001-62L11
|
Executed
|
08/05/2022
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(2,568-Ft) Standard Overlay, ADA ramp improvements and new HMA Shoulders, located from Willow Rd to Old Willow Rd in the Villages of Northbrook and Glenview in Cook County.
|
01X-76J90
|
Active
|
05/19/2022
|
|
|
5
|
8
|
Madison
|
Mandatory
|
Replacement of SN 060-0035 which carries I-270 over the Mississippi River.
|
002-62N43
|
Executed
|
08/05/2022
|
|
1 |
1
|
1
|
Cook
|
|
(5,878-Ft) SMART overlay and ADA improvements on US 12/20/45 (La Grange Rd) from 31st St to north of Cermak Rd, located in the Village of La Grange Park and Westchester in Cook County.
|
003-62N47
|
Executed
|
08/03/2022
|
|
1 |
1
|
1
|
Will
|
|
(1.198-Mile) SMART Overlay and ADA ramp improvements from E o f I-80 to E of Church St. Work also includes sidewalk removal, removal and replacement of combination concrete curb and gutter, installation of PCC sidewalk, detectable warnings, adjustment of drainage structures, and pavement markings located in the Village of New Lenox.
|
004-62N50
|
Executed
|
08/08/2022
|
|
1 |
1
|
1
|
Will
|
|
(1.71-Mile) SMART Overlay and ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK FAP 876: IL 1 (Main St), from Burville Road to Union Avenue, located in the Village of Crete.
|
005-62P14
|
Executed
|
08/05/2022
|
2 / 2 |
1 |
1
|
1
|
Lake
|
|
(2,344-Ft) Removal and construction of bridge deck, approach slab and pavement connector for bridge carrying over UPRR and bridge deck scarification and overlay for the bridge carrying over US 41 in the City of Park City and Village of Gurnee, Lake County.
|
006-62P58
|
Executed
|
08/03/2022
|
2 / 2 |
|
1
|
1
|
DuPage
|
|
(1.40-Mile) Bridge joint repairs and approach slab replacements at the structures earring 1-290 EB over IL 83 and Wooddale Road located in the City of Elmhurst and Village of Addison in DuPage County.
|
007-62P59
|
Executed
|
08/05/2022
|
|
|
1
|
1
|
Cook
|
|
Improvement is located at the IDOT I-57 maintenance yard at 16010 S. Crawford Ave. within the City of Markham in Cook County includes pavement removal, pavement patching, new drainage structures and storm sewer and installation of hot-mix asphalt and pcc pavement and final pavement markings.
|
008-62P84
|
Executed
|
08/08/2022
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of a culvert repair and rock fill of the culvert culvert carrying IL 171 0.4 miles west of 95th St in the Village of Willow Springs in Cook County.
|
009-62R32
|
Executed
|
08/05/2022
|
4 / 4 |
|
1
|
1
|
Cook
|
|
(263.3-Ft) Improvement consist of bridge beam repairs for structure located on Touhy Avenue over Des Plaines River in the City of Park Ridge, Cook County.
|
010-62R49
|
Rejected
|
07/07/2022
|
1 / 1 |
1 |
1
|
1
|
Various
|
|
(116.5-Mile) Improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties.
|
011-64K62
|
Executed
|
08/02/2022
|
1 / 1 |
1 |
2
|
2
|
Jo Daviess
|
|
The proposed southern culvert (PSN 043-1117) will be replaced (ESN 043-1024). The proposed structure skews the alignment and adds riprap to control erosion. The proposed northern culvert (PSN 043-1118) will be replaced (ESN 043-1021). The proposed structure uses a dropbox on the upstream end, skews the alignment, and adds riprap to control erosion.
|
012-64N64
|
Executed
|
08/02/2022
|
1 / 1 |
1 |
2
|
2
|
Winnebago
|
|
0.14 Miles, Sidewalk ADA Ramp Improvements, From New Milford School Rd to Toms Rd. in the VIllage of New Milford .
|
013-64N77
|
Executed
|
08/02/2022
|
1 / 1 |
1 |
2
|
2
|
Whiteside
|
|
The replacement of non-compliant pedestrian (ADA) curb ramps along IL 136 from 4th Street to 0.1-mile West of IL 84 in Fulton. The proposed improvement generally consists of the removal and replacement of pedestrian (ADA) curb ramps, curb and gutter, and grading and shaping. Update curb ramps, sidewalks, and crosswalks (no changes to roadway).
|
014-64P15
|
Executed
|
08/02/2022
|
|
1 |
2
|
2
|
Whiteside
|
|
2.985 miles - From IandM Feeder Canal 0.3 Mi East of IL 40 in Rock Falls to the Lee County Line - Cold Milling, Pavement Patching, and HMA Resurfacing.
|
015-64P95
|
Executed
|
08/02/2022
|
|
|
2
|
2
|
Whiteside
|
|
0.049 miles (261 ft), intersection improvements at US 30 and Emerson Road intersections. Approved HSIP Location.
|
016-64R40
|
Executed
|
08/12/2022
|
|
|
2
|
2
|
Whiteside
|
|
Full cleaning and painting of structural steel of SN 098-0005 carrying US 30 over UP RR 2.5 miles West of Morrison.
|
017-64R45
|
Rejected
|
07/07/2022
|
|
|
2
|
2
|
Various
|
|
Removal of dead trees along State maintained routes.
|
018-64R47
|
Executed
|
08/02/2022
|
|
|
2
|
2
|
Rock Island
|
|
IL 5 from 7th Street to 16th Street pavement patching.
|
019-64R59
|
Executed
|
08/02/2022
|
|
|
2
|
2
|
Various
|
|
Traffic signal cabinet and controller upgrades at nine (9) railroad interconnected intersection: US 6 at Patriot Way (Annawan); US 20 EB Ramp at S. Appleton Road (Belvidere); IL 92118th Ave at IL 84119th St (Silvis); IL 9214th Ave at 15th, 17th, 19th, and 23rd Streets (Moline); IL 9211st Ave at 17th and 18th Streets (Rock Island).
|
020-66616
|
Executed
|
08/03/2022
|
2 / 2 |
2 |
2
|
3
|
LaSalle
|
|
Project consists of milling and resurfacing 3.75" on IL 23, from N. of I-80 in Ottawa to S. of US 52 (W. Junction) in LaSalle for a total of 6.31 miles. The scope of work includes some traffic signal upgrades, guardrail, and drainage improvements.
|
021-66A80
|
Executed
|
08/03/2022
|
|
|
2
|
3
|
DeKalb
|
|
Work consists of milling and resurfacing 4.25" on IL 72 from Bull Run Creek in Kirkland to State St. in Genoa in Dekalb County. Additional work includes resurfacing parking lanes in Kirkland, guardrail upgrades, and drainage improvements. The total length of the job is 8.1 miles.
|
022-66B77
|
Executed
|
08/02/2022
|
|
|
2
|
3
|
Ford
|
|
This work is located on FAP 796 (IL 115) from South Corporate Limits of Cabery to IL 116 (+/-7.83 miles) in Ford County. This work consists of 3P milling and resurfacing (design overlay).
|
023-66E48
|
Executed
|
08/05/2022
|
|
|
2
|
3
|
Grundy
|
|
Project consists of milling and resurfacing 3.75" on IL 113 from Lincoln St to Will Rd in Grundy County. The project length is 1.60 miles. Additional work includes ADA improvements and traffic signal upgrades. Minor drainage repairs are also proposed.
|
024-66E49
|
Executed
|
08/03/2022
|
1 / 1 |
1 |
2
|
3
|
LaSalle
|
|
This 3P project is located on FAP 68 (US 34) from IL 23 North to IL 23 South in Leland, IL. The length is 4.33 miles, and the work consists of milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors.
|
025-66E53
|
Executed
|
08/10/2022
|
2 / 2 |
2 |
2
|
3
|
Livingston
|
|
Project consists of milling 3.50" and resurfacing 3.75" on IL 116, 100' East of the intersection of IL 23 in Pontiac for a total of 1.71 miles. The scope of work includes some traffic signal upgrades, pavement patching, ADA ramp improvements, and minor drainage maintenance work.
