001-46552
|
Executed
|
09/08/2020
|
|
|
1
|
1
|
McHenry
|
|
Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown.
|
002-46553
|
Executed
|
09/08/2020
|
|
|
1
|
1
|
Kane
|
|
Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown.
|
003-46554
|
Executed
|
09/08/2020
|
|
|
1
|
1
|
Cook
|
|
Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown.
|
004-46555
|
Executed
|
09/08/2020
|
|
|
1
|
1
|
Cook
|
|
Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown.
|
005-61F95
|
Executed
|
10/14/2020
|
|
|
1
|
1
|
Cook
|
|
Pavement marking removal, new pavement markings and the installation of signs on Pratt Avenue from Lawndale Avenue to McCormick Boulevard in the Village of Lincolnwood.
|
006-61G64
|
Executed
|
09/02/2020
|
|
|
1
|
1
|
Will
|
|
Construction of a multi-use path along the natural gas pipeline right of way, from Taylor Road to Normantown Road in Romeoville
|
007-61G65
|
Executed
|
09/08/2020
|
3 / 3 |
|
1
|
1
|
Lake
|
|
Construction of a shared-use path from the Raven Glen Forest Preserve to the Ethel's Woods Forest Preserve, and construction of a US 45 pedestrian underpass in Antioch.
|
008-62J06
|
Executed
|
09/22/2020
|
|
1 |
1
|
1
|
Lake
|
|
Traffic Signal Modernization at the intersection of IL 131 (Green Bay Rd) and Audrey Nixon Blvd / Casimir Pulaski Dr in North Chicago, Lake County.
|
009-62J32
|
Executed
|
09/01/2020
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
(6.452 Mile) Standard overlay and new HMA shoulders on IL 60/83 from IL 120 (Belvidere Rd) to IL 176. Located within the Villages of Volo, Ivanhoe, Round Lake Park.
|
010-62J50
|
Executed
|
09/08/2020
|
|
|
1
|
1
|
Cook
|
|
(3.1 mile) Standard overlay and ADA improvements on Narragansett Ave., from Cortland St. to Nagle Ave. in the City of Chicago, Jefferson Township.
|
011-62K87
|
Executed
|
09/28/2020
|
1 / 1 |
|
1
|
1
|
Cook
|
|
ADA improvement project located along various State routes located in the Villages of Homer Glen, Lemont and Orland Park.
|
012-62K90
|
Executed
|
09/28/2020
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
This is an ADA improvement project located along various State routes located in the City of Country Club Hills and Villages of Matteson, Olympia Fields, Homewood, Tinley Park and Flossmoor.
|
013-62K91
|
Executed
|
09/08/2020
|
|
|
1
|
1
|
Cook
|
|
This is an ADA improvement project located along various State routes located in the Villages of River Forest and Riverside.
|
014-62M21
|
Executed
|
09/08/2020
|
|
|
1
|
1
|
Various
|
|
The improvement consists of impact attenuators and sand barrels on various expressways throughout District One in various counties.
|
015-66K22
|
Executed
|
09/08/2020
|
|
|
2
|
3
|
Kendall
|
|
5.92 miles of shoulder widening and rumble strip installation on US 52 from Townhouse Rd (South leg) to 0.17 mile W of IL 47.
|
016-66K51
|
Withdrawn
|
07/29/2020
|
|
|
2
|
3
|
Iroquois
|
|
3P milling and resurfacing from IL 54 in Onarga to North St in Buckley according to TAMP designed overlay policy. Other work includes culvert work, grading and shaping ditches, stabilization, shoulder stone, pavement marking, and raised reflectors. , 3P milling and resurfacing from IL 54 in Onarga to North St in Buckley according to TAMP designed overlay policy. Other work includes culvert work, grading and shaping ditches, stabilization, shoulder stone, pavement marking, and raised reflectors.
|
017-66K93
|
Executed
|
09/29/2020
|
|
|
2
|
3
|
Various
|
|
One year contract to repair damaged high tension cable median barrier, guard rail, attenuators, etc., caused by motorists along various routes.
