Home > Notice of Letting > Contract Detail

March 08, 2019 Letting 10:00 AM
046-64K59

Bulletin Description

1.15 miles of HMA resurfacing and ADA improvements on US 20, from Powder House Road Hill to 3rd Street in Galena.
Region District DBE % VBP % Federal Project #
2 2 4.00 0.00 NHPP1PJB(019)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Jo Daviess
  • FAP 301
  • 29RS-7
  • C-92-065-16
  • 2-20073-0000
Contract Specifics
A mandatory pre-bid meeting will be held on Wednesday, February 13, 2019 at 01:30 PM in the District 2 at 819 Depot Avenue, Dixon, IL 61021. Location Notes - Assembly Room. Meeting Description -

 This conference will advise contractors of the new specifications related to HMA binder grade PG-58-28 being incorporated into this project in lieu of the traditional PG 64-22. Representatives from IDOT District Two staff will be in attendance to answer questions related to the project. Contractors are encouraged to e-mail related questions to Chad Pink at Chad.Pink@illinois.gov in advance of the meeting. . The pre-bid meeting is mandatory for all potential prime contractors interested in bidding. Registered subcontractors and certified disadvantaged business enterprise subcontractors are encouraged to attend. The meeting will begin at 01:30 PM at which time, after a final call for everyone to sign in, the sign-in sheets will be copied. Attendees who show up after the presentation is underway will not be allowed to sign-in thereby not being considered in attendance. Failure on the prime contractor's part to attend will cause the contractor's request for authorization to bid to be denied.

30 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of February 26, 2019 04:30 PM.

Authorized Bidders

  • 1045 Civil Constructors, Inc. d/b/a/ Helm Civil
    2283 Bus Hwy 20 East
    Freeport, IL 61032
    PO Box 750
    Freeport, IL 61032
    Phone: (815) 235-2200 Fax: (815) 235-2219 Email: civilestimating@helmgroup.com
    $808,424.33

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 48.000
25200110 SQ YD SODDING, SALT TOLERANT Base items 364.000
25200200 UNIT SUPPLEMENTAL WATERING Base items 5.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 50.000
28000500 EACH INLET AND PIPE PROTECTION Base items 6.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 11,248.000
40600535 TON LEVELING BINDER (HAND METHOD), N70 Base items 10.000
40600990 SQ YD TEMPORARY RAMP Base items 177.000
40601005 TON HOT-MIX ASPHALT REPLACEMENT OVER PATCHES Base items 187.000
40603310 TON HOT-MIX ASPHALT SURFACE COURSE, MIX "C", N50 Base items 377.000
40603390 TON HOT-MIX ASPHALT SURFACE COURSE, MIX "F", N70 Base items 2,510.000
40800050 TON INCIDENTAL HOT-MIX ASPHALT SURFACING Base items 154.000
42400200 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH Base items 2,158.500
42400800 SQ FT DETECTABLE WARNINGS Base items 148.000
44000156 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 1 3/4" Base items 24,794.000
44000500 FOOT COMBINATION CURB AND GUTTER REMOVAL Base items 451.000
44000600 SQ FT SIDEWALK REMOVAL Base items 1,845.500
44002232 SQ YD HOT-MIX ASPHALT REMOVAL OVER PATCHES, 8" Base items 418.000
48102100 TON AGGREGATE WEDGE SHOULDER, TYPE B Base items 96.000
60255500 EACH MANHOLES TO BE ADJUSTED Base items 3.000
60255800 EACH MANHOLES TO BE ADJUSTED WITH NEW TYPE 1 FRAME, CLOSED LID Base items 1.000
60260100 EACH INLETS TO BE ADJUSTED Base items 1.000
60265700 EACH VALVE VAULTS TO BE ADJUSTED Base items 2.000
60265900 EACH VALVE VAULTS TO BE ADJUSTED WITH NEW TYPE 1 FRAME, CLOSED LID Base items 1.000
60266600 EACH VALVE BOXES TO BE ADJUSTED Base items 9.000
60605000 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 Base items 451.000
64200108 FOOT SHOULDER RUMBLE STRIPS, 8 INCH Base items 3,648.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 6.000
67100100 L SUM MOBILIZATION Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70102620 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 Base items 1.000
70102622 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701502 Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70102640 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 Base items 1.000
70103815 CAL DA TRAFFIC CONTROL SURVEILLANCE Base items 5.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 34,740.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 1,035.000
72400320 SQ FT REMOVE SIGN PANEL - TYPE 2 Base items 11.000
78009000 SQ FT MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 406.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 27,538.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 629.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 329.000
78009024 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 24" Base items 167.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 234.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 75.000
89100400 EACH ILLUMINATED SIGN, LED Base items 1.000
A2000114 EACH TREE, ACER X FREEMANII AUTUMN BLAZE (AUTUMN BLAZE FREEMAN MAPLE), 1-3/4" CALIPER, BALLED AND BURLAPPED Base items 2.000
X4400196 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL (SPECIAL) Base items 202.000
X5030290 SQ FT STAINING CONCRETE STRUCTURES Base items 2,750.000
X5091765 FOOT PIPE HANDRAIL (SPECIAL) Base items 182.500
X7240505 EACH RELOCATE SIGN PANEL AND POST Base items 8.000
Z0007126 FOOT HANDRAIL REMOVAL Base items 182.500
Z0007430 SQ FT TEMPORARY SIDEWALK Base items 622.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0025505 EACH PROPERTY MARKERS Base items 10.000
Z0033700 FOOT LONGITUDINAL JOINT SEALANT Base items 8,859.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.