|
026-66H07
|
Executed
|
08/12/2022
|
4 / 3 |
|
2
|
3
|
DeKalb
|
|
This work is located on FAP 573 (US 30) from the Lee County line to 0.5 miles East of Shabbona Road in Shabbona. This work consists of 3.96 miles of 3-3/4" milling and hot-mix asphalt resurfacing. The project also_includes the reconstruction of several ADA sidewalk ramps throughout Shabbona.
|
027-66K76
|
Executed
|
08/02/2022
|
|
|
2
|
3
|
Livingston
|
|
This work is located at FAP 326 (IL 47) from US 24 in Forrest to Ford County line in Livingston County (+/-9.35 miles). This work consists of milling and resurfacing (designed overlay) with ADA sidewalk work.
|
028-66K78
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
Iroquois
|
|
This project is located on FAS 317 (US 45), beginning at North St in Danforth to US 24, for a total of 4.09 miles. The work consists of milling and resurfacing (designed overlay), ADA ramps, pavement marking, and raised reflectors.
|
029-66L48
|
Executed
|
08/05/2022
|
3 / 3 |
|
2
|
3
|
Grundy
|
|
Rest area and renovations, I-80 Three Rivers Rest Stop.
|
030-66L89
|
Executed
|
08/08/2022
|
1 / 1 |
|
2
|
3
|
Ford
|
|
This work is located at FAP 697 (IL 9) from Stockholm Road in Paxton to Vermillion County Line in Ford County (+/- 7.68 miles). This work consists of 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch grading, channel excavation and riprap placement.
|
031-66M02
|
Executed
|
08/12/2022
|
1 / 1 |
1 |
2
|
3
|
DeKalb
|
|
This work is located at Structure No. 019-0012 carrying FAP Route 17 (IL 64) over the Kishwaukee River approximately 1.5 miles West of Jct. IL 23 (Sycamore) This work consists riprap placement, guardrail removal and replacement, expansion joint replacement, deck patching, pavement striping, and other related construction items.
|
032-66M05
|
Executed
|
08/05/2022
|
|
|
2
|
3
|
Iroquois
|
|
This project is located at the Mainline Rest Areas in Buckley on I-57. The work consists of replacing the high mast light towers.
|
033-66M15
|
Executed
|
08/05/2022
|
|
|
2
|
3
|
LaSalle
|
|
This project consists of the installation of an overhead flashing beacon at the intersection of IL 71 and US 52 in LaSalle County. An additional flashing beacon will be installed adjacent to each of the four legs at the existing intersection warning sign location.
|
034-66M18
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
Iroquois
|
|
This project consists of 2.9 miles of shoulder widening and rumble strip installation on IL 54 from N 200E Rd to 0.22 mi west of N 500E Rd in Iroquois County.
|
035-66M25
|
Executed
|
10/25/2022
|
|
|
2
|
3
|
LaSalle
|
|
This project is located at Structure No. 050-0233 carrying FAS 1265 (Old US 34, W. Union Street) over Indian Creek in Earlville. This work consists of of cleaning and painting all structural and non-structural steel components of the structure.
|
036-66M40
|
Executed
|
08/05/2022
|
|
|
2
|
3
|
LaSalle
|
|
This project is located on I-39 beginning at the Marshall Co line and ending at 0.3 mi S of the Lee Co line (36.2 miles); I-80 interchange ramps._The work shall consist of Class A and B patching, pavement marking, and shoulder reconstruction.
|
037-66M44
|
Executed
|
08/16/2022
|
|
|
2
|
3
|
Various
|
|
One year contract repair damaged High Tension Cable Median Barrier, Guard Rail Attenuators, etc., caused by motorists along various routes in District 3.
|
038-66M50
|
Executed
|
08/05/2022
|
|
|
2
|
3
|
Kankakee
|
|
This project is located on F.A.P. Route 332 (IL 71) beginning approximately 630 feet North of the intersection of IL Route 1 and IL Route 17 on the East side of Grant Park and ending approximately 650 feet North of The intersection of IL Route 1 and 9000N Rd. This work consists of milling and resurfacing, striping, and pavement markers.
|
039-66M58
|
Executed
|
08/05/2022
|
|
|
2
|
3
|
Various
|
|
Districtwide, Vegetation Control - Tree Removal.
|
040-66M59
|
Executed
|
08/12/2022
|
|
|
2
|
3
|
Iroquois, Livingston
|
|
At Buckley interchange; at Limestone rest area south of Pontiac Vegetation Control - Tree Removal.
|
041-66M60
|
Executed
|
08/05/2022
|
1 / 1 |
1 |
2
|
3
|
Ford
|
|
This work is located on FAI Route 57 (I-57) beginning at the Champaign County Line (M.M. 257.08) and ending at the Iroquois County Line (M.M. 263.51). This work consists of Class A Pavement Patching and related construction work.
|
042-68G65
|
Executed
|
08/03/2022
|
|
|
3
|
4
|
Woodford
|
|
This project consists of bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along with other related collateral work necessary to complete the project as shown in the plans and as described herein. Structure carrying TR 134 over 1-74.
|
043-68G69
|
Executed
|
08/03/2022
|
|
1 |
3
|
4
|
Peoria
|
|
This project consists of bridge repairs on SN 072-0148, including the replacement of the existing expansion joints with strip seals and plating all beam ends at both abutments along with other related work necessary to complete the project as shown in the plans and as described herein. Structure carrying Mossville Rd. over IL 6.
|
044-68G72
|
Executed
|
08/10/2022
|
|
|
3
|
4
|
Peoria
|
|
Patching on IL 6 from US 150 to I-74.
|
045-68G92
|
Executed
|
08/03/2022
|
1 / 1 |
|
3
|
4
|
Knox
|
|
1.90 miles of HMA patching at the I-74 interchange from CR 1925 N.
|
046-68G98
|
Executed
|
08/05/2022
|
|
|
3
|
4
|
Knox
|
|
2.45 miles of PCC Patching from I-74/US 34 Interchange to US 150/US 34 Interchange.
|
047-68G99
|
Executed
|
08/10/2022
|
|
|
3
|
4
|
Mercer
|
|
4.02 miles of HMA Patching from US 67 to 5th Ave in Sherrard, IL.
|
048-68H05
|
Executed
|
08/08/2022
|
|
|
3
|
4
|
Tazewell
|
|
HMA Patching on Business US 24 in Washington (2.65 miles); HMA Patching on IL 122 West of Minier (2.00 miles).
|
049-70608
|
Executed
|
08/05/2022
|
|
|
3
|
5
|
Edgar
|
|
Bridge Replacement Over Catfish Creek 2.5 Miles North of ILL 133.
|
050-70B78
|
Executed
|
08/23/2022
|
1 / 1 |
1 |
3
|
5
|
Champaign
|
|
Bridge deck overlay over Saline Branch, 1 mile East of US 45.
|
051-70C07
|
Withdrawn
|
05/31/2022
|
|
|
3
|
5
|
Champaign
|
|
DRAINAGE IMPROVEMENTS ON FAS 1512 (US 150) FROM CR2650 TO MARKET ST. and ON FAP 836 (IL 49) FROM US 150 TO PRAIRIE AVE. IN OGDEN.
|
052-70F39
|
Executed
|
08/02/2022
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
Interstate Resurfacing SMART Overlay of I 57 from US 136 at Rantoul to the Ford County Line.
|
053-70F54
|
Executed
|
08/12/2022
|
|
|
3
|
5
|
Various
|
|
The project is to establish surveillance points at various interchange locations and to connect the surveillance points to existing fiber optic networks located in District 5 including the counties of Mclean, DeWitt, Piatt, Douglas, and Champaign.
|
054-70F71
|
Executed
|
08/02/2022
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
The project is to replace Millerbernd light poles with new aluminum poles and LED lights on existing foundations at the interchanges of 1-74 with Prospect Ave and Neil St in Champaign, IL in Champaign County.
|
055-70F84
|
Executed
|
08/03/2022
|
|
|
3
|
5
|
Vermilion
|
|
Miscellaneous work: Salt Brine Containment Structure and Push Walls at the Danville Storage Facility.