|
018-66K96
|
Executed
|
09/22/2020
|
|
|
2
|
3
|
Kendall
|
|
Pavement patching and striping on FAP 311 (US 34) beginning at the intersection of US 34 and Boulder Hill Pass Rd and ending at the S intersection of US 30 in Kendall County.
|
019-66K99
|
Executed
|
09/14/2020
|
|
|
2
|
3
|
Ford
|
|
Crack and joint serling on FAI 57 (IL 57) from Champaign County line to Irroquois County line in Ford County for a total length of 6.35 mi.
|
020-66L04
|
Executed
|
09/14/2020
|
|
|
2
|
3
|
Kankakee
|
|
Crack and Joint Sealing on FAP 41 (IL 17) from NS RR to 0.3 mi W of Roosevelt Ave in Kankakee and on FAP 330 (US 45/52) from Indian Oaks Rd (5000 N) to 0.1 mi N of Armour Rd in Bourbonnais for a total legnth of 5.32 miles.
|
021-66L05
|
Executed
|
09/14/2020
|
|
|
2
|
3
|
LaSalle
|
|
Crack and Joint Sealing on FAP 623 (US 6) from 0.31 mi of 1-39 to IL 178 in Utica in LaSalle for a total length of 3.57 miles.
|
022-66L06
|
Executed
|
09/14/2020
|
|
|
2
|
3
|
DeKalb
|
|
Crack and Joint Sealing on FAP 324 (IL 23) from Fox Ave in Sycamore to Davy St in Dekalb for a total length of 4.19 miles.
|
023-66L07
|
Rejected
|
08/12/2020
|
|
|
2
|
3
|
LaSalle
|
|
Repairing scour/erosion damage under both abutments by filling the existing void under the footings with a self-consolidating concrete and installing a riprap slope at SN 050-0059 carrying FAP 607 (US 52) over Mission Creek approximately 0.3 mi W of IL 71 in LaSalle County.
|
024-66L08
|
Executed
|
09/10/2020
|
|
|
2
|
3
|
Grundy
|
|
Placing an aggregate wedge shoulder adjacent to existing paved shoulders on FAP 326 (IL 47) beginning at the intersection of IL 47 and Rte 113 and ending at the intersection of IL 47 and Scully Rd in Grundy County.
|
025-66L16
|
Executed
|
09/08/2020
|
|
|
2
|
3
|
Bureau
|
|
Scour mitigation measures (riprap) at SN 006-0114 carrying FAS 248 (Tiskilwa Spur) over Big Bureau Creek 0.3 mi N of Tiskilwa in Bureau County.
|
026-68E18
|
Executed
|
09/08/2020
|
|
|
3
|
4
|
Knox
|
|
Culvert repair to culvert east side of IL Rte 41, approximately 0.57 mi S of IL 116 in Knox County.
|
027-68F61
|
Executed
|
09/01/2020
|
1 / 1 |
1 |
3
|
4
|
Peoria
|
|
Substructure repair to SN 072-0138 carrying IL 6 over Charter Oak Rd in Peoria.
|
028-68F66
|
Executed
|
09/08/2020
|
|
|
3
|
4
|
Peoria
|
|
Bridge beam replacement on SN 072-0056 at Dry Run Creek E of Sterling Ave in West Peoria.
|
029-68F93
|
Executed
|
09/08/2020
|
|
|
3
|
4
|
Henry
|
|
Pavement patching on EB I-74 entrance and exit ramps at IL 17 near Woodull in Henry County.
|
030-72J51
|
Executed
|
09/02/2020
|
|
|
4
|
6
|
Mason
|
|
Deck patching, joint repairs, superstructure repairs and bridge cleaning on SN SN 065-0501 carrying IL 29 over Salt Creek at the Mason / Menard County line.
