001-60M99
|
Executed
|
02/20/2019
|
|
|
1
|
1
|
Will
|
|
Bridge deck repairs and thin polymer overlay of the existing bridge deck of SN 099-0263 carrying US 30 (Cass Street) over Spring Creek in the City of Joliet.
|
002-60Y68
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
Cook
|
|
Landscaping within the following boundaries of I-90/94: Roosevelt Road to Washington Blvd. and Peoria St. to Clinton St., and I-290: Roosevelt Rd. to Van Buren St. and Ashland Ave. to Clinton St.
|
003-62C51
|
Executed
|
02/11/2019
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramp improvement project on IL 83 (Torrence Ave.) from Glenwood Dyer Rd. to south of I-80.
|
004-62F03
|
Executed
|
02/14/2019
|
6 / 6 |
1 |
1
|
1
|
Cook
|
|
Bridge rehabilitation in Northfield.
|
005-62F30
|
Executed
|
02/20/2019
|
6 / 6 |
1 |
1
|
1
|
Cook
|
|
Superstructure replacement, retaining wall modifications, approach slab replacement, HMA resurfcing and ADA ramp installation on IL 171 over CSX RR/Ingredion RR spur.
|
006-62F48
|
Executed
|
02/14/2019
|
4 / 4 |
1 |
1
|
1
|
Lake
|
|
Resurfacing, pedestrian ramp improvement, and culvert repair on US 41 from Park Ave. West to Il 176 (Rockland Rd.); and on IL 22 from Tennyson Lane to US 41. 8.29 miles.
|
007-62G07
|
Executed
|
02/20/2019
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Removal and replacement of headwalls and wingwalls on either side of the existing double cell box culvert crossing Burnham Ave., 40 ft north of 202nd St. in Lynwood.
|
008-62G88
|
Executed
|
02/13/2019
|
|
|
1
|
1
|
DuPage
|
|
Cleaning and painting designated steel surfaces of I-290 bridge (SN 022-0107) at Metra (north of IL 19 - Irving Park Road) in the Village of Itasca.
|
009-62H47
|
Executed
|
02/27/2019
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Resurfacing on Palatine Rd. approximately 100 feet west of the centerline of US 14 (Northwest Hwy.) to 70 feet east of centerline of US 12 (Rand Rd.). 2.93 miles.
|
010-64N19
|
Executed
|
02/20/2019
|
|
|
2
|
2
|
Stephenson
|
|
Pavement patchingh on US 20 from Ayp Road to Browns Mill Road.
|
011-64N24
|
Executed
|
02/14/2019
|
|
|
2
|
2
|
Lee
|
|
Removal and replacement of culvert in the south leg of the intersection of IL 251 and US 30.
|
012-66E75
|
Executed
|
03/05/2019
|
1 / 1 |
1 |
2
|
3
|
LaSalle
|
|
Paching, milling, and resurfacing at various locations on IL 23/IL 71 from Freemont St. to 0.2 miles south of McKinley Rd., and 0.1 mile south of Lincoln Place.
|
013-66E99
|
Executed
|
02/25/2019
|
|
|
2
|
3
|
LaSalle
|
|
3P milling and resurfacing of US 6 from IL 178 to the west city limits of Ottawa. 7.11 miles.
|
014-66H81
|
Executed
|
02/26/2019
|
|
|
2
|
3
|
Bureau
|
|
Cleaning and painting all strucutral steel of SN 006-0090 carrying IL 40 over Hennepin Canal.
|
015-66J43
|
Executed
|
02/20/2019
|
|
1 |
2
|
3
|
Bureau
|
|
Cleaning and painting all structural steel of SN 006-0039 carrying FAI 180 over FAI 80 approximately 4 miles east of Princeton.
|
016-66J46
|
Executed
|
02/26/2019
|
|
|
2
|
3
|
Bureau
|
|
Cleaning and painting all structural steel of SN 006-0142 carrying IL 89 over a branch of Brush Creek approximately 0.8 miles south of Arlington.
|
017-68A91
|
Executed
|
02/20/2019
|
1 / 1 |
1 |
3
|
4
|
Fulton
|
|
Resurfacing on US 24 from Maple St. in Lewistown to Little America, and on IL 97 from US 24 to North Clark Rd.
|
018-68D59
|
Executed
|
02/13/2019
|
1 / 1 |
2 |
3
|
4
|
Tazewell
|
|
Bridge repair on Washington Street (IL 40) and the Industrial Spur (IL 40).
|
019-70997
|
Executed
|
02/20/2019
|
|
|
3
|
5
|
Champaign
|
|
Standard overlay with ADA improvements on US 150 between Mattis Ave. and Propect Ave. in Champaign.
|
020-70D49
|
Executed
|
02/20/2019
|
|
|
3
|
5
|
DeWitt, McLean, Piatt
|
|
5.88 miles of Class A patching from Champaign County line to east of Downs on I-74, and one spot location just south of Hudson on I-39.
|
021-72K65
|
Deleted
|
11/13/2018
|
|
|
4
|
6
|
Pike
|
|
Painting portions of 2 bridges on I-72, 1.8 miles west of Barry (SN 075-0098 and Sn 075-0099).
