001-60N80
|
Executed
|
07/22/2020
|
2 / 2 |
|
1
|
1
|
Cook
|
|
Removal and replacement the bridge superstructure, raising roadway profile on Joliet Road over Flag Creek in the Village of indian Head Park and Burr Ridge. LT 600 FT SN 016-0393
|
002-61G35
|
Executed
|
07/22/2020
|
|
|
1
|
1
|
Cook
|
|
Reconstruction of 21st Avenue from 16th Street to 19th Street, and the reconstruction of 19th Street from 21st Avenue to 17th Avenue in Broadview.
|
003-61G39
|
Executed
|
07/22/2020
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Resurfacing Wentworth Avenue from Bernice Road to Ridge Road in Lansing.
|
004-61G42
|
Executed
|
07/22/2020
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Reconstruction of Central Avenue from the Union Pacific Railroad to Sheridan Road. Resurfacing of Wilmette Avenue from the Union Pacific Railroad to Lake Avenue, and traffic signal modernization at Central and Wilmette Avenues in Wilmette.
|
005-61G47
|
Executed
|
07/22/2020
|
|
|
1
|
1
|
Lake
|
|
Traffic Signal modifications, installation of fiber optic communication system, sidewalk replacement and pavment markings at various locations in Waukegan.
|
006-61G49
|
Executed
|
07/22/2020
|
|
|
1
|
1
|
Lake
|
|
Installation of snow-proof lens cover for red signal indications.
|
007-61G51
|
Executed
|
07/22/2020
|
2 / 2 |
|
1
|
1
|
Cook
|
|
Construction of a pedestrian bridge on Bryn Mawr Avenue over the Des Plaines River in Rosemont.
|
008-61G61
|
Executed
|
07/22/2020
|
|
|
1
|
1
|
Cook
|
|
Construction of a multi-use path adjacent to Old Green Bay Road, from Maple Hill Road to Park Avenue in Glencoe.
|
009-62F22
|
Executed
|
07/22/2020
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
Installation of new shoulders, milled rumble strips, and guardrail on Monee- , Installation of new shoulders, milled rumble strips, and guardrail on Monee- Manhattan Road from Brynn Drive to Center Road. The gross length of the project is 35 ,622 feet (6.75 miles) in the Village of Manhattan and unincorporated Green Garden and Manhattan Townships in Will County.
|
010-62F90
|
Executed
|
09/14/2020
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Traffic Signal Modernization, Channelization, Standard Overlay, ADA Improvements; FAP Route 348 (IL 43 / Harlem Ave) at Archer Ave in the City of Chicago and the Village of Summit in Cook County.
|
011-62J98
|
Executed
|
07/24/2020
|
3 / 3 |
|
1
|
1
|
Cook
|
|
Bridge beam replacement for SN 016-0825 carrying Church St over I-94.
|
012-62K10
|
Executed
|
07/22/2020
|
|
|
1
|
1
|
Various
|
|
Dead tree removal along expressway and arterial routes of District One.
|
013-62K20
|
Executed
|
07/22/2020
|
|
|
1
|
1
|
Cook
|
|
Improvements to bridge parapet, joint, steel, and wingwall on I-55 over BRC RR in Chicago.
|
014-62K35
|
Executed
|
07/22/2020
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Permanent protective shield installation on IL 53 bridges over IL 62, US 14 and RR, Palatine Rd, Kirchoff Rd, Anderson Dr, as well as Fulton Market St bridge over I-90/I-94.
|
015-62K71
|
Executed
|
07/22/2020
|
4 / 4 |
2 |
1
|
1
|
Kane
|
|
5.6 Miles, Standard Overlay, ADA Improvements, Bridge Repairs, West Rd to Strom Dr in the City of Elgin. , 5.6 Miles, Standard Overlay, ADA Improvements, Bridge Repairs West Rd to Strom Dr in the City of Elgin.
|
016-62K76
|
Executed
|
07/28/2020
|
|
|
1
|
1
|
Cook
|
|
Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, in the South Chicago Township, and Roosevelt Road over IHB Rail Road. , Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, and Roosevelt Road Over IHB Railroad.
|
017-64L74
|
Executed
|
07/22/2020
|
2 / 2 |
1 |
2
|
2
|
Whiteside
|
|
Removal and replacement of the reinforced concrete drop beam along the bridge centerline. A new concrete overlay and other miscellaneous bridge repairs on the structure carrying US 30 over Hennepin Feeder Canal in Rock Falls.
|
018-64N60
|
Executed
|
08/10/2020
|
|
|
2
|
2
|
Carroll
|
|
9.6 miles of micro-surfacing from Plum River E of Savanna to 0.4 miles E of Benton St in Mount Carroll.
|
019-64N99
|
Executed
|
07/22/2020
|
|
|
2
|
2
|
Ogle
|
|
Painting and cleaning of SN's 071-0050 carrying Big Mound Rd over I-39 located 1.5 miles S of IL 72 and 071-0056 carrying Bethel Rd over I-39 located 1 mile S of IL 64.
|
020-64P25
|
Executed
|
07/24/2020
|
|
|
2
|
2
|
Various
|
|
Maintenance of signs along state maintained routes within District 2.
|
021-64P33
|
Executed
|
07/22/2020
|
2 / 2 |
|
2
|
2
|
Henry
|
|
Cleaning and painting beam ends on SN's 037-0001 and 037-0002 carrying I-74/280 over Mosquito Creek.
|
022-64P36
|
Executed
|
07/28/2020
|
3 / 3 |
3 |
2
|
2
|
Rock Island
|
|
Expansion joint replacement on SN 081-0074 carrying IL 92 over Hills Creek 0.1 mile E of 115th St in Andalusia.
|
023-64P37
|
Executed
|
07/22/2020
|
|
|
2
|
2
|
Whiteside
|
|
Removal and replacement of fabric reinforced elastomeric troughs for the finger joints on SN 098-0079 and SN 098-0080 carrying I-88 over the Rock River 3 miles west of Rock Falls.
|
024-64P39
|
Executed
|
09/01/2020
|
|
|
2
|
2
|
Whiteside
|
|
Removal and replacement of exterior precast prestressed concrete deck beam on SN 098-0054 carrying IL 172 over the Hennepin Canal 3.2 miles W of IL 40.
|
025-66A86
|
Executed
|
07/22/2020
|
|
|
2
|
3
|
Kankakee
|
|
Milling and resurfacing the existing pavement 3.75", guardrail updates, and various types of drainage work on IL 115 from S13000W Rd in Herscher to S600W Rd N of Irwin.
|
026-66B04
|
Executed
|
07/22/2020
|
1 / 1 |
|
2
|
3
|
Ford
|
|
15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work. , 15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work.
|
027-66B78
|
Executed
|
07/23/2020
|
|
|
2
|
3
|
Ford, Kankakee
|
|
9.26 miles of milling and resurfacing existing pavement 3.75- on IL 115 from CH 18 to 0.3 mile S of Main St in Cabery and Cabery to west corporate limits of Herscher. Work includes guardrail updates, various types of drainage work, and ADA ramp construction in Cabery.
|
028-66D81
|
Executed
|
07/23/2020
|
|
|
2
|
3
|
Ford
|
|
8.999 miles of milling and resurfacing from US 24 to IL 54 (N) in Roberts.
