                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 09/15/23  15:41:41                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 08/04/2023  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 97811  LETTING ITEM NUMBER: 075
 RESPONSIBLE DISTRICT: 08                                                                                  BIDS LOCKED: Y
 SECTION: 21-00033-00-BT                           COUNTY: MADISON                                         ESTIMATE:
 STATE JOB NUMBER:   C-98-019-25                   MUNICIPALITY: BETHALTO
 PROJECT NUMBER: KYJ2-157 /   /
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 0338  Baxmeyer Construction, Inc.
                          NO ALT                              907,107.77 *     907,107.77     907,107.77    *

 3108  Keller Construction, Inc.
                          NO ALT                            1,111,977.98     1,111,977.98   1,111,977.98

 5802  Stutz Excavating, Inc.
                          NO ALT                            1,146,039.15     1,146,039.15   1,146,039.15

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =      69
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    X1400326  R R FL BEACON A COMP                         2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  8,560.0000       17,120.00       17,120.00
 3108      Keller Construction, Inc.                                   10,500.0000       21,000.00       21,000.00
 5802      Stutz Excavating, Inc.                                      11,000.0000       22,000.00       22,000.00

    X4406020  PART DEP REM T1  2                           8.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                    106.0000          848.00          848.00
 3108      Keller Construction, Inc.                                      105.0000          840.00          840.00
 5802      Stutz Excavating, Inc.                                         212.0000        1,696.00        1,696.00

    X5427602  REMOV EX FLAR END SEC                        3.000     EACH
 0338      Baxmeyer Construction, Inc.                                    205.0000          615.00          615.00
 3108      Keller Construction, Inc.                                      520.6000        1,561.80        1,561.80
 5802      Stutz Excavating, Inc.                                         240.0000          720.00          720.00

    X6024240  INLETS SPL                                   1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  3,130.0000        3,130.00        3,130.00
 3108      Keller Construction, Inc.                                    3,606.0000        3,606.00        3,606.00
 5802      Stutz Excavating, Inc.                                       2,525.0000        2,525.00        2,525.00

    X7010216  TRAF CONT & PROT SPL                         1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                  8,500.0000        8,500.00        8,500.00
 3108      Keller Construction, Inc.                                   14,769.0000       14,769.00       14,769.00
 5802      Stutz Excavating, Inc.                                       6,200.0000        6,200.00        6,200.00

    X8140115  HANDHOLE TO BE ADJUST                        1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  8,650.0000        8,650.00        8,650.00
 3108      Keller Construction, Inc.                                    6,090.0000        6,090.00        6,090.00
 5802      Stutz Excavating, Inc.                                       6,380.0000        6,380.00        6,380.00

    Z0076600  TRAINEES                                   500.000     HOUR
 0338      Baxmeyer Construction, Inc.                                      0.8000          400.00          400.00
 3108      Keller Construction, Inc.                                        0.8000          400.00          400.00
 5802      Stutz Excavating, Inc.                                           0.8000          400.00          400.00

    Z0076604  TRAINEES TPG                               500.000     HOUR
 0338      Baxmeyer Construction, Inc.                                     15.0000        7,500.00        7,500.00
 3108      Keller Construction, Inc.                                       15.0000        7,500.00        7,500.00
 5802      Stutz Excavating, Inc.                                          15.0000        7,500.00        7,500.00

    20100110  TREE REMOV 6-15                            244.000     UNIT
 0338      Baxmeyer Construction, Inc.                                     83.0000       20,252.00       20,252.00
 3108      Keller Construction, Inc.                                      128.8000       31,427.20       31,427.20
 5802      Stutz Excavating, Inc.                                          81.0000       19,764.00       19,764.00

    20100210  TREE REMOV OVER 15                         376.000     UNIT
 0338      Baxmeyer Construction, Inc.                                     86.0000       32,336.00       32,336.00
 3108      Keller Construction, Inc.                                       72.8000       27,372.80       27,372.80
 5802      Stutz Excavating, Inc.                                          73.4000       27,598.40       27,598.40

    20200100  EARTH EXCAVATION                           550.000    CU YD
 0338      Baxmeyer Construction, Inc.                                     89.0000       48,950.00       48,950.00
 3108      Keller Construction, Inc.                                       31.7500       17,462.50       17,462.50
 5802      Stutz Excavating, Inc.                                         135.0000       74,250.00       74,250.00