|
031-72L73
|
Executed
|
09/16/2020
|
|
|
4
|
6
|
Logan
|
|
Patching on Lincoln Parkway in Lincoln.
|
032-72L81
|
Executed
|
09/14/2020
|
|
|
4
|
6
|
Logan
|
|
0.2 miles of design overlay on US 136 from 0.1 miles west of Illinois Central Railroad to 0.1 miles west of Emden Road (600th Avenue).
|
033-72M06
|
Rejected
|
08/12/2020
|
2 / 2 |
|
4
|
6
|
Adams
|
|
Parking improvements at the Quincy Maintenance Yard / Sign Shop parking lot.
|
034-72M09
|
Executed
|
08/24/2020
|
|
|
4
|
6
|
Various
|
|
On-call repair of guardrail, cable median barrier, impact attenuators and fence at locations throughout District 6.
|
035-72M10
|
Executed
|
09/23/2020
|
|
|
4
|
6
|
Sangamon
|
|
Bridge superstructure, substructure, and joint repairs on SN 084-0116 carrying East Lakeshore Drive over I-55, 0.7 miles south of Lake Springfield.
|
036-72M11
|
Executed
|
08/24/2020
|
|
|
4
|
6
|
Logan
|
|
Replacing bridge bearings and expansion joint seals on SN 054-0059 carrying County Highway 2 over I-55, 3.1 miles east of I-155.
|
037-72M12
|
Executed
|
09/08/2020
|
|
|
4
|
6
|
Adams
|
|
Deck patching and miscellaneous repairs on SN 001-0073 carrying IL 96 over Pigeon Creek, 1.7 miles southeast of Payson.
|
038-72M14
|
Executed
|
09/16/2020
|
|
|
4
|
6
|
Cass
|
|
Culvert replacements on IL 125 from 5.3 miles west of IL 78 to 3.9 miles west of IL 78.
|
039-72M15
|
Executed
|
09/01/2020
|
|
|
4
|
6
|
Cass
|
|
HMA surface removal and replacement on IL 78, 0.1 miles north of the Morgan County line and at the IL 78/IL 125 intersection in Virginia.
|
040-72M16
|
Executed
|
09/02/2020
|
|
|
4
|
6
|
Sangamon
|
|
Seal coat and pavement markings at the District 6 parking lot, 126 East Ash Street in Springfield.
|
041-76N15
|
Withdrawn
|
06/30/2020
|
|
|
5
|
8
|
Madison
|
|
Bridge joint repairs and HMA overlay with bridge repairs on SN 060-0278 and 060-0279 on IL 255 over the Cahokia Diversion Canal. , Bridge joint repairs and HMA overlay with bridge repairs on SN 060-0278 and 060-0279 on IL 255 over the Cahokia Diversion Canal.
|
042-76N53
|
Executed
|
09/08/2020
|
1 / 1 |
1 |
5
|
8
|
Jersey
|
|
Demolition of 2 houses and five buildings on 3 parcels and debris removal from 2 parcels along the proposed US 67 corridor.
|
043-76N74
|
Executed
|
09/08/2020
|
|
|
5
|
8
|
Randolph
|
|
1.9 miles of crack and joint sealing on IL 4 from 0.1 miles north of VFW Drive to IL 154.
|
044-76N75
|
Executed
|
09/22/2020
|
|
|
5
|
8
|
Washington
|
|
Crack and joint sealing on IL 127 from 0.1 miles south of Holzhauer Drive to 0.7 miles south of I-64.
|
045-76N76
|
Executed
|
09/08/2020
|
|
|
5
|
8
|
Madison
|
|
1.4 miles of crack and joint sealing on IL 159 from Clay Street to Kinloch Avenue.
|
046-78600
|
Executed
|
09/08/2020
|
1 / 1 |
|
5
|
9
|
Jefferson
|
|
4.2 miles of patching, milling, HMA surface, HMA shoulders and guardrail on I-57 from north of the northern tri-level in Jefferson County to 2 miles south of the Dix interchange.
