001X-68B46
|
Active
|
01/30/2019
|
2 / 0 |
|
3
|
4
|
Peoria, Tazewell
|
|
Bridge replacement of the existing eastbound US 150 (McClugage) bridge over the Illinois River. Project includes interchange improvements at the US 150/IL 29 interchange and the US 15/US 24/IL 116 interchange.
|
001-60M72
|
Executed
|
04/03/2019
|
|
1 |
1
|
1
|
Cook
|
|
Bridge deck overlay, joint repairs, structural repair of concrete and steel to I-94 at IL 68 (Dundee Road).
|
002-60M75
|
Executed
|
04/08/2019
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
Bridge deck overlay and bridge joint repair improvement of Emroy Ave over I-290.
|
003-60N00
|
Executed
|
04/08/2019
|
1 / 1 |
|
1
|
1
|
Will
|
|
Bridge deck overlay and joint repairs on the bridge carrying US 52 over Forked Creek.
|
004-60N83
|
Executed
|
04/19/2019
|
6 / 6 |
1 |
1
|
1
|
Cook
|
|
Rehabilitation and widening on SN 016-0533 carrying Willow Road over Lehigh and SOO line in Glenview.
|
005-60P68
|
Executed
|
04/02/2019
|
4 / 4 |
2 |
1
|
1
|
DuPage
|
|
Resurfacing on IL-56 from Naperville Rd. to IL 53; includes retrofitting sidewalks to comply with ADA and Signal modernaization at the intersection with Park Ave.
|
006-60R65
|
Executed
|
04/08/2019
|
|
|
1
|
1
|
Cook
|
|
Overlay 016-2525 bridge deck with thin polymer in the City of Harvey.
|
007-60R68
|
Executed
|
04/05/2019
|
|
1 |
1
|
1
|
Lake
|
|
Bridge deck scarification and latex concrete overlay, retrofitting bridge parapets, and reconstruction of transverse bridge joints to IL 43 over IL 120.
|
008-60R75
|
Executed
|
04/08/2019
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Bridge deck scarification and latex concrete overlay, reconstruction of transverse bridge joints, and substructure repairs on US 30 over Thorn Creek.
|
009-60W87
|
Executed
|
04/03/2019
|
|
|
1
|
1
|
Cook
|
|
Surface preparation and painting of structrual steel, containment and disposal of lead waste and maintenance of traffic at 5 bridge structures located on IL 171 and on I-55 in Villages of McCook and Summit.
|
010-62C14
|
Executed
|
04/03/2019
|
5 / 5 |
1 |
1
|
1
|
Kane
|
|
Bridge deck replacement with widened roadway, new expansion joints, and approach slab replacement on IL 38 over UPRR.
|
011-62D38
|
Executed
|
04/08/2019
|
|
1 |
1
|
1
|
Lake
|
|
Remove and replace original section of the culvert (approximately 40 ft) in the center portion of the culvert carrying IL 21 (Milwaukee Ave.) over a ditch in the village of Vernon Hills (SN 049-0599)
|
012-62F35
|
Executed
|
04/09/2019
|
2 / 2 |
1 |
1
|
1
|
McHenry
|
|
Bridge joint repairs and deck overlay on SN 056-0007 carrying US 14/IL 173 (Division Street) over UPRR in the City of Harvard.
|
013-62F37
|
Executed
|
04/04/2019
|
|
|
1
|
1
|
Cook
|
|
Repairs on Bridge SN 016-0225 carrying US 34 (Ogden Avenue) over IHB Railroad in the Village of LaGrange.
|
014-62F49
|
Executed
|
04/04/2019
|
1 / 1 |
|
1
|
1
|
Cook, Will
|
|
6.45 miles of 3P resurfacing and ADA ramps on IL 43 from north of US 30 to just north of US 6.
|
015-62F54
|
Executed
|
04/03/2019
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
2.5 miles of resurfacing and ADA sidewalk improvements on IL 64 (North Avenue) from Villa Avenue to the Cook County line in the Village of Villa Park and the City of Elmhurst.
|
016-62G21
|
Executed
|
03/29/2019
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramp improvements on US 12/20/41 (Indianapolis Ave) from S. Ewing Ave. to 106th Street in the City of Chicago.
|
017-62G47
|
Executed
|
04/03/2019
|
|
2 |
1
|
1
|
Cook
|
|
7.33 miles of resurfacing and pedestrian ramp projects on IL 171 (First Ave.) from 43rd Street to Des Plaines River Road.
|
018-62G48
|
Executed
|
04/01/2019
|
3 / 3 |
|
1
|
1
|
McHenry
|
|
Removal and replacement of culvert SN 056-0227 on IL 31 in the City of McHenry.
|
019-62G50
|
Executed
|
04/08/2019
|
|
1 |
1
|
1
|
Cook
|
|
Deck overlay, joint repair and structural steel repair on SN 016-0344 carrying US 45 over the Cal Sag Channel in Palos Township.
|
020-62G58
|
Executed
|
04/04/2019
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
2 miles of resurfacing on IL 137 (Amstutz Expressway) from IL 120 (Belvidere Street) to just south of IL 137 (Greenwood Avenue) in the City of Waukegan.
|
021-62G62
|
Executed
|
04/03/2019
|
|
|
1
|
1
|
DuPage
|
|
6 miles of resurfacing on US 34 (Ogden Avenue) from Ivanhoe Ave to east of IL 83 (Kingery Highway in the Villages of Lisle, Downers Grove, Westmont and Clarendon Hills.
|
022-62G64
|
Executed
|
04/02/2019
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
2.4 miles of resurfacing and pedestrian ramp improvements on US 20 (W. Lake Street) from west of Summerfield Drive to west of I-355 (Veterans Memorial Tollway) in the Villages of Addison and Bloomingdale.
|
023-62G67
|
Executed
|
04/02/2019
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Resurfacing and ADA pedestrian ramp improvements on vincennes Avenue from 119th Street to 127th Street in Blue Island.