|
029-66J34
|
Executed
|
07/23/2020
|
|
|
2
|
3
|
LaSalle
|
|
Class B patching on IL 18 and IL 71 and Class A and B patching on the entrance and exit ramps, at the interchanges of I-39 and IL 18 and IL 71.
|
030-66J96
|
Executed
|
07/23/2020
|
|
|
2
|
3
|
LaSalle
|
|
HMA milling and resurfacing, PCC pavement replacement, storm sewer replacement, gutter removal, guardrail, and striping on FAP Rte 68 (IL 23) from the N intersection of IL 23 and US 34 to 400' N of SN 050-0042 (BNSF Railway).
|
031-66K14
|
Executed
|
07/28/2020
|
|
|
2
|
3
|
LaSalle
|
|
Cleaning and painting all structural steel components, including beams/girders, diaphragms, cross and lateral framing, bearings, drains, angle brackets, steel handrails when present, and other related steel components of SN 050-0129 carrying E. 14th Rd (TR 244) over FAI 80 (I-80) 6 miles E of IL 178.
|
032-66K21
|
Executed
|
07/24/2020
|
|
|
2
|
3
|
Kankakee
|
|
4.96 miles of shoulder widening and rumble strip installation on US 45/52 from 0.37 mile N of 6000N Rd to 0.40 mile S of the Will County line.
|
033-66K22
|
Deleted
|
04/28/2020
|
|
|
2
|
3
|
Kendall
|
|
5.92 miles of shoulder widening and rumble strip installation on US 52 from Townhouse Rd (South leg) to 0.17 mile W of IL 47. , 5.92 miles of shoulder widening and rumble strip installation on US 52 from Townhouse Rd (South leg) to 0.17 mile W of IL 47.
|
034-66K28
|
Executed
|
07/23/2020
|
|
|
2
|
3
|
Bureau
|
|
3P milling and resurfacing (designed overlay) and ADA from US 6/34 to BSNF RR S of Buda.
|
035-66K44
|
Executed
|
07/23/2020
|
1 / 1 |
1 |
2
|
3
|
Kankakee
|
|
This contract is for 2 permanent crossovers in Kankakee. The North crossover is located approximately 1500' N of SN 046-0010/11 over Grinnell Rd, the South crossover is located 2300' S of SN 046-0008/0009 over railroad tracks.
|
036-66K52
|
Executed
|
07/23/2020
|
|
|
2
|
3
|
Livingston
|
|
Milling and resurfacing 2.75- HMA from the mainline as part of the 3P standard overlay. Areas on Culverts SN 053-2003 and SN 053-2029 will have additional HMA lifts so the new HMA overlay equals 2.75-. In addition, the project includes guardrail upgrades, grading and shaping ditches, and ADA improvements in Forrest.
|
037-66K53
|
Executed
|
07/24/2020
|
2 / 2 |
1 |
2
|
3
|
Kankakee
|
|
1.91 miles of 3P milling and resurfacing on FAU 6194 (IL 113) from Indian Trail to IL 17 in Kankakee.
|
038-66K79
|
Executed
|
07/23/2020
|
|
1 |
2
|
3
|
Livingston
|
|
Bridge expansion joint removal and replacement, bridge approach shoulder removal and replacement, deck slab repairs, guardrail and terminal sections sections removal and replacement, pavement striping removal and replacement, traffic control, and other related construction items on SN 053-0158 carrying FAP 649 (IL 17) over the west fork of the Mazon River 1.33 miles west of I-55 near Dwight.
|
039-66K90
|
Executed
|
07/23/2020
|
|
|
2
|
3
|
Iroquois
|
|
Class A pavement patching and pavement marking on I-57 from the Ford/Iroquois county line to the Iroquois/Kankakee county line.
|
040-66K91
|
Executed
|
09/16/2020
|
|
|
2
|
3
|
Ford
|
|
Class A pavement patching and pavement marking on I-57 from the Champaign/Ford county line to the Ford/Iroquois county line.
|
041-66K93
|
Deleted
|
05/01/2020
|
|
|
2
|
3
|
Various
|
|
One year contract to repair damaged High Tension Cable Median Barrier, Guard Rail, Attenuators, etc., caused by motorists along various routes. , One year contract to repair damaged high tension cable median barrier, guard rail, attenuators, etc., caused by motorists along various routes.
|
042-66K97
|
Executed
|
07/23/2020
|
|
|
2
|
3
|
LaSalle
|
|
Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0). , Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0).
|
043-66L07
|
Deleted
|
04/23/2020
|
|
|
2
|
3
|
LaSalle
|
|
Repairing scour/erosion damage under both abutments by filling the existing void under the footings with a self-consolidating concrete and installing a a riprap slope at SN 050-0059 carrying FAP 607 (US 52) over Missions Creek 0.3 mile W of IL 71. , Repairing scour/erosion damage under both abutments by filling the existing void under the footings with a self-consolidating concrete and installing a riprap slope at SN 050-0059 carrying FAP 607 (US 52) over Mission Creek approximately 0.3 mi W of IL 71 in LaSalle County.
|
044-68894
|
Executed
|
07/24/2020
|
2 / 2 |
1 |
3
|
4
|
Tazewell
|
|
Replacement of SN 090-0091 carrying Pinecrest Dr over I-74, 2 miles E of the IL 8 interchange.
|
045-68A83
|
Executed
|
07/23/2020
|
|
1 |
3
|
4
|
Peoria
|
|
Resurfacing on I-74 from E of Il 78 to W of Kickapoo/Edwards Rd including joint replacement and slope wall repair to SN-s 072-0077 and 072-0078 over Schlink Rd and joint replacement to SN-s 072-0078 and 072-0080 on I-74 over Kickapoo Creek.
|
046-68F24
|
Executed
|
07/23/2020
|
|
|
3
|
4
|
Woodford
|
|
9 miles of surface maintenance on IL 26 from the Marshall County line to the north city limits of Spring Bay (Zimmerman Rd).
|
047-68F40
|
Executed
|
07/24/2020
|
|
|
3
|
4
|
Various
|
|
Replace river clearance gauge signage on the Illinois River Bridges in District 4. SN-s 062-0003, 090-0001, 090-0122, 090-0108, and 090-0109.
|
048-68F52
|
Executed
|
07/23/2020
|
|
|
3
|
4
|
Marshall, Woodford
|
|
10 miles of pavement patching on I-39 from N of IL 116 to S of IL 17..
|
049-68F53
|
Executed
|
07/24/2020
|
|
|
3
|
4
|
Knox
|
|
Beam straightening and strengthening on SN 048-0022 carrying US 34/IL 110 over US 150.
|
050-68F55
|
Executed
|
07/23/2020
|
1 / 1 |
|
3
|
4
|
Henry
|
|
Culvert repair to SN 037-2010 on I-74/IL 110, 0.1 mile N of the Knox County line.
|
051-68F58
|
Executed
|
07/23/2020
|
|
|
3
|
4
|
Peoria
|
|
2.42 miles of longitudinal joint repair and pavement marking maintenance along US 150 (War Memorial Dr) from N Frostwood Pkwy to W Northbound Ave.
|
052-68F59
|
Executed
|
08/26/2020
|
|
1 |
3
|
4
|
Henderson
|
|
Placement of riprap and grout around piers of SN 036-0037 carrying IL 164 over Henderson Creek 1.5 miles E of Oquawka.