|
047-78701
|
Executed
|
09/01/2020
|
|
|
5
|
9
|
Union
|
|
Construction of additional truck parking lot adjacent to the existing lots at both the northbound and southbound Trail of Tears Rest Area on I-57, north of IL 146.
|
048-78731
|
Executed
|
09/29/2020
|
|
|
5
|
9
|
Jefferson
|
|
1.3 miles of ADA ramp modifications, flashing left turn arrows, mast arm improvements to properly locate signal heads, controller upgrades and interconnect upgrades due to signal spacing on IL 15 from east of 44th Street to west of 25th Street in Mt. Vernon.
|
049-78735
|
Executed
|
09/30/2020
|
|
|
5
|
9
|
Various
|
|
Crack sealing on various routes throughout various counties of District 9.
|
050-78763
|
Executed
|
09/10/2020
|
|
|
5
|
9
|
White
|
|
8.2 miles of patching and resurfacing on US 45 from IL 14 to IL 1; including sidewalk ramps in Norris City.
|
051-78769
|
Executed
|
09/10/2020
|
2 / 2 |
1 |
5
|
9
|
Franklin
|
|
1.8 miles of HMA surface removal, HMA resurfacing, patching and ADA ramp h reconstruction on IL 149 in West Frankfort, from IL 37 to the east corp limits near Horrell Street.
|
052-78782
|
Executed
|
09/01/2020
|
|
|
5
|
9
|
Gallatin
|
|
1.2 miles of pavement patching, milling, HMA binder and surface, HMA shoulders and curb ramp / sidewalk modifications on Main Street from IL 1 to Murphy Murphy Street in Ridgway.
|
053-78783
|
Executed
|
09/01/2020
|
|
|
5
|
9
|
Jackson
|
|
4 miles of patching, milling, HMA binder and surfacing, HMA shoulders and spot drainage improvements on Old IL 13 from just west of Tower Road in Carbondale to just east of IL 127 in Murphysboro.
|
054-78784
|
Executed
|
09/08/2020
|
1 / 1 |
|
5
|
9
|
Jackson
|
|
0.52 miles of resurfacing and patching on IL 13 westbound in Carbondale, sidewalk ramp update at Lewis Lane and the addition of a new bike lane.
|
055-78787
|
Executed
|
09/08/2020
|
1 / 1 |
1 |
5
|
9
|
Williamson
|
|
5.8 miles of resurfacing on I-57 from Herrin Road to Old IL 13 in Marion.
|
056-78797
|
Executed
|
09/15/2020
|
1 / 1 |
|
5
|
9
|
Various
|
|
Bridge deck concrete sealing at various structures in Gallatin, Hardin, Pope, Saline and Williamson Counties.
|
057-78799
|
Withdrawn
|
07/28/2020
|
|
|
5
|
9
|
Massac, Pulaski
|
|
9 miles of HMA surface removal, HMA surface course, pavement patching and ADA curb ramp improvements on IL 169 from IL 37 to US 45. , 9 miles of HMA surface removal, HMA surface course, pavement patching and ADA curb ramp improvements on IL 169 from IL 37 to US 45.
|
058-78807
|
Executed
|
08/26/2020
|
|
|
5
|
9
|
Jefferson
|
|
11 miles of patching, partial depth removal and partial depth patching on I-64 from the Washington County line to I-57 / I-64 Tri-level north of Mt. Vernon.
|
059-89768
|
Executed
|
09/08/2020
|
|
1 |
3
|
4
|
Tazewell
|
|
Construct a shared-use path along North Main Street from Cruger Road to Easy Street in Washington.
|
060-93748
|
Executed
|
09/01/2020
|
1 / 1 |
2 |
4
|
6
|
Sangamon
|
|
Cold-in-place recycling with HMA overlay, HMA shoulders and aggregate shoulders on CH 12 from south of the I-72 Interchange to west of the Sangamon River bridge.
