Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
4 | 7 | 4.00 | 0.00 | STPHBDZ(807) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
Completion Date: August 07, 2019 Plus 15 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20100110 | UNIT | TREE REMOVAL (6 TO 15 UNITS DIAMETER) | Base items | 50.000 | |||
20200100 | CU YD | EARTH EXCAVATION | Base items | 3,386.000 | |||
20201200 | CU YD | REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL | Base items | 10.000 | |||
28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 36.000 | |||
28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 447.000 | |||
28100107 | SQ YD | STONE RIPRAP, CLASS A4 | Base items | 214.000 | |||
28200200 | SQ YD | FILTER FABRIC | Base items | 214.000 | |||
30300112 | SQ YD | AGGREGATE SUBGRADE IMPROVEMENT 12" | Base items | 664.000 | |||
31101900 | TON | SUBBASE GRANULAR MATERIAL, TYPE C | Base items | 26.000 | |||
42000501 | SQ YD | PORTLAND CEMENT CONCRETE PAVEMENT 10" (JOINTED) | Base items | 427.000 | |||
44000100 | SQ YD | PAVEMENT REMOVAL | Base items | 427.000 | |||
44004250 | SQ YD | PAVED SHOULDER REMOVAL | Base items | 222.000 | |||
44200050 | SQ YD | WELDED WIRE REINFORCEMENT | Base items | 427.000 | |||
48101600 | SQ YD | AGGREGATE SHOULDERS, TYPE B 8" | Base items | 62.000 | |||
48300300 | SQ YD | PORTLAND CEMENT CONCRETE SHOULDERS 8" | Base items | 222.000 | |||
50104400 | EACH | CONCRETE HEADWALL REMOVAL | Base items | 2.000 | |||
51500100 | EACH | NAME PLATES | Base items | 1.000 | |||
54001001 | EACH | BOX CULVERT END SECTIONS, CULVERT NO. 1 | Base items | 2.000 | |||
54010705 | FOOT | PRECAST CONCRETE BOX CULVERTS 7' X 5' | Base items | 255.000 | |||
60108200 | FOOT | PIPE UNDERDRAINS 6" (SPECIAL) | Base items | 281.000 | |||
67000500 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE B | Base items | 4.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100310 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701421 | Base items | 1.000 | |||
70101830 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21 | Base items | 1.000 | |||
70102635 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 | Base items | 1.000 | |||
70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 28.000 | |||
78001110 | FOOT | PAINT PAVEMENT MARKING - LINE 4" | Base items | 317.000 | |||
X2501000 | ACRE | SEEDING, CLASS 2 (SPECIAL) | Base items | 0.700 | |||
X5015225 | FOOT | PIPE CULVERT REMOVAL (SPECIAL) | Base items | 556.000 | |||
Z0023602 | CU YD | GRANULAR CULVERT BACKFILL | Base items | 2,022.000 | |||
Z0054505 | TON | ROCK FILL - REPLACEMENT | Base items | 20.000 | |||
No More Pay Items |