Home > Notice of Letting

November 05, 2021 Letting 12:00 PM
Notice of Letting
Volume 024, No. 040

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-61H19 Withdrawn 10/26/2021 1 1 1 DuPage Construction of a bike path along the North Central DuPage Regional Trail, from the Illinois Prairie Path to Forest Preserve Drive, in the Villages of Wayne and Bartlett. , Construction of a bike path along the North Central DuPage Regional Trail, from the Illinois Prairie Path to Forest Preserve Drive, in the Villages of Wayne and Bartlett.
002-61H22 Executed 12/21/2021 1 / 1 1 1 DuPage Traffic signal improvements at various locations in DuPage County
003-61H28 Executed 12/07/2021 4 / 4 1 1 1 Lake Replace the bridge carrying Central Avenue over an unamed ravine, 0.1 mile west of Lake Michigan in Highland Park.
004-62H97 Executed 12/07/2021 1 1 DuPage (1.826-Mile) Designed overlay and ADA improvements on I-55 N. Frontage Rd. from IL 83 to Elm St., located in the Villages of Willowbrook and Burr Ridge.
005-62J26 Executed 12/02/2021 4 / 4 2 1 1 Lake (2300-Ft) Rehabilitation of culverts located on US 41 over Unnamed Creeks (N of IL 173 to S of Westleigh Rd) in the Villages of Wardsworth, Gurnee and Lake Forest. (SN 049-0228, SN 049-2015, SN 049-2016, SN 049-0575)
006-62L12 Executed 12/07/2021 1 1 Cook (1.34-Mile) Designed Overlay, Pedestrian Ramps. Location: Torrence Avenue, from Calumet River to 86 feet N. of 114th Street in the City of Chicago.
007-62L84 Executed 12/01/2021 1 1 1 Cook (2.87-Mile) Standard Overlay, ADA Improvements; Location: FAP 353: US 30 Lincoln Highway from Lowe Ave to East of IL 394 in the City of Chicago Heights and Village of Ford Heights in Cook County.
008-62M19 Executed 12/07/2021 2 / 2 1 1 1 Cook (5.18-Mile) SMART Overlay, ADA improvements, patching, crack and joint sealing, pavement markings project on US 12-20-41 from I-94 (Dan Ryan Expy) to I-90 (Chicago Skyway). Located in the City of Chicago in Cook County.
009-62M28 Executed 12/02/2021 4 / 4 1 1 Cook (364-ft) Bridge Preservation Project including bridge deck patching and overlay expansion joints replacement, bearings, piers and beams repairs. Location: Bridge carrying Glenwood-Lansing Road over IL 394, in the Village of Glenwood.
010-62M30 Executed 12/02/2021 3 / 2 2 1 1 Cook (675-ft) Bridge repair, joint replacement and bridge deck overlay, located on Interstate 57 (I-57) over the Wisconsin Central Limited (WCL) Railroad in the Villages of Matteson and Richton Park.
011-62M34 Executed 12/08/2021 5 / 5 1 1 1 DuPage (1555-Ft) Bridge deck overlay, expansion joint replacement and drainage scuppers repair located on a bridge carrying II 56 over 1-355 in the Village of Downers Grove.
012-62M35 Executed 12/08/2021 3 / 3 1 1 1 DuPage (1556-Ft) Bridge deck overlay and expansion joint replacement located on a bridge carrying 1164 over 1-355 in the Village of Lombard in DuPage County, IL.
013-62M93 Executed 12/01/2021 1 1 Cook (0.17-Mile) Roadway lighting improvement, located in the Village of South Holland, IL. on US6 (162ND St.) east of 1-94 (Bishop Ford Expressway). Light tower and foundation removal. Install new light poles, metal foundations, LED luminaires, conduits and cables, excavations and site restoration.
014-62N46 Executed 12/01/2021 4 / 2 1 1 McHenry (1.11-mile) ultra-thin bonded wearing course along US 14 from Crowley Road to Oak Grove Road. Located in the City of Harvard and unincorporated McHenry Co.
015-62N52 Executed 12/07/2021 3 / 3 2 1 1 Cook, Kane (2.63-Mile) Standard overlay and ADA improvement project on IL 19 (Irving Park Road) from IL 25 to IL 59 in Cook and Kane Counties.
016-62N55 Executed 12/03/2021 1 / 1 1 1 Kane (1.64-mile) Standard Overlay, Milled Rumble Strip and ADA improvements project, consisting of HMA removal, pavement patching, HMA resurfacing, curb ramps (ADA) improvements, pavement markings install. Located on IL 25 from Hazel Avenue to the Kendall County Line in the City of Aurora and the Village of Montgomery.
