Home > Notice of Letting > Contract Detail

November 05, 2021 Letting 12:00 PM
066-76P54

Bulletin Description

4.5 miles of resurfacing on IL 161 from Albers Road to Hanover Street in Germantown.
Region District DBE % VBP % Federal Project #
5 8 12.00 0.00 COVDTNX0(499)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Clinton
  • FAP 805
  • (126,126-1)RS-3
  • C-98-090-21
  • 8-00854-0000
Contract Specifics
35 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of October 26, 2021 04:30 PM.

  • Note 4 on plan sheet 2 specifies a method of construction that is normally reserved for multi-lane highways and/or interstate sections and is used to eliminate potential drop-offs/drop-ins. This project is a Smart Resurfacing (mill 1.5" and overlay 1.5") on a 2-lane rural section. Are there any special circumstances/conditions or other reasoning related to this section that necessitates using this more restrictive and more expensive method of construction?
    The contractor should bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (10/20/2021)

  • General Note #4 on Plan Sheet #2 states, "All milled lanes shall be resurfaced with the appropriate surface course prior to opening the lane to traffic." By this statement the Contractor must mill the roadway, clean the milled surface, apply the prime coat and longitudinal joint sealant, and place the surface course all in the same day. Also meaning that the mill can only cut the amount of area that can be paved in the same day. Is this the Departments intent on this contract?
    The intent of the general note #4 is for the Contractor to mill and clean the surface, apply prime coat and longitudinal joint sealant, and place surface course within the same day. This would mean that the Contractor should mill can only amount of area that can be pave in a one day's course. (10/06/2021)

Authorized Bidders

  • 1034 Christ Bros. Asphalt, Inc.
    820 s fritz st.
    P.O. Box 158
    Lebanon, IL 62254
    Phone: (618) 537-6174 Fax: (618) 537-6199 Email: No Record
    $1,222,498.31

  • 2692 Howell Paving, Inc.
    1020 N. 13th Street
    Mattoon, IL 61938
    P.O. Box 1009
    Mattoon, IL 61938
    Phone: (217) 234-8877 Fax: (217) 234-4226 Email: estimates@howellco.com
    $1,298,427.28

  • 3157 The Kilian Corporation
    608 South Independence Street
    Mascoutah, IL 62258
    P.O. Box A
    Mascoutah, IL 62258
    Phone: (618) 566-2000 Fax: (618) 566-2314 Email: sharon.weier@kiliancorp.com
    $1,263,677.17

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 28,005.000
40604052 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70 Base items 5,228.000
44000155 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" Base items 67,420.000
44200180 SQ YD PAVEMENT PATCHING, TYPE II, 15 INCH Base items 315.000
44200184 SQ YD PAVEMENT PATCHING, TYPE III, 15 INCH Base items 680.000
44200186 SQ YD PAVEMENT PATCHING, TYPE IV, 15 INCH Base items 1,853.000
48102100 TON AGGREGATE WEDGE SHOULDER, TYPE B Base items 145.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 6.000
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70100600 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701336 Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 6,365.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 707.000
70300210 SQ FT TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS Base items 122.000
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 34,294.000
70300280 FOOT TEMPORARY PAVEMENT MARKING - LINE 24" Base items 72.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 122.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 34,294.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 72.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 292.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 292.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 11,590.000
Z0033700 FOOT LONGITUDINAL JOINT SEALANT Base items 23,338.000
Z0034105 TON MATERIAL TRANSFER DEVICE Base items 5,228.000
Z0070100 EACH SURVEY MONUMENT COVER ASSEMBLY Base items 4.000
Z0076600 HOUR TRAINEES Base items 500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.