    20400800  FURNISHED EXCAVATION                     3,160.000    CU YD
 0338      Baxmeyer Construction, Inc.                                     14.7500       46,610.00       46,610.00
 3108      Keller Construction, Inc.                                       34.9000      110,284.00      110,284.00
 5802      Stutz Excavating, Inc.                                          37.0000      116,920.00      116,920.00

    20800150  TRENCH BACKFILL                            205.000    CU YD
 0338      Baxmeyer Construction, Inc.                                     30.0000        6,150.00        6,150.00
 3108      Keller Construction, Inc.                                       36.8000        7,544.00        7,544.00
 5802      Stutz Excavating, Inc.                                          38.1500        7,820.75        7,820.75

    21101615  TOPSOIL F & P  4                         8,484.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                      4.0000       33,936.00       33,936.00
 3108      Keller Construction, Inc.                                       12.0800      102,486.72      102,486.72
 5802      Stutz Excavating, Inc.                                          12.6500      107,322.60      107,322.60

    25000115  SEEDING CL  1B                               2.000     ACRE
 0338      Baxmeyer Construction, Inc.                                  3,100.0000        6,200.00        6,200.00
 3108      Keller Construction, Inc.                                    3,108.0000        6,216.00        6,216.00
 5802      Stutz Excavating, Inc.                                       3,250.0000        6,500.00        6,500.00

    25000400  NITROGEN FERT NUTR                         181.000    POUND
 0338      Baxmeyer Construction, Inc.                                      5.0000          905.00          905.00
 3108      Keller Construction, Inc.                                        5.0000          905.00          905.00
 5802      Stutz Excavating, Inc.                                           5.2000          941.20          941.20

    25000500  PHOSPHORUS FERT NUTR                       181.000    POUND
 0338      Baxmeyer Construction, Inc.                                      5.0000          905.00          905.00
 3108      Keller Construction, Inc.                                        5.0000          905.00          905.00
 5802      Stutz Excavating, Inc.                                           5.2000          941.20          941.20

    25000600  POTASSIUM FERT NUTR                        181.000    POUND
 0338      Baxmeyer Construction, Inc.                                      5.0000          905.00          905.00
 3108      Keller Construction, Inc.                                        5.0000          905.00          905.00
 5802      Stutz Excavating, Inc.                                           5.2000          941.20          941.20

    25100115  MULCH METHOD 2                               1.900     ACRE
 0338      Baxmeyer Construction, Inc.                                  4,450.0000        8,455.00        8,455.00
 3108      Keller Construction, Inc.                                    4,410.0000        8,379.00        8,379.00
 5802      Stutz Excavating, Inc.                                       4,600.0000        8,740.00        8,740.00

    25100630  EROSION CONTR BLANKET                      534.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                      6.3500        3,390.90        3,390.90
 3108      Keller Construction, Inc.                                        6.3000        3,364.20        3,364.20
 5802      Stutz Excavating, Inc.                                           6.6000        3,524.40        3,524.40

    28000250  TEMP EROS CONTR SEED                       386.000    POUND
 0338      Baxmeyer Construction, Inc.                                      6.2500        2,412.50        2,412.50
 3108      Keller Construction, Inc.                                        5.3600        2,068.96        2,068.96
 5802      Stutz Excavating, Inc.                                           5.0000        1,930.00        1,930.00

    28000305  TEMP DITCH CHECKS                           72.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     21.0000        1,512.00        1,512.00
 3108      Keller Construction, Inc.                                       50.9300        3,666.96        3,666.96
 5802      Stutz Excavating, Inc.                                          53.3500        3,841.20        3,841.20

    28000400  PERIMETER EROS BAR                         528.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      8.7500        4,620.00        4,620.00
 3108      Keller Construction, Inc.                                        8.0000        4,224.00        4,224.00
 5802      Stutz Excavating, Inc.                                           8.3500        4,408.80        4,408.80

    28000500  INLET & PIPE PROTECT                        29.000     EACH
 0338      Baxmeyer Construction, Inc.                                    200.0000        5,800.00        5,800.00
 3108      Keller Construction, Inc.                                      182.3500        5,288.15        5,288.15
 5802      Stutz Excavating, Inc.                                          75.0000        2,175.00        2,175.00

    35101800  AGG BASE CSE B  6                        3,811.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     11.2500       42,873.75       42,873.75
 3108      Keller Construction, Inc.                                       15.4500       58,879.95       58,879.95
 5802      Stutz Excavating, Inc.                                          16.0000       60,976.00       60,976.00