017-62P24 Executed 12/07/2021 1 / 1 1 1 1 Cook (1,054-ft) Bridge Painting on (SNs 016-0343, 016-0344) carrying US Route 45 over the Cal Sag Channel in unincorporated Cook County.
018-62P46 Executed 12/07/2021 1 1 Cook Cleaning and painting of steel bridge structures at 3 locations. 1)Lake-Cook Road over US 41 (SN-016-0811) in Village of Highland Park. 2) Dundee Road (IL-68) over 1-94 (SN-016-0939) in the Village of Northbrook and Glencoe. 3) US-14 over IL-58 (Golf Road) (SN-016-0236) in the City of Des Plaines.
019-62P49 Executed 12/01/2021 2 / 2 1 1 Cook Bridge deck sealing and bridge joint repair. Location: 1-90/94 at various locations in the City of Chicago in Cook County. (SN-016-0189, SN-016-0398, SN-016-1007, SN-016-1152, SN-016-1153).
020-62P61 Executed 02/23/2022 1 1 1 Cook (631-Mile) Litter/ Debris Removal project from edge of pavement to the Pedestrian Barrier on 1-90/94 (Dan Ryan Expwy) expressway from Congress Pkwy to 1-57/ 1-94 (Bishop Ford Expwy).
021-62P62 Executed 02/23/2022 1 1 Cook (528-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1) FAI 94: 1-94 from 1-90/94 (Dan Ryan Expwy) to 1-80; 2) FAP 341: Stony Island from 1-94 to US 12 (95th) 3) FAU 1574: 103rd St from Cottage Groove to Stony Island.
022-64H58 Executed 12/07/2021 4 / 4 2 2 Jo Daviess Removal and replacement of the SN 043-0040 carrying IL 78 over the Plum River located 6.3 miles South of US 20.
023-64M41 Executed 12/01/2021 3 / 3 2 2 Lee 0.37 mile, Removal and replacement of concrete box culverts carrying IL 251 over drainage from 0.5 mile South of US 30 to 0.3 mile North of Tower Road. (SN's 052-1064, 1066, C003, 1076, 1077)
024-64P97 Executed 12/09/2021 2 2 Rock Island Washing the bridge (SN 081-0011) carrying I-80 over the Mississippi River.
025-64P98 Executed 12/09/2021 2 2 Various Washing three bridges over the Mississippi River, Carroll County (SN 008-0052) carrying US 52/IL 64, Rock Island County (SN 081-9905) carrying US 67, Whiteside County (SN 098-6003) carrying US 30.
026-64P99 Executed 12/09/2021 2 2 Various Washing six bridges over the Rock River, in Henry, Rock Island and Whiteside Counties.
027-64R01 Executed 12/09/2021 2 2 Various Washing eight bridges at various locations in Henry, Lee, Ogle, Stephenson and Whiteside Counties.
028-64R05 Executed 12/09/2021 2 2 Various Washing twelve bridges at various locations in Henry, Lee, Rock Island, and Whiteside Counties.
029-64R07 Executed 12/09/2021 2 2 Various Washing seventeen bridges at various locations in Carroll, Ogle, Stephenson, and Whiteside Counties.
030-64R25 Executed 01/04/2022 2 2 Ogle Repair slope failure of Northbound embankment 0.6 mile South of IL 38.
031-64R27 Executed 12/27/2021 2 2 Whiteside Pavement patching on IL 2 from Lynn Blvd in Sterling to Prairieville Road.
032-64R28 Executed 12/03/2021 2 2 Rock Island Pavement patching from Kennedy Dr in East Moline to Hospital RD in Silvis.
033-66F01 Executed 12/01/2021 3 / 3 2 3 Iroquois The project length is 700 feet. It is located along IL 1 and includes the replacement of the exisiting SN 038-0028 over Gay Creek approximately 0.2 miles South of Wellington, Il.
034-66F71 Executed 12/01/2021 2 3 Kankakee This project is located on FAP 330 (US 45/52) North of Bourbonnais in Kankakee County. SN 046-0047 carries US 45/52 over South Branch Rock Creek approximately 1.5 miles South of County Highway 9. Work on this project consists of pier, pier cap, and bearing seat repairs, abutment repairs, and expansion joint gland repairs.