|
022-74261
|
Executed
|
02/21/2019
|
6 / 6 |
2 |
4
|
7
|
Coles
|
|
3.1 miles of pavement patching, HMA milling and resurfacing, rehab of 2 bridges 3 culvert extensions and guardrail on IL 16 from Ashmore to the Edgar County line.
|
023-74419
|
Deleted
|
12/07/2018
|
|
|
4
|
7
|
|
|
|
024-74432
|
Executed
|
02/26/2019
|
2 / 2 |
|
4
|
7
|
Cumberland
|
|
Removing and replacing concrete deck beams with a PCC slab superstructure, Bridge approach pavements, HMA resurfacing and guardrail on Montrose Blacktop approximately 1.5 miles south of IL 121 (SN 018-0056).
|
025-74561
|
Executed
|
02/14/2019
|
1 / 1 |
|
4
|
7
|
Coles
|
|
Superstructure replacement on SN 015-0070 carrying 900 N/IL 316 over Riley Creek Branch, 0.8 miles northwest of Loxa.
|
026-74863
|
Executed
|
02/20/2019
|
|
|
4
|
7
|
Various
|
|
Sealing the bridge decks on 114 structures throughout District 7.
|
027-74869
|
Executed
|
02/21/2019
|
|
|
4
|
7
|
Moultrie
|
|
8.1 miles of bituminous surface treatment on Cadwell Road from IL 121 to IL 133.
|
028-74883
|
Deleted
|
12/07/2018
|
|
|
4
|
7
|
|
|
|
029-74888
|
Executed
|
02/20/2019
|
|
|
4
|
7
|
Richland
|
|
8.3 miles of base repair, pot hole patching and application of bituminous surface treatment at 2 locations on Old US 50; 1) from just west of the Lawrenceville Correctional Center (CR 2100 E) to the intersection of US 50/IL 250; 2) from 1100 North (IL 250 to 1400 East (St. Marie Road).
|
030-74889
|
Executed
|
03/20/2019
|
1 / 1 |
1 |
4
|
7
|
Coles, Shelby
|
|
10.5 miles of bituminous surface treatment at 3 locations in Coles County and 4 locations in Shelby County.
|
031-74892
|
Executed
|
02/15/2019
|
|
|
4
|
7
|
Clay
|
|
Placing aggregate wedge shoulders on the Kinmundy/Louisville Blacktop from the Marion County line to US 45 in Louisville.
|
032-76L35
|
Executed
|
02/07/2019
|
2 / 2 |
|
5
|
8
|
Madison
|
|
Crack and joint sealing on I-55 from 1.3 miles north of Il 140 to the Macoupin County line.
|
033-76L99
|
Executed
|
02/20/2019
|
|
|
5
|
8
|
Madison
|
|
Bridge painting SN 060-0238 and 060-0239 on I-255 over Collinsville Road.
|
034-78502
|
Executed
|
02/08/2019
|
4 / 4 |
|
5
|
9
|
Massac
|
|
Removal and replacement of the existing structures (SN 064-0024 and SN 064-0028) carrying I-24 over CH13 (Country Club Road) near Metropolis.
|
035-78617
|
Executed
|
02/20/2019
|
|
|
5
|
9
|
Union
|
|
Scour repair below SN 091-0068 carrying IL 127 over Clear Creek south of Alto Pass.
|
036-78658
|
Executed
|
02/08/2019
|
1 / 1 |
|
5
|
9
|
Franklin
|
|
0.66 miles of HMA partial depth patching over existing PCC pavement on IL 149 from Ken Grey Boulevard to Joiner Street
|
037-78659
|
Executed
|
02/08/2019
|
1 / 1 |
|
5
|
9
|
Franklin
|
|
5.6 miles of replacing aggregate shoulder with a 2' safety shoulder consisting of 8" HMA on IL 14 from Mt. Zion Road to Ewing Road.
|
038-78667
|
Executed
|
02/08/2019
|
|
|
5
|
9
|
Williamson
|
|
Bridge repairs and approach work on SN 100-0062 carrying Cambria Rd. over Big Muddy River, 1 mile south of Hurst.
|
039-78693
|
Executed
|
02/20/2019
|
2 / 2 |
1 |
5
|
9
|
Union
|
|
2.4 miles of milling and resurfacing of I-57 southbound from 0.5 miles south of IL 146 to 0.5 miles north of the rest area near the Cache River.
|
040-62C77
|
Executed
|
02/14/2019
|
2 / 2 |
|
1
|
1
|
Lake
|
|
Resurfacing on US 41 (Skokie Hwy) from 1000 feet north of IL 176 (Rockland Rd) to 100 feet north of IL 120 (Belvidere Rd.).
|
041-68E76
|
Executed
|
03/05/2019
|
3 / 3 |
|
3
|
4
|
Tazewell
|
|
Installation and removal of guardrail, inlet adjustments and miscellaneous concrete work to separate US 150 (West Jackson Street) from the adjacent multi-use trial from Beverly Avenue to Cedar Avenue, on the northwest side of Morton
|
042-62G93
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
DuPage
|
|
Bridge deck overlay and approach pavement with latex concrete. Adjacent HMA pavement will be resurfaced to provide a smooth transition.