    40600275  BIT MATLS PR CT                          6,999.000    POUND
 0338      Baxmeyer Construction, Inc.                                      1.0000        6,999.00        6,999.00
 3108      Keller Construction, Inc.                                        1.0300        7,208.97        7,208.97
 5802      Stutz Excavating, Inc.                                           1.1500        8,048.85        8,048.85

    40600290  BIT MATLS TACK CT                          620.000    POUND
 0338      Baxmeyer Construction, Inc.                                      5.0000        3,100.00        3,100.00
 3108      Keller Construction, Inc.                                        5.0800        3,149.60        3,149.60
 5802      Stutz Excavating, Inc.                                           1.8500        1,147.00        1,147.00

    40604000  HMA SC IL-9.5FG C N50                      300.000      TON
 0338      Baxmeyer Construction, Inc.                                    177.5000       53,250.00       53,250.00
 3108      Keller Construction, Inc.                                      176.2100       52,863.00       52,863.00
 5802      Stutz Excavating, Inc.                                         181.4000       54,420.00       54,420.00

    40604002  HMA SC IL-9.5FG C N70                      307.000      TON
 0338      Baxmeyer Construction, Inc.                                    177.5000       54,492.50       54,492.50
 3108      Keller Construction, Inc.                                      176.2100       54,096.47       54,096.47
 5802      Stutz Excavating, Inc.                                         181.6500       55,766.55       55,766.55

    42400100  PC CONC SIDEWALK 4                       1,640.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                     15.0000       24,600.00       24,600.00
 3108      Keller Construction, Inc.                                       14.1200       23,156.80       23,156.80
 5802      Stutz Excavating, Inc.                                          14.8000       24,272.00       24,272.00

    42400800  DETECTABLE WARNINGS                        180.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                     68.0000       12,240.00       12,240.00
 3108      Keller Construction, Inc.                                       67.4600       12,142.80       12,142.80
 5802      Stutz Excavating, Inc.                                          70.0000       12,600.00       12,600.00

    44000100  PAVEMENT REM                                24.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     44.0000        1,056.00        1,056.00
 3108      Keller Construction, Inc.                                       59.1600        1,419.84        1,419.84
 5802      Stutz Excavating, Inc.                                          30.4000          729.60          729.60

    44000157  HMA SURF REM    2                          823.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     20.5000       16,871.50       16,871.50
 3108      Keller Construction, Inc.                                       20.3500       16,748.05       16,748.05
 5802      Stutz Excavating, Inc.                                          15.4000       12,674.20       12,674.20

    44000500  COMB CURB GUTTER REM                       396.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     30.0000       11,880.00       11,880.00
 3108      Keller Construction, Inc.                                       22.5100        8,913.96        8,913.96
 5802      Stutz Excavating, Inc.                                          44.2000       17,503.20       17,503.20

    44000600  SIDEWALK REM                               393.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      3.0000        1,179.00        1,179.00
 3108      Keller Construction, Inc.                                        6.9000        2,711.70        2,711.70
 5802      Stutz Excavating, Inc.                                           8.5500        3,360.15        3,360.15

    50105220  PIPE CULVERT REMOV                         137.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      8.0000        1,096.00        1,096.00
 3108      Keller Construction, Inc.                                       18.6500        2,555.05        2,555.05
 5802      Stutz Excavating, Inc.                                          14.4000        1,972.80        1,972.80

    54213657  PRC FLAR END SEC 12                          3.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,030.0000        3,090.00        3,090.00
 3108      Keller Construction, Inc.                                    1,612.0000        4,836.00        4,836.00
 5802      Stutz Excavating, Inc.                                         575.0000        1,725.00        1,725.00

    54213669  PRC FLAR END SEC 24                          1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,480.0000        1,480.00        1,480.00
 3108      Keller Construction, Inc.                                    1,870.0000        1,870.00        1,870.00
 5802      Stutz Excavating, Inc.                                         870.0000          870.00          870.00

    54248510  CONCRETE COLLAR                               .200    CU YD
 0338      Baxmeyer Construction, Inc.                                  1,950.0000          390.00          390.00
 3108      Keller Construction, Inc.                                   17,890.0000        3,578.00        3,578.00
 5802      Stutz Excavating, Inc.                                       3,160.0000          632.00          632.00