|
024-62G80
|
Executed
|
04/02/2019
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
3P resurfacing and median rehabilitation with pedestrian ramps along 127th Street/Burr Oak Ave from east of I-294 to Atesian Avenue in Blue Island.
|
025-62G98
|
Executed
|
04/04/2019
|
2 / 2 |
1 |
1
|
1
|
Will
|
|
Removal and replacement of bridge decks of SN 099-0286, 099-0005 and 099-0304 c carrying I-55 over BNSF Railroad and Grant Creek in Wilminton and Channahon Townships.
|
026-62H01
|
Executed
|
04/03/2019
|
|
1 |
1
|
1
|
DuPage
|
|
Bridge deck overlay, joint repair, structural repair of concrete, drainage structure adjustment and concrete repair of beam ends for the structures carrying IL 83 of US 34 and the BNSF Railroad in the Villages of Hinsdale, Clarendon Hills and Westmont.
|
027-62H04
|
Executed
|
04/08/2019
|
2 / 2 |
1 |
1
|
1
|
DuPage
|
|
Bridge deck scarification, latex overlay, joint repairs, structural concrete and steel repairs on IL 38 (Roosevelt Road) over Salt Creek, also Bridge deck scarification, latex overlay, and joint repairs on IL 38 Frontage Road over Salt Creek.
|
028-62H07
|
Executed
|
04/04/2019
|
|
|
1
|
1
|
Cook
|
|
0.5 miles of HMA resurfacing, pavement patching, milled shoulder rumble strips and pavement marking on IL 19 from Taft Avenue to Seymour Avenue in Chicago.
|
029-62H24
|
Executed
|
04/04/2019
|
|
|
1
|
1
|
DuPage
|
|
2.4 miles of resurfacing and pedestrian ramp work on IL 56 (Butterfield Road) from the Kane County line to the CNRR overpass in Aurora.
|
030-62H27
|
Executed
|
04/18/2019
|
|
|
1
|
1
|
Cook
|
|
Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement, and longitudinal joints between existing pavement and Curb and gutter and restriping with hot spray thermoplastic pavement marking.
|
031-62H30
|
Executed
|
04/08/2019
|
|
|
1
|
1
|
DuPage
|
|
Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement; longitudinal joints between the existing HMA pavement and curb and gutter; and restriping with hot spray thermoplastic pavement marking.
|
032-62H32
|
Executed
|
04/15/2019
|
1 / 1 |
1 |
1
|
1
|
Kane
|
|
7.55 miles of Resurfacing (SMART) and pedestrian ramp project on IL 64 from IL 47 to Randall Road.
|
033-62H35
|
Executed
|
04/04/2019
|
1 / 1 |
2 |
1
|
1
|
Will
|
|
Repairs on SN 099-0056 carrying I-80 over the Des Plaines River in Joliet.
|
034-62H41
|
Executed
|
03/29/2019
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
2.4 miles of resurfacing and pedestrian ramp upgrades on IL 171 (Archer Ave.) from west of Ashland Avenue to State Street in the City of Chicago.
|
035-62H43
|
Executed
|
04/04/2019
|
|
1 |
1
|
1
|
Cook
|
|
2.3 miles of resurfacing and pedestrian ramp improvements on US 14 from Western Avenue to Vernon Avenue through the cities of Des Plaines and Park Ridge.
|
036-62H55
|
Executed
|
04/04/2019
|
|
|
1
|
1
|
Will
|
|
9.62 miles of Shoulder rumble strip installation on I-80 at various locations between the Will County line and US 30.
|
037-72J97
|
Executed
|
04/02/2019
|
1 / 1 |
1 |
4
|
6
|
Sangamon
|
|
Joint replacement, microsilica overlay and bridge painting on I-55/72 from the Cook Street overpass to the Fancy Creek structures north of Sherman (SN 084-0020, 0022, 0023, 0050, 0051, 0103)
|
038-78618
|
Executed
|
04/03/2019
|
2 / 2 |
2 |
5
|
9
|
Perry
|
|
Removal and replacement of double barrel 7'x 7' box culvert SN 073-7074 on IL 13 in Perry.
|
039-78646
|
Executed
|
04/08/2019
|
1 / 1 |
1 |
5
|
9
|
Perry
|
|
Bearm end repairs and joint replacement on SN 073-0033 carrying US 51 over ICG Railroad.
|
040-76H15
|
Executed
|
04/01/2019
|
5 / 5 |
1 |
5
|
8
|
Clinton
|
|
5 miles of resurfacing on IL 160 from IL 161 in New Baden to 4th Street in Trenton.
|
041-76J81
|
Executed
|
04/08/2019
|
3 / 3 |
1 |
5
|
8
|
St. Clair
|
|
ADA improvements on N. Belt West from Frank Scott Parkway to 17th Street in Belleville.
|
042-76L67
|
Executed
|
04/08/2019
|
2 / 2 |
1 |
5
|
8
|
St. Clair
|
|
Intersection improvement and traffic signal replacement at IL 15 (Missouri Ave) and IL 163/Pocket Road in Alorton.
|
043-76L76
|
Executed
|
04/08/2019
|
|
|
5
|
8
|
St. Clair
|
|
Traffic signal installation on IL 4 at the I-64 eastbound ramp.
|
044-76M10
|
Executed
|
04/04/2019
|
|
|
5
|
8
|
Monroe
|
|
1.9 miles of ultra-thin overlay on I-255 from JB Bridge to IL 13.
|
045-76M14
|
Executed
|
04/18/2019
|
|
|
5
|
8
|
Madison
|
|
Crack and joint sealing on I-255 from the St. Clair County line to I-270.
|
046-64K59
|
Executed
|
04/04/2019
|
|
1 |
2
|
2
|
Jo Daviess
|
Mandatory
|
1.15 miles of HMA resurfacing and ADA improvements on US 20, from Powder House Road Hill to 3rd Street in Galena.
|
047-64M94
|
Executed
|
04/01/2019
|
|
2 |
2
|
2
|
Whiteside
|
|
Ultra-thin bonded wearing course on I-88 from 1/2 mile west of IL 78 to Elkhorn Creek.
