Home > Notice of Letting > Contract Detail

July 30, 2021 Letting 12:00 PM
062-95904

Bulletin Description

Resurfacing, HMA shoulders, rumble strips and culvert replacement on FAS 1804 from 1150 North Road to Sun and Sand Road.
Region District DBE % VBP % Federal Project #
4 7 3.00 0.00 SE27(409)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Lawrence
  • FAS 1804
  • 19-00126-00-RS
  • C-97-005-22
  • 0-00106-7001
  • 7-10903-0000
Contract Specifics
30 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of July 20, 2021 04:30 PM.

Authorized Bidders

  • 0138 Ambraw Asphalt Materials, Inc.
    9930 State Route One
    Lawrenceville, IL 62439
    P.O. Box 551
    Lawrenceville, IL 62439
    Phone: (618) 943-4716 Fax: (618) 943-4149 Email: tzeigler@ambrawasphalt.com
    $1,263,794.21

Non Bidders

  • 3145 Kieffer Bros. Construction Co., Inc.
    933 West 3rd Street
    Mt. Carmel, IL 62863
    Phone: (618) 262-5108 Fax: (618) 263-3215 Email: doug@kiefferbros.net

Pay Item # UOM Description Type Quantity Unit Price
20800150 CU YD TRENCH BACKFILL Base items 106.000
40200800 TON AGGREGATE SURFACE COURSE, TYPE B Base items 42.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 16,140.000
40604052 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70 Base items 5,529.000
48203100 TON HOT-MIX ASPHALT SHOULDERS Base items 4,500.000
542C1081 FOOT PIPE CULVERTS, CLASS C, TYPE 2 36" Base items 200.000
64200108 FOOT SHOULDER RUMBLE STRIPS, 8 INCH Base items 21,076.000
67100100 L SUM MOBILIZATION Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70100600 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701336 Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 2,152.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 897.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 2,690.000
XX127400 TON PAVEMENT REMOVAL AND REPLACEMENT (SPECIAL) Base items 48.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.