Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
4 | 7 | 5.00 | 0.00 | 6HIL(452) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
35 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20100500 | ACRE | TREE REMOVAL, ACRES | Base items | 0.100 | |||
20200100 | CU YD | EARTH EXCAVATION | Base items | 23.000 | |||
20300100 | CU YD | CHANNEL EXCAVATION | Base items | 233.000 | |||
20400800 | CU YD | FURNISHED EXCAVATION | Base items | 911.000 | |||
28000250 | POUND | TEMPORARY EROSION CONTROL SEEDING | Base items | 60.000 | |||
28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 32.000 | |||
28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 990.000 | |||
28000500 | EACH | INLET AND PIPE PROTECTION | Base items | 2.000 | |||
28100207 | TON | STONE RIPRAP, CLASS A4 | Base items | 351.000 | |||
28200200 | SQ YD | FILTER FABRIC | Base items | 450.000 | |||
35101400 | TON | AGGREGATE BASE COURSE, TYPE B | Base items | 569.000 | |||
50100100 | EACH | REMOVAL OF EXISTING STRUCTURES | Base items | 1.000 | |||
50105220 | FOOT | PIPE CULVERT REMOVAL | Base items | 55.000 | |||
50200100 | CU YD | STRUCTURE EXCAVATION | Base items | 42.000 | |||
50300225 | CU YD | CONCRETE STRUCTURES | Base items | 25.600 | |||
50400505 | SQ FT | PRECAST PRESTRESSED CONCRETE DECK BEAMS (27" DEPTH) | Base items | 1,636.000 | |||
50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 3,500.000 | |||
50900205 | FOOT | STEEL RAILING, TYPE S1 | Base items | 140.000 | |||
51200959 | FOOT | FURNISHING METAL SHELL PILES 14" X 0.312" | Base items | 124.000 | |||
51201900 | FOOT | FURNISHING STEEL PILES HP14X89 | Base items | 112.000 | |||
51202305 | FOOT | DRIVING PILES | Base items | 236.000 | |||
51203200 | EACH | TEST PILE METAL SHELLS | Base items | 1.000 | |||
51203900 | EACH | TEST PILE STEEL HP14X89 | Base items | 1.000 | |||
51204650 | EACH | PILE SHOES | Base items | 5.000 | |||
51500100 | EACH | NAME PLATES | Base items | 1.000 | |||
54262712 | EACH | METAL FLARED END SECTIONS 12" | Base items | 2.000 | |||
54262715 | EACH | METAL FLARED END SECTIONS 15" | Base items | 2.000 | |||
542C0217 | FOOT | PIPE CULVERTS, CLASS C, TYPE 1 12" | Base items | 28.000 | |||
542C0220 | FOOT | PIPE CULVERTS, CLASS C, TYPE 1 15" | Base items | 40.000 | |||
59300100 | CU YD | CONTROLLED LOW-STRENGTH MATERIAL | Base items | 44.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
72501000 | EACH | TERMINAL MARKER - DIRECT APPLIED | Base items | 4.000 | |||