                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 04/20/26  10:44:52                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 02/27/2026  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 68J46  LETTING ITEM NUMBER: 025
 RESPONSIBLE DISTRICT: 04                                                                                  BIDS LOCKED: Y
 SECTION: 116N,TS-1                                COUNTY: PEORIA                                          ESTIMATE:
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 0335  Otto Baum Company, Inc.
                          NO ALT                              749,500.00 *     749,500.00     749,500.00    *

 1284  R. A. Cullinan and Son, a div of UCM, Inc.
                          NO ALT                            1,063,024.03     1,063,024.03   1,063,024.03

 2024  Gensini Excavating, Inc.
                          NO ALT                              759,806.44       759,806.44     759,806.44

 2824  Illinois Civil Contractors, Inc.
                          NO ALT                              856,937.09       856,937.09     856,937.09

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =      76
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    X4402020  CONC MEDIAN SURF REM                       459.000    SQ FT
 2024      Gensini Excavating, Inc.                                         3.2400        1,487.16        1,487.16
 2824      Illinois Civil Contractors, Inc.                                 9.1200        4,186.08        4,186.08
 0335      Otto Baum Company, Inc.                                          2.6700        1,225.53        1,225.53
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       3.2400        1,487.16        1,487.16

    X6062400  CONC GUTTER SPL                             42.000     FOOT
 2024      Gensini Excavating, Inc.                                        55.0800        2,313.36        2,313.36
 2824      Illinois Civil Contractors, Inc.                               138.6900        5,824.98        5,824.98
 0335      Otto Baum Company, Inc.                                        116.6800        4,900.56        4,900.56
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     211.5000        8,883.00        8,883.00

    X8950114  MOD EX CONTR & CAB                           1.000     EACH
 2024      Gensini Excavating, Inc.                                     8,426.6500        8,426.65        8,426.65
 2824      Illinois Civil Contractors, Inc.                             8,735.6200        8,735.62        8,735.62
 0335      Otto Baum Company, Inc.                                      7,896.7800        7,896.78        7,896.78
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   8,302.8000        8,302.80        8,302.80

    Z0013798  CONSTRUCTION LAYOUT                          1.000    L SUM
 2024      Gensini Excavating, Inc.                                    10,256.1100       10,256.11       10,256.11
 2824      Illinois Civil Contractors, Inc.                             5,786.7100        5,786.71        5,786.71
 0335      Otto Baum Company, Inc.                                      9,677.4400        9,677.44        9,677.44
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  13,882.6500       13,882.65       13,882.65

    20200100  EARTH EXCAVATION                           722.000    CU YD
 2024      Gensini Excavating, Inc.                                        32.1000       23,176.20       23,176.20
 2824      Illinois Civil Contractors, Inc.                                56.3900       40,713.58       40,713.58
 0335      Otto Baum Company, Inc.                                         41.7300       30,129.06       30,129.06
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     101.0700       72,972.54       72,972.54

    21101615  TOPSOIL F & P  4                           221.000    SQ YD
 2024      Gensini Excavating, Inc.                                        21.8100        4,820.01        4,820.01
 2824      Illinois Civil Contractors, Inc.                                33.7300        7,454.33        7,454.33
 0335      Otto Baum Company, Inc.                                         20.6600        4,565.86        4,565.86
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      28.0000        6,188.00        6,188.00

    25000750  MOWING                                       6.000     ACRE
 2024      Gensini Excavating, Inc.                                     2,332.6900       13,996.14       13,996.14
 2824      Illinois Civil Contractors, Inc.                             1,377.4700        8,264.82        8,264.82
 0335      Otto Baum Company, Inc.                                         10.0000           60.00           60.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     495.0000        2,970.00        2,970.00

    25100630  EROSION CONTR BLANKET                      221.000    SQ YD
 2024      Gensini Excavating, Inc.                                         8.1500        1,801.15        1,801.15
 2824      Illinois Civil Contractors, Inc.                                 3.6900          815.49          815.49
 0335      Otto Baum Company, Inc.                                          3.9200          866.32          866.32
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       5.3200        1,175.72        1,175.72

