Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 3 | 6.00 | 0.00 | AS8E(832) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
25 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
40600275 | POUND | BITUMINOUS MATERIALS (PRIME COAT) | Base items | 3,343.000 | |||
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 31,897.000 | |||
40600627 | TON | LEVELING BINDER (MACHINE METHOD), IL-9.5FG, N50 | Base items | 3,883.000 | |||
40603310 | TON | HOT-MIX ASPHALT SURFACE COURSE, MIX "C", N50 | Base items | 4,021.000 | |||
40800050 | TON | INCIDENTAL HOT-MIX ASPHALT SURFACING | Base items | 182.000 | |||
44000160 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 2 3/4" | Base items | 244.000 | |||
48102100 | TON | AGGREGATE WEDGE SHOULDER, TYPE B | Base items | 2,818.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70300100 | FOOT | SHORT TERM PAVEMENT MARKING | Base items | 3,774.000 | |||
70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 633.000 | |||
78000100 | SQ FT | THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS | Base items | 122.400 | |||
78000650 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 24" | Base items | 66.000 | |||
78001110 | FOOT | PAINT PAVEMENT MARKING - LINE 4" | Base items | 10,362.000 | |||
X4401198 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH | Base items | 597.000 | |||
X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
Z0034105 | TON | MATERIAL TRANSFER DEVICE | Base items | 4,021.000 | |||
Z0048665 | L SUM | RAILROAD PROTECTIVE LIABILITY INSURANCE | Base items | 1.000 | |||
Z0055300 | EACH | RUMBLE STRIP | Base items | 8.000 | |||
No More Pay Items |