20100110
|
UNIT
|
TREE REMOVAL (6 TO 15 UNITS DIAMETER)
|
Base items
|
79.000
|
|
20101000
|
FOOT
|
TEMPORARY FENCE
|
Base items
|
1,500.000
|
|
20101200
|
EACH
|
TREE ROOT PRUNING
|
Base items
|
5.000
|
|
20101300
|
EACH
|
TREE PRUNING (1 TO 10 INCH DIAMETER)
|
Base items
|
10.000
|
|
20101350
|
EACH
|
TREE PRUNING (OVER 10 INCH DIAMETER)
|
Base items
|
10.000
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
465.000
|
|
20201200
|
CU YD
|
REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL
|
Base items
|
195.000
|
|
20400800
|
CU YD
|
FURNISHED EXCAVATION
|
Base items
|
705.000
|
|
20800150
|
CU YD
|
TRENCH BACKFILL
|
Base items
|
4.000
|
|
21001000
|
SQ YD
|
GEOTECHNICAL FABRIC FOR GROUND STABILIZATION
|
Base items
|
1,070.000
|
|
21101505
|
CU YD
|
TOPSOIL EXCAVATION AND PLACEMENT
|
Base items
|
5,228.000
|
|
25000100
|
ACRE
|
SEEDING, CLASS 1
|
Base items
|
0.150
|
|
25100125
|
ACRE
|
MULCH, METHOD 3
|
Base items
|
8.050
|
|
25200200
|
UNIT
|
SUPPLEMENTAL WATERING
|
Base items
|
2.000
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
803.000
|
|
28000305
|
FOOT
|
TEMPORARY DITCH CHECKS
|
Base items
|
60.000
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
6,965.000
|
|
30300112
|
SQ YD
|
AGGREGATE SUBGRADE IMPROVEMENT 12"
|
Base items
|
565.000
|
|
35101400
|
TON
|
AGGREGATE BASE COURSE, TYPE B
|
Base items
|
1,300.000
|
|
35101800
|
SQ YD
|
AGGREGATE BASE COURSE, TYPE B 6"
|
Base items
|
565.000
|
|
35102000
|
SQ YD
|
AGGREGATE BASE COURSE, TYPE B 8"
|
Base items
|
10,800.000
|
|
35102400
|
SQ YD
|
AGGREGATE BASE COURSE, TYPE B 12"
|
Base items
|
1,355.000
|
|
35200410
|
SQ YD
|
PROCESSING SOIL-CEMENT BASE COURSE 10"
|
Base items
|
4,320.000
|
|
35200500
|
100 WT
|
CEMENT
|
Base items
|
2,510.000
|
|
40600275
|
POUND
|
BITUMINOUS MATERIALS (PRIME COAT)
|
Base items
|
21,481.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
2,153.000
|
|
40603080
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50
|
Base items
|
1,565.000
|
|
40604060
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50
|
Base items
|
1,060.000
|
|
48101500
|
SQ YD
|
AGGREGATE SHOULDERS, TYPE B 6"
|
Base items
|
250.000
|
|
54213669
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS 24"
|
Base items
|
2.000
|
|
542A0229
|
FOOT
|
PIPE CULVERTS, CLASS A, TYPE 1 24"
|
Base items
|
33.000
|
|
60100060
|
EACH
|
CONCRETE HEADWALLS FOR PIPE DRAINS
|
Base items
|
6.000
|
|
60108400
|
FOOT
|
PIPE UNDERDRAINS 10" (SPECIAL)
|
Base items
|
108.000
|
|
60108500
|
FOOT
|
PIPE UNDERDRAINS 12" (SPECIAL)
|
Base items
|
78.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
72000100
|
SQ FT
|
SIGN PANEL - TYPE 1
|
Base items
|
66.000
|
|
72800100
|
FOOT
|
TELESCOPING STEEL SIGN SUPPORT
|
Base items
|
285.000
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
1,311.000
|
|
A2006716
|
EACH
|
TREE, QUERCUS MACROCARPA (BUR OAK), 2" CALIPER, BALLED AND BURLAPPED
|
Base items
|
6.000
|
|
A2007116
|
EACH
|
TREE, QUERCUS RUBRA (RED OAK), 2" CALIPER, BALLED AND BURLAPPED
|
Base items
|
6.000
|
|
X0326406
|
EACH
|
INFORMATION KIOSK COMPLETE
|
Base items
|
1.000
|
|
X0326806
|
L SUM
|
WASHOUT BASIN
|
Base items
|
1.000
|
|
X0327487
|
SQ YD
|
TRIAXIAL GEOGRID REINFORCEMENT, TYPE I
|
Base items
|
1,575.000
|
|
X2130010
|
FOOT
|
EXPLORATION TRENCH (SPECIAL)
|
Base items
|
50.000
|
|
X2502024
|
ACRE
|
SEEDING, CLASS 4B (MODIFIED)
|
Base items
|
7.900
|
|
X2511630
|
SQ YD
|
EROSION CONTROL BLANKET (SPECIAL)
|
Base items
|
6,668.000
|
|
X4240430
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH (SPECIAL)
|
Base items
|
4,738.000
|
|
X6029510
|
EACH
|
CATCH BASINS, TYPE C, WITH SPECIAL FRAME AND GRATE
|
Base items
|
10.000
|
|
X7010216
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
|
Base items
|
1.000
|
|
XX000503
|
FOOT
|
SPLIT RAIL FENCE
|
Base items
|
215.000
|
|
XX006729
|
FOOT
|
PERIMETER EROSION BARRIER, ROLLED EXCELSIOR
|
Base items
|
385.000
|
|
XX009334
|
EACH
|
BICYCLE REPAIR STATION
|
Base items
|
1.000
|
|
Z0003850
|
EACH
|
BENCHES
|
Base items
|
12.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0064800
|
UNIT
|
SELECTIVE CLEARING
|
Base items
|
12.000
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
500.000
|
$0.80
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
500.000
|
$15.00
|