    28000250  TEMP EROS CONTR SEED                         5.000    POUND
 2024      Gensini Excavating, Inc.                                        37.6800          188.40          188.40
 2824      Illinois Civil Contractors, Inc.                                 7.0800           35.40           35.40
 0335      Otto Baum Company, Inc.                                         33.9700          169.85          169.85
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      28.5300          142.65          142.65

    28000305  TEMP DITCH CHECKS                           10.000     FOOT
 2024      Gensini Excavating, Inc.                                        14.7100          147.10          147.10
 2824      Illinois Civil Contractors, Inc.                                11.2700          112.70          112.70
 0335      Otto Baum Company, Inc.                                         45.1100          451.10          451.10
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      53.7400          537.40          537.40

    28000400  PERIMETER EROS BAR                         399.000     FOOT
 2024      Gensini Excavating, Inc.                                         4.2800        1,707.72        1,707.72
 2824      Illinois Civil Contractors, Inc.                                 7.2200        2,880.78        2,880.78
 0335      Otto Baum Company, Inc.                                          5.2100        2,078.79        2,078.79
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      13.1200        5,234.88        5,234.88

    28000500  INLET & PIPE PROTECT                         2.000     EACH
 2024      Gensini Excavating, Inc.                                       259.1300          518.26          518.26
 2824      Illinois Civil Contractors, Inc.                               307.5100          615.02          615.02
 0335      Otto Baum Company, Inc.                                        128.3100          256.62          256.62
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     716.3100        1,432.62        1,432.62

    31101000  SUB GRAN MAT B                             767.000      TON
 2024      Gensini Excavating, Inc.                                        46.4600       35,634.82       35,634.82
 2824      Illinois Civil Contractors, Inc.                                70.4000       53,996.80       53,996.80
 0335      Otto Baum Company, Inc.                                         54.5800       41,862.86       41,862.86
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      72.1900       55,369.73       55,369.73

    35300215  PCC BSE CSE  7 3/4                         304.000    SQ YD
 2024      Gensini Excavating, Inc.                                       125.2800       38,085.12       38,085.12
 2824      Illinois Civil Contractors, Inc.                                70.1300       21,319.52       21,319.52
 0335      Otto Baum Company, Inc.                                         74.9800       22,793.92       22,793.92
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     119.0700       36,197.28       36,197.28

    35300500  PCC BSE CSE 10                             698.000    SQ YD
 2024      Gensini Excavating, Inc.                                       132.9800       92,820.04       92,820.04
 2824      Illinois Civil Contractors, Inc.                                70.1300       48,950.74       48,950.74
 0335      Otto Baum Company, Inc.                                         78.3300       54,674.34       54,674.34
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     114.0100       79,578.98       79,578.98

    40600295  P BIT MATLS TACK CT                        787.000    POUND
 2024      Gensini Excavating, Inc.                                         2.7700        2,179.99        2,179.99
 2824      Illinois Civil Contractors, Inc.                                 7.0400        5,540.48        5,540.48
 0335      Otto Baum Company, Inc.                                          2.6200        2,061.94        2,061.94
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       6.0800        4,784.96        4,784.96

    40600405  MATL TRANSFER DEVICE                       224.500      TON
 2024      Gensini Excavating, Inc.                                        22.1800        4,979.41        4,979.41
 2824      Illinois Civil Contractors, Inc.                                31.5400        7,080.73        7,080.73
 0335      Otto Baum Company, Inc.                                         20.9200        4,696.54        4,696.54
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      27.2500        6,117.63        6,117.63

    40603208  P HMA BC IL-9.5 N70                        112.300      TON
 2024      Gensini Excavating, Inc.                                       266.1000       29,883.03       29,883.03
 2824      Illinois Civil Contractors, Inc.                               392.2500       44,049.68       44,049.68
 0335      Otto Baum Company, Inc.                                        251.0900       28,197.41       28,197.41
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     338.9200       38,060.72       38,060.72