|
048-64N11
|
Executed
|
04/15/2019
|
|
|
2
|
2
|
Lee
|
|
Clean and paint structural steel on SN 052-055 carrying Chicago Road over I-39.
|
049-64N12
|
Executed
|
04/15/2019
|
|
|
2
|
2
|
Lee
|
|
Clean and paint structural steel on SN 052-0054 carrying Beemerville Road over I-39.
|
050-66J44
|
Executed
|
04/15/2019
|
|
|
2
|
3
|
LaSalle
|
|
Clean and paint structural steel and steel components on SN 050-0188 carrying IL 71 over Covel Creek.
|
051-66J45
|
Executed
|
04/15/2019
|
|
|
2
|
3
|
DeKalb
|
|
Cleaning and painting all structural steel and other related steel components of SN 019-0030 carrying IL 72 over Owens Creek.
|
052-66J54
|
Executed
|
04/01/2019
|
|
|
2
|
3
|
LaSalle
|
|
crack and joint sealing on IL 251 from 0.3 mile south of N 31st Rd. to I-80, and 1-pass full-width microsurfacing on IL 251 from I-80 to US 6 in Peru.
|
053-66J55
|
Executed
|
04/18/2019
|
|
|
2
|
3
|
LaSalle
|
|
9.76 miles of crack and joint sealing on IL 71 from north of I-80 to US 52.
|
054-68B78
|
Executed
|
04/01/2019
|
|
|
3
|
4
|
Warren
|
|
Resurfacing on US 34/US 67/IL 100/IL 164 from 0.25 mile south of 11th Ave. to 0.9 mile east of 11th Street in Monmouth.
|
055-68D10
|
Executed
|
04/04/2019
|
1 / 1 |
|
3
|
4
|
Knox
|
|
Replacement of a single box culvert with a double (SN-048-2008), HMA pavement, guardrail replacement, earthwork, and other collateral work necessary, located 0.6 mile west of IL-180 near Victoria.
|
056-68D22
|
Executed
|
04/02/2019
|
|
2 |
3
|
4
|
Peoria
|
|
Resurfacing, ADA improvements, traffic signal improvements, and drainage improvements along IL Rte 29 south of US Rte 150 to Abington St in Peoria.
|
057-68E36
|
Executed
|
04/04/2019
|
|
|
3
|
4
|
Peoria
|
|
Bituminous surface treatment- A1 on IL Rte 91 from the Stark county line.
|
058-68E66
|
Executed
|
04/15/2019
|
|
|
3
|
4
|
Henderson
|
|
Crack and joint sealing on US 34 (Biggsvile Bypass) and on IL 94/IL 116 from 1425N to 0.14 mile south of 1500N.
|
059-68E67
|
Executed
|
04/02/2019
|
|
|
3
|
4
|
Various
|
|
Bridge deck sealing on various structures district wide.
|
060-68E75
|
Executed
|
04/15/2019
|
|
|
3
|
4
|
Tazewell
|
|
Crack and joint sealing on I-155 from I-74 to the Tazewell/Logan county line.
|
061-70A99
|
Executed
|
04/04/2019
|
|
|
3
|
5
|
Edgar
|
|
Standard overlay from 0.5 mile south of Gibson Dr. in Paris to Clark county line for a distance of 7.204 miles.
|
062-70D15
|
Executed
|
04/01/2019
|
|
|
3
|
5
|
Champaign
|
|
425 feet of bridge repairs at overhead SN 010-0186, I-74 under Prospect Ave in Champaign.
|
063-70D27
|
Executed
|
04/09/2019
|
|
|
3
|
5
|
Vermilion
|
|
450 feet of bridge repairs at SN 092-0034 to mainline IL-1 over the north fork of the Vermilion River 2.8 miles south of Rossville.
|
064-70D29
|
Executed
|
04/02/2019
|
|
|
3
|
5
|
Various
|
|
Bridge deck sealing along various routes throughout Region 3, District 5.
|
065-70D54
|
Executed
|
05/01/2019
|
|
|
3
|
5
|
McLean
|
|
Bridge joint repairs and patching to SN 057-0018 and 0019 over Old 150 and NandW RR 3.8 miles SW of RT 51.
|
066-64J41
|
Executed
|
04/01/2019
|
5 / 5 |
1 |
2
|
2
|
Boone, Winnebago
|
|
4.37 miles of HMA resurfacing on IL 173 from 0.1 mile west of the Winnebago county line to 0.2 mile west of IL 76.
|
067-66J11
|
Executed
|
04/03/2019
|
|
|
2
|
3
|
Iroquois
|
|
4.96 miles of shoulder widening and rumble strip installation on IL 49 from just north of E 4300 Rd to 200' south of Mud Creek.
|
068-70C97
|
Executed
|
04/09/2019
|
|
|
3
|
5
|
Vermilion
|
|
360 feet of bridge repairs at SN 092-0033 to mainline FAP 332 (IL-1) north fork of the Vermilion River 1.4 miles north of Rossville.
|
069-72H53
|
Executed
|
04/01/2019
|
|
|
4
|
6
|
Macoupin, Sangamon
|
|
6.3 miles of resurfacing on IL-4 from 0.3 mile south of IL 104 in Auburn to the Macoupin county line and from the Sangamon county line to north of George St in Virden.
|
070-72K01
|
Executed
|
04/02/2019
|
|
|
4
|
6
|
Various
|
|
Sealing the decks and parapets of 136 structures on various routes in Christian, Macoupin, Montgomery and Sangamon counties.
|
071-72K77
|
Deleted
|
01/28/2019
|
|
|
4
|
6
|
Macoupin, Montgomery
|
|
Painting three bridges on 1-55 in Macoupin and Montgomery counties (SN 068-0052, 059-0037, 059-0038)
|
072-72K78
|
Deleted
|
01/28/2019
|
|
|
4
|
6
|
Scott
|
|
Painting portions of two bridges on IL 100 and Hillview Road (SN 086-0016, 086- 0039)
|
073-72K79
|
Rejected
|
03/20/2019
|
|
|
4
|
6
|
Montgomery
|
|
Painting SN 068-0058 which carries IL 127 over the West Fork Shoal Creek Tributary, 1.6 miles south of IL 48.
