Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
3 | 5 | 0.00 | 0.00 | HSIPJCAJ(522) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
30 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20200100 | CU YD | EARTH EXCAVATION | Base items | 3,100.000 | |||
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 5,271.000 | |||
40800029 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 240.000 | |||
40800050 | TON | INCIDENTAL HOT-MIX ASPHALT SURFACING | Base items | 46.000 | |||
44000100 | SQ YD | PAVEMENT REMOVAL | Base items | 581.000 | |||
48102100 | TON | AGGREGATE WEDGE SHOULDER, TYPE B | Base items | 4.000 | |||
48203029 | SQ YD | HOT-MIX ASPHALT SHOULDERS, 8" | Base items | 15,443.000 | |||
64200108 | FOOT | SHOULDER RUMBLE STRIPS, 8 INCH | Base items | 35,842.000 | |||
66900200 | CU YD | NON-SPECIAL WASTE DISPOSAL | Base items | 1,250.000 | |||
66900530 | EACH | SOIL DISPOSAL ANALYSIS | Base items | 4.000 | |||
66901001 | L SUM | REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN | Base items | 1.000 | |||
66901003 | L SUM | REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT | Base items | 1.000 | |||
66901006 | CAL DA | REGULATED SUBSTANCES MONITORING | Base items | 2.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100310 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701421 | Base items | 1.000 | |||
X4400196 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL (SPECIAL) | Base items | 532.000 | |||
Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
Z0070100 | EACH | SURVEY MONUMENT COVER ASSEMBLY | Base items | 2.000 | |||
No More Pay Items |