    40604162  P HMA SC IL-9.5 D N70                      112.300      TON
 2024      Gensini Excavating, Inc.                                       266.1000       29,883.03       29,883.03
 2824      Illinois Civil Contractors, Inc.                               392.2500       44,049.68       44,049.68
 0335      Otto Baum Company, Inc.                                        251.0900       28,197.41       28,197.41
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     338.9200       38,060.72       38,060.72

    44000100  PAVEMENT REM                               360.000    SQ YD
 2024      Gensini Excavating, Inc.                                        14.4700        5,209.20        5,209.20
 2824      Illinois Civil Contractors, Inc.                                36.8700       13,273.20       13,273.20
 0335      Otto Baum Company, Inc.                                         45.6100       16,419.60       16,419.60
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      78.1300       28,126.80       28,126.80

    44000400  GUTTER REM                                  43.000     FOOT
 2024      Gensini Excavating, Inc.                                         7.4400          319.92          319.92
 2824      Illinois Civil Contractors, Inc.                                20.5700          884.51          884.51
 0335      Otto Baum Company, Inc.                                         27.0300        1,162.29        1,162.29
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      34.5900        1,487.37        1,487.37

    44000500  COMB CURB GUTTER REM                       896.000     FOOT
 2024      Gensini Excavating, Inc.                                         7.4400        6,666.24        6,666.24
 2824      Illinois Civil Contractors, Inc.                                15.4600       13,852.16       13,852.16
 0335      Otto Baum Company, Inc.                                         10.3200        9,246.72        9,246.72
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      16.6000       14,873.60       14,873.60

    44201299  DOWEL BARS 1 1/2                           558.000     EACH
 2024      Gensini Excavating, Inc.                                        16.6300        9,279.54        9,279.54
 2824      Illinois Civil Contractors, Inc.                                31.6100       17,638.38       17,638.38
 0335      Otto Baum Company, Inc.                                         22.4200       12,510.36       12,510.36
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      14.5500        8,118.90        8,118.90

    44213204  TIE BARS    3/4                            315.000     EACH
 2024      Gensini Excavating, Inc.                                        11.0900        3,493.35        3,493.35
 2824      Illinois Civil Contractors, Inc.                                22.3600        7,043.40        7,043.40
 0335      Otto Baum Company, Inc.                                         18.4700        5,818.05        5,818.05
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      35.9300       11,317.95       11,317.95

    60600095  CLASS SI CONC OUTLET                         2.100    CU YD
 2024      Gensini Excavating, Inc.                                     1,172.4800        2,462.21        2,462.21
 2824      Illinois Civil Contractors, Inc.                             2,693.4400        5,656.22        5,656.22
 0335      Otto Baum Company, Inc.                                      1,360.8400        2,857.76        2,857.76
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   2,163.9700        4,544.34        4,544.34

    60603500  COMB CC&G TB6.06                           443.000     FOOT
 2024      Gensini Excavating, Inc.                                        50.8700       22,535.41       22,535.41
 2824      Illinois Civil Contractors, Inc.                               108.9400       48,260.42       48,260.42
 0335      Otto Baum Company, Inc.                                         67.7800       30,026.54       30,026.54
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     206.2200       91,355.46       91,355.46

    60603800  COMB CC&G TB6.12                           343.000     FOOT
 2024      Gensini Excavating, Inc.                                        53.9100       18,491.13       18,491.13
 2824      Illinois Civil Contractors, Inc.                                90.6900       31,106.67       31,106.67
 0335      Otto Baum Company, Inc.                                         76.4200       26,212.06       26,212.06
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     222.3500       76,266.05       76,266.05