|
074-74865
|
Executed
|
04/08/2019
|
|
|
4
|
7
|
Moultrie, Shelby
|
|
18.9 miles of microsurfacing joint repairs, raised reflective pavement markers and paint pavement on IL 16 and IL 32 between Shelbyville and the Coles county line.
|
075-74866
|
Executed
|
04/09/2019
|
|
|
4
|
7
|
Macon
|
|
10.8 miles of microsurfacing joint repair, raised reflective pavement markers and paint pavement marking lines on IL 48 from County Line Road to I-72.
|
076-74879
|
Executed
|
04/04/2019
|
|
|
4
|
7
|
Shelby
|
|
0.6 miles of 2 1/4" inlay, patching, pavement marking, ADA ramps and detector loop updates on IL 128 from IL 16 to 0.2 miles north of N 6th Street in Shelbyville.
|
077-78454
|
Executed
|
04/02/2019
|
1 / 1 |
1 |
5
|
9
|
Pulaski
|
|
Removal and replacement of SN 077-0026 carrying County Highway 7 over I-57 at the Ullin interchange.
|
078-60R69
|
Executed
|
04/08/2019
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Deck patching, deck scarification, latex concrete overlay abutment repairs, joint repairs, slab repairs and debris removal on Golf Road over the East and West Fork N. Branch Chicago River (SN 016-0355, 016-0356, 016-1256 and 016-1257)
|
079-62G90
|
Executed
|
04/01/2019
|
|
|
1
|
1
|
Lake
|
|
Sheet pile retaining wall and parking improvement at Illinois Beach State Park
|
080-62H14
|
Executed
|
04/15/2019
|
|
|
1
|
1
|
Various
|
|
Vegetation management on various expressway and primary routes along Historic US Route 66
|
081-62H17
|
Executed
|
04/04/2019
|
|
|
1
|
1
|
Cook
|
|
Structural repairs of concrete on the structure carrying Joliet Road over the BandOCT RR in the Village of McCook
|
082-62H19
|
Executed
|
04/04/2019
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Bridge joint replacement and bridge deck sealing on SN 016-0273 carrying Torrence Avenue over I-80/I-94 in the Village of Lansing
|
083-62H39
|
Executed
|
04/03/2019
|
|
|
1
|
1
|
Lake
|
|
Demolition of a single-family home in Mundelein and an auto repair building in Grayslake.
|
084-64N18
|
Executed
|
04/04/2019
|
|
|
2
|
2
|
Various
|
|
Roadside restoration of right-of-way turf damage caused by motorists along state maintained routes in District 2
|
085-64N22
|
Executed
|
04/15/2019
|
|
|
2
|
2
|
Rock Island
|
|
Cold Milling and HMA resurfacing in the southbound lane
|
086-64N25
|
Executed
|
04/04/2019
|
2 / 2 |
1 |
2
|
2
|
Carroll
|
|
Expansion joint replacement and concrete overlay on SN 008-0005 carrying US 52 over Straddle Creek located 3.4 miles east of IL 78.
|
087-64N26
|
Executed
|
04/04/2019
|
|
|
2
|
2
|
Carroll
|
|
Expansion joint replacement, concrete overlay and beam end repairs on SN 008-0033 carying IL 40 over Johnson Creek
|
088-64N27
|
Executed
|
04/04/2019
|
1 / 1 |
1 |
2
|
2
|
Jo Daviess
|
|
Expansion joint replacement, concrete overlay, repair and paint beam ends on SN 043-0039 carrying IL 78 over the Plum River
|
089-64N28
|
Rejected
|
03/20/2019
|
1 / 1 |
|
2
|
2
|
Lee
|
|
Expansion joint replacement, deck patching, and concrete overlay on SN 052-0060 carrying US 52 over the Green River.
|
090-64N29
|
Executed
|
04/04/2019
|
|
|
2
|
2
|
Henry
|
|
Expansion joint replacement, concrete overlay, repair and paint beam ends on SN 037-0138 carrying IL 82 over South Branch of the Edwards River.
|
091-66J50
|
Executed
|
04/04/2019
|
|
|
2
|
3
|
LaSalle
|
|
Class B pavement patching, curb and gutter, and concrete median removal and replacement on IL 23 from Grace Community Church North of Streator to the intersection of IL 23 and N. 17th Rd. (Richards Road)
|
092-66J59
|
Executed
|
04/09/2019
|
|
|
2
|
3
|
Kankakee
|
|
Removal and replacement of a cross road culvert located 0.4 miles north of 5000S RD at STA. 870+00.
|
093-66J61
|
Executed
|
04/01/2019
|
|
|
2
|
3
|
Kendall
|
|
Adding aggregate shoulders to US-52 from LaSalle County Line to Will County Line.
|
094-68C63
|
Executed
|
05/06/2019
|
|
|
3
|
4
|
Tazewell
|
|
Culvert replacement on IL 98, 0.1 mile east of Cole Hollow Rd (SN 090-1002)
|
095-68E14
|
Executed
|
05/01/2019
|
|
|
3
|
4
|
Tazewell
|
|
Substructure repairs to SN 090-0037 carrying US RTE 150 over Farm Creek, TWP Railroad, and Norfolk Southern Railroad.
|
096-68E28
|
Executed
|
04/02/2019
|
|
1 |
3
|
4
|
Woodford
|
|
Cold in-place recycling on IL 117 from IL 116 to Mill St in Eureka.
|
097-68E62
|
Executed
|
04/08/2019
|
|
|
3
|
4
|
Peoria
|
|
Landscaping along I-74 from Ellis St to the Illinois River.
|
098-68E63
|
Executed
|
04/15/2019
|
|
|
3
|
4
|
Various
|
|
Pavement markings throughout District 4.