|
053-68F60
|
Executed
|
09/01/2020
|
1 / 1 |
|
3
|
4
|
Henderson
|
|
Repair to North abutment with structural fa«ade to SN 036-0010 over Honey Creek, 1.5 miles S of Stronghurst.
|
054-68F62
|
Executed
|
07/23/2020
|
|
|
3
|
4
|
Peoria
|
|
Shoulder repair along IL 6 from the IL 29 interchange to E of IL 40 (Knoxville Ave) in Peoria.
|
055-70710
|
Executed
|
08/14/2020
|
1 / 1 |
1 |
3
|
5
|
Douglas
|
|
2.011 miles of standard resurfacing/ADA improvements on ILL 133 from US 45 in Arcola to 0.5 miles E of I-57 and US 45 from ILL 133 to Madison St.
|
056-70A92
|
Deleted
|
04/24/2020
|
|
|
3
|
5
|
Vermilion
|
|
Bridge superstructure replacements over Salt Fork Vermilion River. , Bridge superstructure replacements over Salt Fork Vermilion River.
|
057-70D74
|
Executed
|
07/24/2020
|
2 / 2 |
1 |
3
|
5
|
Douglas, Edgar
|
|
10.387 miles of resurfacing (3P policy standard overlay), new shoulders, milled rumble overlay, and culvert replacement from Vermilion/Edgar Co. line to 1800th Rd N of Brocton.
|
058-70D82
|
Executed
|
07/24/2020
|
2 / 2 |
1 |
3
|
5
|
Vermilion
|
|
2.887 miles 3P Designed Overlay: 3- Cold Central Plant Recycle (CCPR) mixture, 1.5- HMA surface course, and Aggregate Type B from ECL of Indianola to Georgetown/Indianola Rd.
|
059-70E39
|
Executed
|
07/27/2020
|
|
|
3
|
5
|
Champaign, Vermilion
|
|
0.226 mile of patching on I-74 at US 150, and 9.015 miles of patching on I-57 from MM 244 to Ford County line.
|
060-70E45
|
Executed
|
07/27/2020
|
|
|
3
|
5
|
McLean
|
|
0.833 mile of patching at Carlock Weigh Station.
|
061-70E69
|
Executed
|
07/23/2020
|
|
|
3
|
5
|
Champaign
|
|
2020 National Highway Preservation Project to install new traffic signals at the I-57 NB and SB ramps with FAP 807 (Curtis Rd).
|
062-70E71
|
Executed
|
07/27/2020
|
|
|
3
|
5
|
Champaign, DeWitt, Douglas
|
|
13.8 miles of Pollinator Habitat signs along US 45 from Douglas/Coles County line to Windsor Rd in Champaign. Tree removal, weed control, and seeding are included.
|
063-72D31
|
Executed
|
07/08/2020
|
8 / 7 |
1 |
4
|
6
|
Montgomery
|
|
7.4 miles of milling and resurfacing on I-55, bridge removal, bridge deck overlay and new bridge deck on I-55 from 0.8 miles north of IL 16 to 0.6 miles north of IL 108.
|
064-72L56
|
Executed
|
07/28/2020
|
1 / 1 |
|
4
|
6
|
Pike
|
|
Painting SN 075-0036 carrying IL 96 over Hadley Creek, 0.5 miles south of Kinderhook.
|
065-72L57
|
Executed
|
07/28/2020
|
|
|
4
|
6
|
Schuyler
|
|
Painting SN 085-0001 carrying US 67 over Crane Creek, 2.5 miles southeast of Rushville.
|
066-72L74
|
Executed
|
07/27/2020
|
|
|
4
|
6
|
Logan
|
|
Deck patching on SN 054-0105 carrying IL 10 over the Kickapoo Creek Overflow, 0.5 miles west of I-55.
|
067-72L75
|
Executed
|
07/27/2020
|
|
|
4
|
6
|
Scott
|
|
Deck patching and joint repair on SN 086-0013 carrying IL 106 over Little Sandy Creek, 1.5 miles north of Alsey.
|
068-72L76
|
Executed
|
07/27/2020
|
|
|
4
|
6
|
Christian
|
|
Deck patching and joint repair on SN 011-0033 carrying Lincoln Trail over the Flat Branch River, 1.1 miles east of IL 48.
|
069-72L77
|
Executed
|
07/27/2020
|
|
|
4
|
6
|
Christian
|
|
Replacing bridge approach pavement on SN 011-0021 carrying IL 104 over Lake Sangchris, 1 mile west of Tovey.
|
070-72L83
|
Executed
|
07/27/2020
|
|
|
4
|
6
|
Pike
|
|
Repairing and sealing parapets on SN 075-0123 carrying I-72 westbound over the Illinois River,
|
071-72L87
|
Executed
|
07/27/2020
|
|
|
4
|
6
|
Morgan
|
|
Substructure and slope wall repairs on SN 069-0048 and 069-0049 carrying I-72 over North Fork Mauvaise Terre Creek, 1.1 miles east of Old US 36 near Jacksonville.
|
072-72M00
|
Active
|
04/18/2020
|
|
|
4
|
6
|
Hancock
|
|
Bituminous surface treatment and precast concrete parking blocks on scenic turnouts along IL 96 beginning at the Hoot Owl Rest Area at County Road 1550 and continuing north to the Stone Arch Bridge Scenic Turnout in Nauvoo.
|
073-72M01
|
Rejected
|
06/25/2020
|
|
|
4
|
6
|
Sangamon
|
|
Patching and profile diamond grinding concrete pavement on Old US 36 from Farmingdale Road to 0.2 miles south of International Parkway.
|
074-72M02
|
Executed
|
07/23/2020
|
|
|
4
|
6
|
Morgan
|
|
Patching on IL 72 from US 67 to the Sangamon County line.
|
075-72M04
|
Executed
|
07/23/2020
|
|
|
4
|
6
|
Various
|
|
Weed spraying on various routes in various counties of District 6.
|
076-72M05
|
Executed
|
07/23/2020
|
|
|
4
|
6
|
Sangamon
|
|
Tree removal, fence repair and seeding at multiple locations: I-72 (WB) from Riverton Interchange (Exit 108) to 2.5 miles east; at Taintor Road north of Browning Avenue; and at the Springfield west Maintenance Yard.
|
077-72M03
|
Executed
|
07/23/2020
|
|
|
4
|
6
|
Pike
|
|
Patching on I-72 from I-172 to IL 96.
|
078-72M07
|
Executed
|
07/23/2020
|
|
|
4
|
6
|
Sangamon
|
|
Tree removal and seeding at the I-55 and East Lake Shore Drive Interchange (Exit 88) south of Springfield.
|
079-74464
|
Executed
|
07/28/2020
|
|
|
4
|
7
|
Clay, Effingham
|
|
5.1 miles of HMA pavement removal, HMA resurfacing, aggregate shoulders and pavement patching on Dietrich Blacktop from north of 200th Avenue in Effingham County to south of Zion Lane in Clay County.
|
080-74874
|
Active
|
04/18/2020
|
|
|
4
|
7
|
Clay
|
|
Base course widening, bridge joint replace/repair and bridge deck patching and overlay on US 50 over the Little Wabash River, 2 miles west of the Richland County line. (SN 013-0004)
|
081-74971
|
Executed
|
07/27/2020
|
|
|
4
|
7
|
Effingham
|
|
4.9 miles of cape seal on US 45 from the Shelby County line to Rickelman Avenue in Effingham.