    60605000  COMB CC&G TY B-6.24                         98.000     FOOT
 2024      Gensini Excavating, Inc.                                        60.0200        5,881.96        5,881.96
 2824      Illinois Civil Contractors, Inc.                               121.0700       11,864.86       11,864.86
 0335      Otto Baum Company, Inc.                                        103.2900       10,122.42       10,122.42
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     225.6300       22,111.74       22,111.74

    60618300  CONC MEDIAN SURF 4                         471.000    SQ FT
 2024      Gensini Excavating, Inc.                                        16.3600        7,705.56        7,705.56
 2824      Illinois Civil Contractors, Inc.                                10.6500        5,016.15        5,016.15
 0335      Otto Baum Company, Inc.                                         11.8200        5,567.22        5,567.22
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      22.7900       10,734.09       10,734.09

    67000500  ENGR FIELD OFFICE B                          4.000   CAL MO
 2024      Gensini Excavating, Inc.                                     3,326.3100       13,305.24       13,305.24
 2824      Illinois Civil Contractors, Inc.                             2,486.8200        9,947.28        9,947.28
 0335      Otto Baum Company, Inc.                                      1,750.0000        7,000.00        7,000.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   4,204.4900       16,817.96       16,817.96

    67100100  MOBILIZATION                                 1.000    L SUM
 2024      Gensini Excavating, Inc.                                    55,502.5100       55,502.51       55,502.51
 2824      Illinois Civil Contractors, Inc.                            51,416.2200       51,416.22       51,416.22
 0335      Otto Baum Company, Inc.                                     89,271.6800       89,271.68       89,271.68
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  59,393.0900       59,393.09       59,393.09

    70102632  TR CONT & PROT 701602                        1.000    L SUM
 2024      Gensini Excavating, Inc.                                    35,000.0000       35,000.00       35,000.00
 2824      Illinois Civil Contractors, Inc.                            15,022.3100       15,022.31       15,022.31
 0335      Otto Baum Company, Inc.                                     15,618.1600       15,618.16       15,618.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  18,207.3600       18,207.36       18,207.36

    70102635  TR CONT & PROT 701701                        1.000    L SUM
 2024      Gensini Excavating, Inc.                                     3,159.9900        3,159.99        3,159.99
 2824      Illinois Civil Contractors, Inc.                             3,298.4300        3,298.43        3,298.43
 0335      Otto Baum Company, Inc.                                      4,737.5900        4,737.59        4,737.59
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   3,135.0000        3,135.00        3,135.00

    70103815  TR CONT SURVEILLANCE                        28.000   CAL DA
 2024      Gensini Excavating, Inc.                                         0.0100            0.28            0.28
 2824      Illinois Civil Contractors, Inc.                               845.9500       23,686.60       23,686.60
 0335      Otto Baum Company, Inc.                                        304.9800        8,539.44        8,539.44
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,857.7700       52,017.56       52,017.56

    70107008  PAVT MK BLKOUT TAPE 8                       84.000     FOOT
 2024      Gensini Excavating, Inc.                                         5.2700          442.68          442.68
 2824      Illinois Civil Contractors, Inc.                                 5.5000          462.00          462.00
 0335      Otto Baum Company, Inc.                                         10.4600          878.64          878.64
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       5.2300          439.32          439.32

    70107025  CHANGEABLE MESSAGE SN                       21.000   CAL DA
 2024      Gensini Excavating, Inc.                                       138.6000        2,910.60        2,910.60
 2824      Illinois Civil Contractors, Inc.                               144.6700        3,038.07        3,038.07
 0335      Otto Baum Company, Inc.                                         68.0000        1,428.00        1,428.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     137.5000        2,887.50        2,887.50

    70300150  SHRT TRM PAVT MK REM                       771.000    SQ FT
 2024      Gensini Excavating, Inc.                                         2.2200        1,711.62        1,711.62
 2824      Illinois Civil Contractors, Inc.                                15.2400       11,750.04       11,750.04
 0335      Otto Baum Company, Inc.                                          2.0900        1,611.39        1,611.39
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       3.9500        3,045.45        3,045.45