|
099-68E64
|
Executed
|
04/04/2019
|
|
|
3
|
4
|
Various
|
|
Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high tensions cable barrier).
|
100-72K75
|
Rejected
|
03/20/2019
|
|
|
4
|
6
|
Adams, Hancock, Pike
|
|
Painting portions of five bridges on various routes in Adams, Hancock, and Pike Counties (SN 001-0052, 001-0069, 034-0065, 075-0133, 075-0134)
|
101-74835
|
Executed
|
04/02/2019
|
|
|
4
|
7
|
Macon
|
|
Construction of a J-Turn intersection at the intersection of US 51 and Andrews Street
|
102-76K71
|
Executed
|
04/03/2019
|
|
|
5
|
8
|
Greene, Jersey
|
|
3.7 miles of resurfacing on IL 16/IL 100 from 0.1 mile south of Busby Lane to the Joe Page Bridge.
|
103-76L08
|
Executed
|
04/01/2019
|
|
|
5
|
8
|
Clinton
|
|
4.4 miles of resurfacing and HMA soulders/ rumble strips on IL 160/ IL 177 from 0.1 mile west of Sand Hill Road to the Washington County line/ Kaskaskia River Bridge.
|
104-76M07
|
Executed
|
04/01/2019
|
1 / 1 |
1 |
5
|
8
|
Clinton
|
|
7.5 miles of patching and underdrains on I-64 from the St. Clair County line to the Washington County line in Clinton County.
|
105-76M16
|
Withdrawn
|
02/11/2019
|
|
|
5
|
8
|
Madison
|
|
Deck waterproofing and joint and beam end repair on SN 060-0026 carrying IL 140 over UPRR 3.1 miles west of I-55 and SN 060-0227 carrying IL 140 over NandWRR 2.9 miles west of I-55. , Deck waterproofing and joint and beam end repair on SN 060-0226 carrying IL 140 over UPRR 3.1 miles west of I-55 and on SN 060-0227 carrying IL 140 over NandWRR 2.9 miles miles west of I-55.
|
106-78637
|
Executed
|
04/08/2019
|
|
|
5
|
9
|
Williamson
|
|
Installation of sidewalks, ADA improvements and installation of pedestrian crossing signals on IL 13 from Johnson Street to Railroad Street in Marion.
|
107-62F66
|
Executed
|
04/04/2019
|
|
|
1
|
1
|
Cook
|
|
1.91 miles of HMA resurfcing, pavement patching, removal and replacement of curb and gutter, sidewalk removal and replacement and placement of thermoplastic markings along Avondale Avenue from Ogallah Avenue to Bryn Mawr Avenue in Chicago.
|
108-72K85
|
Executed
|
04/08/2019
|
|
|
4
|
6
|
Sangamon
|
|
7 miles of centerline micro-surfacing on I-72 at two locations: 1) from I-55 to 0.4 mile east of I-55; 2) 0.7 mile east of Dawson Road to 1.6 miles east of Lanesville Road
|
109-72K90
|
Active
|
01/14/2019
|
|
|
4
|
6
|
Morgan
|
|
Bituminous surface treatment on Mound Road in the City of Jacksonville
|
110-72K93
|
Executed
|
04/03/2019
|
|
|
4
|
6
|
Sangamon
|
|
This project consists of tree removal at various locations within Sangamon County
|
111-72L00
|
Executed
|
04/09/2019
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes in the eastern half of the district
|
112-72L01
|
Executed
|
04/09/2019
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes in the western half of the district
|
113-72L02
|
Executed
|
04/04/2019
|
|
|
4
|
6
|
Morgan
|
|
Patching on 1072 from the Scott County line to 3.2 miles east of Business I-72 east of Jacksonville
|
114-72L03
|
Executed
|
04/02/2019
|
|
|
4
|
6
|
Sangamon
|
|
Sign installation on I-55 and I-72 Alternate
|
115-74881
|
Executed
|
04/03/2019
|
|
|
4
|
7
|
Effingham
|
|
2.06 miles of patching on US 45 (Banker Street) from Wabash Avenue to Jaycee Avenue in Effingham
|
116-74882
|
Executed
|
04/04/2019
|
|
|
4
|
7
|
Fayette
|
|
9.3 miles of pavement patching on US 40 from Bond County line to Rock Island Drive and on US 51 and IL 185 from Veterans Avenue (US 40 going west) to Bear Creek
|
117-74883
|
Executed
|
04/04/2019
|
|
|
4
|
7
|
Macon
|
|
Pavement patching on I-72 from 4.4 miles west of the Piatt County line to 0.3 miles west of the Piatt County line
|
118-74884
|
Executed
|
04/02/2019
|
1 / 1 |
1 |
4
|
7
|
Macon
|
|
Removing HMA wearing surface, deck slab repair, new bearing assemblies, new expansion joints, placement of waterproofing and HMA wearing surface on SN 058-0091 at the I-72 Argenta interchange
|
119-74885
|
Executed
|
04/02/2019
|
|
|
4
|
7
|
Clark
|
|
PCC base course widening, bridge joint repairs and bridge deck repairs on SN 0012-0050 and 012-0051 carrying 1-70 (east and west lanes) over the north fork of the Embarrass River, approximately 1 mile west of the Martinsville interchange
|
120-76M01
|
Executed
|
04/08/2019
|
|
|
5
|
8
|
Various
|
|
Resurfacing at various locations: 1) 0.81 mile along South SIUE University Drive; 2) 1.0 mile along 1-55 North Frontage Road; 3) 0.89 mile along I-55 South_Frontage Road; 4) Columbia Maintenance Yard; 5) Belleville Maintenance Yard
|
121-78662
|
Executed
|
04/08/2019
|
|
|
5
|
9
|
Williamson
|
|
Joint reconstruction, approach slab and deck slab repairs, waterproofing membrane system, HMA overlays and substructure repairs on SN 100-0032 and SN 100-0033 carrying IL 148 over the Big Muddy River and Pond Creek
|
122-78700
|
Deleted
|
01/25/2019
|
|
|
5
|
9
|
Jackson
|
|
Resurfacing, ADA improvements, sidewalks and pipe drains at the District 9 headquarters
|
123-60K72
|
Deleted
|
01/16/2019
|
|
|
1
|
1
|
Cook
|
|
Pavement removal, south approach superstructure and substructure removal and replacement, guardrail removal, sidewal;k and curb removal, pier and abutment removal beginning 325 feet north of the intersection of Western Avenue and Des Plaines Street and extending north over Broadway Street, Canal Street, the Cal-Sag Channel, and over the Metra tracks.