035-66H26 Executed 12/27/2021 2 / 2 1 2 3 Bureau The project is a bridge replacement over the Hennepin Feeder Canal located on IL 92, 1 mile East of IL 172 in Bureau County. The profile grade will be raised approx 5'-10", therefore, additional work such as guardrail upgrades, embankment, etc is expected. Work within IDNR property is also proposed. Construction shall be achieved via Detour.
036-66J01 Executed 12/08/2021 2 3 Bureau This project is located on FAI 80 (I-80) at the Maple Grove Creek crossing, approximately 2 miles north of Wyanet, in Bureau County. The work consists of removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline and shoulders, guardrail removal and replacement, and other work.
037-66L96 Executed 12/08/2021 1 / 1 2 3 Grundy This project is located at Structure No. 032-2525, a 12' x 8' concrete box culvert, 400' feet West of Ashley Rd. in Grundy County. This project consists of removing and replace failed wing wall stems and headwall.
038-68E12 Executed 12/01/2021 3 4 Fulton Culvert replacement with slope repair on IL Route 97, 1.0 mile North of Cuba, Fulton County.
039-68F74 Executed 12/02/2021 1 / 1 1 3 4 Peoria Bridge deck overlay and bridge joint replace/repair on IL 8 structures; S.N. 072-0164 over Nixon Run Creek; S.N. 072-0165 over Warsaw Creek and S.N. 072-0166 over Kickapo Creek Tributary.
040-68G57 Executed 12/01/2021 2 / 2 1 3 4 Marshall, Woodford Bridge painting at various locations in Marshall and Woodford Counties on Structure Nos.: 062-0085, 062-0049, 062-0053, 062-0054, 062-0055, 102-048, 102-0050 and 102-0051.
041-68G64 Executed 12/08/2021 3 4 Tazewell Remove and replace existing high mast light tower, luminaires and concrete foundation on Riverfront Drive Spur, e ast of W ashinton Street in East Peoria.
042-70905 Executed 12/02/2021 1 / 1 3 5 Vermilion Bridge Replacement of SN 092-0060 over a Drainage Ditch 0.5 Mi N of US 136 (E.) Gross Length= Net Length= 300.00 FT = 0.057 Mi.
043-70E74 Withdrawn 10/04/2021 3 5 McLean Bridge painting at 10 structure locations on FAI-74 and FAI-39 in McLean County. , Bridge painting at 10 structure locations on FAI-74 and FAI-39 in McLean County.
044-70E93 Executed 12/03/2021 3 5 Vermilion Modernize traffic signals on IL Rt 1 / US Rt 150 at the intersection with Ross Lane in Tilton of Vermilion County.
045-72F35 Executed 12/01/2021 8 / 8 2 4 6 Mason 2 culvert replacements on IL 78: 1. Over a ditch, 0.8 miles south of White Oak Creek south of Havana; 2. Over a ditch, 0.8 miles north of Elm Street in Bath. (SN 063-7017 and 063-7020)
046-72K81 Executed 12/08/2021 3 / 3 4 6 Logan 5.5 miles of standard overlay, bridge joint repair/replacement, bridge repair and drain repair/replacement on US 136 west of Union Road to the McLean County line. (SN 054-0026 and 054-0027)
047-72L62 Executed 12/16/2021 3 / 3 1 4 6 Adams Bridge repair on US 24 over Homan Creek, 0.1 miles north of 12th Street in Quincy. (SN 001-0010)
048-72M92 Executed 12/16/2021 4 6 Morgan Bearing replacements on two bridges carrying I-72 over North Fork Mauvaise Terre Creek, 1.1 miles northeast of Old US 36 near Jacksonville. (SN 069-0048 and SN 069-0049)
049-72M93 Executed 12/01/2021 4 6 Adams Deck patching and expansion joint repairs on SN 001-0069 carrying East 1100th Street over I-172, 0.1 miles northwest of the Pike County line.
050-72M94 Executed 12/08/2021 4 6 Scott Deck patching on SN 086-0501 and 086-0502 on IL 106 near Alsey.
051-72N04 Executed 12/03/2021 4 6 Logan Bridge painting on SN 054-0041 and 054-0042 carrying I-55 over Salt Creek, 2.2 miles south of IL 10.
052-72N05 Executed 12/01/2021 4 6 Sangamon Bridge painting on SN 084-0154 carrying Overpass Road over I-72, 1.4 miles east of the Sangamon River at the Riverton Interchange.