|
082-74972
|
Executed
|
07/08/2020
|
2 / 2 |
1 |
4
|
7
|
Cumberland
|
|
Constructing PCC base course, replacing expansion joints, bearings and wearing surface on SN 018-0042 and SN 018-0043 on I-70, 4.6 miles east of the Effingham County line.
|
083-74A17
|
Executed
|
07/27/2020
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems in Macon, Moultrie, Shelby, Clark, Cumberland, Effingham and Coles Counties.
|
084-74A18
|
Executed
|
07/23/2020
|
1 / 1 |
1 |
4
|
7
|
Various
|
|
Repair or replace steel plate beam guardrail damaged by motorists throughout District 7.
|
085-76H08
|
Executed
|
07/28/2020
|
1 / 1 |
|
5
|
8
|
Bond
|
|
Designed overlay resurfacing, patching and guardrail improvements on US 40 from Pokey Road to Overpass Road, Millersburg Road from US 40 to S Frontage Road, and N Frontage Road from US 40 to 0.1 miles east.
|
086-76H17
|
Executed
|
07/23/2020
|
|
|
5
|
8
|
Jersey
|
|
5.2 miles of patching, milling, and resurfacing along US 67 from 0.5 miles north of Fulkerson Drive to Crystal Lake Road in the City of Jerseyville.
|
087-76J71
|
Executed
|
07/23/2020
|
3 / 3 |
2 |
5
|
8
|
Randolph
|
|
Milling and filling mainline, parking lanes, and shoulders, guardrail improvements, ADA upgrades, storm sewer, and scour mitigation under SN 079-0002; along IL 3 from 0.2 miles south of 1st Street in Ruma to the Monroe County line.
|
088-76K64
|
Executed
|
07/27/2020
|
2 / 2 |
1 |
5
|
8
|
Clinton
|
|
4 miles of designed overlay and bridge deck overlay on US 50 from 1 mile east of Crackerneck Road to 0.2 miles west of St. Rose Road.
|
089-76L17
|
Executed
|
07/23/2020
|
|
|
5
|
8
|
Clinton
|
|
3.3 miles of resurfacing along US 50 from Shattuc Road to the Marion County line.
|
090-76M22
|
Executed
|
07/23/2020
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Mechanical plumbing work at the Bowman Pump Station and McCambridge Avenue Pump Station.
|
091-76M42
|
Executed
|
07/28/2020
|
|
|
5
|
8
|
St. Clair
|
|
0.8 miles of resurfacing on IL 13 (Freeburg Avenue) from S. Belt East to Nocturne Court in Belleville.
|
092-76M57
|
Executed
|
07/23/2020
|
|
1 |
5
|
8
|
Various
|
|
Guardrail and cable rail repair at various locations in District 8.
|
093-76M59
|
Rejected
|
06/25/2020
|
|
|
5
|
8
|
Various
|
|
Maintain and service all ITS equipment in District 8.
|
094-76N29
|
Executed
|
07/28/2020
|
|
|
5
|
8
|
Madison
|
|
Resurfacing and patching along IL 111 from Edwardsville Road to 0.1 miles north of Wesley Drive.
|
095-76N49
|
Executed
|
07/23/2020
|
|
|
5
|
8
|
Madison
|
|
1.4 miles of resurfacing along IL 140 from Terra Drive to Annex Street in Alton.
|
096-76N50
|
Executed
|
07/28/2020
|
|
|
5
|
8
|
Bond, Madison
|
|
19.8 miles of patching on IL 140 from IL 4 to IL 127.
|
097-76N51
|
Executed
|
07/23/2020
|
|
|
5
|
8
|
Clinton
|
|
4.1 miles of patching on US 50 from St. Rose Road to Frogtown Road.
|
098-76N54
|
Executed
|
07/23/2020
|
|
|
5
|
8
|
St. Clair
|
|
Repairs at the Bowman Pump Station.
|
099-76N56
|
Executed
|
07/23/2020
|
|
|
5
|
8
|
Clinton
|
|
2 miles of pavement patching on IL 161 from Church Steeple Road to Slant Road near Bartelso.
|
100-76N57
|
Executed
|
07/24/2020
|
13 / 11 |
1 |
5
|
8
|
Jersey, Madison
|
|
5.9 miles of guardrail replacement on IL 100 from 0.1 miles south of Piasa Bird Monument to Lockhaven Road.
|
101-76N79
|
Executed
|
07/24/2020
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
Removal and replacement of the pumps at Collinsville #2 Pump Station in Collinsville and Grey-s Farm Pump Station in Pontoon Beach.
|
102-76N81
|
Executed
|
07/24/2020
|
2 / 2 |
|
5
|
8
|
Clinton
|
|
7.2 miles of ultra-thin bonded wearing course on I-64 from 0.3 miles east of the St. Clair County line to the Washington County line.
|
103-78709
|
Executed
|
08/03/2020
|
1 / 1 |
|
5
|
9
|
Jackson
|
|
Intersection improvements, pavement widening, HMA resurfacing and a multi-use path on IL 13 from just east of Veterans Parkway to the Williamson County line.
|
104-78717
|
Executed
|
07/24/2020
|
|
|
5
|
9
|
Saline
|
|
Reconstruction of ADA ramps at 7 locations along IL 34 (Main Street) and along Old IL 13 (Polar Steet) in Harrisburg.
|
105-78730
|
Executed
|
07/24/2020
|
|
|
5
|
9
|
Johnson
|
|
Combination of joint reconstruction, partial depth patching, structure repair, HMA overlay and substructure repairs on 4 structures in Johnson County (SN 044-0011, 044-0025, 044-0027 and 044-0054).
|
106-78733
|
Executed
|
07/24/2020
|
2 / 2 |
1 |
5
|
9
|
Jefferson, Perry
|
|
Bridge repairs including deck/approach patching, shallow strip seals, substructure repairs, waterproofing and bituminous overlay on SN 041-0046 carrying IL 142 over ICRR in Jefferson County and SN 073-0023 carrying IL 152 over Beaucoup Creek in Perry County.
|
107-78746
|
Executed
|
07/24/2020
|
|
|
5
|
9
|
Various
|
|
Electrical repair and/or replacement on various routes in various counties of District 9.
|
108-78747
|
Executed
|
07/24/2020
|
|
|
5
|
9
|
Various
|
|
Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9.
|
109-78753
|
Executed
|
07/24/2020
|
3 / 3 |
1 |
5
|
9
|
Jefferson
|
|
Bridge deck microsilica concrete overlay, approach slab replacements, joint reconstruction, bearing replacements, backwall replacements, slope wall repairs and floor drain extensions on SN 041-0060 carrying I-64 westbound (2nd level structure) over I-57 southbound at the north tri-level, north of Vernon.
|
110-78758
|
Executed
|
07/24/2020
|
1 / 1 |
|
5
|
9
|
Pulaski, Williamson
|
|
Bearing removal and replacement, joint reconstruction, plating beam ends, diaphragm removal and replacement, concrete overlay and deck patching on SN SN 100-0057 over I-57 in Williamson County and bearing removal and replacement on SN 077-0028(31) over I-57 in Pulaski County.