|
124-60T49
|
Executed
|
04/15/2019
|
|
1 |
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramp improvements on US 14 (Northwest Highway) through the Village of Arlington Heights, Village of Mount Prospect and the city of Des Plaines
|
125-62H68
|
Executed
|
03/21/2019
|
4 / 3 |
1 |
1
|
1
|
Will
|
|
Bridge structural steel repair and bearing replacement of the bridges carrying I-80 over Des Plaines River in Joliet
|
126-64D70
|
Executed
|
04/15/2019
|
3 / 3 |
1 |
2
|
2
|
Winnebago
|
|
1.94 miles milling and resurfacing of mainline and 1.97 miles of resurfacing of frontage roads 0.2 mile south of Sandy Hollow Rd in Rockford to 0.2 mile south of Backhawk Rd and Frontage roads; structure removal and culvert replacement drainage ditch 1.5 miles south of US 20 in Rockford
|
127-64M80
|
Executed
|
04/18/2019
|
|
|
2
|
2
|
Jo Daviess
|
|
Building removals at 481 Sisinawa Avenue, East Dubuque and 11653 US 20 NW of Galena.
|
128-66J53
|
Executed
|
04/03/2019
|
|
|
2
|
3
|
Livingston
|
|
Microsurfacing full-width existing pavement on IL 116 from Pearl Street in Pontiac to IL 47. The project is 10.61 miles
|
129-66J75
|
Executed
|
04/04/2019
|
|
|
2
|
3
|
Kendall, LaSalle
|
|
Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders
|
130-66J76
|
Executed
|
04/01/2019
|
|
|
2
|
3
|
Bureau, LaSalle
|
|
Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders.
|
131-66J77
|
Executed
|
04/01/2019
|
|
|
2
|
3
|
Grundy
|
|
Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders.
|
132-66J78
|
Executed
|
04/04/2019
|
|
|
2
|
3
|
Various
|
|
Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders.
|
133-66J79
|
Executed
|
04/01/2019
|
|
|
2
|
3
|
Iroquois, Kankakee
|
|
Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders.
|
134-66J80
|
Executed
|
04/04/2019
|
|
|
2
|
3
|
DeKalb
|
|
Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders.
|
135-68E68
|
Executed
|
04/15/2019
|
|
|
3
|
4
|
Marshall, Mason, Tazewell
|
|
Bridge washing of eleven bridges over the Illinois River
|
136-70D46
|
Rejected
|
03/20/2019
|
|
|
3
|
5
|
Piatt
|
|
400 feet of bridge repairs at SN 074-0082 to mainline FAP 760 (IL-48) over Friends Creek ditch three miles north of I-72
|
137-70D48
|
Executed
|
04/02/2019
|
|
|
3
|
5
|
DeWitt, McLean
|
|
8.126 miles of resurfacing (smart) at various locations
|
138-70D58
|
Executed
|
04/15/2019
|
|
|
3
|
5
|
Champaign, Vermilion
|
|
Five spot locations of bridge painting on FAI 72, IL 1/US 150, Bowman Ave in Danville, and CH 18.
|
139-74890
|
Executed
|
04/01/2019
|
|
|
4
|
7
|
Cumberland, Effingham
|
|
Beam repairs under two structures: 1) I-57/70 under IL 32/33 in Effingham; 2) US 40 over Embarras River west of Greenup (SN 025-0034 and 018-0008)
|
140-74694
|
Deleted
|
01/25/2019
|
|
|
4
|
7
|
Coles
|
|
3.9 miles of resurfacing, ADA improvements and traffic signals on IL 16 from 0.2 mile west of Douglas Drive in Charleston to 0.4 mile east of Madison Street , 3.9 miles of resurfacing, ADA improvements, and traffic signals on IL 16 from 0.2 mile west of Douglas Drive to 0.4 mile east of Madison Street in Charleston.
|
141-76J17
|
Deleted
|
01/22/2019
|
|
|
5
|
8
|
Calhoun
|
|
Deck replacement on IL 96 over an unnamed creek in Kampsville (SN 007-0014) , Deck replacement on SN 007-0014 carrying IL 96 over an unnamed creek in Kampsville.
|
142-76L91
|
Deleted
|
01/22/2019
|
|
|
5
|
8
|
Madison
|
|
ADA improvements on IL 3 from 20th Street to Niedrinhaus Avenue , ADA improvements on IL 3 from 20th Street to Niedrinhaus Ave. in Granite City.
|
143-61F03
|
Executed
|
04/22/2019
|
|
1 |
1
|
1
|
Cook
|
|
Sidewalk construction on 26th Street from Harlem Avenue to Riverside Drive; Riverside Drive from Maple Avenue to 27th Street; and Riverside Drive from 26th Street to Home Avenue in the City of Berwyn.
|
144-61F41
|
Executed
|
04/23/2019
|
3 / 1 |
1 |
1
|
1
|
Cook
|
|
Roadway reconstruction on Irving Park Road from east of IL 59 to Bartlett Road in Streamwood.
|
145-61F45
|
Executed
|
04/18/2019
|
1 / 1 |
1 |
1
|
1
|
Kane
|
|
Replace the bridge carrying Silver Glen Road over Otter Creek.
|
146-61F47
|
Executed
|
04/15/2019
|
|
1 |
1
|
1
|
Lake
|
|
Resurfacing Greenwood Avenue from Wilmot Road to Waukegan Road in Deerfield.