053-74181 Executed 12/16/2021 1 / 1 1 4 7 Crawford Replacement of SN 017-0003 and SN 017-0004 on IL 1, 2.5 and 0.3 miles north of IL 33.
054-74320 Executed 12/07/2021 4 7 Wabash Removal and replacement of SN 093-0006, PCC pavement and sidewalks on IL 1 between 11th and 12th Streets in Mt. Carmel.
055-74948 Executed 02/07/2022 1 / 1 1 4 7 Wabash Polymer overlay on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel.
056-74995 Executed 12/16/2021 4 7 Cumberland Bridge deck overlay, bridge deck repairs, bridge approach replacement HMA paving and guardrail on US 40 over Big Muddy Creek, 1.3 miles east of Woodbury. (SN 018-0007)
057-74996 Executed 12/27/2021 3 / 3 1 4 7 Macon Bridge deck overlay, bridge joint replacement/repair and bridge repair on the structure carrying North Wyckles Rd. Over I-72, 2 miles north of Harristown.
058-74997 Executed 12/07/2021 7 / 7 1 4 7 Wayne Bridge deck overlay, bridge joint replace/repair, bridge deck repairs, approach slab replacements on 8 structures between IL. 242 and US 45.
059-74A66 Executed 12/09/2021 4 7 Various Cleaning and painting 3 structures on I-57 and I-70.
060-74A84 Executed 12/03/2021 4 7 Effingham, Fayette 23 miles of weed spraying along I-70 from milepost 61 in Fayette County to milepost 84 in Effingham County.
061-74A86 Executed 01/13/2022 4 7 Clay, Effingham, Fayette Tree removal on I-57 from mile marker 134 to mile marker 158.
062-74A87 Executed 12/02/2021 4 7 Fayette Slope wall repair, shoulder replacement and guardrail work on I-70 between the twin bridges over CSXT Railroad, 1.5 miles west of the Brownstown Interchange.
063-76L10 Executed 12/07/2021 1 / 1 5 8 Jersey 8.2 miles of resurfacing on IL 109 from US 67 in Jerseyville to IL 3.
064-76P05 Executed 12/02/2021 5 / 5 1 5 8 St. Clair Bridge joint repair on SN 082-0318 carrying the eastbound I-70 departure over the Mississippi River.
065-76P51 Executed 12/07/2021 1 / 1 1 5 8 Jersey Cleaning and painting two steel bridges on IL 100 over Chautauqua and Elsah Creek, South of Grafton. (SN 042-0013 and SN 042-0014)
066-76P54 Executed 12/09/2021 2 / 2 5 8 Clinton 4.5 miles of resurfacing on IL 161 from Albers Road to Hanover Street in Germantown.
067-76P55 Executed 12/09/2021 1 / 1 1 5 8 St. Clair 2 miles of resurfacing along US 50 from Anne Avenue to IL 158.
068-76P64 Executed 12/01/2021 5 8 St. Clair Bridge painting at the Poplar Street Complex; I-55/64 Eastbound Collector - Distributor Lanes over TRRA Railroad and over and under IL 3 ramps (SN 082-0144).
069-76P84 Executed 12/09/2021 5 8 Madison 3.8 miles of pavement patching along IL 111 / IL 3 / US 67 from Montclaire Avenue to Homer Adams Parkway, then to Alby Street.
070-76P89 Executed 12/01/2021 5 8 Monroe, St. Clair 9.2 miles of patching on I-255 from the Jefferson Barracks Bridge to IL 157.
071-76P93 Deleted 10/05/2021 5 8 Madison Procurement and delivery of electrical and drainage related items for future interchange reconstruction of I-270 at IL 111.
072-78829 Executed 12/07/2021 5 9 Massac Removing a single barrel reinforced concrete box culvert and replacing it with a single barrel precast box culvert, carrying IL 145 over a ditch, 2.1 miles north of Rosebud Road. (SN 064-7027)
073-78871 Executed 12/07/2021 1 / 1 1 5 9 Saline Resurfacing of Old IL 13 between the intersections with IL 13; Resurfacing of IL 13 from US 45 to Pankey Creek Bridge.
074-85695 Executed 12/20/2021 7 / 7 3 2 2 Winnebago Sidewalk replacement, construction of new sidewalks, lighting improvements, streetscaping and landscaping along Center Street from North Street to Howard Street in Durand.
075-87742 Executed 01/05/2022 3 / 3 1 2 3 LaSalle Replace the bridge carrying TR 222 over a tributary of Indian Creek, 0.5 mile north of Earville.