|
043-62G99
|
Executed
|
02/11/2019
|
1 / 1 |
|
1
|
1
|
Will
|
|
Bridge deck overlay, joint repairs, structural repair of concrete, and drainage repairs on 099-0264 carrying US 30 over WCL RR in Joliet.
|
044-62H67
|
Executed
|
02/21/2019
|
|
1 |
1
|
1
|
Various
|
|
Cleaning (sweeping) various expressway and arterial highways throughout District 1.
|
045-64N16
|
Rejected
|
01/29/2019
|
|
|
2
|
2
|
Various
|
|
"On-Call" guardrail and fence repairs along state maintained routes in Boone, Carroll, Jo Davies, Ogle, Stephenson and Winnebago Counties.
|
046-64N17
|
Rejected
|
01/29/2019
|
|
|
2
|
2
|
Various
|
|
"On-Call" guardrail and fence repairs along state maintained routes in Henry, Lee, Rock Island, Whiteside, and portions of LaSalle Counties.
|
047-64N21
|
Executed
|
02/14/2019
|
|
|
2
|
2
|
Ogle
|
|
Cold milling and HMA resurfacing on IL 2 from chestnut Street to 0.2 mile north in Byron.
|
048-64N23
|
Executed
|
02/14/2019
|
|
|
2
|
2
|
Whiteside
|
|
Mill and resurface I-88 bridge roadway approaches on SN 098-0084(EB), 098-0087(EB), 098-0088(WB), 098-0089(WB), and 098-0090(EB).
|
049-66J13
|
Executed
|
02/11/2019
|
|
|
2
|
3
|
DeKalb
|
|
Install span wire mounted four-way flashing read beacon at the intersection of IL 23 and IL 72. The project includes installation of post-mounted flashing yellow beacon on the advance intersection warning signs adjacent to the north, east, and west legs.
|
050-66J37
|
Executed
|
02/11/2019
|
1 / 1 |
|
2
|
3
|
Bureau
|
|
Concrete deck, bearing, expansion joint, floor drain, guardrail/terminal section removal and replacement, and installing steel bridge railing to SN 006-0061 carrying US 6 over King Creek.
|
051-66J42
|
Executed
|
03/05/2019
|
1 / 1 |
|
2
|
3
|
Ford
|
|
removal and replacement of a 3'x 2' concrete box culvert with 30' ERS RCCP culv ert located on IL 115, 0.7 mile south of Main Street in Cabery.
|
052-68E56
|
Executed
|
02/21/2019
|
|
|
3
|
4
|
McDonough, Schuyler
|
|
Intermittent centerline joint repair and partial depth patching on US 67 from north of the city limits of Industry to IL 101.
|
053-68E57
|
Executed
|
02/07/2019
|
|
|
3
|
4
|
Fulton, McDonough
|
|
Partial depth patching on IL 41 from the north city limits of Avon to IL 9.
|
054-68E69
|
Executed
|
02/14/2019
|
1 / 1 |
|
3
|
4
|
Various
|
|
Dead tree removal throughout District 4.
|
055-68E74
|
Executed
|
02/13/2019
|
|
|
3
|
4
|
Knox
|
|
Structural steel repairs to beams on SN 048-0065 carrying Farnham Street over US 34.
|
056-62H65
|
Executed
|
03/29/2019
|
|
|
1
|
1
|
Various
|
|
Expressway mowing south.
|
057-62H66
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
Various
|
|
Expressway mowing north.
|
058-64M21
|
Executed
|
02/07/2019
|
|
|
2
|
2
|
Ogle, Winnebago
|
|
19.53 miles routing, cleaning, and sealing the centerline and shoulder joints on I-39 from the Lee County line to 0.4 miles north of Baxter Road.
|
059-64N30
|
Executed
|
02/14/2019
|
1 / 1 |
1 |
2
|
2
|
Winnebago
|
|
Expansion joint replacement, beam end repairs, and bearing replacements on SN 101-0144 carrying Rotary Road over I-39.
|
060-66F57
|
Executed
|
02/14/2019
|
2 / 2 |
|
2
|
3
|
Kankakee
|
|
Substructure widening and superstructure replacement on SN 046-0035, 0036 carrying IL 17 over Baker Creek.
|
061-66J67
|
Executed
|
02/14/2019
|
|
|
2
|
3
|
Grundy, Livingston
|
|
Two application of spray mixtures at designated times, once in the Spring and once in the summer, along I-80, I-55 and IL 113 in Grundy County and along I-55, IL 47, and IL 23 in Livingston County.
|
062-72K67
|
Executed
|
02/20/2019
|
2 / 2 |
|
4
|
6
|
Adams
|
|
9.9 miles of micro-surfacing, cape seal on pavement and fog seal on shoulders, on IL 110/336 and north interchange ramps, and overhead roadway at the IL 61 and IL 110/336 interchange.
|
063-72K69
|
Executed
|
02/14/2019
|
|
|
4
|
6
|
Schuyler
|
|
Installing cross road pipe culver, existing pipe culvert removal and fill, and related ditch improvements on IL 99 just south of Vaughn Lane, south of Camden.
|
064-72K72
|
Executed
|
02/20/2019
|
|
|
4
|
6
|
Montgomery
|
|
Paint 3 bridges on I-55 in northern Montgomery County(SN 068-0036, 0040, 0041).