    70300211  TEMP PVT MK LTR & SYM PAINT                374.000    SQ FT
 2024      Gensini Excavating, Inc.                                         3.8800        1,451.12        1,451.12
 2824      Illinois Civil Contractors, Inc.                                 4.0500        1,514.70        1,514.70
 0335      Otto Baum Company, Inc.                                          5.2300        1,956.02        1,956.02
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       3.8500        1,439.90        1,439.90

    70300221  TEMP PVT MK LINE 4 - PAINT               3,758.000     FOOT
 2024      Gensini Excavating, Inc.                                         0.4300        1,615.94        1,615.94
 2824      Illinois Civil Contractors, Inc.                                 0.4500        1,691.10        1,691.10
 0335      Otto Baum Company, Inc.                                          0.5200        1,954.16        1,954.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       0.4300        1,615.94        1,615.94

    70300241  TEMP PVT MK LINE 6 - PAINT               6,921.000     FOOT
 2024      Gensini Excavating, Inc.                                         0.6400        4,429.44        4,429.44
 2824      Illinois Civil Contractors, Inc.                                 0.6700        4,637.07        4,637.07
 0335      Otto Baum Company, Inc.                                          1.0500        7,267.05        7,267.05
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       0.6400        4,429.44        4,429.44

    70300251  TEMP PVT MK LINE 8 - PAINT               3,653.000     FOOT
 2024      Gensini Excavating, Inc.                                         0.8600        3,141.58        3,141.58
 2824      Illinois Civil Contractors, Inc.                                 0.9000        3,287.70        3,287.70
 0335      Otto Baum Company, Inc.                                          1.5700        5,735.21        5,735.21
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       0.8600        3,141.58        3,141.58

    70300261  TEMP PVT MK LINE 12 - PAINT              1,247.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.2900        1,608.63        1,608.63
 2824      Illinois Civil Contractors, Inc.                                 1.3400        1,670.98        1,670.98
 0335      Otto Baum Company, Inc.                                          2.0900        2,606.23        2,606.23
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.2800        1,596.16        1,596.16

    70300281  TEMP PVT MK LINE 24 - PAINT                181.000     FOOT
 2024      Gensini Excavating, Inc.                                         4.4400          803.64          803.64
 2824      Illinois Civil Contractors, Inc.                                 4.6300          838.03          838.03
 0335      Otto Baum Company, Inc.                                          5.2300          946.63          946.63
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       4.4000          796.40          796.40

    70307100  TEMP PVT MK LTR & SYM T4 TAPE               16.000    SQ FT
 2024      Gensini Excavating, Inc.                                        11.3700          181.92          181.92
 2824      Illinois Civil Contractors, Inc.                                11.8600          189.76          189.76
 0335      Otto Baum Company, Inc.                                         33.4800          535.68          535.68
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      11.2800          180.48          180.48

    70307120  TEMP PVT MK L4 T4 TAPE                   2,099.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.7700        3,715.23        3,715.23
 2824      Illinois Civil Contractors, Inc.                                 1.8500        3,883.15        3,883.15
 0335      Otto Baum Company, Inc.                                          1.6700        3,505.33        3,505.33
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.7600        3,694.24        3,694.24

    72000100  SIGN PANEL T1                               30.000    SQ FT
 2024      Gensini Excavating, Inc.                                       223.9700        6,719.10        6,719.10
 2824      Illinois Civil Contractors, Inc.                               150.4500        4,513.50        4,513.50
 0335      Otto Baum Company, Inc.                                         25.0000          750.00          750.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      61.6000        1,848.00        1,848.00

    72000200  SIGN PANEL T2                               10.000    SQ FT
 2024      Gensini Excavating, Inc.                                        52.4800          524.80          524.80
 2824      Illinois Civil Contractors, Inc.                                43.9800          439.80          439.80
 0335      Otto Baum Company, Inc.                                         62.7700          627.70          627.70
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      41.8000          418.00          418.00