076-87754 Executed 12/01/2021 2 3 DeKalb Pavement patching, resurfacing, striping, signing, landscaping, installation of an automated pedestrian signal system and DA improvements at various locations at Northern Illinois University in Dekalb
077-87782 Executed 12/01/2021 1 / 1 2 3 Grundy Resurfacing, sidewalk replacement, curb and gutter replacement and pedestrian traffic signal improvements on Minooka Road from Tables Road to Ridge Road in Minooka.
078-89781 Withdrawn 10/06/2021 3 4 Warren Replace the bridge carrying CH 7 over Cedar Creek, 3.4 miles northeast of Monmouth. , Replace the bridge carrying CH 7 over Cedar Creek, 3.4 miles northeast of Monmouth.
079-89811 Executed 12/02/2021 2 / 2 1 3 4 Peoria Replace the bridge carrying CH 23R over the west fork of Kickapoo Creek, located southeast of Elmwood.
080-91613 Executed 12/03/2021 4 / 4 1 3 5 Champaign Construction of a shared use path along 1st Street from Windsor Road to Curtis Road in Savoy.
081-93740 Executed 12/17/2021 4 6 Hancock Reconstruction of aggregate base, resurfacing, curlverts, storm sewer, sidwalks , curb and gutter, and pavement markings on CH11, from west of the Basco corporate limits to east of Washington Street in Basco.
082-93776 Rejected 12/13/2021 4 6 Logan Replace the bridge carrying CH 12 over Lake Fork Creek, 1 mile east of Broadwell.
083-95822 Executed 01/04/2022 4 7 Effingham Trailhead, parking, and sidewalk crossing improvements, construction of a pedestrian path and signage at various locations along Outer Belt West in Effingham.
084-46583 Executed 12/02/2021 2 3 Various This project is located on various highways throughout District 3. This project consists of repairing various widths of pavement markings including lines, letters, numbers and symbols.
085-46924 Executed 12/01/2021 3 / 1 1 2 3 LaSalle The project consists of reconstructing a new retaining wall with associated appurtenances, HMA pavement, aggregate base course, type B gutter, guardrail, pavement markings and other improvements along the Entrance Road to the Buffalo Rock State Park, gross and net length 0.05 mi.
086-46930 Executed 12/01/2021 4 / 4 1 2 2 Winnebago These proposed improvements consist of road reconstruction, bridge repairs, culvert replacements to park roads and parking areas, and all other necessary work to complete the project within the Rock Cut State Park in Winnebago County, gross/net length 3.00 mi.
087-61F88 Withdrawn 10/22/2021 1 1 DuPage Sidewalk improvement on IL 53 from Hobson Road to Mulligan Drive in the Village of Woodridge. , Sidewalk improvement on IL 53 from Hobson Road to Mulligan Drive in the Village of Woodridge.
088-61G85 Rejected 11/23/2021 10 / 8 1 1 1 Lake Pavement reconstruction, resurfacing, curb and gutter replacement, sidewalk replacement, storm sewer, traffic signal improvements and pavement markings on Clavey Road, from 0.4 miles east of US 41 to Green Bay Road in Highland.
089-61H27 Executed 12/07/2021 15 / 12 3 1 1 McHenry Pavement widening and construction, curb and gutter, sidewalks, lighting, traffic signals, storm sewer and water main improvements on Main Street from IL 176 to the UP Railroad tracks, and on IL 176 from 2nd Street to Illinois Street in Crystal Lake.
090-62P48 Rejected 11/16/2021 1 1 Cook This improvement consists of bridge repairs and substructure repair at the bridge spanning 1-290 over Des Plaines River (SN 016-0090) in the Village of Park, Proviso Township, Cook County.
091-62P63 Executed 02/23/2022 1 1 Cook (167.4-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 - Stevenson expressway from Lake Shore Dr. to IL 43 (Harlem Ave.).
092-62P64 Executed 02/23/2022 3 / 3 1 1 1 Cook (417.6-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-290/ IL 11 O expressway from Austin Blvd to Wells St.
093-62P65 Executed 04/07/2022 1 1 Cook (292.2-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-190; 1-90/94 expressways from W. of US 12/45 Mannheim Rd to Congress Parkway.
094-62P66 Executed 12/02/2021 1 1 Various The improvement consists of temporary traffic control setup on various State maintained expressway and arterial routes District-wide on a work order basis.