|
061-95856
|
Executed
|
09/08/2020
|
1 / 1 |
|
4
|
7
|
Wabash
|
|
Resurfacing CH 4 from the Lawrence County line to CH 11.
|
062-95878
|
Executed
|
09/02/2020
|
|
|
4
|
7
|
Coles
|
|
Construction of HMA shoulders with rumbnle strips, aggregate shoulds and pavement markings on CH 18 from IL 121 to CH 20.
|
063-97740
|
Executed
|
09/08/2020
|
10 / 10 |
|
5
|
8
|
St. Clair
|
|
Reconstruction of West Morris Street from 2nd Street to North Main Street in Caseyville.
|
064-97743
|
Executed
|
09/08/2020
|
1 / 1 |
1 |
5
|
8
|
Marion
|
|
Resurfacing South Locust Street from East 3rd Street to East 17th Street in Centralia.
|
065-97745
|
Executed
|
09/08/2020
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
Resurfacing Johnson Road from Nameoki Road to Terrace Lane in Granite City.
|
066-99646
|
Executed
|
09/08/2020
|
|
|
5
|
9
|
Union
|
|
Replace the bridge carrying TR 164 over a tributary to Big Creek, 4 miles southeast of Anna.
|
067-99648
|
Executed
|
09/21/2020
|
1 / 1 |
|
5
|
9
|
Massac
|
|
Resurfacing New Columbia Road from the Johnson County line to Teague Hill Road.
|
068-99652
|
Executed
|
09/10/2020
|
|
|
5
|
9
|
White
|
|
Resurfacing Epworth Road from E 1100 N Road to E 650 N Road.
|
069-99653
|
Executed
|
09/08/2020
|
|
|
5
|
9
|
Jefferson
|
|
Resurfacing CH 8 from IL 15 to 5th Street in Bluford.
|
070-61F92
|
Executed
|
10/19/2020
|
8 / 4 |
1 |
1
|
1
|
Cook
|
|
Replace the bridge carrying Central Street over the North Shore Channel in Evanston.
|
071-61G62
|
Executed
|
09/08/2020
|
10 / 9 |
|
1
|
1
|
DuPage
|
|
Resurfacing, sidewalks, landscaping and contruction of a train platform shelter on Prospect Avenue, from Burlington Avenue to Ann Street in Clarendon Hills.
|
072-68F15
|
Executed
|
08/26/2020
|
3 / 3 |
|
3
|
4
|
Peoria
|
|
5.75 miles of resurfacing on I-74 from W of Kickapoo/Edwards Rd to 0.7 mile E of I-474.
|
073-68F21
|
Executed
|
09/01/2020
|
|
|
3
|
4
|
Henderson
|
|
Resurface IL 164 from 8th St in Oquaka to the Warren County line in Henderson county.
|
074-70A92
|
Executed
|
09/10/2020
|
2 / 2 |
2 |
3
|
5
|
Vermilion
|
|
Bridge superstructure replacements over Salt Fork Vermilion River.
|
075-76568
|
Executed
|
09/08/2020
|
26 / 26 |
2 |
5
|
8
|
Jersey
|
|
2.4 miles of grading, drainage and paving on new alignment on US 67 for the New Delhi Bypass.
|
076-76K91
|
Executed
|
09/01/2020
|
4 / 4 |
|
5
|
8
|
Calhoun
|
|
Extending the sea wall, dredging and constructing a collision cell at the Kampsville Ferry on IL 108, on the Greene County side.
|
077-78796
|
Executed
|
09/01/2020
|
|
|
5
|
9
|
Massac
|
|
Removal and replacement of HMA overlay at various locations, partial depth patching, cleaning of deck drains and removal of debris from the shoulders on I-24 at SN 064-0035 over the Ohio River.
|
078-78808
|
Executed
|
09/01/2020
|
|
|
5
|
9
|
Alexander, Pulaski
|
|
Pavement patching on I-57 from mile marker 1 to mile marker 8.