    73000100  WOOD SIN SUPPORT                            15.000     FOOT
 2024      Gensini Excavating, Inc.                                        35.0500          525.75          525.75
 2824      Illinois Civil Contractors, Inc.                                97.5400        1,463.10        1,463.10
 0335      Otto Baum Company, Inc.                                         31.3900          470.85          470.85
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      49.5000          742.50          742.50

    78009000  MOD URETH PM LTR-SYM                       374.000    SQ FT
 2024      Gensini Excavating, Inc.                                         4.9900        1,866.26        1,866.26
 2824      Illinois Civil Contractors, Inc.                                 5.2100        1,948.54        1,948.54
 0335      Otto Baum Company, Inc.                                          8.3700        3,130.38        3,130.38
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       4.9500        1,851.30        1,851.30

    78009004  MOD URETH PM LINE  4                     3,758.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.1900        4,472.02        4,472.02
 2824      Illinois Civil Contractors, Inc.                                 1.2400        4,659.92        4,659.92
 0335      Otto Baum Company, Inc.                                          1.3600        5,110.88        5,110.88
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.1800        4,434.44        4,434.44

    78009006  MOD URETH PM LINE  6                     6,921.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.7700       12,250.17       12,250.17
 2824      Illinois Civil Contractors, Inc.                                 1.8500       12,803.85       12,803.85
 0335      Otto Baum Company, Inc.                                          2.0900       14,464.89       14,464.89
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.7600       12,180.96       12,180.96

    78009008  MOD URETH PM LINE  8                     3,653.000     FOOT
 2024      Gensini Excavating, Inc.                                         2.3800        8,694.14        8,694.14
 2824      Illinois Civil Contractors, Inc.                                 2.4900        9,095.97        9,095.97
 0335      Otto Baum Company, Inc.                                          2.7200        9,936.16        9,936.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.3700        8,657.61        8,657.61

    78009012  MOD URETH PM LINE 12                     1,247.000     FOOT
 2024      Gensini Excavating, Inc.                                         3.5600        4,439.32        4,439.32
 2824      Illinois Civil Contractors, Inc.                                 3.7200        4,638.84        4,638.84
 0335      Otto Baum Company, Inc.                                          5.2300        6,521.81        6,521.81
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       3.5300        4,401.91        4,401.91

    78009024  MOD URETH PM LINE 24                       181.000     FOOT
 2024      Gensini Excavating, Inc.                                         7.1000        1,285.10        1,285.10
 2824      Illinois Civil Contractors, Inc.                                 7.4100        1,341.21        1,341.21
 0335      Otto Baum Company, Inc.                                          8.3700        1,514.97        1,514.97
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       7.0400        1,274.24        1,274.24

    78011000  GRV RCSD PM LTR & SYM                      526.000    SQ FT
 2024      Gensini Excavating, Inc.                                         5.5400        2,914.04        2,914.04
 2824      Illinois Civil Contractors, Inc.                                 5.7900        3,045.54        3,045.54
 0335      Otto Baum Company, Inc.                                          6.2800        3,303.28        3,303.28
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       5.5000        2,893.00        2,893.00

    78011025  GRV RCSD PVT MRKG   5                    3,758.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.4300        5,373.94        5,373.94
 2824      Illinois Civil Contractors, Inc.                                 1.4900        5,599.42        5,599.42
 0335      Otto Baum Company, Inc.                                          1.0500        3,945.90        3,945.90
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.4200        5,336.36        5,336.36

    78011035  GRV RCSD PVT MRKG   7                    6,921.000     FOOT
 2024      Gensini Excavating, Inc.                                         2.1100       14,603.31       14,603.31
 2824      Illinois Civil Contractors, Inc.                                 2.2000       15,226.20       15,226.20
 0335      Otto Baum Company, Inc.                                          1.3100        9,066.51        9,066.51
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.0900       14,464.89       14,464.89