|
147-61F48
|
Executed
|
04/04/2019
|
|
1 |
1
|
1
|
Cook
|
|
Sidewalk construction adjacent to 79th Street from Garden Lane to Oak Grove Avenue in the Village of Justice.
|
148-61F49
|
Executed
|
04/18/2019
|
|
2 |
1
|
1
|
Cook
|
|
Reconstruction of Northfield Road from Winnetka Road to Willow Road in the Village of Northfield.
|
149-61F54
|
Executed
|
04/09/2019
|
|
1 |
1
|
1
|
Cook
|
|
Resurfacing Schick Road from Petersdorf Road to Fairfax Lane, and resurfacing Petersdorf Road from Schick Road to Army Trial Road in the Village of Bartlett.
|
150-61F59
|
Executed
|
04/04/2019
|
|
1 |
1
|
1
|
Kane
|
|
Trffic signal interconnect along Indian Trail between Aurora Avenue and Pennsbury Lane in Aurora.
|
151-61F60
|
Executed
|
04/02/2019
|
|
1 |
1
|
1
|
Cook
|
|
Construction of a multi-use path along Brainard Avenue from Joliet Road to 55th Street in the City of Countryside.
|
152-61F61
|
Executed
|
04/04/2019
|
|
1 |
1
|
1
|
Will
|
|
Resurfacing Burville Road from stte Street to IL 394 in the Village of Crete.
|
153-85671
|
Executed
|
04/22/2019
|
|
1 |
2
|
2
|
Rock Island
|
|
Concrete restoration of Knoxville Road from 78th Avenue to 134th Avenue.
|
154-85676
|
Executed
|
04/01/2019
|
|
1 |
2
|
2
|
Lee
|
|
Resurfacing Inlet Road from Green Wing Road to Shaw Road.
|
155-85677
|
Executed
|
04/15/2019
|
|
1 |
2
|
2
|
Ogle
|
|
Resurfacing Freeport Road from Lanark Road to US 52.
|
156-87622
|
Executed
|
04/15/2019
|
|
1 |
2
|
3
|
Livingston
|
|
Resurfacing CH 16 from Long Point Road to IL 17.
|
157-87694
|
Executed
|
04/04/2019
|
|
1 |
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 97 over Deer Creek, 4 miles northeast of Pontiac.
|
158-91752
|
Rejected
|
06/03/2019
|
|
1 |
3
|
5
|
Vermilion
|
|
Reconstruction of Old Ottawa Road with on-street bicycle lanes, between Rue Bienville Street and Denmark Road, and along Denmark Road between the Old Ottawa Road and the intersection with Winter Avenue and logan Avenue in the City of Danville.
|
159-93719
|
Withdrawn
|
02/01/2019
|
|
|
4
|
6
|
Sangamon
|
|
Reconstruction of Archer Elevator Road from a 2 lane rural roadway to a 3 lane urban roadway. Project is located just north of Wabash Avenue to just south of Lavender Lane, and 0.25 miles north of Isles Avenue for a total of 0.50 mile in the City of Springfield.
|
160-97681
|
Executed
|
04/15/2019
|
|
1 |
5
|
8
|
Marion
|
|
Resurfacing Kinoka Road from Garrett Road to the I-57 ramp southwest of Kinmundy.
|
161-97683
|
Executed
|
04/15/2019
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
Replace the superstructure and modifications to the abutments of the structure carrying New Poag Road over the MCT Goshen Trail, 1.0 mile west of IL 157 in Edwardsville.
|
162-97685
|
Executed
|
04/08/2019
|
|
1 |
5
|
8
|
St. Clair
|
|
Resurface Scott-Troy Road from the Madison County Line to US 50.
|
163-97687
|
Executed
|
04/04/2019
|
|
1 |
5
|
8
|
Madison
|
|
Resurfacing and patching on Franklin Avenue from IL 140 to California Avenue in the Village of East Alton.
|
164-68E80
|
Executed
|
05/01/2019
|
|
|
3
|
4
|
Peoria
|
|
Construction of an aggregate parking lot with fence east of District 4 materials lab off of US 150 in Edwards.
|
165-68E81
|
Executed
|
04/04/2019
|
|
|
3
|
4
|
Tazewell
|
|
Longitudinal joint repair, raised pavement markers, pavement striping on US 24 from east of College Drive to east of Cummings Lane.
|
166-61F40
|
Executed
|
04/22/2019
|
9 / 7 |
3 |
1
|
1
|
Will
|
|
Construct an extension of Kings Road from Rodeo Drive to Hassert Boulevard in Bollingbrook.
|
167-61F57
|
Executed
|
04/29/2019
|
2 / 1 |
2 |
1
|
1
|
Kane
|
|
construction of a dedicated entrance ramp from northbound Randall Road to eastbound US 20, removal of the Weld Road connection to Randall Road, creation of a cul-de-sac on Weld Road and the reconfiguration of Randall Road, in the City of Elgin.
|
168-85674
|
Rejected
|
03/20/2019
|
1 / 1 |
1 |
2
|
2
|
Stephenson
|
|
Construction of a shared-use path along the north side of the Pecatonia River in Freeport and along an abandoned railroad from Tutty's Crossing Trailhead at Stephenson Street (IL 75) to River Road, east of Freeport.
|
169-85678
|
Executed
|
05/20/2019
|
|
1 |
2
|
2
|
Henry
|
|
Resurfacing East Street from US 34 to South Street in Kewanee.
|
170-87700
|
Executed
|
04/15/2019
|
1 / 1 |
1 |
2
|
3
|
DeKalb
|
|
Construction of a right turn lane with safety shoulders on Barber Greene from Peace Road to Somonauk Road.
|
171-87707
|
Executed
|
04/04/2019
|
|
1 |
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 108 over a tributary of Baker Run, located 3 miles northwest of Pontiac.
|
172-89713
|
Executed
|
04/19/2019
|
4 / 3 |
2 |
3
|
4
|
Tazewell
|
|
Resurfacing, sidewalks, street and pedestrian lighting, storm sewer, curb and g gutter, and pavement markings on IL 29 (Main Street) from Poplar Street to Margaret Drive in Creve Coeur.