|
056-70G10
|
Executed
|
08/05/2022
|
|
1 |
3
|
5
|
DeWitt
|
|
0.911 Miles of Standard Overlay on IL 54 at IL 48 Southwest of Farmer City.
|
057-72129
|
Executed
|
08/12/2022
|
|
|
4
|
6
|
Sangamon
|
|
Tree removal on IL 54 from 0.4 miles east of the Sangamon River to Brickler Road.
|
058-72130
|
Executed
|
08/12/2022
|
|
|
4
|
6
|
Sangamon
|
|
Erosion control and tree removal on I-72 near Riverton.
|
059-72883
|
Executed
|
08/10/2022
|
|
|
4
|
6
|
Sangamon
|
|
Patching on I-55 from exit 105, north of Sherman, to the Logan County line.
|
060-72D11
|
Executed
|
08/08/2022
|
1 / 1 |
1 |
4
|
6
|
Macoupin
|
|
HMA overlay, small culvert extensions, ditch grading and guardrail upgrades on IL 111 / IL 267 from the Jersey County line north of Medora to north of IL 16.
|
061-72M30
|
Executed
|
08/05/2022
|
1 / 1 |
|
4
|
6
|
Cass
|
|
Hydroscarification with microsilica overlay on the bridge deck and approaches on SN 009-0013 carrying IL 78 over Little Creek; also includes guardrail replacement.
|
062-72M72
|
Executed
|
08/02/2022
|
|
|
4
|
6
|
Brown
|
|
ADA sidewalk improvements along US 24 / IL 99 in Mt. Sterling.
|
063-72N25
|
Executed
|
08/02/2022
|
1 / 1 |
|
4
|
6
|
Macoupin, Montgomery
|
|
Cured-in-place pipe liners on I-55.
|
064-72N27
|
Executed
|
08/02/2022
|
1 / 1 |
|
4
|
6
|
Brown, Pike
|
|
Cured-in-place pipe liners on IL 107.
|
065-72N28
|
Executed
|
08/02/2022
|
|
|
4
|
6
|
Adams
|
|
Rock excavation on I-172, 0.2 miles north of the IL 57 interchange.
|
066-72N37
|
Executed
|
08/05/2022
|
|
|
4
|
6
|
Logan
|
|
Bridge deck patching and concrete repairs on SN 054-0003 carrying IL 10 over the Kickapoo Creek, 0.6 miles west of IL 10.
|
067-72N38
|
Executed
|
08/02/2022
|
|
|
4
|
6
|
Pike
|
|
Bridge deck repairs on SN 075-0135 carrying IL 100 over Bee Creek, 0.4 miles north of the Calhoun County line.
|
068-72N40
|
Executed
|
08/05/2022
|
|
|
4
|
6
|
Menard
|
|
Bridge deck patching on SN 065-0016 carrying IL 123 over the Sangamon River, 0.2 miles east of IL 97 in Petersburg.
|
069-72N41
|
Executed
|
08/05/2022
|
|
|
4
|
6
|
Scott
|
|
Bridge deck patching on SN 086-0500 carrying IL 100 over Mauvaise Terre Creek, 1.8 miles north of I-72.
|
070-72N42
|
Executed
|
08/02/2022
|
|
|
4
|
6
|
Brown
|
|
Bridge deck patching and bridge joint repairs on SN 005-0002 carrying IL 107 over McKee Creek, 2.9 miles north of the Pike County line.
|
071-74959
|
Executed
|
08/05/2022
|
|
|
4
|
7
|
Macon, Moultrie
|
|
8.3 miles of patching, milling, resurfacing, guardrail replacement and culvert replacements on US 36 from 0.4 miles east of Airport Road in Decatur to 0.2 miles west of IL 32.
|
072-74B08
|
Executed
|
08/10/2022
|
|
|
4
|
7
|
Fayette
|
|
1 mile of patching on eastbound I-70 at the Brownstown Weigh Station.
|
073-74B14
|
Executed
|
08/08/2022
|
|
|
4
|
7
|
Fayette
|
|
10.5 miles of shoulder milling, resurfacing and rumble strips on I-70 from the Bond County line to the Kaskaskia River.
|
074-74B15
|
Executed
|
08/10/2022
|
|
|
4
|
7
|
Fayette
|
|
Pavement patching on IL 185 in Farina from John Deere Road to Carlton Avenue.
|
075-74B17
|
Executed
|
08/08/2022
|
|
|
4
|
7
|
Various
|
|
Railroad signal upgrades at six locations throughout District 7.
|
076-76M80
|
Executed
|
08/10/2022
|
|
1 |
5
|
8
|
Monroe
|
|
5.3 miles of resurfacing on IL 3 from I-255 to Gilmore Lake Road in Columbia.
|
077-76P56
|
Executed
|
08/05/2022
|
|
|
5
|
8
|
St. Clair
|
|
Electrical repairs at the Bowman Pump Station on I-55 / 70 at Exchange Avenue.
|
078-76P61
|
Executed
|
08/10/2022
|
|
|
5
|
8
|
Various
|
|
Patching at various locations throughout District 8.
|
079-76P62
|
Executed
|
08/05/2022
|
|
|
5
|
8
|
Various
|
|
Weed spraying for John Grass along I-64, I-55, I-55/70, I-255, I-270 and I-255.
|
080-76P71
|
Executed
|
08/05/2022
|
|
|
5
|
8
|
Madison
|
|
Bridge painting on I-255 over IL 162 (SN 060-0220 and SN 060-0221), IL 157 over Burdick Branch Creek (SN 060-0088), and Main Street / Glen Carbon Road over I-270 (SN 060-0184).
|
081-76P78
|
Executed
|
08/05/2022
|
|
1 |
5
|
8
|
Marion
|
|
Bridge joint replacement and repair on SN 061-0078 carrying Selmaville Road over Crooked Creek, 3.25 miles south of US 50.
|
082-76P79
|
Executed
|
08/16/2022
|
|
1 |
5
|
8
|
Clinton
|
|
Bridge joint replacement and repairs on SN 014-0063 carrying IL 127 over Flat Branch Creek, 8.1 miles north of Carlyle.
|
083-76P80
|
Executed
|
08/02/2022
|
|
1 |
5
|
8
|
Washington
|
|
Bridge joint replacement and repairs on SN 095-0065 carrying IL 127 over Locust Creek, 5.5 miles south of Nashville.
|
084-76P94
|
Executed
|
08/05/2022
|
1 / 1 |
1 |
5
|
8
|
Madison, St. Clair
|
|
Traffic signal modernization on IL 157 at Lazercheff Drive in Cahokia, on IL 157 at Kenneth Street / Paris Avenue in Cahokia, on IL 3 at IL 143 in Wood River, on IL 3 / IL 111 at IL 140 in Alton, and on IL 3 / IL 111 at Bloomer Drive in Alton.
|
085-76P95
|
Deleted
|
04/19/2022
|
|
|
5
|
8
|
Various
|
|
Maintain and service all ITS equipment at various locations throughout District 8 and replacement of the dynamic message board on westbound I-70 at mile marker 16.8.
|
086-76P96
|
Executed
|
08/05/2022
|
|
|
5
|
8
|
Various
|
|
Highway lighting, traffic signal and repair at various locations throughout District 8.
|
087-76R03
|
Executed
|
08/08/2022
|
|
|
5
|
8
|
Various
|
|
Guardrail and cable median repair at various locations in District 8.
|
088-78619
|
Executed
|
08/10/2022
|
4 / 4 |
|
5
|
9
|
Williamson
|
|
Replacing SN 100-0055 carrying Westminster Drive over I-57 near the City of Marion.
|
089-78624
|
Executed
|
08/10/2022
|
2 / 2 |
1 |
5
|
9
|
Perry
|
|
Intersection reconstruction at the IL 13 / 127 and resurfacing along IL 13 / 127 from IL 154 to the railroad underpass in Pinckneyville.
|
090-78685
|
Executed
|
08/10/2022
|
|
|
5
|
9
|
Massac
|
|
Remove and replace SN 064-0017 (WB) and SN 064-0018 (EB) carrying I-24 over Bear Creek, 4 miles south of the Johnson County line.