|
079-85684
|
Withdrawn
|
07/29/2020
|
2 / 2 |
1 |
2
|
2
|
Rock Island
|
|
Construction of a shared-use path adjacent to Avenue of the Cities, from Hospital Road to Greenview Memorial Gardens in the City of Silvs. , Construction of a shared-use path adjacent to Avenue of the Cities, from Hospital Road to Greenview Memorial Gardens in the City of Silvs.
|
080-87727
|
Executed
|
09/10/2020
|
3 / 3 |
1 |
2
|
3
|
LaSalle
|
|
Replace the bridge carrying CH 5 over Wolf Creek, 2.3 miles east of IL 23.
|
081-89719
|
Executed
|
08/26/2020
|
|
|
3
|
4
|
Mercer
|
|
Replace the bridge carrying _CH 16 over Snake Creek, at the western edge of Seaton
|
082-89735
|
Executed
|
09/15/2020
|
7 / 6 |
2 |
3
|
4
|
Tazewell
|
|
Reconstruct the intersection of Camp Street and River Road in East Peoria.
|
083-89770
|
Executed
|
09/08/2020
|
1 / 1 |
|
3
|
4
|
Tazewell
|
|
Construction of sidewalks and ADA Ramps at various locations in Pekin.
|
084-91593
|
Executed
|
09/08/2020
|
|
|
3
|
5
|
Vermilion
|
|
Replace the bridge carrying TR 186 over Windfall Creek, 3 miles southeast of Jamesburg.
|
085-91595
|
Executed
|
09/08/2020
|
1 / 1 |
|
3
|
5
|
Vermilion
|
|
Replace the bridge carrying TR 15 over Whiskey Creek, 2.5 miles southeast of Rankin.
|
086-95872
|
Rejected
|
08/20/2020
|
1 / 1 |
|
4
|
7
|
Effingham
|
|
Sidewalk, lighting, curb and gutter, and resurfacing at various locations in Dieterich.
|
087-97733
|
Executed
|
09/10/2020
|
5 / 5 |
|
5
|
8
|
St. Clair
|
|
Resurfacing, curb and gutter, sidewalks and ADA ramps on Centreville Avenue from Dintelman Avenue to 0.02 mile south of West Lincoln Street in Belleville.
|
088-99639
|
Executed
|
09/08/2020
|
|
|
5
|
9
|
Jackson
|
|
Reconstruct the intersection of Chautaugua Street at McLafferty Road/Briarwood Drive in Carbondale to a roundabout with multi-use path and pavement markings.
|
089-62K84
|
Executed
|
11/05/2020
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
ADA improvement project located along various State routes located in the Villages of Tinley Park, Homewood, Hazel Crest and Cities of Country Club Hills, Oak Forest and Blue Island.
|
090-62K86
|
Executed
|
09/21/2020
|
|
1 |
1
|
1
|
Cook
|
|
ADA improvement project located along various State routes located in the Town of Cicero.
|
091-68E79
|
Withdrawn
|
07/02/2020
|
|
|
3
|
4
|
Tazewell
|
|
Bridge rehabilitation, joint replacement, and deck repairs to SN 090-0114 over the Illinois River at Pekin. , Bridge rehabilitation, joint replacement, and deck repairs to SN 090-0114 over the Illinois River at Pekin.
|
092-87733
|
Executed
|
10/05/2020
|
2 / 2 |
1 |
2
|
3
|
Kankakee
|
|
Construction of a raised median, sidewalk replacement, curb and gutter, flashing beacons, pedestrian push buttons and pavement markings on IL 17 from Orchard Road to Hunter Avenue in Kankakee.
|
093-62M20
|
Executed
|
09/08/2020
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(0.953 miles) SMART overlay project on 471h Street from east of County line Rd. to east of Wolf Road, includes PCC pavement overlay, ADA sidewalk located in Villages of Hinsdale and Western Springs.
