                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 09/05/18  16:22:44                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 06/15/2018  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 60Y40  LETTING ITEM NUMBER: 005
 RESPONSIBLE DISTRICT: 01                                                                                  BIDS LOCKED: Y
 SECTION: (1517&1415)I-14                          COUNTY: COOK                                            ESTIMATE:
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 1552  Dunnet Bay Construction Company
                          NO ALT                           11,098,062.30    11,098,062.30  11,098,062.30

 2520  Herlihy Mid-Continent Company
                          NO ALT                           10,742,877.28 *  10,742,877.28  10,742,877.28    *

 3127  Kenny Construction Company
                          NO ALT                           10,972,714.44    10,972,714.44  10,972,714.44

 3505  Lorig Construction Company
                          NO ALT                           10,983,668.46    10,983,668.46  10,983,668.46

 3702  Martam Construction Incorporated
                          NO ALT                           13,696,531.73    13,696,531.73  13,696,531.73

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =     197
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    A2C056G3  T-QUERC MACR    CG 3G                       20.000     EACH
 1552      Dunnet Bay Construction Company                                 80.0000        1,600.00        1,600.00
 2520      Herlihy Mid-Continent Company                                   80.0000        1,600.00        1,600.00
 3127      Kenny Construction Company                                      80.0000        1,600.00        1,600.00
 3505      Lorig Construction Company                                      80.0000        1,600.00        1,600.00
 3702      Martam Construction Incorporated                                87.2000        1,744.00        1,744.00

    A2C35G15  T-QUERC BICL 15G RPMS                       10.000     EACH
 1552      Dunnet Bay Construction Company                                325.0000        3,250.00        3,250.00
 2520      Herlihy Mid-Continent Company                                  325.0000        3,250.00        3,250.00
 3127      Kenny Construction Company                                     325.0000        3,250.00        3,250.00
 3505      Lorig Construction Company                                     325.0000        3,250.00        3,250.00
 3702      Martam Construction Incorporated                               354.2500        3,542.50        3,542.50

    A2000320  T-ACER MIY MOR  2-1/2                       11.000     EACH
 1552      Dunnet Bay Construction Company                                585.0000        6,435.00        6,435.00
 2520      Herlihy Mid-Continent Company                                  585.0000        6,435.00        6,435.00
 3127      Kenny Construction Company                                     585.0000        6,435.00        6,435.00
 3505      Lorig Construction Company                                     585.0000        6,435.00        6,435.00
 3702      Martam Construction Incorporated                               637.6500        7,014.15        7,014.15

    A2002008  T-AESCUL FLV YSB 2 BB                        6.000     EACH
 1552      Dunnet Bay Construction Company                                520.0000        3,120.00        3,120.00
 2520      Herlihy Mid-Continent Company                                  520.0000        3,120.00        3,120.00
 3127      Kenny Construction Company                                     520.0000        3,120.00        3,120.00
 3505      Lorig Construction Company                                     520.0000        3,120.00        3,120.00
 3702      Martam Construction Incorporated                               566.8000        3,400.80        3,400.80

    A2002020  T-AESCULUS GLA  2-1/2                        5.000     EACH
 1552      Dunnet Bay Construction Company                                490.0000        2,450.00        2,450.00
 2520      Herlihy Mid-Continent Company                                  490.0000        2,450.00        2,450.00
 3127      Kenny Construction Company                                     490.0000        2,450.00        2,450.00
 3505      Lorig Construction Company                                     490.0000        2,450.00        2,450.00
 3702      Martam Construction Incorporated                               534.1000        2,670.50        2,670.50

    A2002282  T-ALNUS SPAETHII  2.5                        5.000     EACH
 1552      Dunnet Bay Construction Company                                485.0000        2,425.00        2,425.00
 2520      Herlihy Mid-Continent Company                                  485.0000        2,425.00        2,425.00
 3127      Kenny Construction Company                                     485.0000        2,425.00        2,425.00
 3505      Lorig Construction Company                                     485.0000        2,425.00        2,425.00
 3702      Martam Construction Incorporated                               528.6500        2,643.25        2,643.25

    A2002564  T-CARP CAROL SF    5'                        5.000     EACH
 1552      Dunnet Bay Construction Company                                415.0000        2,075.00        2,075.00
 2520      Herlihy Mid-Continent Company                                  415.0000        2,075.00        2,075.00
 3127      Kenny Construction Company                                     415.0000        2,075.00        2,075.00
 3505      Lorig Construction Company                                     415.0000        2,075.00        2,075.00
 3702      Martam Construction Incorporated                               452.3500        2,261.75        2,261.75

    A2002916  T-CELTIS OCCID      2                       10.000     EACH
 1552      Dunnet Bay Construction Company                                465.0000        4,650.00        4,650.00
 2520      Herlihy Mid-Continent Company                                  465.0000        4,650.00        4,650.00
 3127      Kenny Construction Company                                     465.0000        4,650.00        4,650.00
 3505      Lorig Construction Company                                     465.0000        4,650.00        4,650.00
 3702      Martam Construction Incorporated                               506.8500        5,068.50        5,068.50

    A2003216  T-CORYLUS COLU      2                        8.000     EACH
 1552      Dunnet Bay Construction Company                                500.0000        4,000.00        4,000.00
 2520      Herlihy Mid-Continent Company                                  500.0000        4,000.00        4,000.00
 3127      Kenny Construction Company                                     500.0000        4,000.00        4,000.00
 3505      Lorig Construction Company                                     500.0000        4,000.00        4,000.00
 3702      Martam Construction Incorporated                               545.0000        4,360.00        4,360.00