095-64L12 Executed 12/01/2021 2 / 2 2 2 2 Henry, Rock Island Sidewalk Ramps for the disabled along various routes in the villages of Alpha, Andover, Osco, Woodhull, Andalusia, Coal Valley, and Edgington.
096-64P79 Executed 12/03/2021 2 2 Henry Pavement patching on 1-74 from the I-74/I-80/I-280 Interchange to IL 81.
097-64R00 Executed 12/09/2021 2 2 Henry, Rock Island Washing five bridges over the Rock River, in Henry and Rock Island Counties.
098-64R06 Executed 12/27/2021 2 2 Boone, Winnebago Washing eleven bridges at various locations in Boone and Winnebago Counties.
099-74A73 Executed 12/03/2021 4 7 Macon 25 miles of weed spraying along I-72 in Macon County.
100-76P63 Deleted 10/01/2021 5 8
101-85712 Executed 01/04/2022 2 2 Rock Island Sidewalk construction on 48th Street, from Wilson Middle School to 53rd Street onto 20th Avenue to 19th Avenue at the YMCA in Moline.
102-87752 Executed 01/04/2022 2 3 LaSalle Realign and reconstruct the intersection of Commercial Street, Broadway Street, and Main Street in Marseilles.
103-87767 Executed 12/07/2021 1 / 1 1 2 3 DeKalb Replace the bridge carrying TR 244 over Coon Creek 0.30 mile south of IL 72.
104-89721 Executed 12/02/2021 1 / 0 3 4 Tazewell Replace the bridge carrying Furrow Road over Lost Creek, one half mile east of Pekin.
105-61H15 Executed 01/05/2022 3 / 2 1 1 1 Cook Reconstruction and widening of roadway, sidewalk replacement, construct multi-use path, roadway lighting and traffic signal upgrade on IL 19 from Winchester DRive to east of Bartlett Road and on Bartlett Road from East Oltendorf Road to south of IL 19 in Streamwood
106-61H24 Withdrawn 10/26/2021 1 / 1 1 1 Cook Resurfacing, streetscape, lighting and traffic signal improvements at various locations in Berwyn. , Resurfacing, streetscape, lighting and traffic signal improvements at various locations in Berwyn.
107-62M86 Executed 12/01/2021 13 / 13 3 1 1 Various Mandatory This contract is for annual maintenance of electrical systems including the Signal Systems, Lighting Systems, Pump Station Systems, Surveilliance System and other Electrical Systems, many subsystems and components, mechanical system and including buildings, structures and grounds located withing District 1.
108-74364 Executed 12/02/2021 8 / 8 2 4 7 Cumberland Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road.
109-89727 Executed 12/13/2021 4 / 2 1 3 4 Tazewell Resurfacing, HMA shoulders, concrete curb, drainage improvements and pavement markings on Broadway Road from Veterans Drive to Springfield Road.
110-62N63 Executed 12/01/2021 1 / 1 1 1 1 Cook Standard overlay resurfacing of IL 58 (Summit St) begins 240 ft west of Hawatha Dr, proceed easterly (3.578 miles) to 300 ft east of IL 59 (Sutton Rd) in the Villages of Elgin and Hoffman Estates, Hanover Township.
111-62C25 Executed 01/12/2022 9 / 9 2 1 1 Cook (1.86-Mile) Channelization improvements at the intersections of East Ave. at Joliet Rd. and 55th St., traffic signal modernization, drainage improvements, retaining walls, culvert rehabilitation, and modifications to lighting in McCook, Hodgkins, and Countryside.
112-62F87 Executed 12/13/2021 1 / 1 1 1 Cook, Will (1,215 Ft.) Channelization project on Illinois Route 50 (Cicero Avenue) and Steger Road that includes standard overlay, traffic signal installation, and lighting installation. Located in the Villages of University Park and Richton Park.
113-78875 Executed 12/07/2021 5 9 Alexander 1.8 miles of pavement patching, HMA surface removal and HMA surfacing on IL 3 in Olive Branch from 0.1 miles west of Pigeon Roost Road to Brownsville Road.
1LR-M2007 Active 10/01/2021 1 / 1 0 0 Saline Voluntary The Beecher Williams #1 Reclamation Project is for the elimination of public health and safety hazards. This project, nine miles southeast of Harrisburg, contains a Project Labor Agreement.
2LR-M2009 Active 10/01/2021 1 / 0 1 0 0 LaSalle Voluntary The North Utica Drifts Reclamation Project removes four vertical openings located north of 530 West Johnson Street, and south of 509 and 513 West Washington Street.
No More Data