40600295
|
POUND
|
POLYMERIZED BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
124,631.000
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
1,887.000
|
|
40600990
|
SQ YD
|
TEMPORARY RAMP
|
Base items
|
933.000
|
|
44000158
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/4"
|
Base items
|
275,435.000
|
|
44201835
|
SQ YD
|
CLASS D PATCHES, TYPE I, 16 INCH
|
Base items
|
4.000
|
|
44201839
|
SQ YD
|
CLASS D PATCHES, TYPE II, 16 INCH
|
Base items
|
10.000
|
|
44201845
|
SQ YD
|
CLASS D PATCHES, TYPE IV, 16 INCH
|
Base items
|
460.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70100420
|
EACH
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701411
|
Base items
|
20.000
|
|
70100800
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701401
|
Base items
|
1.000
|
|
70100815
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701446
|
Base items
|
1.000
|
|
70100825
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701456
|
Base items
|
1.000
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
56.000
|
|
70200100
|
L SUM
|
NIGHTTIME WORK ZONE LIGHTING
|
Base items
|
1.000
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
41,827.000
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
4,647.000
|
|
70300210
|
SQ FT
|
TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS
|
Base items
|
324.000
|
|
70300240
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 6"
|
Base items
|
269,260.000
|
|
70300250
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 8"
|
Base items
|
16,376.000
|
|
78004200
|
SQ FT
|
PREFORMED PLASTIC PAVEMENT MARKING, TYPE B - INLAID - LETTERS AND SYMBOLS
|
Base items
|
324.000
|
|
78004230
|
FOOT
|
PREFORMED PLASTIC PAVEMENT MARKING, TYPE B - INLAID - LINE 6"
|
Base items
|
269,260.000
|
|
78004240
|
FOOT
|
PREFORMED PLASTIC PAVEMENT MARKING, TYPE B - INLAID - LINE 8"
|
Base items
|
16,376.000
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
2,096.000
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
1,959.000
|
|
X4060006
|
TON
|
POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, STONE MATRIX ASPHALT, 12.5, N80
|
Base items
|
31,019.000
|
|
X7030005
|
SQ FT
|
TEMPORARY PAVEMENT MARKING REMOVAL
|
Base items
|
146,107.000
|
|
Z0033700
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
86,234.000
|
|
Z0034105
|
TON
|
MATERIAL TRANSFER DEVICE
|
Base items
|
31,019.000
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
3,000.000
|
$0.80
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
3,000.000
|
$15.00
|