Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
3 | 4 | 2.00 | 0.00 | STP668O(478) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
20 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
40600982 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT | Base items | 520.000 | |||
40600990 | SQ YD | TEMPORARY RAMP | Base items | 160.000 | |||
40603200 | TON | POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-4.75, N50 | Base items | 5.000 | |||
40604060 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50 | Base items | 10,693.000 | |||
40800050 | TON | INCIDENTAL HOT-MIX ASPHALT SURFACING | Base items | 191.000 | |||
44000152 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 3/4" | Base items | 125,960.000 | |||
48101200 | TON | AGGREGATE SHOULDERS, TYPE B | Base items | 1,181.000 | |||
67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 1.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100450 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 | Base items | 1.000 | |||
70100460 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 | Base items | 1.000 | |||
70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 14.000 | |||
70300100 | FOOT | SHORT TERM PAVEMENT MARKING | Base items | 4,665.000 | |||
70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 1,555.000 | |||
78009000 | SQ FT | MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS | Base items | 31.200 | |||
78009004 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 4" | Base items | 55,276.000 | |||
78009006 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 6" | Base items | 94,660.000 | |||
78009008 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 8" | Base items | 210.000 | |||
78100100 | EACH | RAISED REFLECTIVE PAVEMENT MARKER | Base items | 796.000 | |||
78300200 | EACH | RAISED REFLECTIVE PAVEMENT MARKER REMOVAL | Base items | 386.000 | |||
X0300017 | POUND | BITUMINOUS MATERIALS (WAX-MODIFIED HOT APPLIED ASPHALT TACK) | Base items | 119,201.000 | |||
X0328001 | SQ YD | REGENERATIVE AIR SWEEPER | Base items | 124,697.000 | |||
X0556100 | SQ YD | PARTIAL DEPTH PATCHING (SPECIAL) | Base items | 54.000 | |||
X4400196 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL (SPECIAL) | Base items | 2,592.000 | |||
X4421000 | TON | PARTIAL DEPTH PATCHING | Base items | 12.000 | |||
XZ013798 | L SUM | CONSTRUCTION STATION LAYOUT | Base items | 1.000 | |||
Z0034105 | TON | MATERIAL TRANSFER DEVICE | Base items | 10,693.000 | |||
No More Pay Items |