|
091-78824
|
Rejected
|
07/07/2022
|
|
1 |
5
|
9
|
Johnson
|
|
Embankment stabilization on IL 146, 0.3 miles west of the Pope County line.
|
092-78874
|
Executed
|
08/02/2022
|
|
|
5
|
9
|
Jackson, Union
|
|
12.4 miles of HMA resurfacing, patching, ADA improvements and ditch re-grading on Old US 51 from Makanda to Anna.
|
093-78899
|
Executed
|
08/02/2022
|
|
|
5
|
9
|
Alexander
|
|
Joint replacement of 14 bridge joints (7 per bridge) on existing SN 002-0023 002-0024 on I-57 at the Cairo interchange (exit 3) over IL 3, Outer Road, CN/IC Railroad and Levee Road.
|
094-78909
|
Deleted
|
05/12/2022
|
|
|
5
|
9
|
Saline
|
|
Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg.
|
095-78940
|
Executed
|
08/10/2022
|
|
|
5
|
9
|
Jefferson
|
|
13.2 miles of patching on I-64 from the Washington County line to the north tri-level, north of Mt. Vernon and on I-57 from the north tri-level to Veteran's Drive. Project also includes deck slab repair on SN 041-0012 and 041-0013 on I-57.
|
096-78946
|
Executed
|
08/02/2022
|
|
|
5
|
9
|
Various
|
|
Electrical repair and/or replacement at various locations throughout District 9.
|
097-78947
|
Rejected
|
07/07/2022
|
|
1 |
5
|
9
|
Various
|
|
Upgrade railroad interconnected traffic signals in Carbondale, Herrin and Anna.
|
098-78950
|
Executed
|
08/02/2022
|
1 / 1 |
1 |
5
|
9
|
Gallatin
|
|
0.4 miles of patching at the intersection of IL 13 and IL 1 in Equality.
|
099-78951
|
Executed
|
08/02/2022
|
2 / 2 |
1 |
5
|
9
|
Franklin
|
|
Patching at the northbound and southbound rest areas on I-57 near Rend Lake.
|
100-78952
|
Active
|
04/18/2022
|
1 / 1 |
|
5
|
9
|
Various
|
|
Replace batteries in uninterruptable power supplies at various locations throughout District 9.
|
101-78954
|
Executed
|
08/10/2022
|
|
|
5
|
9
|
Alexander, Pulaski
|
|
Pavement patching on I-57 from the Mississippi River Bridge to the Pulaski / Union County line.
|
102-78955
|
Executed
|
08/02/2022
|
|
|
5
|
9
|
Johnson, Union
|
|
12.7 miles of patching on the I-57 northbound lanes from mile marker 44 to mile marker 31.
|
103-64R69
|
Executed
|
08/02/2022
|
|
|
2
|
2
|
Henry, Rock Island
|
|
Maintenance of signs along State maintained routes in Henry and Rock Island Counties.
|
104-61H51
|
Executed
|
08/05/2022
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Construction of a bike path along the west side of Kuhn Road from Army Trail Road to 0.10 mile south of Lies Road in Carol Stream.
|
105-61H65
|
Rejected
|
12/28/2022
|
|
|
1
|
1
|
Cook
|
|
Resurface National Parkway from Woodfield Road to Higgins Road in Schaumburg.
|
106-61H69
|
Executed
|
08/08/2022
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Realignment of shared-use path, pavement reconstruction, and retaining wall along Green Bay Trail at Hazel Avenue in Glencoe.
|
107-61H70
|
Executed
|
08/05/2022
|
|
|
1
|
1
|
Cook
|
|
Resurface Washington Avenue from Hemman Avenue to Prairie Avenue in Brookfield.
|
108-61H77
|
Executed
|
08/05/2022
|
|
|
1
|
1
|
Cook
|
|
Resurface Biesterfield Road from west village limits to Meacham Road in Elk Grove Village.
|
109-61H79
|
Executed
|
08/05/2022
|
1 / 0 |
|
1
|
1
|
Lake
|
|
Resurface Barclay Boulevard from Aptaksic Road to Half Day Road in Lincolnshire .
|
110-62N31
|
Deleted
|
05/02/2022
|
|
|
1
|
1
|
Various
|
|
(3.04-Mile) Temp pavement construction, median and shoulder rehab, ditch grading, temp drainage improvements, traffic staging, earthwork, erosion control, construction layout, pavement markings, temp lighting, and landscaping on I-80 from E of Ridge Road to E of River Road in Villages of Minooka and Shorewood and Troy Township.
|
111-62P55
|
Executed
|
08/08/2022
|
3 / 3 |
|
1
|
1
|
Cook
|
|
(2007.6-Ft) Structural rehabilitation and substructure repairs of three bridges earring 1-94 over Little Calumet River and over CSXTand IHB Railroad in the City of Dolton and the City of Calumet City.
|
112-62R48
|
Executed
|
08/12/2022
|
1 / 1 |
1 |
1
|
1
|
Various
|
|
(332.1-Mile) Improvement consists of cleaning (nighttime sweeping) various expressways throughout District One in various counties.
|
113-66J71
|
Executed
|
08/05/2022
|
|
1 |
2
|
3
|
Kendall
|
|
LaSalle County Line to 0.2 MI W of IL 47 in Yorkville. This work consists of milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, raised reflectors, and ADA ramps.
|
114-66M16
|
Executed
|
08/05/2022
|
|
|
2
|
3
|
LaSalle
|
|
This project consists of 6.8 miles of shoulder widening and rumble strip installation on IL 170 from N 16th Rd to N 21st Rd in LaSalle County.
|
115-68G89
|
Executed
|
08/05/2022
|
|
|
3
|
4
|
Various
|
|
Weed spraying (off road) in various counties on various routes.
|
116-68G93
|
Executed
|
08/03/2022
|
1 / 1 |
|
3
|
4
|
Warren
|
|
6.22 miles of HMA patching from 20th Street to US 67.
|
117-68G94
|
Executed
|
08/05/2022
|
|
|
3
|
4
|
Knox
|
|
1.15 miles of Class B Patching from Swing Blvd to Main Street in Galesburg, IL.
|
118-68G95
|
Executed
|
08/05/2022
|
|
|
3
|
4
|
Knox
|
|
9.62 miles of PCC Patching from US 150/IL 97 Interchange to the Spoon River Rest Area.
|
119-74780
|
Executed
|
08/05/2022
|
|
|
4
|
7
|
Macon
|
|
6 miles of overlay and bridge joint replacement and repairs with bridge deck overlay on Old US 51 from US 51 to Cleveland Ave in Decatur.
|
120-74B20
|
Executed
|
08/05/2022
|
|
|
4
|
7
|
Various
|
|
Repairs of location-specific motorist caused guardrail damage and on-call repairs of guardrail damage throughout District 7.
|
121-89812
|
Executed
|
08/08/2022
|
|
|
3
|
4
|
Woodford
|
|
HMA Pavement widening, resurfacing and PCC pavement on CH 13 from US 24 north for 0.13 mile.
|
122-91543
|
Executed
|
08/08/2022
|
|
|
3
|
5
|
McLean
|
|
Resurface CH 24 from Tazewell County line to IL 122.
|
123-93786
|
Executed
|
08/02/2022
|
|
|
4
|
6
|
Macoupin
|
|
Replace bearings and joints at both abutments, partial depth deck patches, substructure concrete repairs and steel repairs to the structure carrying Stanton-Bunker Hill Road over West Fork of Cahokia Creek.
|
124-93787
|
Executed
|
08/05/2022
|
1 / 1 |
|
4
|
6
|
Scott
|
|
Full-depth pavement reclamation with bituminous surface treatment on Winchester-Glasgow Road from jIL 106 to Van Meter Lane, and on Hoots Road from Bloomfield Road to IL 106.
|
125-93788
|
Executed
|
08/10/2022
|
|
|
4
|
6
|
Adams
|
|
Resurface CH 11 from IL 61/94 to 0.2 mile south of North 2400th Avenue.