|
111-78794
|
Executed
|
07/24/2020
|
2 / 2 |
2 |
5
|
9
|
Alexander
|
|
Major bridge preventative maintenance on SN 002-0002 carrying I-57 over Golden Lilly Road (TR 163B), 0.3 miles south of the Pulaski County line.
|
112-78795
|
Executed
|
07/24/2020
|
|
|
5
|
9
|
Alexander
|
|
Pier repairs on SN 002-0005 carrying US 60/62 over the Mississippi River.
|
113-78800
|
Executed
|
07/09/2020
|
|
|
5
|
9
|
Jefferson
|
|
3000' of pavement, shoulder, curb and gutter removal; PCC pavement (jointed); PCC shoulders; combination concrete curb and gutter; and pavement striping.
|
114-87716
|
Executed
|
07/24/2020
|
|
|
2
|
3
|
Iroquois
|
|
Resurfacing CH 23 from CH 4 to IL 116.
|
115-60X71
|
Executed
|
07/24/2020
|
|
1 |
1
|
1
|
Cook
|
|
Intersection re-alignment of Joliet Road at 55th Street in the village of McCook, in Lyons Township, in Cook County.
|
116-89782
|
Executed
|
07/24/2020
|
|
|
3
|
4
|
Mercer
|
|
Full-depth pavement reclamation followed by an A-3 bituminous surface treatment and aggregate wedge shoulders on CH 9 from 0.36 mile south of 155th Avenue to 110th Street.
|
117-91585
|
Executed
|
07/24/2020
|
|
|
3
|
5
|
McLean
|
|
Resurfacing CH 14 from IL 165 to CH 29 in Towanda
|
118-91589
|
Executed
|
07/27/2020
|
|
|
3
|
5
|
McLean
|
|
Sidewalk construction at various locations within 2 miles of the Sheridan Elementary Shcool in Bloomington.
|
119-93746
|
Executed
|
09/01/2020
|
|
|
4
|
6
|
Hancock
|
|
Replace the bridge carrying CH 6 over La Moine River, 1 mile east of St. Mary.
|
120-95862
|
Executed
|
08/10/2020
|
|
|
4
|
7
|
Cumberland
|
|
Replace the bridge carrying CH 19 over Lake Mattoon, 1.5 miles north of Neoga.
|
121-95865
|
Executed
|
08/03/2020
|
|
|
4
|
7
|
Shelby
|
|
Replace the bridge carrying TR 367 over Brush Creek, 3.7 miles northwest of Stewardson.
|
122-95873
|
Executed
|
07/24/2020
|
|
|
4
|
7
|
Fayette
|
|
Replace the bridge carrying CH 28 over Dismal Creek, 4.5 miles north of Farina.
|
123-95876
|
Executed
|
07/28/2020
|
|
|
4
|
7
|
Lawrence
|
|
Resurfacing Sand Barrens Lane from 250E Road to Bridgeport Road.
|
124-97723
|
Executed
|
07/24/2020
|
|
|
5
|
8
|
Clinton
|
|
Resurfacing Bartelso Road from Old US 50 in Beckemeyer to IL 161 in Bartelso.
|
125-97730
|
Executed
|
07/24/2020
|
|
|
5
|
8
|
St. Clair
|
|
Rehabilitate the bridge carrying CH 39 over Prairie Creek, just south of IL 157
|
126-97731
|
Executed
|
08/03/2020
|
|
|
5
|
8
|
Washington
|
|
Replace the bridge carrying CH 5 over Rayse Creek, one half mile east of Richview.
|
127-99627
|
Executed
|
07/24/2020
|
|
|
5
|
9
|
Alexander
|
|
Replace the bridge carrying TR 89A over Miller Creek, 3.7 miles southeast of Thebes.
|
128-99638
|
Executed
|
07/24/2020
|
2 / 2 |
1 |
5
|
9
|
Johnson
|
|
Resurfacing Goreville Road from I-57 southbound ramp to IL 37.
|
129-99644
|
Executed
|
07/24/2020
|
|
|
5
|
9
|
White
|
|
Replace the bridge carrying TR 380 over Crooked Creek, one half mile north of Garnerville.
|
130-99645
|
Executed
|
08/03/2020
|
|
|
5
|
9
|
Hamilton
|
|
Construct a 20'- 22' wide bituminous service treatment on various county highways.
|
131-99647
|
Executed
|
07/24/2020
|
1 / 1 |
1 |
5
|
9
|
Perry
|
|
Resufacing South Walnut Street from Randolph Street to Kaskaskia Street in Pinckneyville.
|
132-99649
|
Executed
|
07/24/2020
|
3 / 3 |
1 |
5
|
9
|
Saline
|
|
Resurfacing Mill Street from Town Park Road to Oak Street.
|
133-46538
|
Executed
|
07/27/2020
|
|
|
4
|
6
|
Various
|
|
Repair, maintenance or replacement of damaged sign components, furnishing overhead sign structures or repairs, installing new signs or supports on a work order basis throughout the entire state.
|
134-46540
|
Executed
|
07/27/2020
|
|
|
4
|
7
|
Various
|
|
Removal of reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings, and removing damaged raised reflective pavement marker castings from a portion of a route or from an entire route throughout various counties of District 7.
|
135-46542
|
Executed
|
07/27/2020
|
1 / 1 |
|
3
|
4
|
Various
|
|
Placing epoxy and modified urethane pavement marking lines, letters and symbols , and the removal of existing pavement markings within the limits specified on each individual work order.
|
136-46543
|
Executed
|
07/27/2020
|
|
|
3
|
5
|
McLean, Piatt
|
|
Grooving and pavement striping in Piatt and McLean counties.
|
137-46546
|
Executed
|
07/27/2020
|
1 / 1 |
|
3
|
4
|
Various
|
|
Removing damaged raised reflective pavement markers and replacing them with new raised reflective pavement markers within the limits shown.
|
138-46548
|
Executed
|
07/27/2020
|
|
|
2
|
3
|
Various
|
|
Raised reflective pavement marker removal, furnishing and installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors.
|
139-46549
|
Executed
|
07/27/2020
|
|
|
2
|
3
|
Various
|
|
Raised reflective pavement marker removal, furnishing and installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors at various locations.
|
140-46550
|
Executed
|
07/27/2020
|
|
|
2
|
3
|
Various
|
|
Raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors at various locations.
|
141-46913
|
Executed
|
07/27/2020
|
|
|
4
|
7
|
Coles
|
|
Slope failure repair with pile retaining wall, roadway realignment, striping parking lots, sign replacements and aggregate resurfacing of camp pads at the IDNR Fox Ridge State Park.
|
142-46919
|
Executed
|
07/27/2020
|
|
|
4
|
6
|
Christian, Sangamon
|
|
Oil and chip treatment of park roads and parking lots, sealing existing parking lots, pavement marking and other miscellaneous improvements at the Sangchris Lake State Park (IDNR).
|
143-62F20
|
Executed
|
08/03/2020
|
5 / 5 |
|
1
|
1
|
Cook, DuPage
|
|
(18.3 mi), IL 83 between IL 171 and Third Ave, guardrail installation, shoulder rumble strip, re-striping pavement markings, wireless interconnect and reflecto ized traffic signal backplates.
