March 09, 2018 Letting 10:00 AM
01A-SR091

Bulletin Description

Reconstruct T-Hangar Taxiway Pavement with PCC and Correct Drainage Issues Adjacent to the South End of the Main Ramp
Region District DBE % VBP % Federal Project #
5 8 4.00 0.00 317SBGP139
County(s) IL Project # Airport Sponsor City
  • Madison
ALN 4587 St. Louis Regional St. Louis Regional Airport Authority East Alton
Contract Specifics
The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting.
37 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of February 27, 2018 04:30 PM.

  • The special provisions state that Taxiway closure 'X's are going to be needed and to refer to the plans for locations. However i do not see any in the plans. Please review.
    Taxiway closure crosses are not required for this project. (03/01/2018)

  • Will a concrete paving machine be required to pour the 6" PCC pavement for this project?
    Please refer to the Illinois Standard Specifications for Construction of Airports, Adopted April 1, 2012, Item 501, Section 501-3.10, Placing Concrete. (03/01/2018)

  • Sheet #9 has a reinforcement detail and reinforcement notes. Does this only apply to the 4 panels of concrete pavement that are shaded on sheet #8
    The Pavement Reinforcing Details and Reinforcing Notes on Plan Sheet 9 are only applicable to the shaded panels on Sheet 8, noted in the Legend as “Proposed Reinforced Panel”. A total of 4 panels on this project. (03/01/2018)

  • Sheet 9 of the plans has a detail for mesh stating that other configurations of mesh are acceptable as long as the area is 0.5. I think it should read 0.05% of the cross sectional area. Please review.
    The Reinforcement Sheet Wire Fabric Detail note shown on Sheet 9 titled Jointing Details should state the following: “Different wire mesh sizes or configurations are permitted if the minimum cross sectional area equals 0.05% or greater.” (02/08/2018)

Authorized Bidders

  • 5802 Stutz Excavating, Inc.
    3837 Fosterburg Road
    Alton, IL 62002
    Phone: (618) 259-2485 Fax: (618) 259-2465 Email: No Record
    $242,377.25

  • 0338 Baxmeyer Construction, Inc.
    1034 Floraville Road
    Waterloo, IL 62298
    Phone: (618) 939-3000 Fax: (618) 939-4299 Email: estimator@baxmeyerconstruction.com

  • 5564 G. M. Sipes Construction, Inc.
    503 E. ADAMS ST
    RUSHVILLE, IL 62681
    P.O. BOX 109
    RUSHVILLE, IL 62681
    Phone: (217) 322-6543 Fax: (217) 322-4712 Email: support@gmsipes.com

  • 2308 Hank's Excavating & Landscaping, Inc.
    5825 West State Route 161
    Belleville, IL 62223
    Phone: (618) 398-5556 Fax: (618) 398-2729 Email: No Record
    $352,169.90

  • 3108 Keller Construction, Inc.
    22 Illini Drive
    Glen Carbon, IL 62034
    Phone: (618) 656-0033 Fax: (618) 656-7134 Email: dan.walker@kellerconstruction.com
    $294,865.98

  • 4928 RCS Construction, Inc.
    960 E. Airline Drive
    East Alton, IL 62024
    Phone: (618) 254-3816 Fax: (618) 254-3841 Email: heather@rcs-construction.com
    $274,266.00

Non Bidders

  • 1034 Christ Bros. Asphalt, Inc.
    820 s fritz st.
    P.O. Box 158
    Lebanon, IL 62254
    Phone: (618) 537-6174 Fax: (618) 537-6199 Email: No Record

Pay Item # UOM Description Type Quantity Unit Price
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150540 L SUM HAUL ROUTE Base items 1.000
AR152480 SQ YD SHOULDER ADJUSTMENT Base items 64.000
AR209510 TON CRUSHED AGGREGATE BASE COURSE Base items 1,211.000
AR401900 SQ YD REMOVE BITUMINOUS PAVEMENT Base items 2,820.000
AR401911 SQ YD REMOVE & REPLACE BIT. SURFACE Base items 80.000
AR501506 SQ YD 6" PCC PAVEMENT Base items 2,819.000
AR501530 EACH PCC TEST BATCH Base items 1.000
AR701006 FOOT 6" PVC STORM SEWER Base items 53.000
AR701012 FOOT 12" PVC STORM SEWER Base items 76.000
AR701015 L.F. 15" PVC STORM SEWER Base items 20.000
AR701900 FOOT REMOVE PIPE Base items 316.000
AR751001 FOOT TRENCH DRAIN Base items 271.000
AR751900 EACH REMOVE INLET Base items 3.000
AR751912 EACH REMOVE SPECIAL STRUCTURE Base items 1.000
AR752850 EACH SPECIAL STRUCTURE Base items 1.000
No More Pay Items