|
065-72K73
|
Rejected
|
01/29/2019
|
|
|
4
|
6
|
Logan
|
|
Painting portions of four bridges on I-55, I-155 and US 136 in Logan County (SN 054-0052, 054-0027, 054-0076, 054-0077).
|
066-72K91
|
Executed
|
02/21/2019
|
|
|
4
|
6
|
Montgomery
|
|
Bituminous surface treatment and resurfacing on I-55 West Frontage Road, from IL 108 to 18th Avenue, and on I-55 East Frontage Road from IL 48 to IL 108.
|
067-72K94
|
Executed
|
02/14/2019
|
1 / 1 |
|
4
|
6
|
Morgan
|
|
Centerline microsurfacing on I-72 from 0.7 mile west of US 67 to 3.3 miles east of Business IL 72.
|
068-72K97
|
Executed
|
02/20/2019
|
1 / 1 |
1 |
4
|
6
|
Macoupin
|
|
Replacing expansion joints, placing microsilica overlay, performing substructure repairs and painting beam ends on SN 059-0035 carrying IL 108 over Lick Creek.
|
069-74177
|
Executed
|
02/15/2019
|
3 / 3 |
1 |
4
|
7
|
Lawrence
|
|
Replacement of two structures on US 50 over an abandoned railroad and Otter Pond Ditch; and replacement of two superstructures on US 50 over IL 1 and CH 12 north of Lawrenceville (SN 051-0012, 0013, 0014, 0015).
|
070-74868
|
Executed
|
02/20/2019
|
|
1 |
4
|
7
|
Coles
|
|
7.8 miles of microsurfacing on Old IL 316 from 0.2 mile north of IL 16 to D Street in Charleston.
|
071-76J81
|
Deleted
|
12/06/2018
|
|
|
5
|
8
|
St. Clair
|
|
ADA improvement on N Belt West from Frank Scott Parkway to 17th in Belleville.
|
072-76L79
|
Executed
|
02/14/2019
|
|
|
5
|
8
|
St. Clair
|
|
Well treatment at various locations.
|
073-76M03
|
Executed
|
02/11/2019
|
|
|
5
|
8
|
Clinton
|
|
Bridge and jooint repair on SN 014-0031 on Old US 50 approximately 1.2 miles east of Aviston.
|
074-76M04
|
Executed
|
02/14/2019
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Bridge and joint repair on Sn 082-0267 carryingh Bond Avenue over Alton and Southern Railroad.
|
075-76M05
|
Executed
|
02/14/2019
|
|
1 |
5
|
8
|
Madison
|
|
Bridge repair and guardrail improvements on SN 060-0177 carrying I-55 over Maple Grove Road.
|
076-78455
|
Executed
|
02/20/2019
|
12 / 10 |
1 |
5
|
9
|
Jefferson
|
|
Removal and replacement SN 041-055 carrying CH 42 over I-57 at Ina.
|
077-78596
|
Executed
|
02/08/2019
|
1 / 1 |
1 |
5
|
9
|
Union
|
|
1.3 miles of patching, resurfacing and sidewalk ramps along IL 146 in Anna.
|
078-78630
|
Executed
|
02/08/2019
|
3 / 3 |
2 |
5
|
9
|
White
|
|
Inlaying 1.5" HMA, deck repairs, joint replacement and bearing replacement on SN 097-000 and 097-0004 carrying I-64 over the Wabash River into Indiana.
|
079-72K03
|
Executed
|
02/14/2019
|
|
|
4
|
6
|
Adams, Hancock
|
|
Clean 3 bridges: 1) SN 001-0019, US 24 EB over the Mississippi River in Quincy, 2) SN 001-0068, US 24 WD over the Mississippi River in Quincy, 3) SN 034-0062 US 136 over the Mississippi River near Keokuk, IA.
|
080-72K74
|
Rejected
|
01/29/2019
|
|
|
4
|
6
|
Sangamon
|
|
Painting portions of 4 bridges on I-72, Business 55, and IL 4 in Sangamon County.
|
081-76K30
|
Executed
|
02/14/2019
|
2 / 2 |
1 |
5
|
8
|
Madison
|
|
Bridge joint replacement at south abutment and other repairs on Clark Bridge (US 67 over the Mississippi River (SN 060-0255).
|
082-76M06
|
Executed
|
02/20/2019
|
|
|
5
|
8
|
Bond
|
|
Patching on IL 127 from Montgomery County line to IL 140.
|
083-76M08
|
Executed
|
02/15/2019
|
|
|
5
|
8
|
Greene
|
|
Patching on US 67 from Pine Street to Walnut Street in Carrolton.
|
084-78677
|
Executed
|
02/15/2019
|
|
|
5
|
9
|
Various
|
|
Cleaning and painting portions of 14 structures: 1 in Alexander County, 2 in Franklin County, 1 in Hamilton County, 8 in Jefferson County, 1 in Massac County, and 2 in White County. (SN 041-0039, 0040, 0041, 0042, 0077, 0078, 0087, 0088, 002-0032, 028-0038, 0041, 033-0012, 064-0003, 097-0024)
|
085-46476
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
Various
|
|
Removal of existing pavement marking and placing various widths of thermoplastic pavement marking lines, letters, and symbols within the limits specified on each individual work order.
|
086-46481
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
Lake
|
|
Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown.