|
144-62J89
|
Executed
|
07/27/2020
|
2 / 2 |
|
1
|
1
|
Cook
|
|
(5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located within South Chicago and Hyde park Townships. , (5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located
|
145-62J91
|
Executed
|
07/27/2020
|
1 / 1 |
|
1
|
1
|
Will
|
|
(1.32 Mile) Standard overlay from Bluff Road to Frontage Road West. in Village of Channahon in Will County. , (1.32 Mile) Standard overlay from Bluff Road to Frontage Road West in
|
146-62K49
|
Executed
|
07/28/2020
|
|
|
1
|
1
|
Cook
|
|
Partial beam and deck replacement on the bridge carrying Sibley Blvd. over I- 94 located in the Village of Dolton, IL. LT= 1110 FT (0.21MI)
|
147-62K55
|
Executed
|
07/27/2020
|
4 / 4 |
1 |
1
|
1
|
Will
|
|
Light tower and foundation removal. Install new light poles, metal foundations, LED luminaires, conduits, cables, excavation and site restorations at 1-55 at I 113 (Coal City Rd) Interchange.
|
148-62K97
|
Executed
|
07/28/2020
|
1 / 1 |
1 |
1
|
1
|
Cook, DuPage
|
|
Entire concrete bridge deck, top of sidewalks, inside and top of parapets. Drai age system repairs and cleaning. Structures located at various locations within Cook and DuPage County.
|
149-62K98
|
Executed
|
07/27/2020
|
3 / 3 |
|
1
|
1
|
Various
|
|
Repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in Cook, various Counties.
|
150-64P38
|
Executed
|
07/27/2020
|
1 / 1 |
|
2
|
2
|
Boone
|
|
Expansion joint replacement, deck patching, and HMA wearing surface with waterproofing membrane system on SN 004-0004 and SN 004-9900 carrying US 20 over I-90 0.1 mile E of Wheeler Rd.
|
151-68F21
|
Withdrawn
|
06/03/2020
|
2 / 2 |
|
3
|
4
|
Henderson
|
|
Resurface IL 164 from 8th St in Oquaka to the Warren County line in Henderson county. , Resurface IL 164 from 8th St in Oquaka to the Warren County line in Henderson county.
|
152-62J92
|
Executed
|
07/27/2020
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
(3.10 Mile) Overlay, pedestrian ramp new HMA Shoulders on IL- 173 Shoulders on IL- 173 from Green Bay Rd to Sheridan Rd . Drainage improvement between Hebron Ave. and Galilee Ave. in the City of Zion.
|
153-62H60
|
Executed
|
07/27/2020
|
|
1 |
1
|
1
|
Kane
|
|
Pavement removal, drainage structures, placement of subbase granular material, hot-mix asphalt pavement and installation of thermoplastic pavement markings at the St. Charles Maintenance Yard. , Pavement removal, drainage structures, placement of subbase, HMA asphalt pavement and pavement markings at the IDOT St. Charles Maintenance Yard at 38W 027 Illinois Route 38.
|
154-62H70
|
Executed
|
07/27/2020
|
|
|
1
|
1
|
Cook
|
|
This is a slope stabilization project on IL Rte 83 from north of Glenwood Dyer Road to south of Glenwood Lansing Road that includes guardrail replacement. It is located in Village of Lynwood in Cook county. The gross and net length of the project is 1.183 miles (6250 ft). , (6250 ft) Slope stabilization on IL Rte 83 from N. of Glenwood Dyer Rd. to S. of Glenwood Lansing Rd, includes guardrail replacement located in the Village of Lynwood.
|
155-87758
|
Executed
|
07/27/2020
|
5 / 5 |
1 |
2
|
3
|
Iroquois
|
|
Remove existing guardrail and terminals, install new guardrail and terminals, pipe culverts and shaping ditches at various locations in Iroquois County.
|
156-60Y69
|
Executed
|
07/29/2020
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Landscaping within the following boundaries I-90/94: Roosevelt Rd to Washington Blvd and Peoria St to Clinton St and I-290: Roosevelt Rd to Van Buren St and Damen ve to Clinton St.
|
157-64N70
|
Executed
|
07/27/2020
|
|
|
2
|
2
|
Rock Island
|
|
Replace highway lighting at IL 92 at 7th ave, 18th ave, and 31st ave interchanges.
|
158-66K08
|
Executed
|
07/27/2020
|
|
|
2
|
3
|
Iroquois
|
|
Class B pavement patching from N 2950 East Rd to US 24.
|
159-66K89
|
Executed
|
07/28/2020
|
3 / 3 |
1 |
2
|
3
|
Grundy, LaSalle
|
|
Beam end cleaning and painting on SN 032-0099 (IL 47 in Morris) and SN 050-0219 (CH 15, Marseilles Rd in Marseilles).
|
160-74A16
|
Executed
|
09/01/2020
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems in Fayette, Effingham, Jasper, Crawford, Lawrence, Richland, Clay, Wayne, Edwards and Wabash Counties.
|
161-60X94
|
Executed
|
07/08/2020
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
Reconstruction of Adams St and Jackson Blvd bridges over I-90/94 including reconstruction of entrance and exit ramps, construction of 5 prop. Conc. Retaining walls and rehab of one existing retaining wall, signing, ITS, lighting and urban enhancements.
|
162-61G41
|
Executed
|
07/28/2020
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Construction of a pedestrian path adjacent to IL 72/Higgins Road, from west of Plum Grove Road to east of Plum Grove Road in Schaumburg.
|
163-61G50
|
Executed
|
07/27/2020
|
|
|
1
|
1
|
Cook
|
|
Resurface Vincennes Road from Us 6 to Armory Drive, Armory Drive from Westview Avenue to Vincennes Road, and Westview Avenue from 172nd Street to Armory Drive in South Holland.
|
164-61G52
|
Executed
|
07/27/2020
|
|
1 |
1
|
1
|
Cook
|
|
Buffalo Creek trail extension from Lake Cook Road to the existing trail in Arlington.
|
165-61G55
|
Executed
|
08/03/2020
|
6 / 5 |
|
1
|
1
|
DuPage
|
|
Construction of a multi-use path, pedestrian bridge and boardwalk adjacent to Hager Road from west of Salt Creek to Yorkshire Road in Oak Brook.
|
166-61G63
|
Executed
|
07/27/2020
|
|
|
1
|
1
|
McHenry
|
|
Sidewalk and pedestrian crossing improvements on West Main Street from Cary-Algonquin Road to Wulff street in Cary
|
167-62A38
|
Executed
|
07/27/2020
|
2 / 2 |
2 |
1
|
1
|
Cook
|
|
(0.27 mile) Intersection improvement consisting of HMA surface removal, pavement widening, earth excavation, ADA sidewalk repair, construction of a concrete barrier median and HMA resurfacing on IL 171 (1st Ave) at Roosevelt Rd.
|
168-62G02
|
Executed
|
08/10/2020
|
|
|
1
|
1
|
Cook
|
|
Traffic Signal Modernization and left turn lane storage extension at the the intersection of Ogden Ave and Austin Blvd located in the Town of Cicero.
