Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
4 | 6 | 5.00 | 0.00 | NHPPA0BV(584) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
15 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
40400121 | SQ YD | MICRO-SURFACING, SINGLE PASS, MIXTURE D | Base items | 22,024.000 | |||
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 5,947.000 | |||
40600400 | TON | MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS | Base items | 13.400 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100310 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701421 | Base items | 1.000 | |||
70100420 | EACH | TRAFFIC CONTROL AND PROTECTION, STANDARD 701411 | Base items | 7.000 | |||
70100700 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701406 | Base items | 1.000 | |||
70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 45.000 | |||
70300100 | FOOT | SHORT TERM PAVEMENT MARKING | Base items | 7,929.000 | |||
78009005 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 5" | Base items | 19,620.000 | |||
78009008 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 8" | Base items | 350.000 | |||
78100100 | EACH | RAISED REFLECTIVE PAVEMENT MARKER | Base items | 1,032.000 | |||
78300200 | EACH | RAISED REFLECTIVE PAVEMENT MARKER REMOVAL | Base items | 1,032.000 | |||
X0327979 | SQ FT | PAVEMENT MARKING REMOVAL - GRINDING | Base items | 8,321.000 | |||
No More Pay Items |