|
126-93790
|
Executed
|
08/05/2022
|
2 / 2 |
|
4
|
6
|
Sangamon
|
|
Resurface North Farmingdale Road from Farmingdale to IL 125, South Bradforton Road from Old Jacksonville Road to South of Washington Street, and South Williamsville Road from north of IL 54/RR tracks to north of Wolf Creek Road.
|
127-93791
|
Executed
|
08/10/2022
|
2 / 2 |
1 |
4
|
6
|
Morgan
|
|
Resurfacing and culvert replacement on Murrayville Road from IL 267 to US 67.
|
128-95916
|
Executed
|
08/05/2022
|
|
|
4
|
7
|
Fayette
|
|
Replace the bridge carrying TR 571B over a tributary to North Fork Creek, 6 miles west of Farina.
|
129-95917
|
Executed
|
08/16/2022
|
9 / 6 |
|
4
|
7
|
Jasper
|
|
Remove existing guardrail and terminals, install new steel plate beam guardrail and traffic barrier terminals on various routes in Jasper County.
|
130-95918
|
Executed
|
08/05/2022
|
|
1 |
4
|
7
|
Jasper
|
|
Reconstruct existing roadway with a 10" soil-cement base course from IL 130 to IL 49.
|
131-95924
|
Executed
|
08/03/2022
|
3 / 3 |
1 |
4
|
7
|
Wayne
|
|
Construction of HMA surface pavement, regading the subgrade and making existing intersection a controlled 4 way stop at the intersection with CH 2, 9 miles north of Fairfield.
|
132-97761
|
Executed
|
08/02/2022
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Resurface Keebler Road from 0.1 mile south of IL 162 to Lorry Lane in Maryville .
|
133-97763
|
Executed
|
08/30/2022
|
3 / 3 |
1 |
5
|
8
|
Madison
|
|
Reconstruct First Street from C Street to E Street in America's Central Port District.
|
134-97772
|
Executed
|
08/02/2022
|
3 / 3 |
2 |
5
|
8
|
Washington
|
|
Resurface CH 10 from the Village of Elkton to Oakdale.
|
135-97775
|
Executed
|
08/05/2022
|
|
1 |
5
|
8
|
Monroe
|
|
Sidewalk Construction, Pedestian Signals, pavement markings at Country Club Lane, HH Road and IL 3.
|
136-97776
|
Executed
|
08/10/2022
|
|
|
5
|
8
|
Monroe
|
|
Construct HMA shoulders and rumble strips for 6 miles on Mayestown Road from Waterloo city limits to Mill Street in Mayestown.
|
137-97777
|
Executed
|
08/08/2022
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Traffic signal improvments along Troy Road from Monclaire Avenue to Illini Drive in Glen Carbon and Edwardsville.
|
138-97778
|
Executed
|
08/16/2022
|
|
|
5
|
8
|
Marion
|
|
Roadway reconstruction on Whittake Street from South college Street to 100' east of Pearl Street in Salem.
|
139-99655
|
Executed
|
08/02/2022
|
1 / 1 |
|
5
|
9
|
Perry
|
|
Resurface Pyatt-Culter Road from IL 4 to Union School Road.
|
140-99676
|
Executed
|
08/02/2022
|
1 / 0 |
|
5
|
9
|
Williamson
|
|
Resurface Thompsonville Road from Locust Grove road to Corinth Road.
|
141-99677
|
Executed
|
08/02/2022
|
1 / 0 |
|
5
|
9
|
Gallatin
|
|
Resurface Ridgway/New Haven Road from Murphy Street in Ridgway, to Shawneetown Road.
|
142-99682
|
Executed
|
08/10/2022
|
2 / 2 |
|
5
|
9
|
Franklin
|
|
Resurface Creek Nation Blacktop from IL 184 to IL 148.
|
143-99685
|
Executed
|
08/12/2022
|
3 / 3 |
|
5
|
9
|
Massac
|
|
Replace the bridge carrying Unionville Road over Mud Creek, 2.9 miles east of Unionville.
|
144-99686
|
Rejected
|
07/07/2022
|
|
1 |
5
|
9
|
Williamson
|
|
Resurface Pittsburg Road from Corinth Road to IL 13.
|
145-46575
|
Executed
|
08/19/2022
|
|
|
1
|
1
|
Various
|
|
This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, 8, 12, and 24 inches in width.
|
146-46589
|
Executed
|
09/23/2022
|
|
|
2
|
3
|
Various
|
|
Guardrail and barrier wall delineation.
|
147-46593
|
Executed
|
08/08/2022
|
|
|
1
|
1
|
Cook
|
|
This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width.
|
148-46594
|
Executed
|
08/02/2022
|
|
|
1
|
1
|
DuPage
|
|
This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown.
|
149-46601
|
Executed
|
08/02/2022
|
|
|
3
|
4
|
Various
|
|
This work shall consist of removing damaged raised reflective pavement markers and replacing them with new raised reflective pavement markers or lenses within the limits shown in the plans.
|
150-62N41
|
Deleted
|
05/02/2022
|
|
|
1
|
1
|
Will
|
|
(1,195-Ff) Removal of existing 4-span bridge along Shepley Road over I-80 in Will County, IL and replacement with a 2-span 264'-00" long, 36'-10" out to out wide bridge. Bridge approach roadway improvements include pavement reconstruction, shoulder construction, guardrail replacement, and maintenance of traffic control.
|
151-64P89
|
Executed
|
08/02/2022
|
|
|
2
|
2
|
Whiteside
|
|
Bridge deck sealing on SN 098-6003 carrying US 30 over the Mississippi River 1.0 miles West of IL 84.
|
152-64R62
|
Executed
|
08/08/2022
|
|
|
2
|
2
|
Ogle
|
|
Approximately 600 ft. of Concrete Pavement with the Installation of a New Weigh-In-Motion Sensors.
|
153-66J62
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
Grundy
|
|
Spot improvements to remove SN 032-0052 carrying Nettle Creek Road over I-80, 8.2 miles West of IL 47.
|
154-66K68
|
Executed
|
08/08/2022
|
2 / 2 |
1 |
2
|
3
|
Iroquois
|
|
This work is located on FAS 1324 (US 45) from First South Street in Chebanse to Third Ave in Clifton in Iroquois County (+/-4.73 miles). This work consists of 3P milling and resurfacing (designed overlay) and ADA improvements.
|
155-66L45
|
Executed
|
08/08/2022
|
1 / 1 |
|
2
|
3
|
Kankakee
|
|
1.7 Miles, Milling and Resurfacing (SMART OVERLAY) and ADA. Work begins 0.35 miles West of Roosevelt Ave and ends just West of 5th Ave in Kankakee.
|
156-66L88
|
Executed
|
08/08/2022
|
4 / 4 |
1 |
2
|
3
|
Kankakee
|
|
This work is located at FAP 631 (IL 102) from Will County line to US 45/52 in Bourbonnais in Kankakee County (+/-8.14 miles). This work consists of 3P milling and resurfacing (designed overlay), ADA.
|
157-66M13
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
Putnam
|
|
This project is located at Structure No. 078-0022 carrying CH 1 over I-180, approximately 0.46 miles west of the I-180 and IL Route 26 Interchange near Hennepin. This project consists of cleaning and painting all structural and non-structural steel components of the structure.
|
158-66M17
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
Kankakee
|
|
This project consists of 4.3 miles of shoulder widening and rumble strip installation on IL 115 from S 3000W Rd to 0.5 mi west of Curtis Ave in Kankakee County.
|
159-66M21
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
Livingston
|
|
This project is located at three structures: Structure No. 053-0123 carrying E1400N Rd. over I-55 and Mazon River, 3 miles Southwest of Pontiac; SN 053-0047 carrying IL 47 over Five Mile Creek, 0.3 miles North of IL 116; SN 053-0168 carrying IL 47 over the Vermilion River, 0.4 miles South of US 24. This project consists of cleaning all structural steel and other steel components of the structures.
|
160-66M35
|
Executed
|
08/19/2022
|
|
|
2
|
3
|
Bureau, LaSalle
|
|
This project is located at five structures spanning the Illinois River in IDOT District 3. This work consists of washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, tops of piers, deck drains and scuppers.