    78011045  GRV RCSD PVT MRKG   9                    3,653.000     FOOT
 2024      Gensini Excavating, Inc.                                         2.8600       10,447.58       10,447.58
 2824      Illinois Civil Contractors, Inc.                                 2.9900       10,922.47       10,922.47
 0335      Otto Baum Company, Inc.                                          1.5700        5,735.21        5,735.21
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.8400       10,374.52       10,374.52

    78011065  GRV RCSD PVT MRKG  13                    1,247.000     FOOT
 2024      Gensini Excavating, Inc.                                         3.3300        4,152.51        4,152.51
 2824      Illinois Civil Contractors, Inc.                                 3.4700        4,327.09        4,327.09
 0335      Otto Baum Company, Inc.                                          3.4000        4,239.80        4,239.80
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       3.3000        4,115.10        4,115.10

    78011125  GRV RCSD PVT MRKG  25                      181.000     FOOT
 2024      Gensini Excavating, Inc.                                         6.6500        1,203.65        1,203.65
 2824      Illinois Civil Contractors, Inc.                                 6.9400        1,256.14        1,256.14
 0335      Otto Baum Company, Inc.                                          6.8000        1,230.80        1,230.80
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       6.6000        1,194.60        1,194.60

    78200020  CURB REFLECTORS                             58.000     EACH
 2024      Gensini Excavating, Inc.                                        23.2800        1,350.24        1,350.24
 2824      Illinois Civil Contractors, Inc.                                24.3000        1,409.40        1,409.40
 0335      Otto Baum Company, Inc.                                         15.6900          910.02          910.02
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      23.1000        1,339.80        1,339.80

    78300202  PVT MKG REM WTR BLAST                       87.000    SQ FT
 2024      Gensini Excavating, Inc.                                        63.0300        5,483.61        5,483.61
 2824      Illinois Civil Contractors, Inc.                                65.7900        5,723.73        5,723.73
 0335      Otto Baum Company, Inc.                                        104.6200        9,101.94        9,101.94
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      62.5400        5,440.98        5,440.98

    81603000  UD 2#8 #8G XLPUSE 3/4                      325.000     FOOT
 2024      Gensini Excavating, Inc.                                       105.3300       34,232.25       34,232.25
 2824      Illinois Civil Contractors, Inc.                               109.9500       35,733.75       35,733.75
 0335      Otto Baum Company, Inc.                                         99.3900       32,301.75       32,301.75
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     104.5000       33,962.50       33,962.50

    83600356  LP F M 15BC 8 5/8X6                          1.000     EACH
 2024      Gensini Excavating, Inc.                                     1,663.1500        1,663.15        1,663.15
 2824      Illinois Civil Contractors, Inc.                             1,736.0100        1,736.01        1,736.01
 0335      Otto Baum Company, Inc.                                      1,569.3100        1,569.31        1,569.31
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,650.0000        1,650.00        1,650.00

    83800650  BKWY DEV COU SS SCRN                         4.000     EACH
 2024      Gensini Excavating, Inc.                                       282.7400        1,130.96        1,130.96
 2824      Illinois Civil Contractors, Inc.                               295.1200        1,180.48        1,180.48
 0335      Otto Baum Company, Inc.                                        266.7800        1,067.12        1,067.12
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     280.5000        1,122.00        1,122.00

    84200804  REM POLE FDN                                 1.000     EACH
 2024      Gensini Excavating, Inc.                                     3,880.6900        3,880.69        3,880.69
 2824      Illinois Civil Contractors, Inc.                             4,050.7000        4,050.70        4,050.70
 0335      Otto Baum Company, Inc.                                      3,661.7300        3,661.73        3,661.73
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   3,850.0000        3,850.00        3,850.00

    84400105  RELOC EX LT UNIT                             1.000     EACH
 2024      Gensini Excavating, Inc.                                     2,217.5400        2,217.54        2,217.54
 2824      Illinois Civil Contractors, Inc.                             2,314.6900        2,314.69        2,314.69
 0335      Otto Baum Company, Inc.                                      2,092.4200        2,092.42        2,092.42
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   2,200.0000        2,200.00        2,200.00