|
087-46482
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
DuPage
|
|
Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement markeer castings.
|
088-46483
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
Cook
|
|
Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings.
|
089-46484
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
Kane
|
|
Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings.
|
090-46485
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
Will
|
|
Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings.
|
091-46486
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
Various
|
|
Removal of existing pavement marking and placing hot spray thrermoplastic pavement and modified urethane marking lines, letters, and sysmbols within the limits specified on individual work orders.
|
092-60484
|
Executed
|
02/11/2019
|
14 / 13 |
1 |
1
|
1
|
Cook
|
|
Removal of existing bridge structure carrying 135th Street over Ashland Avenue, also, storm sewer installation, integral retaining wall, sidewalk and concrete barrier wall construction.
|
093-62B68
|
Executed
|
02/11/2019
|
1 / 1 |
|
1
|
1
|
Kendall
|
|
Realignment and widening project on US 30 at the intersections with Harvey Rd. and Treasure Drive, includes intersection improvement and traffic signals.
|
094-62F23
|
Executed
|
02/11/2019
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Palatine Road from US 12 to IL 21, and patching on Dundee Road from east of Kennicott Ave to First Street.
|
095-62G14
|
Executed
|
02/14/2019
|
13 / 13 |
1 |
1
|
1
|
Will
|
|
Insatallation of a fiber optic line to provide local centralized control and operation of 6 moveable bridges over the Des Plaines River in Joliet.
|
096-62G66
|
Executed
|
03/05/2019
|
11 / 11 |
1 |
1
|
1
|
DuPage, Will
|
|
Installation of seven truss mounted LED dynamic message signs, CCTBV, fiber optic networks and roadside bluetooth detectors at various locations.
|
097-62G87
|
Executed
|
02/08/2019
|
1 / 1 |
|
1
|
1
|
Cook, Lake, McHenry
|
|
Cleaning and painting existing steel on structures. IL 137 over US 45, IL 31 over UPRR, and Green Bay Road over North Shore Channel.
|
098-62G95
|
Executed
|
03/05/2019
|
|
|
1
|
1
|
DuPage
|
|
Drainage improvement project in the median of IL 83 from 67th Street to Plainfield Road.
|
099-62H31
|
Executed
|
02/25/2019
|
3 / 3 |
1 |
1
|
1
|
Cook, Lake
|
|
Crack and joint sealing on US 12 (Rand Rd.) from Ela Road to IL 58 (Golf Rd.)
|
100-64N09
|
Executed
|
02/08/2019
|
1 / 1 |
1 |
2
|
2
|
Henry
|
|
Cleaning and painting structrual steel on SN 037-0104 carrying N 1200th Ave. over I-74, 2.0 miles north of IL 81.
|
101-68D79
|
Executed
|
02/20/2019
|
4 / 4 |
1 |
3
|
4
|
Woodford
|
|
Resurfacing I-39 from the Mclean County line to 0.25 mile north of US 24, includes repair on bridges SN 102-0058 and 102-0059.
|
102-70D51
|
Executed
|
02/20/2019
|
|
|
3
|
5
|
Champaign, Douglas
|
|
25.51 miles of Class A (SPL) and Class B patching_on I-57 between Tuscola and Rantoul, and on I-72 from Champaign to the Piatt County Line.
|
103-46470
|
Rejected
|
01/29/2019
|
|
|
2
|
2
|
Various
|
|
Repairing or replacing damaged or deteriorated overhead sign structures, structure components, and supports at locations described in the schedule of locations.
|
104-46503
|
Executed
|
02/20/2019
|
|
|
2
|
3
|
Various
|
|
Pavement marking grooving, placing thermoplastic, epoxy, polyurea, modified urethane, preformed plastic, and hot spray thermoplastic pavement marking lines, letter, numbers, and symbols and the removal of exiswting pavement markings within the limits specified.
|
105-64L50
|
Executed
|
02/08/2019
|
|
1 |
2
|
2
|
Henry
|
|
Cleaning and painting structural steel on SN 037-0117 carrying township 400A over I-80, 2.8 miles west of IL 78.
|
106-64N07
|
Executed
|
02/08/2019
|
|
1 |
2
|
2
|
Henry
|
|
Cleaning and painting structural steel on SN 037-0102 carrying N 1900th Avenue over I-74, 1.0 mile south of I-80.
|
107-64N08
|
Executed
|
02/08/2019
|
|
1 |
2
|
2
|
Henry
|
|
Clean and paint structural steel on SN 037-0103 carrying N 1700th Avenue over I-74, 3.0 miles south of I-80.
|
108-68E78
|
Executed
|
02/15/2019
|
|
|
3
|
4
|
Tazewell
|
|
Install communications duct, communications vaults, fiber optic cable, CCTV cameras along US 24 and Business Route 24 in and around Washington.
|
109-61E89
|
Executed
|
03/12/2019
|
2 / 2 |
|
1
|
1
|
Cook
|
|
Reconstruct the intersection of Bloomingbank Road at Riverside Road in the Village of Riverside.
|
110-61E90
|
Executed
|
03/05/2019
|
|
|
1
|
1
|
Cook
|
|
Resurface Barrypoint Road from Bloomingbank Road to Fairbank Road, Forext Ave. from Des Plaines River Bridge to Longcommon Road and Herrick Road from Longcommon Road to Cowley Road in the Village of Riverside.