|
169-62J28
|
Executed
|
07/27/2020
|
|
1 |
1
|
1
|
Cook
|
|
Removal and replacement of an existing 32-foot long 18" x 24" culvert with a proposed 48-foot long 36" x 72" cast in place culvert (Proposed SN 016-2272) on 147th Street over Tributary C. of Cal-Sag Channel in the city of Oak Forest and The Forest Preserve District of Cook County. , (LT 351 Ft.) Improve 147th Street over Tributary C. of Cal-Sag Channel
|
170-62J62
|
Executed
|
07/27/2020
|
|
1 |
1
|
1
|
Will
|
|
(3.69 Mile) Standard overlay, new shoulder and milled rumble strip in Wesley Wesley Township in Will County.
|
171-62J68
|
Executed
|
07/27/2020
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
8 miles of standard overlay, HMA and Class B patching, and pedestrian ramps on US 45 / IL 21 from just north of Columbus Parkway to North of Rand Road in the Villages of Wheeling, Mount Prospect and Cities of Prospect Heights and Des Plaines. , Standard Overlay, HMA, Class B patching and pedestrian ramp begins 500 ft north of Columbus Pkwy and proceeds 41323 ft (8.0 miles) southerly direction to North of Rand Rd. in the Villages of Wheeling, Mount Prospect and Cities of Prospect Height and Des·Plaines.
|
172-64M32
|
Executed
|
07/27/2020
|
|
|
2
|
2
|
Winnebago
|
|
Traffic signal upgrades at the intersection of Alpine Rd and Florida Dr/ Cleveland Dr and removal of the signals at Louisiana Rd.
|
173-64P03
|
Executed
|
07/27/2020
|
|
|
2
|
2
|
Winnebago
|
|
Traffic signal upgrades at the intersection of IL 70 at Springfield Ave. Upgrades include cabinet replacement on existing foundation, video detection, and flashing yellow left turn signals.
|
174-64P31
|
Executed
|
07/27/2020
|
|
|
2
|
2
|
Whiteside
|
|
Cold-In-Place recycling with HMA overlay on Garden Plain Rd from 0.1 mile E of IL 84 to 0.3 mile E of Fenton Rd.
|
175-68F15
|
Withdrawn
|
06/03/2020
|
|
|
3
|
4
|
Peoria
|
|
5.75 miles of resurfacing on I-74 from W of Kickapoo/Edwards Rd to 0.7 mile E of I-474. , 5.75 miles of resurfacing on I-74 from W of Kickapoo/Edwards Rd to 0.7 mile E of I-474.
|
176-70C25
|
Executed
|
07/27/2020
|
|
|
3
|
5
|
Champaign, Piatt
|
|
11.033 miles of resurfacing of I-72 from White Heath Rd NE of White Heath to I-57 W of Champaign. Work includes Fiber-Mod Asphalt Crack Sealing and Micro-Surfacing 2 Pass in Piatt County and IL 10 ramps, HMA surface removal 2" and 2" Polymer HMA resurfacing in Champaign County and IL 47 ramps.
|
177-70E16
|
Executed
|
07/27/2020
|
|
|
3
|
5
|
McLean
|
|
2.989 miles of Standard overlay on Old Rte 66 from Shirley to I-74.
|
178-70E31
|
Executed
|
07/27/2020
|
1 / 1 |
|
3
|
5
|
McLean
|
|
Resurfacing (SMART) 0.3 mile W of I-55 to Old Route 66 W of Chenoa.
|
179-85696
|
Rejected
|
06/25/2020
|
|
|
2
|
2
|
Rock Island
|
|
Remove and replace guardrail and terminals at various locations in Rock Island County.
|
180-87717
|
Rejected
|
06/25/2020
|
1 / 1 |
|
2
|
3
|
LaSalle
|
|
Sidewalk replacement, paving brick sidewalk, traffic signals and street lighting along IL 18 from the Vermilion River to Wasson Street, on Vemilion Street from Hickory St. to Bridge St. and on Monroe St. from Hickory St. to Bridge St. in Streator.
|
181-87720
|
Executed
|
07/27/2020
|
1 / 1 |
|
2
|
3
|
Bureau
|
|
Replace the bridge carrying Jefferson Street over Rocky run Creek in Tiskilwa.
|
182-87721
|
Executed
|
07/27/2020
|
|
|
2
|
3
|
Bureau
|
|
Resurface Ladd Road from US 6 to Dakota Street in Spring Valley.
|
183-87732
|
Executed
|
07/27/2020
|
|
|
2
|
3
|
DeKalb
|
|
Sidewalk improvements at various locations in Somonauk.
|
184-89738
|
Executed
|
08/10/2020
|
1 / 1 |
2 |
3
|
4
|
Knox
|
|
Reconstruct South Seminary Street from East Berrien Street to Fifth Steet in Galesburg.
|
185-95524
|
Executed
|
08/26/2020
|
|
|
4
|
7
|
Effingham
|
|
Replace the superstructure and rehabilitate the abutments to the structure carrying CH 6 over Lake Sara, 3.0 miles southeast of Shumway.
|
186-97699
|
Executed
|
07/28/2020
|
2 / 2 |
1 |
5
|
8
|
Calhoun
|
|
Resurfacing CH 6 from 0.2 mile east of Park Street to West of Hill Top Road.
|
187-97732
|
Executed
|
08/03/2020
|
|
|
5
|
8
|
Randolph
|
|
replace the bridge carrying CH 5 over Little Mill Creek, 3 miles north of Rockwood.
|
188-97734
|
Executed
|
07/29/2020
|
|
|
5
|
8
|
Madison
|
|
Replace the bridge carrying Ch 32 over Mill Creek, 2 miles east of Troy-O'Fallon Road.
|
189-97736
|
Executed
|
08/03/2020
|
|
|
5
|
8
|
Marion
|
|
Resurface Ch 37 from Green Street to IL 161.
|
190-97739
|
Executed
|
08/03/2020
|
|
|
5
|
8
|
Bond
|
|
Hot-in-place surface recycling on CH 8 from IL 185 to the Mongomery County line.
|
191-97741
|
Executed
|
07/27/2020
|
|
|
5
|
8
|
Bond
|
|
Resurface CH 10 from US 40 to Trapper Avenue.
|
192-99600
|
Executed
|
07/27/2020
|
1 / 1 |
|
5
|
9
|
Saline
|
|
Removal of a three-span precast prestressed concrete deck beam bridge, construction of 148 feet of reinforced concrete culvert pipe, construction of 300 feet of roadway embankment (using 22,392 cu. yd. of furnished excavation) and hot-mix asphalt pavement with aggregate base, placing riprap for erosion control, seeding all distrubed areas and miscellaneous items necessary to complete the improvement.
|
193-99615
|
Executed
|
08/10/2020
|
|
|
5
|
9
|
Jefferson
|
|
Replace the bridge carrying TR 1A over East Creek, 1.5 miles east of Boyd.
|
194-46524
|
Executed
|
07/27/2020
|
|
|
1
|
1
|
Various
|
|
Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings.
|
195-46525
|
Executed
|
07/27/2020
|
|
|
1
|
1
|
Various
|
|
Various widths of thermoplastic, modified urethane pavement marking lines, letters and symbols and removal of existing pavement markings.
|
196-46544
|
Executed
|
07/28/2020
|
|
|
1
|
1
|
Cook
|
|
This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 Inches In width.
|
197-46545
|
Executed
|
07/28/2020
|
|
|
1
|
1
|
Lake
|
|
Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings.