    550A0050  STORM SEW CL A 1  12                       868.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     48.3000       41,924.40       41,924.40
 3108      Keller Construction, Inc.                                       53.2500       46,221.00       46,221.00
 5802      Stutz Excavating, Inc.                                          65.5500       56,897.40       56,897.40

    550A0070  STORM SEW CL A 1  15                        70.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     61.0000        4,270.00        4,270.00
 3108      Keller Construction, Inc.                                       77.0000        5,390.00        5,390.00
 5802      Stutz Excavating, Inc.                                          85.7500        6,002.50        6,002.50

    550A0090  STORM SEW CL A 1  18                       499.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     62.5000       31,187.50       31,187.50
 3108      Keller Construction, Inc.                                       68.6500       34,256.35       34,256.35
 5802      Stutz Excavating, Inc.                                          76.4000       38,123.60       38,123.60

    550A0120  STORM SEW CL A 1  24                       961.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     71.6000       68,807.60       68,807.60
 3108      Keller Construction, Inc.                                       79.5000       76,399.50       76,399.50
 5802      Stutz Excavating, Inc.                                         111.2500      106,911.25      106,911.25

    55100500  STORM SEWER REM  12                         64.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     21.3000        1,363.20        1,363.20
 3108      Keller Construction, Inc.                                       33.3500        2,134.40        2,134.40
 5802      Stutz Excavating, Inc.                                          25.7000        1,644.80        1,644.80

    55100700  STORM SEWER REM  15                        293.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     15.5000        4,541.50        4,541.50
 3108      Keller Construction, Inc.                                       13.8500        4,058.05        4,058.05
 5802      Stutz Excavating, Inc.                                          34.6000       10,137.80       10,137.80

    60218400  MAN TA 4 DIA T1F CL                          8.000     EACH
 0338      Baxmeyer Construction, Inc.                                  3,050.0000       24,400.00       24,400.00
 3108      Keller Construction, Inc.                                    3,646.0000       29,168.00       29,168.00
 5802      Stutz Excavating, Inc.                                       3,000.0000       24,000.00       24,000.00

    60218500  MAN TA 4 DIA T3F&G                           4.000     EACH
 0338      Baxmeyer Construction, Inc.                                  3,264.0000       13,056.00       13,056.00
 3108      Keller Construction, Inc.                                    3,646.0000       14,584.00       14,584.00
 5802      Stutz Excavating, Inc.                                       3,000.0000       12,000.00       12,000.00

    60219000  MAN TA 4 DIA T8G                             2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,850.0000        5,700.00        5,700.00
 3108      Keller Construction, Inc.                                    3,646.0000        7,292.00        7,292.00
 5802      Stutz Excavating, Inc.                                       3,000.0000        6,000.00        6,000.00

    60236200  INLETS TA T8G                                3.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,250.0000        6,750.00        6,750.00
 3108      Keller Construction, Inc.                                    2,810.0000        8,430.00        8,430.00
 5802      Stutz Excavating, Inc.                                       1,475.0000        4,425.00        4,425.00

    60236800  INLETS TA T11F&G                             5.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,887.0000        9,435.00        9,435.00
 3108      Keller Construction, Inc.                                    2,781.0000       13,905.00       13,905.00
 5802      Stutz Excavating, Inc.                                       1,475.0000        7,375.00        7,375.00

    60237470  INLETS TA T24F&G                             1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,675.0000        1,675.00        1,675.00
 3108      Keller Construction, Inc.                                    2,846.0000        2,846.00        2,846.00
 5802      Stutz Excavating, Inc.                                       1,475.0000        1,475.00        1,475.00

    60240220  INLETS TB T3F&G                              1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,430.0000        2,430.00        2,430.00
 3108      Keller Construction, Inc.                                    3,318.0000        3,318.00        3,318.00
 5802      Stutz Excavating, Inc.                                       2,365.0000        2,365.00        2,365.00

    60240310  INLETS TB T11F&G                             4.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,444.0000        9,776.00        9,776.00
 3108      Keller Construction, Inc.                                    3,318.0000       13,272.00       13,272.00
 5802      Stutz Excavating, Inc.                                       2,365.0000        9,460.00        9,460.00

    60260100  INLETS ADJUST                                5.000     EACH
 0338      Baxmeyer Construction, Inc.                                    523.0000        2,615.00        2,615.00
 3108      Keller Construction, Inc.                                      728.0000        3,640.00        3,640.00
 5802      Stutz Excavating, Inc.                                         305.0000        1,525.00        1,525.00

