| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 5 | 9 | 10.00 | 0.00 | HQRA(195) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 35 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 20200100 | CU YD | EARTH EXCAVATION | Base items | 254.000 | |||
| 28100207 | TON | STONE RIPRAP, CLASS A4 | Base items | 204.000 | |||
| 40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 638.000 | |||
| 40602970 | TON | HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N70 | Base items | 20.000 | |||
| 40604002 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5FG, MIX "C", N70 | Base items | 20.000 | |||
| 48101200 | TON | AGGREGATE SHOULDERS, TYPE B | Base items | 38.000 | |||
| 50100100 | EACH | REMOVAL OF EXISTING STRUCTURES | Base items | 1.000 | |||
| 50300225 | CU YD | CONCRETE STRUCTURES | Base items | 25.200 | |||
| 50400405 | SQ FT | PRECAST PRESTRESSED CONCRETE DECK BEAMS (21" DEPTH) | Base items | 1,142.000 | |||
| 50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 3,330.000 | |||
| 50901050 | FOOT | STEEL RAILING, TYPE SM | Base items | 98.000 | |||
| 51200957 | FOOT | FURNISHING METAL SHELL PILES 12" X 0.250" | Base items | 272.000 | |||
| 51202305 | FOOT | DRIVING PILES | Base items | 272.000 | |||
| 51500100 | EACH | NAME PLATES | Base items | 1.000 | |||
| 58100200 | SQ YD | WATERPROOFING MEMBRANE SYSTEM | Base items | 142.000 | |||
| 59300100 | CU YD | CONTROLLED LOW-STRENGTH MATERIAL | Base items | 20.000 | |||
| 63000001 | FOOT | STEEL PLATE BEAM GUARDRAIL, TYPE A, 6 FOOT POSTS | Base items | 300.000 | |||
| 63100075 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 5A | Base items | 2.000 | |||
| 63100167 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT | Base items | 2.000 | |||
| 63200310 | FOOT | GUARDRAIL REMOVAL | Base items | 207.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 72501000 | EACH | TERMINAL MARKER - DIRECT APPLIED | Base items | 2.000 | |||
| 78001110 | FOOT | PAINT PAVEMENT MARKING - LINE 4" | Base items | 237.000 | |||
| No More Pay Items | |||||||