|
111-61F08
|
Executed
|
03/05/2019
|
1 / 0 |
1 |
1
|
1
|
McHenry
|
|
Replace the bridge carrying Union Road over the Kishwaukee River, located 0.80 mile north of IL 176.
|
112-61F12
|
Rejected
|
03/11/2019
|
2 / 2 |
1 |
1
|
1
|
Will
|
|
Rehabilitate the bridge carrying IL 7 Frontage Road over the Des Plaines River in the City of Lockport.
|
113-61F13
|
Executed
|
02/26/2019
|
|
1 |
1
|
1
|
Kane
|
|
High friction surface treatment, signing, pavement markings, rumble strips and traffic signal upgrades on Kisk Road from IL 56 to Cherry Lane.
|
114-61F20
|
Executed
|
03/05/2019
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing west Avenue from First Street to St. Charles Road in Elmhurst.
|
115-61F21
|
Executed
|
02/27/2019
|
7 / 7 |
2 |
1
|
1
|
Cook
|
|
Pavement reconstruction, widening and resurfacing, traffic signal replacement at the intersection of US 6 and Van Dam Road in the Village of South Holland.
|
116-61F23
|
Executed
|
03/07/2019
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
Pavement widening, resurfacing, traffic signal installation, street lighting, and construction of a bike/pedestrian path at the intersection of US 14 and Virginia Road in the City of Crystal Lake.
|
117-61F24
|
Executed
|
03/06/2019
|
|
|
1
|
1
|
Cook
|
|
Resurfacing on Lively Boulevard from Devon Avenue to Landmeier Road in the Village of Elk Grove Village.
|
118-61F28
|
Executed
|
03/07/2019
|
|
|
1
|
1
|
Kane
|
|
Intersection improvement on Randall Road at Stearns Road; includes pavement widening, resurfacing, curb and gutter, street lighting and traffic signal improvements.
|
119-61F30
|
Executed
|
03/05/2019
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing on Lies Road from Gary Avenue to Schmale Road in Carol Stream.
|
120-61F31
|
Executed
|
03/05/2019
|
2 / 2 |
2 |
1
|
1
|
Kane
|
|
Replace the bridge carrying TR 189A over Indian Creek, 0.10 mile west of Farnsworth.
|
121-61F38
|
Executed
|
02/20/2019
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Resufacing on York Road from Grand Avenue to Green Street in Bensenville.
|
122-61F43
|
Executed
|
03/07/2019
|
4 / 4 |
2 |
1
|
1
|
Cook
|
|
Rehabilitate the bridges carrying Oak Street and Cherry Street over the UP Railroad in the Village of Winnetka.
|
123-66J04
|
Executed
|
02/26/2019
|
1 / 1 |
1 |
2
|
3
|
LaSalle
|
|
Removal of the existing parking lot pavement and replacement with a new parking area.
|
124-68E20
|
Rejected
|
01/29/2019
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
Installation of fiber optic cable, communications equipment and CCTV for a new traffic signal system in Peoria.
|
125-74694
|
Deleted
|
12/07/2018
|
|
|
4
|
7
|
|
|
|
126-76J12
|
Executed
|
02/21/2019
|
3 / 3 |
|
5
|
8
|
Madison
|
|
Replace bridge 060-2454 carrying IL 157 over Silver Creek Tributary south of Hamel.
|
127-78650
|
Executed
|
02/15/2019
|
1 / 1 |
1 |
5
|
9
|
Various
|
|
Steel, bearing and joint repairs on 11 structures in Alexander, Hamilton and Jefferson Counties. (SN 041-0007, 0087, 0088, 0077, 0078, 002-0032, 033-0038, 0041-0041, 0042, 0097)
|
128-91568
|
Executed
|
02/25/2019
|
4 / 4 |
|
3
|
5
|
Champaign
|
Voluntary
|
Construct 7" PCC pavement, aggregate shoulder and culvert replacment on Sunny Acres Road from South Mahomet Road to US 150 in the Village of Mahomet.
|
129-91575
|
Executed
|
02/15/2019
|
|
|
3
|
5
|
Vermilion
|
|
Replace the bridge carrying TR 54 over Baum Branch, 3 miles southwest of Jamaica.
|
130-93722
|
Executed
|
03/05/2019
|
2 / 2 |
|
4
|
6
|
Brown
|
|
Resurfacing, lighting, and sidewalk improvements on Main Street, from Cross Street to Capitol Street in Mt. Sterling.
|
131-95841
|
Executed
|
02/15/2019
|
3 / 2 |
|
4
|
7
|
Macon
|
|
Rehabilitate 058-3035 and 058-3036 carrying Mound Road over Spring Creek in the City of Decatur.
|
132-97682
|
Executed
|
02/21/2019
|
4 / 3 |
|
5
|
8
|
Jersey
|
|
County-wide guardrail replacement and/or repair at various locations in Jersey County.
|
133-97686
|
Executed
|
02/20/2019
|
5 / 4 |
3 |
5
|
8
|
Madison
|
|
Construction of roundabouts at Broadway/St. Rose Road, and at Iberg Road/ Veterans Honor Parkway, in the City of Highland.