    60500060  REMOV INLETS                                 4.000     EACH
 0338      Baxmeyer Construction, Inc.                                    375.0000        1,500.00        1,500.00
 3108      Keller Construction, Inc.                                      520.0000        2,080.00        2,080.00
 5802      Stutz Excavating, Inc.                                         195.0000          780.00          780.00

    60603800  COMB CC&G TB6.12                         1,377.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     37.0000       50,949.00       50,949.00
 3108      Keller Construction, Inc.                                       37.5000       51,637.50       51,637.50
 5802      Stutz Excavating, Inc.                                          42.0000       57,834.00       57,834.00

    60605000  COMB CC&G TB6.24                           534.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     88.0000       46,992.00       46,992.00
 3108      Keller Construction, Inc.                                       56.1500       29,984.10       29,984.10
 5802      Stutz Excavating, Inc.                                          93.0000       49,662.00       49,662.00

    63200310  GUARDRAIL REMOV                            176.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      9.0000        1,584.00        1,584.00
 3108      Keller Construction, Inc.                                       20.6500        3,634.40        3,634.40
 5802      Stutz Excavating, Inc.                                          20.0000        3,520.00        3,520.00

    67100100  MOBILIZATION                                 1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                 41,553.4200       41,553.42       41,553.42
 3108      Keller Construction, Inc.                                   84,000.0000       84,000.00       84,000.00
 5802      Stutz Excavating, Inc.                                      15,870.0000       15,870.00       15,870.00

    72000100  SIGN PANEL T1                               93.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                     32.0000        2,976.00        2,976.00
 3108      Keller Construction, Inc.                                       42.5000        3,952.50        3,952.50
 5802      Stutz Excavating, Inc.                                          33.5000        3,115.50        3,115.50

    72800100  TELES STL SIN SUPPORT                      224.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     18.0000        4,032.00        4,032.00
 3108      Keller Construction, Inc.                                       45.0000       10,080.00       10,080.00
 5802      Stutz Excavating, Inc.                                          19.0000        4,256.00        4,256.00

    78001110  PAINT PVT MK LINE  4                       604.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      3.0000        1,812.00        1,812.00
 3108      Keller Construction, Inc.                                        1.0500          634.20          634.20
 5802      Stutz Excavating, Inc.                                           3.0000        1,812.00        1,812.00

    78001180  PAINT PVT MK LINE 24                       401.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     13.0000        5,213.00        5,213.00
 3108      Keller Construction, Inc.                                        2.1000          842.10          842.10
 5802      Stutz Excavating, Inc.                                          13.4000        5,373.40        5,373.40

    78300202  PAVMT MRKG REM WTR BL                       54.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                     21.0000        1,134.00        1,134.00
 3108      Keller Construction, Inc.                                       25.0000        1,350.00        1,350.00
 5802      Stutz Excavating, Inc.                                         120.0000        6,480.00        6,480.00

    87301215  ELCBL C SIGNAL 14  2C                      336.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      6.0000        2,016.00        2,016.00
 3108      Keller Construction, Inc.                                        8.4000        2,822.40        2,822.40
 5802      Stutz Excavating, Inc.                                           8.8000        2,956.80        2,956.80

    87301225  ELCBL C SIGNAL 14  3C                      350.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      8.0000        2,800.00        2,800.00
 3108      Keller Construction, Inc.                                       10.5000        3,675.00        3,675.00
 5802      Stutz Excavating, Inc.                                          11.0000        3,850.00        3,850.00

    88102717  PED SH LED 1F BM CDT                         2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,040.0000        4,080.00        4,080.00
 3108      Keller Construction, Inc.                                    2,625.0000        5,250.00        5,250.00
 5802      Stutz Excavating, Inc.                                       2,750.0000        5,500.00        5,500.00

    88800100  PED PUSH-BUTTON                              2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,250.0000        4,500.00        4,500.00
 3108      Keller Construction, Inc.                                    1,050.0000        2,100.00        2,100.00
 5802      Stutz Excavating, Inc.                                       1,100.0000        2,200.00        2,200.00

    89502200  MOD EX CONTR                                 1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  3,335.0000        3,335.00        3,335.00
 3108      Keller Construction, Inc.                                    2,625.0000        2,625.00        2,625.00
 5802      Stutz Excavating, Inc.                                       2,750.0000        2,750.00        2,750.00