|
173-95821
|
Executed
|
04/15/2019
|
|
|
4
|
7
|
Cumberland
|
|
Full-depth reclamation, HMA resurfacing and aggregate shoulders on CH 1, from US 45 to IL 121.
|
174-97672
|
Executed
|
04/25/2019
|
|
1 |
5
|
8
|
Madison
|
|
Construct dedicated left turn lanes on all approaches and install new traffic signals at the intersection of US 40 and Spring Valley Rd. in the City of Troy.
|
175-97680
|
Executed
|
04/29/2019
|
|
2 |
5
|
8
|
Madison
|
|
Pavement reconstruction on Fehling Road from State Street to Bradley Avenue in Granite City.
|
176-99605
|
Executed
|
04/23/2019
|
|
1 |
5
|
9
|
Perry
|
|
Replace the Bridge carrying Pyatt-Cutles Road over Little Galum Creek, 4 miles west of IL 13.
|
177-99606
|
Executed
|
03/29/2019
|
|
1 |
5
|
9
|
Hamilton
|
|
21.95 miles of bituminous surface treatment on various roadways in Hamilton County.
|
178-99608
|
Executed
|
04/15/2019
|
1 / 1 |
1 |
5
|
9
|
Jackson
|
|
Place embankment along the proposed horizontal and vertical alignment and resurfacing from 1.5 miles west of Reed Station Road to 0.2 mile Westerly.
|
179-99611
|
Executed
|
04/08/2019
|
|
1 |
5
|
9
|
Union
|
|
Replace the bridge carrying TR 116 over Dutch Creek, 1.2 miles southwest of Jonesboro.
|
180-99614
|
Executed
|
04/18/2019
|
3 / 3 |
1 |
5
|
9
|
Jefferson
|
|
Resurfacing Log Cabin Lane from East Adams to Road to East Ina Road.
|
181-61F44
|
Executed
|
04/09/2019
|
|
1 |
1
|
1
|
Will
|
|
Replace the bridge carrying TR 68 over Lily Creek, 0.1 mil north of Caton Farm Road in Plainfield Township.
|
182-61F62
|
Executed
|
04/17/2019
|
|
1 |
1
|
1
|
DuPage
|
|
Roadway reconstruction on Washington Street from Town Road to Arbor Avenue in the city of West Chicago.
|
183-85673
|
Executed
|
05/03/2019
|
6 / 5 |
1 |
2
|
2
|
Winnebago
|
|
Construction of a shared use path adjacent to East Rockton Road from Old Meadow Lane to Stonebridge Trial in Rockton.
|
184-95843
|
Executed
|
04/15/2019
|
|
1 |
4
|
7
|
Moultrie
|
|
Replace the bridge carrying TR 81B over Jonathon Creek, 2 miles south of Cadwell.
|
185-95845
|
Executed
|
04/29/2019
|
1 / 1 |
1 |
4
|
7
|
Wayne
|
|
Replace the bridge carrying TR 383 over Little Dry Fork, 3 miles northeast of Sims.
|
186-64N16
|
Executed
|
04/04/2019
|
|
|
2
|
2
|
Various
|
|
"On-Call" guardrail and fence repairs along state maintained routes in Boone, Carroll, Jo Davies, Ogle, Stephenson and Winnebago Counties.
|
187-64N17
|
Executed
|
04/04/2019
|
|
|
2
|
2
|
Various
|
|
"On-Call" guardrail and fence repairs along state maintained routes in Henry, Lee, Rock Island, Whiteside, and portions of LaSalle Counties.
|
188-72K73
|
Executed
|
04/01/2019
|
|
|
4
|
6
|
Logan
|
|
Painting portions of four bridges on I-55, I-155 and US 136 in Logan County (SN 054-0052, 054-0027, 054-0076, 054-0077).
|
189-72K74
|
Executed
|
04/15/2019
|
|
|
4
|
6
|
Sangamon
|
|
Painting portions of 4 bridges on I-72, Business 55, and IL 4 in Sangamon County.
|
190-46470
|
Executed
|
03/29/2019
|
|
|
2
|
2
|
Various
|
|
Repairing or replacing damaged or deteriorated overhead sign structures, structure components, and supports at locations described in the schedule of locations.
|
191-68E20
|
Executed
|
04/01/2019
|
2 / 2 |
1 |
3
|
4
|
Peoria
|
|
Installation of fiber optic cable, communications equipment and CCTV cameras in Peoria.
|
01A-VE054
|
Executed
|
08/26/2019
|
|
1 |
3
|
5
|
Vermilion
|
|
Rehabilitate Taxiway B Between Runway 16 and Apron Pavements
|
02A-MV063
|
Executed
|
07/07/2019
|
|
1 |
5
|
9
|
Jefferson
|
|
Rehabilitate Taxiway A1
|
03A-CE036
|
Executed
|
08/06/2019
|
|
2 |
5
|
8
|
Marion
|
|
Construct Access Taxiway to Runway 9
|
04A-RA017
|
Withdrawn
|
02/01/2019
|
|
|
3
|
5
|
Champaign
|
|
Phase 3: Construct Wildlife Deterrent Fence
|
05A-ED019
|
Rejected
|
05/14/2019
|
|
1 |
3
|
5
|
Edgar
|
|
East Aircraft Parking Ramp Expansion and Rehabilitate Partial Parallel Taxiway to Runway 9/27
|
06A-MC028
|
Executed
|
08/12/2019
|
|
1 |
4
|
7
|
Lawrence
|
|
Construct Fencing And Terminal Area Gate
|
07A-HA030
|
Executed
|
02/19/2020
|
|
3 |
5
|
9
|
Saline
|
|
Rehabilitate Airfield Storm Sewer System
|
08A-LA041
|
Executed
|
10/22/2019
|
|
1 |
1
|
1
|
Cook
|
|
Phase 1 and 2 Remark Airfield Pavement Marking
|