|
161-66M61
|
Rejected
|
08/15/2022
|
|
|
2
|
3
|
Iroquois
|
|
This project includes a small native planting project at the Ashkum Maintenance Yard using wildflower seeding.
|
162-68G43
|
Executed
|
08/08/2022
|
|
|
3
|
4
|
McDonough, Warren
|
|
Bridge deck overlay, bridge approach roadway and bridge repair to SN 094-0037, SN SN 094-0038 over Big Negro Creek, SN 094-0039, SN 094-0040 over Swan Creek, SN 055-0031, SN 055-0032 over East Fork Crooked Creek. Total Length = 0.39 miles.
|
163-68G90
|
Executed
|
08/02/2022
|
|
|
3
|
4
|
Various
|
|
Lighting, traffic signals, and ITS upgrades at various locations within District 4.
|
164-68G97
|
Executed
|
08/08/2022
|
1 / 1 |
|
3
|
4
|
Knox
|
|
1.34 miles of HMA Patching from Allens Ave to Michigan Ave in Galesburg, IL.
|
165-68H06
|
Executed
|
08/08/2022
|
|
|
3
|
4
|
McDonough
|
|
Pollinator habitat restoration and preservation (seeding and weeding) along Macomb NW Bypass from US 136 to US 67.
|
166-70A29
|
Executed
|
08/02/2022
|
1 / 1 |
1 |
3
|
5
|
Vermilion
|
|
Reconstruction, designed overlay resurfacing, bridge deck overlay, bridge deck repair from US 150 W of Danville to Vermilion River in Danville (various structures) Gross length 5.95 miles, net length 5.07 miles.
|
167-72100
|
Executed
|
08/10/2022
|
|
|
4
|
6
|
Sangamon
|
|
Patching on IL 4 from J. David Jones Parkway to Camp Lincoln Road and on IL 29 from Hackmore Drive to Jefferson Street.
|
168-74257
|
Executed
|
08/03/2022
|
4 / 4 |
1 |
4
|
7
|
Clark
|
|
8.5 miles of resurfacing on I-70 from 2 miles east of the Cumberland County line to 0.7 miles east of Martinsville.
|
169-74473
|
Executed
|
08/08/2022
|
|
1 |
4
|
7
|
Lawrence
|
|
1.2 miles of standard overlay, ADA updates and traffic signal improvements on IL 1 from Charles Street to Orchard Street.
|
170-74599
|
Executed
|
08/03/2022
|
10 / 10 |
2 |
4
|
7
|
Effingham
|
|
6.9 miles of rubblization, patching, resurfacing, shoulder replacement, guardrail replacement, culvert replacement and bridge deck replacement on I-70 from 0.5 miles east of I-57 to just east of the Cumberland County line.
|
171-74902
|
Executed
|
08/08/2022
|
|
|
4
|
7
|
Macon
|
|
Traffic signal modernization at the intersection of IL 105 (East William Street) and North Country Club Road in Decatur.
|
172-74A24
|
Executed
|
08/08/2022
|
|
|
4
|
7
|
Moultrie
|
|
13.3 miles of designed overlay and inlay resurfacing, replacement of 4 box culverts and repair to 3 structures on US 36 from 0.2 miles west of IL 32 to the Douglas County line.
|
173-78879
|
Executed
|
08/08/2022
|
|
|
5
|
9
|
Jackson, Williamson
|
|
Signal modifications and fiber optic installation on IL 13 from Reed Station Road in Carbondale to Fair Street in Marion and on I-57 from IL 13 to the DMS sign approximately 3 miles north.
|
174-78897
|
Executed
|
08/10/2022
|
2 / 2 |
1 |
5
|
9
|
Franklin
|
|
1 mile of HMA resurfacing and ADA improvements on IL 34 from Benton Square to Brown Street.
|
175-46595
|
Executed
|
08/08/2022
|
1 / 1 |
|
1
|
1
|
Various
|
|
This work shall consist of placing various widths of thermoplastic, preform plastic, hot spray thermoplastic and modified urethane pavement marking lines, letters and symbols and the removal of existing pavement markings and the installation of grooved pavement markings within the limits specified on each individual work order.
|
176-46597
|
Executed
|
08/08/2022
|
|
|
3
|
5
|
McLean
|
|
0.852 mi, NW of Normal near I-55/I-74 Split, Statewide other - miscellaneous.
|
177-46599
|
Executed
|
08/24/2022
|
|
|
3
|
5
|
Various
|
|
Pavement marking repair at various locations district wide.
|
178-46600
|
Executed
|
08/10/2022
|
|
|
3
|
4
|
Various
|
|
This work shall consist of placing preformed plastic, epoxy and modified urethane pavment markings, letters and symbols, and the removal of existing pavement markings within the limits specified on each individual work order.
|
179-60X98
|
Rejected
|
07/07/2022
|
|
1 |
1
|
1
|
Cook
|
|
(1.39-Mile) Planting of various landscaping features within the 1-90 and 1-290 expressway corridors, installation of various aesthetics features as well as creation of green spaces at selected locations to enhance the overall corridor.
|
180-61D99
|
Rejected
|
09/05/2023
|
7 / 7 |
1 |
1
|
1
|
Cook
|
|
Rehabilitate Structure 016-0194 carrying IL 1 over the CSX Railroad and Stucture 016-0195 carrying IL 1 over the Indiana Harbor Belt Railroad. Includes construction of a shared use path. Project is located between Jackson Street and 142nd Street in Riverdale.
|
181-61H68
|
Executed
|
08/10/2022
|
|
|
1
|
1
|
Cook
|
|
Resurfacing, sidewalk construction, curb and gutter replace, pavement markings, on Springinsguth Road from Bode Road to Schaumburg Road in Schaumburg.
|
182-61H72
|
Executed
|
09/13/2022
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Bode Road from Barrington Road to North Springinsguth Road in Hoffman Estates and Schaumburg
|
183-61H75
|
Executed
|
08/30/2022
|
|
|
1
|
1
|
Will
|
|
Resurfacng Court Street from Eastgate Avenue to Will Center Road in Monee.
|
184-61H76
|
Executed
|
08/08/2022
|
|
|
1
|
1
|
Will
|
|
Resurfacing Budler Road from Taylor Road to Airport Road in Romeoville.
|
185-61H78
|
Rejected
|
10/21/2022
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Construct an aggregate and PCC shared-use path, inlcudes curb and gutter, traffic signal enhancements, pavement markings and signing on the west side of East River Road at the intersection with Bryn Mawr Avenue to Devon Avenue in Chicago and Park Ridge.
|
186-61H80
|
Rejected
|
07/07/2022
|
|
|
1
|
1
|
McHenry
|
|
Reconstruct Souwanas Trail from Oceola Street to Sanbloom Road, and the reconstruction of Schuett Street from Scott Street to Hubbard Street in Algonquin.
|
187-61H84
|
Rejected
|
07/07/2022
|
1 / 0 |
|
1
|
1
|
Cook
|
|
Construction of a shared-use path, includes a reinforced slope system, drainage improvements, culvert headwall modifications, guardrail installation and pavement markings on the east side of 104th Avenue to 159th Street to 163rd Place in Orland Park.
|
188-62H16
|
Executed
|
08/08/2022
|
2 / 2 |
|
1
|
1
|
Will
|
|
(1,778-Ft.) Improvement consists of bridge rehabilitation, channelization and traffic signal modernization at US 52 (Jefferson St) and 1-55 interchange, located in Village of Shorewood, Will County.
|
189-62L00
|
Deleted
|
05/09/2022
|
|
|
1
|
1
|
Cook
|
|
This project consists of Standard Overlay/Pedestrian ramp {ADA) improvements along Morgan Street from 82nd Street to 87th Street spanning a total length of 3,354 ft (1.27 Miles) in the City of Chicago, Cook County.
|
190-62N72
|
Executed
|
08/08/2022
|
|
1 |
1
|
1
|
Cook
|
|
(2.211-Mile)Designed Overlay, Shoulders, Milled Rumble Strips and ADA Improvements, Location of work: Project located from Muskegon Ave to State Line Rd in the Village of Burnham and the City of Chicago in Cook County.