|
134-99584
|
Executed
|
03/11/2019
|
1 / 1 |
|
5
|
9
|
Union
|
|
Replace the bridge carrying TR 203 (Nash Road) over Big Creek, located 3 miles southeast of Anna.
|
135-72C83
|
Executed
|
02/20/2019
|
|
|
4
|
6
|
Christian
|
|
Culvert replacement on US 51 over a ditch, 0.9 mile north of IL 16.
|
136-74849
|
Executed
|
03/05/2019
|
|
1 |
4
|
7
|
Macon
|
|
Culvert removal and replacement on Old US 36 over an unnamed stream approximately 0.1 mile west of US 36.
|
137-62C07
|
Executed
|
02/15/2019
|
2 / 2 |
|
1
|
1
|
Cook
|
|
Traffic signal modernization at Central Park Avenue. Channelization and traffic signal modernization at Crawford/Pulaski Road, and Kedzie Avenue.
|
138-70A61
|
Executed
|
02/20/2019
|
6 / 6 |
2 |
3
|
5
|
Champaign
|
|
Replace the structure carrying Bradley Avenue over I-57, including 0.578 miles of widening and resurfacing on Bradley Avenue.
|
139-61E15
|
Executed
|
02/20/2019
|
13 / 13 |
3 |
1
|
1
|
Kane
|
|
Reconstructin of Chicago Street from Center Street to Liberty Street, in the City of Elgin.
|
140-72C29
|
Executed
|
02/15/2019
|
|
|
4
|
6
|
Adams
|
|
4.4 miles of resurfacing, patching, shoulders, ADA improvements, bridge repair, bridge deck overlay, curlvert repair and riprap on IL 96 from Bear Creek to the Hancock County line (SN 001-0052, 0074, 7039, 7037)
|
141-72J98
|
Executed
|
02/21/2019
|
|
|
4
|
6
|
Pike
|
|
3.6 miles of pavement patching, HMA surface removal, HMA resurfacing and bridge repairs on I-72 from the Sny Slough structures to east of the Trumpet Interchange at I-172.
|
142-61E44
|
Executed
|
03/05/2019
|
3 / 2 |
1 |
1
|
1
|
Cook
|
|
Replace the superstructure and repair the abutments on the structure carrying Barker Avenue over Salt Creek in the City of Rolling Meadows.
|
143-61E74
|
Rejected
|
01/29/2019
|
|
1 |
1
|
1
|
Kane
|
|
Modifications at 27 intersections in Aurora, Batavia, Geneva, North Aurora and unincorporated Kane County.
|
144-61E97
|
Executed
|
02/22/2019
|
1 / 1 |
1 |
1
|
1
|
Kane
|
|
Intersection improvement and the construction of a shared-use path at Kirk Rd.
|
145-61F00
|
Executed
|
02/14/2019
|
1 / 1 |
2 |
1
|
1
|
Cook
|
|
Roadway reconstruction with drainage and lighting work on State and National Parkway from PLum Grove Road to IL Route 58 in Schaumburg.
|
146-61F22
|
Executed
|
03/05/2019
|
4 / 4 |
1 |
1
|
1
|
Cook
|
|
Roadway reconstructioon with sidewalk, curb and gutter, and drainage work on Walnut Lane from Schaumburg Lane to Weathersfield Way in Schaumburg.
|
147-61F27
|
Executed
|
03/07/2019
|
|
|
1
|
1
|
McHenry
|
|
Replace the superstructure, repair abutments, reconstruct approaches to the structure carrying O'Brien Road over Nippecsink Creek, 1.5 miles west of IL 47.
|
148-61F33
|
Executed
|
03/05/2019
|
2 / 2 |
1 |
1
|
1
|
Lake
|
|
Pavement reconstruction, construction of a shared use path, and lighting improvements on 14th Street from Green Bay Road to Sheridan Road in North Chicago.
|
149-61F35
|
Executed
|
03/11/2019
|
|
|
1
|
1
|
Cook
|
|
Sidewalk Construction and traffic signal improvement on Archer Road from 68th Street to 66th Place, and on State Road from Lavergne Avenue to Cicero Avenue in Bedford Park.
|
150-61F42
|
Executed
|
03/08/2019
|
3 / 3 |
2 |
1
|
1
|
McHenry
|
|
Resurfacing from Silver Lake Road to South Rawson Bridge Road in Cary.
|
151-91569
|
Executed
|
02/11/2019
|
|
|
3
|
5
|
Champaign
|
|
Pavement reconstruction, PCC pavement, curb and gutter, storm sewer, street lighting and traffic signals on Prospect Avenue from Curtis Road to Windsor Rd. in the City of Champaign.
|
152-95842
|
Executed
|
02/15/2019
|
1 / 0 |
|
4
|
7
|
Fayette
|
|
Resurfacing on CH 28 from IL 37 to the Effingham County line.
|
153-99610
|
Executed
|
02/15/2019
|
|
|
5
|
9
|
Williamson
|
|
Pavement widening, resurfacing, and water main improvements on East Grand Avenue, from Hofer Road to Hurricane Road in Crainville.
|
154-87710
|
Executed
|
03/05/2019
|
|
|
2
|
3
|
Grundy
|
|
Pavement reconstruction, storm sewers, curb and gutter, sidewalk and roadway lighting, on Broadway Street from IL 113 to Park Street in Coal City.
