Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
4 | 6 | 0.00 | 0.00 | STPAG2B(989) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
35 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
50102400 | CU YD | CONCRETE REMOVAL | Base items | 0.200 | |||
52000030 | FOOT | PREFORMED JOINT SEAL 2 1/2" | Base items | 82.000 | |||
52000040 | FOOT | PREFORMED JOINT SEAL 3 1/2" | Base items | 41.000 | |||
58700300 | SQ FT | CONCRETE SEALER | Base items | 2,446.000 | |||
59200101 | EACH | BRIDGE WASHING NO. 1 | Base items | 1.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100100 | EACH | TRAFFIC CONTROL AND PROTECTION, STANDARD 701316 | Base items | 1.000 | |||
70100450 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 | Base items | 1.000 | |||
70106500 | EACH | TEMPORARY BRIDGE TRAFFIC SIGNALS | Base items | 1.000 | |||
70106700 | EACH | TEMPORARY RUMBLE STRIPS | Base items | 6.000 | |||
X0325748 | SQ YD | ACRYLIC COATING | Base items | 18.300 | |||
X0325749 | SQ FT | FIBER WRAP | Base items | 122.800 | |||
X7200201 | L SUM | WIDTH RESTRICTION SIGNING | Base items | 1.000 | |||
Z0001906 | L SUM | STRUCTURAL STEEL REPAIR | Base items | 1.000 | |||
Z0016002 | SQ YD | DECK SLAB REPAIR (FULL DEPTH, TYPE II) | Base items | 5.000 | |||
Z0016200 | SQ YD | DECK SLAB REPAIR (PARTIAL) | Base items | 122.000 | |||
Z0032500 | FOOT | JOINT SEALING (PATCHES) | Base items | 1,087.000 | |||
Z0041895 | CU FT | POLYMER CONCRETE | Base items | 21.000 | |||
Z0043800 | SQ FT | PRECAST PRESTRESSED CONCRETE I-BEAM REPAIR | Base items | 38.200 | |||
No More Pay Items |