20100110
|
UNIT
|
TREE REMOVAL (6 TO 15 UNITS DIAMETER)
|
Base items
|
83.400
|
|
20100210
|
UNIT
|
TREE REMOVAL (OVER 15 UNITS DIAMETER)
|
Base items
|
53.200
|
|
20101300
|
EACH
|
TREE PRUNING (1 TO 10 INCH DIAMETER)
|
Base items
|
7.000
|
|
20101350
|
EACH
|
TREE PRUNING (OVER 10 INCH DIAMETER)
|
Base items
|
2.000
|
|
20101400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
5.000
|
|
20101500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
5.000
|
|
20101600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
5.000
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
187.000
|
|
21101615
|
SQ YD
|
TOPSOIL FURNISH AND PLACE, 4"
|
Base items
|
1,623.000
|
|
25200110
|
SQ YD
|
SODDING, SALT TOLERANT
|
Base items
|
1,623.000
|
|
25200200
|
UNIT
|
SUPPLEMENTAL WATERING
|
Base items
|
5.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
66,954.000
|
|
40600370
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
35,162.000
|
|
40600400
|
TON
|
MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS
|
Base items
|
299.000
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
1,158.000
|
|
40601005
|
TON
|
HOT-MIX ASPHALT REPLACEMENT OVER PATCHES
|
Base items
|
536.000
|
|
40603200
|
TON
|
POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-4.75, N50
|
Base items
|
4,479.000
|
|
40605026
|
TON
|
POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, STONE MATRIX ASPHALT, 9.5, MIX "F", N80
|
Base items
|
10,080.000
|
|
42001300
|
SQ YD
|
PROTECTIVE COAT
|
Base items
|
1,335.000
|
|
42300200
|
SQ YD
|
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH
|
Base items
|
350.000
|
|
42300400
|
SQ YD
|
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH
|
Base items
|
291.000
|
|
42400200
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH
|
Base items
|
11,122.000
|
|
42400800
|
SQ FT
|
DETECTABLE WARNINGS
|
Base items
|
1,014.000
|
|
44000159
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/2"
|
Base items
|
73,619.000
|
|
44000161
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 3"
|
Base items
|
25,575.000
|
|
44000200
|
SQ YD
|
DRIVEWAY PAVEMENT REMOVAL
|
Base items
|
641.000
|
|
44000600
|
SQ FT
|
SIDEWALK REMOVAL
|
Base items
|
12,588.000
|
|
44002210
|
SQ YD
|
HOT-MIX ASPHALT REMOVAL OVER PATCHES, 2 1/2"
|
Base items
|
1,739.000
|
|
44002212
|
SQ YD
|
HOT-MIX ASPHALT REMOVAL OVER PATCHES, 3"
|
Base items
|
1,739.000
|
|
44003510
|
SQ FT
|
MEDIAN REMOVAL PARTIAL DEPTH
|
Base items
|
1,352.000
|
|
44201761
|
SQ YD
|
CLASS D PATCHES, TYPE I, 10 INCH
|
Base items
|
5.000
|
|
44201765
|
SQ YD
|
CLASS D PATCHES, TYPE II, 10 INCH
|
Base items
|
1,550.000
|
|
44201769
|
SQ YD
|
CLASS D PATCHES, TYPE III, 10 INCH
|
Base items
|
607.000
|
|
44201771
|
SQ YD
|
CLASS D PATCHES, TYPE IV, 10 INCH
|
Base items
|
1,075.000
|
|
60252800
|
EACH
|
CATCH BASINS TO BE RECONSTRUCTED
|
Base items
|
7.000
|
|
60255500
|
EACH
|
MANHOLES TO BE ADJUSTED
|
Base items
|
6.000
|
|
60260100
|
EACH
|
INLETS TO BE ADJUSTED
|
Base items
|
5.000
|
|
60300305
|
EACH
|
FRAMES AND LIDS TO BE ADJUSTED
|
Base items
|
65.000
|
|
60404500
|
EACH
|
FRAMES AND GRATES, TYPE 6
|
Base items
|
5.000
|
|
60406000
|
EACH
|
FRAMES AND LIDS, TYPE 1, OPEN LID
|
Base items
|
27.000
|
|
60406100
|
EACH
|
FRAMES AND LIDS, TYPE 1, CLOSED LID
|
Base items
|
103.000
|
|
66900200
|
CU YD
|
NON-SPECIAL WASTE DISPOSAL
|
Base items
|
175.000
|
|
66900530
|
EACH
|
SOIL DISPOSAL ANALYSIS
|
Base items
|
8.000
|
|
66901001
|
L SUM
|
REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN
|
Base items
|
1.000
|
|
66901003
|
L SUM
|
REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT
|
Base items
|
1.000
|
|
66901006
|
CAL DA
|
REGULATED SUBSTANCES MONITORING
|
Base items
|
15.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70102620
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701501
|
Base items
|
1.000
|
|
70102625
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701606
|
Base items
|
1.000
|
|
70102630
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701601
|
Base items
|
1.000
|
|
70102635
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701701
|
Base items
|
1.000
|
|
70102640
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701801
|
Base items
|
1.000
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
33,267.000
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
11,078.000
|
|
70300211
|
SQ FT
|
TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS - PAINT
|
Base items
|
978.000
|
|
70300221
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT
|
Base items
|
49,622.000
|
|
70300241
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 6"- PAINT
|
Base items
|
6,147.000
|
|
70300251
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 8"- PAINT
|
Base items
|
1,148.000
|
|
70300261
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 12"- PAINT
|
Base items
|
4,268.000
|
|
70300281
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 24"- PAINT
|
Base items
|
1,167.000
|
|
70306120
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE III TAPE
|
Base items
|
8,317.000
|
|
78000100
|
SQ FT
|
THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS
|
Base items
|
978.000
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
49,622.000
|
|
78000400
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 6"
|
Base items
|
6,287.000
|
|
78000500
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 8"
|
Base items
|
1,148.000
|
|
78000600
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 12"
|
Base items
|
4,268.000
|
|
78000650
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 24"
|
Base items
|
1,167.000
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
1,537.000
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
1,537.000
|
|
88600600
|
FOOT
|
DETECTOR LOOP REPLACEMENT
|
Base items
|
2,786.000
|
|
89502376
|
EACH
|
REBUILD EXISTING HANDHOLE
|
Base items
|
4.000
|
|
X0100018
|
UNIT
|
TREE REMOVAL (UNDER 6 UNITS DIAMETER)
|
Base items
|
23.000
|
|
X0320050
|
L SUM
|
CONSTRUCTION LAYOUT (SPECIAL)
|
Base items
|
1.000
|
|
X2010400
|
UNIT
|
STUMP REMOVAL ONLY
|
Base items
|
10.000
|
|
X2100002
|
UNIT
|
PRUNING FOR SAFETY AND EQUIPMENT CLEARANCE
|
Base items
|
23.000
|
|
X4400501
|
FOOT
|
COMBINATION CURB AND GUTTER REMOVAL AND REPLACEMENT LESS THAN OR EQUAL TO 10 FEET
|
Base items
|
178.000
|
|
X6030310
|
EACH
|
FRAMES AND LIDS TO BE ADJUSTED (SPECIAL)
|
Base items
|
187.000
|
|
X6700407
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A (D1)
|
Base items
|
12.000
|
|
Z0004562
|
FOOT
|
COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT
|
Base items
|
3,558.000
|
|
Z0018500
|
EACH
|
DRAINAGE STRUCTURES TO BE CLEANED
|
Base items
|
199.000
|
|
Z0030850
|
SQ FT
|
TEMPORARY INFORMATION SIGNING
|
Base items
|
76.400
|
|
Z0064800
|
UNIT
|
SELECTIVE CLEARING
|
Base items
|
0.750
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
500.000
|
$0.80
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
500.000
|
$15.00
|