|
155-89712
|
Executed
|
03/06/2019
|
2 / 2 |
|
3
|
4
|
Peoria
|
|
Pavement reconstruction, PCC pavement, curb and gutter, storm sewers, PCC multi-use path, street lighting and pedestrian signals, on Dirksen Parkway from Middle Road to Airport Road.
|
156-89732
|
Executed
|
03/05/2019
|
|
|
3
|
4
|
Peoria
|
|
Construction of 4' HMA shoulders with rumble strips, 2' aggregate shoulders and the reconstruction of ditches on Kickapoo-Edwards Road from Shamrock Lane to Countryside Lane.
|
157-95839
|
Executed
|
02/15/2019
|
|
|
4
|
7
|
Crawford
|
|
replace the bridge carrying TR 193 over Dogwood Creek, 2.0 miles southeast of Oblong.
|
158-66C58
|
Executed
|
02/11/2019
|
3 / 3 |
1 |
2
|
3
|
LaSalle
|
|
Removal and replacemnt of SN 050-0073 carrying IL 170 over the BNSF Railroad at the Village of Ransom. Work includes embankment, guardrail, landscaping, and pavement striping.
|
01A-MA029
|
Executed
|
05/20/2019
|
|
|
3
|
4
|
Marshall
|
|
Realign Airport Entrance Road; Reconstruct Aircraft Hangar Pavement
|
02A-MA030
|
Executed
|
06/13/2019
|
|
|
3
|
4
|
Marshall
|
|
Rehabilitate Taxiway C1 and C2
|
03A-UN057
|
Rejected
|
02/14/2019
|
1 / 1 |
1 |
3
|
5
|
Champaign
|
|
Rehabilitate Airport Entrance Road
|
04A-DE080
|
Executed
|
05/20/2019
|
|
|
4
|
7
|
Macon
|
|
Rehabilitate North Terminal Automobile Parking Area
|
05A-DE082
|
Executed
|
05/28/2019
|
1 / 1 |
|
4
|
7
|
Macon
|
|
Rehabilitate North Taxiway G and Taxiway A
|
06A-WA073
|
Executed
|
06/19/2019
|
|
|
1
|
1
|
Lake
|
|
Rehabilitate Airport Entrance Road
|
07A-CO066
|
Executed
|
05/28/2019
|
|
|
4
|
7
|
Coles
|
|
Rehabilitate East Portion of Aircraft Parking Ramp
|
08A-MB032
|
Executed
|
06/17/2019
|
2 / 2 |
|
3
|
4
|
McDonough
|
|
Reconstruct Access Taxiway Pavements
|
09A-MV064
|
Executed
|
05/23/2019
|
|
|
5
|
9
|
Jefferson
|
|
Bituminous Paving of Airport Access Road and Auto Parking Lot in Southwest Quadrant
|
10A-RC008
|
Executed
|
06/14/2019
|
|
|
2
|
2
|
Ogle
|
|
Rehabilitate Access Taxiways: TH/1 and TH 1/1
|
11A-DU084
|
Executed
|
08/08/2019
|
|
|
1
|
1
|
DuPage
|
|
Construct North Service Road Extension Parallel to Taxiway Echo
|
12A-DU085
|
Executed
|
07/17/2019
|
|
|
1
|
1
|
DuPage
|
Mandatory
|
Phase 2: Echo T-Hangar Asphalt Pavement Rehabilitation
|
13A-FR041
|
Executed
|
06/17/2019
|
|
|
2
|
2
|
Stephenson
|
|
Construction of New Electrical Vault
|
14A-FR042
|
Executed
|
06/26/2019
|
1 / 1 |
|
2
|
2
|
Stephenson
|
|
Construct, Light and Mark Southwest Terminal Area Entrance Road - Baileyville Road Connector
|
15A-JO024
|
Executed
|
05/20/2019
|
1 / 1 |
|
1
|
1
|
Will
|
|
Rehabilitate Taxilanes Designated TH/7, TH/7-1, and TH/7-2
|
16A-SR092
|
Executed
|
08/15/2019
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Expand South Apron
|
17A-PA062
|
Executed
|
06/14/2019
|
|
|
1
|
1
|
Cook
|
|
Rehabilitate East Access Road (Tower/FBO Road)
|
19A-WH013
|
Executed
|
07/08/2019
|
|
|
2
|
2
|
Whiteside
|
|
Rehabilitate Taxiway C and D
|
20A-OL017
|
Executed
|
05/23/2019
|
|
|
4
|
7
|
Richland
|
|
Remark Airfield Pavements
|
21A-SH029
|
Executed
|
06/17/2019
|
|
|
1
|
1
|
Cook, DuPage
|
|
Rehabilitate Terminal Entrance Road and Auto Parking Lot
|
22A-CI006
|
Executed
|
05/23/2019
|
|
|
5
|
9
|
Alexander
|
|
Rehabilitation of Aircraft Apron and T-Hangar Taxiways and Remark Runways
|
23A-KA048
|
Executed
|
05/28/2019
|
|
|
2
|
3
|
Kankakee
|
|
Rehabilitate SW Quadrant Taxilane and Taxiway A Crack Repairs
|