146+50 – No proposed driveway pavement is shown, please advise. b. Station 150+07 – No proposed driveway pavement is shown, please advise. c. Station 150+68 – No proposed driveway pavement is shown, please advise. d. Station 151+26 – No proposed driveway pavement is shown. Please advise. e. Station 151+81 – No proposed driveway pavement is shown. Please advise.
    a. Estimated PCC driveway pavement is shown in the entrance schedule. b. Estimated PCC driveway pavement is shown in the entrance schedule. c. Estimated PCC driveway pavement is shown in the entrance schedule. d. Estimated PCC driveway pavement is shown in the entrance schedule. e. Estimated PCC driveway pavement is shown in the entrance schedule. (04/20/2022)

  • 1. The specifications state that excavation should be included under the Portland cement concrete sidewalk pay item. If the excavation and embankment are to be included under the Portland cement concrete sidewalk item, what should be included in the earth excavation pay item? 2. Will a control joint be required down the center of the sidewalk?
    1. An addendum will be issued. 2. A control joint shall not be constructed down the center of the sidewalk. (04/20/2022)

Authorized Bidders

  • 1538 Duce Construction Company
    417 Wilbur Ave.
    Champaign, IL 61822
    Phone: (217) 355-0222 Fax: (217) 355-0999 Email: No Record
    $391,500.00

  • 1770 Feutz Contractors, Inc.
    1120 N. Main St.
    Paris, IL 61944
    PO Box 130
    Paris, IL 61944
    Phone: (217) 465-8402 Fax: (217) 463-2256 Email: feutz.shared@feutzcontractors.com
    $446,407.70

  • 0335 Otto Baum Company, Inc.
    866 N. Main Street
    Morton, IL 61550
    Phone: (309) 266-7114 Fax: (309) 263-1050 Email: johnbasham@ottobaum.com
    $429,255.99

  • 5672 Stark Excavating, Inc.
    1805 W Washington St.
    Bloomington, IL 61701
    Phone: (309) 828-5034 Fax: (309) 829-3897 Email: estimating@starkcompanies.com
    $394,000.00

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 43.000
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 46.000
20200100 CU YD EARTH EXCAVATION Base items 285.000
25000100 ACRE SEEDING, CLASS 1 Base items 0.250
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 20.000
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 20.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 20.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 22.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 2,180.000
28000500 EACH INLET AND PIPE PROTECTION Base items 7.000
42001300 SQ YD PROTECTIVE COAT Base items 2,853.000
42300200 SQ YD PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH Base items 83.000
42300400 SQ YD PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH Base items 56.000
42400200 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH Base items 23,909.000
42400800 SQ FT DETECTABLE WARNINGS Base items 220.000
44000200 SQ YD DRIVEWAY PAVEMENT REMOVAL Base items 264.000
44000500 FOOT COMBINATION CURB AND GUTTER REMOVAL Base items 209.000
44000600 SQ FT SIDEWALK REMOVAL Base items 9,228.000
60255500 EACH MANHOLES TO BE ADJUSTED Base items 3.000
60604400 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18 Base items 209.000
67100100 L SUM MOBILIZATION Base items 1.000
72000100 SQ FT SIGN PANEL - TYPE 1 Base items 25.000
72900100 FOOT METAL POST - TYPE A Base items 110.000
78005130 FOOT EPOXY PAVEMENT MARKING - LINE 6" Base items 316.000
78005150 FOOT EPOXY PAVEMENT MARKING - LINE 12" Base items 397.000
78005180 FOOT EPOXY PAVEMENT MARKING - LINE 24" Base items 67.000
78300202 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 292.000
X0350805 EACH FOLD DOWN BOLLARDS Base items 11.000
X6024503 EACH INLETS TO BE ADJUSTED WITH NEW FRAME AND GRATE (SPECIAL) Base items 4.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
No More Pay Items