|
191-66L58
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
DeKalb, Kendall
|
|
5.41 miles, Milling and Resurfacing (Designed Overlay) and ADA 0.2 miles East of Somonauk Rd in Somonauk to Chilton Way in Plano.
|
192-68G96
|
Executed
|
08/03/2022
|
1 / 1 |
|
3
|
4
|
Knox
|
|
0.87 miles of HMA Patching from US 150/IL 97 Interchange with I-74 to CH 17/CR 1290N.
|
193-68H04
|
Executed
|
08/02/2022
|
|
|
3
|
4
|
Tazewell, Woodford
|
|
2.9 miles of median removal and manhole/inlet repairs.
|
194-85726
|
Executed
|
08/08/2022
|
1 / 1 |
1 |
2
|
2
|
Boone
|
|
Construction of a shared-use path and sidewalk adjacent to Lawrenceville Road from Taylor Ridge Road to Business Route 20, and from the intersection of Lawrenceville Road and Business Route 20 North to Marengo Road.
|
195-87756
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
Grundy
|
|
Replace the bridge carrying DuPont Road over Waupecan Creek.
|
196-87786
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
Kendall
|
|
Resurface Bristol Ridge Road from Kennedy Road to US 34 in Yorkville.
|
197-87798
|
Rejected
|
07/07/2022
|
1 / 1 |
|
2
|
3
|
Ford
|
|
Resurfacing and aggregate shoulders on Elliot Road from 12 North Road to IL 54.
|
198-87810
|
Withdrawn
|
06/01/2022
|
1 / 1 |
|
2
|
3
|
LaSalle
|
|
Construction of a soldier pile wall and slope stabilization along North 2550th Road from North 2551st Road to a point approximently 0.25 mile east along 2550th Road in the Peru Road District.
|
199-89760
|
Executed
|
08/08/2022
|
3 / 3 |
1 |
3
|
4
|
Warren
|
|
Replace the bridge carrying CH 4 over Henderson Creek, 5.4 miles southeast of Alexis.
|
200-95920
|
Executed
|
08/08/2022
|
|
|
4
|
7
|
Macon
|
|
Replace the bridge carrying Washington Street over Friends Creek, 4.9 miles northeast of Argenta.
|
201-95921
|
Executed
|
08/08/2022
|
|
|
4
|
7
|
Moultrie
|
|
Pavement pulverization, processing modified soil, application of A-3 bituminous surface treatment and aggregate shoulders on CH 8 from 2400 North Road to 2200 North Road.
|
202-99632
|
Executed
|
08/10/2022
|
2 / 2 |
|
5
|
9
|
Jackson
|
|
Construction of 5,700 feet of PCC sidewalk, pipe culverts, abutment construction, and a pedestrian truss superstructure along an abandoned rail line from New Era Road to Oakland Avenue in Carbondale.
|
203-62P33
|
Executed
|
08/08/2022
|
|
1 |
1
|
1
|
Lake
|
|
(1.02-Mile) Designed Overlay, ADA Improvements: HMA removal and resurfacing, Class D patching, ADA curb ramps improvements, PMK. FAP 330: IL 21 (Milwaukee Ave) from Church Street to South of Finstad Drive in the Village of Libertyville.
|
204-62P54
|
Executed
|
08/08/2022
|
|
|
1
|
1
|
Cook
|
|
(2,370-Ft) Retaining wall repair and concrete barrier wall replacement located along EB-I-290 between South Central Ave. and South Laramie St. in the City of Chicago.
|
205-62P72
|
Executed
|
08/08/2022
|
|
|
1
|
1
|
Cook, DuPage
|
|
Trombone Mast Arm Replacement at various locations in District 1.
|
206-66957
|
Executed
|
08/08/2022
|
|
|
2
|
3
|
Kankakee
|
|
Widening and resurfacing of the intersection with Armour Road. Other items include storm sewer, shared use path, sidewalk, curb and gutter, roadway lighting, traffic signals, and landscape restoration. (0.72 miles)
|
207-68H03
|
Rejected
|
07/07/2022
|
1 / 1 |
|
3
|
4
|
McDonough
|
|
17.20 miles of HMA Patching from McDonough County Line to US 67.
|
208-60W35
|
Executed
|
08/12/2022
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
(1.19-Mile) Pavement reconstruction along I-80 WB from Gardner St to Rowell Ave, replacement and widening of bridges carrying WB I-80 over Hickory Creek and Rowell Ave/WCL RR, bridge deck patching at EB and WB I-80 over Raynor Ave., SB Center St to EB I-80 Ramps, Des Plaines River, IL 53, and Gardner St/BNSF RR/UP RR and lighting in the city of Joliet in Will County.
|
209-61H44
|
Executed
|
09/30/2022
|
2 / 2 |
|
1
|
1
|
Cook
|
|
Reconstruct Rand Road from Isabella Street to Albany Lane, reconstruct Mount Prospect Road to Westgate Road, and reconstruct Mount Prospect Road from Central Road to Rand Road.
|
210-61H82
|
Executed
|
09/06/2022
|
4 / 4 |
2 |
1
|
1
|
Cook
|
|
Construction of an HMA shared-use path, PCC sidewalk, sheet pile wall, pedestrian traffic signals, storm sewer, guardrail, and pavement markings along Oakton Street from Caldwell Avenue to Lehigh Avenue, and along Caldwell Avenue from Oakton Street to Vapor Lane in Morton, Skokie and Niles.
|
211-85709
|
Executed
|
08/03/2022
|
|
|
2
|
2
|
Whiteside
|
|
Reconstruction of Dixon Avenue from IL 40 to Hennepin Feeder Canal Bridge in Rock Falls.
|
212-85722
|
Executed
|
08/10/2022
|
1 / 1 |
|
2
|
2
|
Stephenson
|
|
Replace the bridge carrying Preston Road over Preston Creek, 1 mile south of IL 20.
|
213-87769
|
Rejected
|
07/07/2022
|
1 / 1 |
|
2
|
3
|
Iroquois
|
|
Replace the bridge carrying 1000 East Road over a tributary to Little Mud Creek , 3 miles northwest of Cissna.
|
214-87778
|
Executed
|
08/12/2022
|
1 / 0 |
|
2
|
3
|
Bureau
|
|
Replace the double barrel box culvert with a 10' x 12' double barrel reinforced concrete box culvert over Hickory Creek at Backbone Road.
|
215-87779
|
Executed
|
08/08/2022
|
9 / 9 |
1 |
2
|
3
|
DeKalb
|
|
Replace two bridges in DeKalb; Lucinda Avenue over the south branch of the Kishwaukee River, and North First Street over the south branch of the Kishwaukee River.
|
216-89813
|
Executed
|
08/30/2022
|
|
|
3
|
4
|
Marshall
|
|
Replace the bridge carrying Camp Grove Road over Senachwine Creek, 1.2 miles west of Yankee Lane.
|
217-95914
|
Executed
|
08/08/2022
|
|
|
4
|
7
|
Shelby
|
|
Replace the bridge carrying TR 235 over Jordan Creek, 3.4 miles southeast of Shelbyville.
|
218-97783
|
Executed
|
08/08/2022
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing Collinsville Avenue from St. Clair Avenue to Summit Avenue in East St. Louis.
|
219-46923
|
Executed
|
08/08/2022
|
|
|
3
|
5
|
Vermilion
|
|
The project consists of bridge repairs to SN 092-9903 and removal of SN 092-9904 at Kickapoo State Park. The work includes bridge deck overlay, slope wall repairs, structure removal, and other miscellaneous improvement items at the Kickapoo State Park in Vermilion County, gross and net length 0.1 miles.
|
220-60T46
|
Executed
|
08/16/2022
|
40 / 40 |
|
1
|
1
|
Cook
|
|
(5.45-Mile) Kennedy Expressway Reversible lanes. REVLAC System rehabilitation. The REVLAC system consists of 115 swing gates, 6 arresting barriers and 4 nodal buildings ComCenter controls. Fiber optic cables, and Programmable Logic Controllers (PLC)
|
221-61H26
|
Executed
|
09/23/2022
|
2 / 2 |
|
1
|
1
|
Will
|
|
Reconstruction of Penfield Street from Gould Street to IL 1, and the reconstruction of Gould Street from Indiana Avenue to Penfield Street in Beecher.