|
094-72M00
|
Executed
|
09/02/2020
|
|
|
4
|
6
|
Hancock
|
|
Bituminous surface treatment and precast concrete parking blocks on scenic turnouts along IL 96 beginning at the Hoot Owl Rest Area at County Road 1550 and continuing north to the Stone Arch Bridge Scenic Turnout in Nauvoo.
|
095-74710
|
Executed
|
09/02/2020
|
|
|
4
|
7
|
Macon
|
|
Pavement patching, milling, HMA resurfacing, traffic signals and traffic control.
|
096-74874
|
Executed
|
09/08/2020
|
|
|
4
|
7
|
Clay
|
|
Base course widening, bridge joint replace/repair and bridge deck patching and overlay on US 50 over the Little Wabash River, 2 miles west of the Richland County line. (SN 013-0004)
|
097-62M24
|
Executed
|
09/29/2020
|
1 / 1 |
|
1
|
1
|
Various
|
|
This improvement consists of High Tension Cable Barrier Repairs at Various Locations on Various Expressway Medians District Wide.
|
098-72M01
|
Executed
|
09/08/2020
|
|
1 |
4
|
6
|
Sangamon
|
|
Patching and profile diamond grinding concrete pavement on Old US 36 from Farmingdale Road to 0.2 miles south of International Parkway.
|
099-62K36
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook, DuPage
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway.
|
100-62K37
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook, DuPage
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd.
|
101-62K38
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St.
|
102-62K39
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook, Lake
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy).
|
103-62K40
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy.
|
104-62K41
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy).
|
105-62K42
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Dan Ryan Expwy) to I-80.
|
106-62K43
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island.
|
107-62K44
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook, Will
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355.
|
108-62K45
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Will
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line.
|
109-62K46
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Cook
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave).
|
110-62K48
|
Rejected
|
11/02/2020
|
|
|
1
|
1
|
Will
|
Mandatory
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd.
|
01A-DK061
|
Executed
|
03/02/2021
|
4 / 4 |
|
2
|
3
|
DeKalb
|
|
Resurface Runway 2/20
|
02A-CO068
|
Executed
|
02/17/2021
|
1 / 1 |
|
4
|
7
|
Coles
|
|
Rehabilitate Taxiway D
|
03A-WI058
|
Executed
|
03/04/2021
|
2 / 2 |
2 |
5
|
9
|
Williamson
|
Voluntary
|
Terminal Ramp Rehabilitation
|
04A-CA021
|
Rejected
|
09/14/2020
|
6 / 6 |
1 |
4
|
6
|
Sangamon
|
Voluntary
|
Runway 18/36 Removal and Associated Improvements, Phase 1
|
05A-LA043
|
Executed
|
04/22/2021
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Rehabilitate Taxiway A and Connectors
|
06A-KA050
|
Executed
|
04/22/2021
|
1 / 1 |
|
2
|
3
|
Kankakee
|
|
Rehabilitate Runway 16/34
|
07A-WH015
|
Executed
|
04/06/2021
|
|
|
2
|
2
|
Whiteside
|
|
Rehabilitate Runway 18/36
|
08A-DI030
|
Executed
|
04/22/2021
|
|
|
2
|
2
|
Lee
|
|
Rehabilitate Runway 8/26
|
09A-DI031
|
Rejected
|
05/19/2021
|
|
|
2
|
2
|
Lee
|
|
Install Perimeter Fence, Phase 1 and 2
|
10A-LE054
|
Executed
|
02/17/2021
|
|
|
1
|
1
|
Will
|
|
Reconstruct and Rehabilitate Hangar Taxiways R2, R3, and Portion of R, Phase 2
|
1LR-M1904
|
Withdrawn
|
07/30/2020
|
1 / 1 |
1 |
0
|
0
|
Vermilion
|
Voluntary
|
Stabilization of dangerous embankments at the Kickapoo State Recreation Area (SRA) abandoned mine site by the Illinois Department of Natural Resources using federal Abandoned Mined Lands funds.
|