Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 2 | 19.00 | 0.00 | 317SBGPTBD |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
RPJ 4765 | Rochelle Municipal | City of Rochelle | Rochelle |
Contract Specifics |
---|
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
50 Calendar Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
AR150530 | L SUM | TRAFFIC MAINTENANCE | Base items | 1.000 | |||
AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 3,316.000 | |||
AR152540 | SQ YD | SOIL STABILIZATION FABRIC | Base items | 1,112.000 | |||
AR154606 | SQ YD | GRANULAR DRAINAGE SUBBASE - 6" | Base items | 8,432.000 | |||
AR156510 | FOOT | SILT FENCE | Base items | 599.000 | |||
AR156513 | SQ YD | SEPARATION FABRIC | Base items | 7,330.000 | |||
AR156520 | EACH | INLET PROTECTION | Base items | 2.000 | |||
AR156531 | SQ YD | EROSION CONTROL BLANKET | Base items | 997.000 | |||
AR156533 | ACRE | TEMPORARY SEED AND MULCH | Base items | 0.210 | |||
AR201661 | FOOT | CLEAN & SEAL BITUMINOUS CRACKS | Base items | 100.000 | |||
AR201663 | FOOT | SAND MIX CRACK REPAIR | Base items | 80.000 | |||
AR208515 | CU YD | POROUS GRANULAR EMBANKMENT | Base items | 2,313.000 | |||
AR209608 | SQ YD | CRUSHED AGG. BASE COURSE - 8" | Base items | 103.000 | |||
AR401613 | TON | BIT. SURF. CSE.-METHOD I, SUPERPAVE | Base items | 27.000 | |||
AR401650 | SQ YD | BITUMINOUS PAVEMENT MILLING | Base items | 323.000 | |||
AR401660 | FOOT | SAW & SEAL BIT. JOINTS | Base items | 527.000 | |||
AR401665 | FOOT | BITUMINOUS PAVEMENT SAWING | Base items | 828.000 | |||
AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 8,418.000 | |||
AR403613 | TON | BIT. BASE CSE.-METHOD I, SUPERPAVE | Base items | 10.000 | |||
AR501506 | SQ YD | 6" PCC PAVEMENT | Base items | 8,322.000 | |||
AR501530 | EACH | PCC TEST BATCH | Base items | 1.000 | |||
AR510510 | EACH | TIE DOWN | Base items | 12.000 | |||
AR510515 | EACH | GROUND ROD | Base items | 2.000 | |||
AR510900 | EACH | REMOVE TIE DOWN | Base items | 12.000 | |||
AR510905 | EACH | REMOVE GROUND ROD | Base items | 2.000 | |||
AR602510 | GALLON | BITUMINOUS PRIME COAT | Base items | 33.000 | |||
AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 65.000 | |||
AR620525 | SQ FT | PAVEMENT MARKING-BLACK BORDER | Base items | 287.000 | |||
AR620530 | SQ FT | PAVEMENT MARKING-EPOXY | Base items | 390.000 | |||
AR705506 | FOOT | 6" PERFORATED UNDERDRAIN | Base items | 1,015.000 | |||
AR705630 | EACH | UNDERDRAIN INSPECTION HOLE | Base items | 5.000 | |||
AR705640 | EACH | UNDERDRAIN CLEANOUT | Base items | 2.000 | |||
AR901510 | ACRE | SEEDING | Base items | 0.210 | |||
AR905520 | CU YD | TOPSOILING (FROM OFF SITE) | Base items | 111.000 | |||
No More Pay Items |