|
222-64L13
|
Executed
|
08/02/2022
|
2 / 2 |
|
2
|
2
|
Henry, Rock Island
|
|
ADA Ramps at various locations in Henry and Rock Island Counties.
|
223-93774
|
Rejected
|
07/07/2022
|
1 / 1 |
|
4
|
6
|
Christian
|
|
Reconstruction of East 9th Street from South Chestnut Street to South Locust Street in Pana.
|
224-93789
|
Executed
|
08/12/2022
|
|
|
4
|
6
|
Christian
|
|
Replace the bridge carrying 1600E over Locust Creek, 2 miles west of Owaneco.
|
225-95919
|
Executed
|
08/12/2022
|
2 / 1 |
1 |
4
|
7
|
Macon
|
|
Reconstruction of Faries Park Road from 1 mile south of Gun Club Road to .3 mile north of Gun club Road.
|
226-95922
|
Executed
|
08/08/2022
|
|
|
4
|
7
|
Macon
|
|
Cold-In-Place recycling and HMA resurfacing on CH 21 from Il 121 to Damon Road.
|
227-97747
|
Rejected
|
07/18/2022
|
4 / 2 |
1 |
5
|
8
|
St. Clair
|
|
Intersection reconstruction to add two right turn lanes at IL 3 in Sauget.
|
228-97780
|
Executed
|
08/02/2022
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Pavement reconstruction, guardrail installation, and the installation of conduit on Sauget Business Boulevard from Curtiss-Steinberg Road to Mousette Lane in Sauget.
|
229-99688
|
Executed
|
08/08/2022
|
4 / 4 |
|
5
|
9
|
Johnson
|
|
Resurface Tunnel Hill Road from IL 37 to Parrish Ridge Lane.
|
230-99689
|
Executed
|
08/12/2022
|
|
|
5
|
9
|
Jackson
|
|
Reconstruction of New Era Road from Glenn Road to Airport Road in Carbondale.
|
231-99692
|
Rejected
|
07/07/2022
|
1 / 1 |
|
5
|
9
|
Jefferson
|
|
Resurfacing, HMA shoulders and rumble strips on Dix Irvington Road from east of US 51 to Boyd Road.
|
232-62H15
|
Executed
|
08/08/2022
|
10 / 10 |
2 |
1
|
1
|
Will
|
|
(2.5-Mile) Interchange reconstruction of I-55 from I-80 to US 52 ; adding auxiliary lanes on I-55 ; intersection improvement; new traffic signals; retaining and noise abatement walls; drainage improvement; shared- use path; roadway lighting; ITS; and aesthetic landscaping located in Joliet and Shorewood.
|
233-70F78
|
Executed
|
08/03/2022
|
1 / 1 |
|
3
|
5
|
Various
|
|
Upgrading and repairing 3 locations of cable median barrier on I 57 and I 74.
|
234-62P53
|
Executed
|
08/23/2022
|
|
|
1
|
1
|
Cook
|
|
(200-Ft) Wingwall replacement and culvert repairs of the culvert carrying Wolf Road over Addition Creek in the City of Northlake, Cook County.
|
235-66M43
|
Withdrawn
|
05/19/2022
|
|
|
2
|
3
|
Iroquois
|
|
This work is located on FAP Route 317 (US 24) beginning at the intersection of US 45/24 (L.M. 0.00) in Gilman and ending at the intersection of US 24 and IL 1 (L.M. 12.34) in Watseka. This work consists of Class B pavement patching and related construction work.
|
236-66M49
|
Rejected
|
07/07/2022
|
|
|
2
|
3
|
Iroquois
|
|
This project is located on F.A.I. Route 57 (I-57) beginning at the Ford County Line and ending approximately 4.5 miles North of US 24 (Gilman). This work consists of intermittent milling 2" and resurfacing, pavement striping, raised reflective pavement marker removal and replacement.
|
237-70F69
|
Withdrawn
|
05/19/2022
|
|
|
3
|
5
|
Piatt
|
|
ILL 105 South of Cerro Gordo: 1.5" HMA Inlay for 700 FT; ILL 105 at Monticello near 1-72 ramps: 1.5" HMA Inlay for 1,100 FT.
|
238-72N33
|
Executed
|
08/08/2022
|
|
|
4
|
6
|
Morgan
|
|
10 miles of ultra-thin bonded wearing course on top of jointed PCC pavement at various locations: US 67/IL 104 from Mauvaise Terre Creek, approximately 1.3 miles east of CH 7 (Concord / Arenzville Road), to east of the US 67/IL 104 Interchange; US 67/IL 104 Interchange to south of I-72 BUS Interchange; and on I-72 BUS at the US 67 Interchange.
|
239-95882
|
Executed
|
08/23/2022
|
|
|
4
|
7
|
Moultrie
|
|
Replace the bridge carrying TR 185A over Whitley Creek, 2.5 miles north of Gays .
|
240-99678
|
Rejected
|
07/07/2022
|
|
|
5
|
9
|
Pulaski
|
|
Replace the bridge carrying Tick Ridge Road over Post Creek Cut-off, 4 miles east of Grand Chain.
|
01A-VE055
|
Executed
|
01/31/2023
|
3 / 3 |
|
3
|
5
|
Vermilion
|
Voluntary
|
Realign Taxiway A, Phase 1
|
02A-CO070
|
Executed
|
01/12/2023
|
|
|
4
|
7
|
Coles
|
|
Rehabilitate Taxiways A and C
|
03A-UN061
|
Rejected
|
09/22/2022
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
New Runway 4 and 22 FAA PAPIs
|
04A-CA023
|
Executed
|
05/23/2023
|
1 / 1 |
1 |
4
|
6
|
Sangamon
|
Voluntary
|
Runway 18/36 Removal and Associated Improvements, Phase 3
|
05A-QI064
|
Executed
|
03/09/2023
|
4 / 4 |
2 |
4
|
6
|
Adams
|
Voluntary
|
Reconstruct Runway 4/22 (Construction: Phase 3)
|
06A-QI065
|
Executed
|
05/23/2023
|
1 / 1 |
1 |
4
|
6
|
Adams
|
Voluntary
|
Construct Airport General Aviation Aircraft Apron and Roadway
|
07A-LW030
|
Executed
|
01/31/2023
|
|
|
4
|
7
|
Lawrence
|
|
Rehabilitate the Runway 18-36 pavement
|
08A-MV067
|
Active
|
05/09/2022
|
1 / 1 |
|
5
|
9
|
Jefferson
|
|
Replace Medium Intensity Taxiway Lights (MITL) on all taxiways on the airfield
|
09A-MV068
|
Active
|
05/09/2022
|
1 / 1 |
|
5
|
9
|
Jefferson
|
|
Replace High Intensity Runway Lights (HIRL) on primary runway and replace Medium Intensity Runway Lights (MIRL) on crosswind runway
|
10A-MB034
|
Executed
|
02/27/2023
|
1 / 1 |
|
3
|
4
|
McDonough
|
|
Rehabilitate Runway 9-27
|
11A-KA051
|
Executed
|
10/03/2022
|
1 / 1 |
|
2
|
3
|
Kankakee
|
|
Construct a new airfield electrical vault
|
1LR-M2109
|
Active
|
05/06/2022
|
4 / 4 |
2 |
0
|
0
|
Perry
|
Voluntary
|
The Fidelity No. 11-McElvain Mine Group Reclamation Project is for the elimination of public health and safety hazards by the Illinois Department of Natural Resources using federal abandoned mined lands funds. The project site is located approximately 2 miles west of Du Quoin in Sections 13, 14, 23, 24, and 25, Township 6 South, Range 2 West, Perry County, Illinois. A voluntary pre-bid meeting is scheduled for this project at 10:00 a.m., Monday, June 6, 2022. All interested prime and subcontractors are encouraged to attend. In accordance with the requirements of the Project Labor Agreement Act (30 ILCS 571), this project contains a Project Labor Agreement. The DBE goal is 7%.
|