|
198-62K19
|
Executed
|
07/08/2020
|
|
|
1
|
1
|
Lake
|
|
(0.019MI) Bridge superstructure repair over Flint Creek Tributary. Located in the Village of Barrington on US 14. SN 049-0003.
|
199-62K72
|
Executed
|
07/28/2020
|
|
|
1
|
1
|
Cook
|
|
(593.9 FT.) Bridge repair project of the structure carrying Torrence Ave over IHB and BandOCT Railroads, in the Village of Burnham, in Thornton Township, in Cook County. SN 016-0935
|
200-62K92
|
Executed
|
07/28/2020
|
|
|
1
|
1
|
Cook
|
|
(12.6 miles) Patching on 1-57, Halsted St. to 1-80, located in the Villages of Calumet Park Dixmoor, Posen, Riverdale, Markham and Blue Island.
|
201-62K95
|
Executed
|
07/28/2020
|
|
|
1
|
1
|
Will
|
|
(290 FT.) Bridge steel repair project on US 30 WB (Cass St.) at the Des Plaines River in the City of Joliet, in Joliet Township, Will County.
|
202-64P35
|
Executed
|
07/28/2020
|
6 / 6 |
2 |
2
|
2
|
Ogle
|
|
Expansion joint replacement on SN 071-0085 carrying IL 251 over Kyte Creek 0.6 N of IL 38 in Rochelle.
|
203-66K59
|
Executed
|
07/28/2020
|
|
|
2
|
3
|
Bureau
|
|
8.532 miles of milling and resurfacing 3-3/4" of mainline from the eastern city limit of Dover to IL 89 in Lamoille. This project includes pavement markings.
|
204-76N52
|
Executed
|
08/03/2020
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Railroad interconnect repair at IL 3 and Monsanto Road; IL 3 and Poag Road; IL 159 and Douglas; Main Street and Carondolet/Dieroff Steet in Dupo; and Pontoon Road and Missouri Avenue in Granite City.
|
205-61G33
|
Executed
|
07/28/2020
|
7 / 7 |
|
1
|
1
|
Cook
|
|
Construct a pedestrian underpass from Burlington Avenue, through the BNSF Railway embankment, to Hillgrove Avenue at Prospect Avenue in Western Springs.
|
206-87692
|
Executed
|
07/28/2020
|
1 / 0 |
|
2
|
3
|
LaSalle
|
|
Replace the bridge carrying FAS 263 (CH 5) over the Vermilion River, 4.0 miles east of Leonore.
|
207-87723
|
Executed
|
09/08/2020
|
3 / 3 |
|
2
|
3
|
DeKalb
|
|
Replace the bridge carrying TR 160 (Motel Road) over the east branch of the Kishwaukee River, 0.5 mile north of IL route 64.
|
208-87724
|
Executed
|
07/28/2020
|
1 / 1 |
1 |
2
|
3
|
Ford
|
|
Replace the bridge carrying CH 2 over Wall Town Drainage Ditch, 5 miles west of Loda.
|
209-93714
|
Executed
|
09/08/2020
|
5 / 5 |
1 |
4
|
6
|
Sangamon
|
|
Construction of the Heritage Route 66 Trail located between Williamsville and Sherman, along the Ameren Illinois Right-of-Way.
|
210-95874
|
Executed
|
07/28/2020
|
|
|
4
|
7
|
Macon
|
|
Replace the bridge carrying CH 27 over Spring Creek and the construction of a box culvert over a drainage ditch, 3.1 miles northeast of Blue Mound.
|
211-95875
|
Executed
|
08/10/2020
|
|
|
4
|
7
|
Crawford
|
|
Replace the bridge carrying TR 68 over Little Creek, 2.0 miles east of Pierceburg.
|
212-61F82
|
Executed
|
08/03/2020
|
|
|
1
|
1
|
Kane
|
|
Reconstruct the intersection of Anderson Road at Keslinger Road, and the extension of Anderson Road from Keslinger Road to Freedom Road in Elburn.
|
213-61G20
|
Executed
|
09/01/2020
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Pavement reconstruction, storm sewers, curb and gutter, sidewalks, traffic signals, lighting, water main, landscaping and pavement markings on IL 62 in Schaumburg.
|
214-85695
|
Withdrawn
|
06/04/2020
|
|
|
2
|
2
|
Winnebago
|
|
Sidewalk replacement, new sidewalks, lighting improvements, streetscaping and landscaping along Center Street, from North Street to Howard Street in Durand.
|
215-89766
|
Withdrawn
|
05/28/2020
|
3 / 2 |
|
3
|
4
|
Peoria
|
|
Reconstruction of Western Ave, from Adams Street to Lincoln Avenue and a portion of IL 8, from Lincoln Avenue to Howett St in Peoria.
|
216-97737
|
Rejected
|
07/30/2020
|
3 / 3 |
|
5
|
8
|
Monroe
|
|
Resurfacing, curb and gutter, sidewalks, HMA multi-use path, storm sewers and pavement markings on Quarry Road from Ghent Road to Palmer Creek Drive in Columbia.
|
217-97735
|
Executed
|
07/28/2020
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Sidewalk replacement, new sidewalk, brick paver sidewalk, curb and gutter replacement, street lighting, landscaping and pavement markings on Broadway Street/IL 160 from Polar Street to Laural Street in the City of Highland.
|
218-46907
|
Executed
|
07/28/2020
|
|
|
4
|
7
|
Shelby
|
|
Resurfacing of roadway and parking areas, dump station improvements, aggregate resurfacing of camp sites, drainage improvements and site lighting at Wolf Creek State Park, northwest of Windsor.
|
219-66J73
|
Executed
|
08/03/2020
|
|
|
2
|
3
|
DeKalb
|
|
3P milling and resurfacing (Standard Overlay) on SBI 23 from Coltonville Rd to Highland Dr in Sycamore.
|
220-74710
|
Withdrawn
|
06/03/2020
|
|
|
4
|
7
|
Macon
|
|
Pavement patching, milling, HMA resurfacing, traffic signals and traffic control. , Pavement patching, milling, HMA resurfacing, traffic signals and traffic control.
|
221-74779
|
Executed
|
07/28/2020
|
|
|
4
|
7
|
Macon
|
|
9.3 miles of milling, patching, resurfacing, HMA and aggregate wedge shoulders on US 51 from 0.5 miles north of the Shelby County line to the US Business 51 interchange southwest of Decatur.
|
222-76N32
|
Executed
|
08/03/2020
|
|
|
5
|
8
|
Clinton
|
|
Resurfacing of Old US 50 from Hilmes Road to Carter.
|
223-93742
|
Withdrawn
|
05/08/2020
|
|
|
4
|
6
|
Pike
|
|
Bituminous surface treatment on various routes throughout Pike County.
|
01A-BO005
|
Executed
|
12/03/2020
|
|
|
1
|
1
|
Will
|
|
Rehabilitate Aircraft Parking Apron Pavements, Phase 2
|
02A-CO067
|
Executed
|
10/16/2020
|
|
|
4
|
7
|
Coles
|
|
Phase 2: Reconstruct Taxiway B
|
03A-UN060
|
Executed
|
03/23/2021
|
|
1 |
3
|
5
|
Champaign
|
Voluntary
|
Rehabilitate Runway 4-22
|