    87301245  ELCBL C SIGNAL 14  5C                    2,516.000     FOOT
 2024      Gensini Excavating, Inc.                                        12.2000       30,695.20       30,695.20
 2824      Illinois Civil Contractors, Inc.                                12.7300       32,028.68       32,028.68
 0335      Otto Baum Company, Inc.                                         11.5100       28,959.16       28,959.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      12.1000       30,443.60       30,443.60

    87301255  ELCBL C SIGNAL 14  7C                    1,874.000     FOOT
 2024      Gensini Excavating, Inc.                                        15.5200       29,084.48       29,084.48
 2824      Illinois Civil Contractors, Inc.                                16.2000       30,358.80       30,358.80
 0335      Otto Baum Company, Inc.                                         14.6500       27,454.10       27,454.10
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      15.4000       28,859.60       28,859.60

    88040070  SH P LED 1F 3S BM                            4.000     EACH
 2024      Gensini Excavating, Inc.                                     1,219.6500        4,878.60        4,878.60
 2824      Illinois Civil Contractors, Inc.                             1,273.0800        5,092.32        5,092.32
 0335      Otto Baum Company, Inc.                                      1,150.8300        4,603.32        4,603.32
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,210.0000        4,840.00        4,840.00

    88040090  SH P LED 1F 3S MAM                           8.000     EACH
 2024      Gensini Excavating, Inc.                                     1,219.6500        9,757.20        9,757.20
 2824      Illinois Civil Contractors, Inc.                             1,273.0800       10,184.64       10,184.64
 0335      Otto Baum Company, Inc.                                      1,150.8300        9,206.64        9,206.64
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,210.0000        9,680.00        9,680.00

    88040110  SH P LED 1F 4S BM                            2.000     EACH
 2024      Gensini Excavating, Inc.                                     1,441.4000        2,882.80        2,882.80
 2824      Illinois Civil Contractors, Inc.                             1,504.5500        3,009.10        3,009.10
 0335      Otto Baum Company, Inc.                                      1,360.0800        2,720.16        2,720.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,430.0000        2,860.00        2,860.00

    88040120  SH P LED 1F 4S MAM                           2.000     EACH
 2024      Gensini Excavating, Inc.                                     1,441.4000        2,882.80        2,882.80
 2824      Illinois Civil Contractors, Inc.                             1,504.5500        3,009.10        3,009.10
 0335      Otto Baum Company, Inc.                                      1,360.0800        2,720.16        2,720.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,430.0000        2,860.00        2,860.00

    88040150  SH P LED 1F 5S BM                            4.000     EACH
 2024      Gensini Excavating, Inc.                                     1,718.5900        6,874.36        6,874.36
 2824      Illinois Civil Contractors, Inc.                             1,793.8800        7,175.52        7,175.52
 0335      Otto Baum Company, Inc.                                      1,621.6200        6,486.48        6,486.48
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,705.0000        6,820.00        6,820.00

    88200100  TS BACKPLATE                                20.000     EACH
 2024      Gensini Excavating, Inc.                                       415.7900        8,315.80        8,315.80
 2824      Illinois Civil Contractors, Inc.                               434.0000        8,680.00        8,680.00
 0335      Otto Baum Company, Inc.                                        392.3300        7,846.60        7,846.60
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     412.5000        8,250.00        8,250.00

    89502375  REMOV EX TS EQUIP                            1.000     EACH
 2024      Gensini Excavating, Inc.                                    21,676.4300       21,676.43       21,676.43
 2824      Illinois Civil Contractors, Inc.                            22,626.0300       22,626.03       22,626.03
 0335      Otto Baum Company, Inc.                                     20,453.3900       20,453.39       20,453.39
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  21,505.0000       21,505.00       21,505.00