    A2004516  T-GINKGO BIL PS     2                        7.000     EACH
 1552      Dunnet Bay Construction Company                                595.0000        4,165.00        4,165.00
 2520      Herlihy Mid-Continent Company                                  595.0000        4,165.00        4,165.00
 3127      Kenny Construction Company                                     595.0000        4,165.00        4,165.00
 3505      Lorig Construction Company                                     595.0000        4,165.00        4,165.00
 3702      Martam Construction Incorporated                               648.5500        4,539.85        4,539.85

    A2004617  T-GLED TR-I DRV 2-1/2                        6.000     EACH
 1552      Dunnet Bay Construction Company                                535.0000        3,210.00        3,210.00
 2520      Herlihy Mid-Continent Company                                  535.0000        3,210.00        3,210.00
 3127      Kenny Construction Company                                     535.0000        3,210.00        3,210.00
 3505      Lorig Construction Company                                     535.0000        3,210.00        3,210.00
 3702      Martam Construction Incorporated                               583.1500        3,498.90        3,498.90

    A2005020  T-GYMNOCLA DIO  2-1/2                       12.000     EACH
 1552      Dunnet Bay Construction Company                                575.0000        6,900.00        6,900.00
 2520      Herlihy Mid-Continent Company                                  575.0000        6,900.00        6,900.00
 3127      Kenny Construction Company                                     575.0000        6,900.00        6,900.00
 3505      Lorig Construction Company                                     575.0000        6,900.00        6,900.00
 3702      Martam Construction Incorporated                               626.7500        7,521.00        7,521.00

    A2006116  T-POPUL DEL SIO     2                        2.000     EACH
 1552      Dunnet Bay Construction Company                                345.0000          690.00          690.00
 2520      Herlihy Mid-Continent Company                                  345.0000          690.00          690.00
 3127      Kenny Construction Company                                     345.0000          690.00          690.00
 3505      Lorig Construction Company                                     345.0000          690.00          690.00
 3702      Martam Construction Incorporated                               376.0500          752.10          752.10

    A2006816  T-QUERCUS MEUH      2                        5.000     EACH
 1552      Dunnet Bay Construction Company                                480.0000        2,400.00        2,400.00
 2520      Herlihy Mid-Continent Company                                  480.0000        2,400.00        2,400.00
 3127      Kenny Construction Company                                     480.0000        2,400.00        2,400.00
 3505      Lorig Construction Company                                     480.0000        2,400.00        2,400.00
 3702      Martam Construction Incorporated                               523.2000        2,616.00        2,616.00

    A2007616  T-TAXODIUM DIS      2                       13.000     EACH
 1552      Dunnet Bay Construction Company                                480.0000        6,240.00        6,240.00
 2520      Herlihy Mid-Continent Company                                  480.0000        6,240.00        6,240.00
 3127      Kenny Construction Company                                     480.0000        6,240.00        6,240.00
 3505      Lorig Construction Company                                     480.0000        6,240.00        6,240.00
 3702      Martam Construction Incorporated                               523.2000        6,801.60        6,801.60

    A2008468  T-ULMUS AMER PRINC  2                        6.000     EACH
 1552      Dunnet Bay Construction Company                                510.0000        3,060.00        3,060.00
 2520      Herlihy Mid-Continent Company                                  510.0000        3,060.00        3,060.00
 3127      Kenny Construction Company                                     510.0000        3,060.00        3,060.00
 3505      Lorig Construction Company                                     510.0000        3,060.00        3,060.00
 3702      Martam Construction Incorporated                               555.9000        3,335.40        3,335.40

    A2012116  T-AESCUL ASP     2 BB                        5.000     EACH
 1552      Dunnet Bay Construction Company                                580.0000        2,900.00        2,900.00
 2520      Herlihy Mid-Continent Company                                  580.0000        2,900.00        2,900.00
 3127      Kenny Construction Company                                     580.0000        2,900.00        2,900.00
 3505      Lorig Construction Company                                     580.0000        2,900.00        2,900.00
 3702      Martam Construction Incorporated                               632.2000        3,161.00        3,161.00

    A2016616  T-QUERCUS ELLIP     2                        7.000     EACH
 1552      Dunnet Bay Construction Company                                465.0000        3,255.00        3,255.00
 2520      Herlihy Mid-Continent Company                                  465.0000        3,255.00        3,255.00
 3127      Kenny Construction Company                                     465.0000        3,255.00        3,255.00
 3505      Lorig Construction Company                                     465.0000        3,255.00        3,255.00
 3702      Martam Construction Incorporated                               506.8500        3,547.95        3,547.95

    A2064012  T-QUERC ALBA XR 2-1/2                        4.000     EACH
 1552      Dunnet Bay Construction Company                                635.0000        2,540.00        2,540.00
 2520      Herlihy Mid-Continent Company                                  635.0000        2,540.00        2,540.00
 3127      Kenny Construction Company                                     635.0000        2,540.00        2,540.00
 3505      Lorig Construction Company                                     635.0000        2,540.00        2,540.00
 3702      Martam Construction Incorporated                               692.1500        2,768.60        2,768.60

    C2C00424  S-ARONIA ARB BRIL 2'C                      230.000     EACH
 1552      Dunnet Bay Construction Company                                 50.0000       11,500.00       11,500.00
 2520      Herlihy Mid-Continent Company                                   50.0000       11,500.00       11,500.00
 3127      Kenny Construction Company                                      50.0000       11,500.00       11,500.00
 3505      Lorig Construction Company                                      50.0000       11,500.00       11,500.00
 3702      Martam Construction Incorporated                                54.5000       12,535.00       12,535.00

    C2011136  S-SYRINGA X PER    3'                      385.000     EACH
 1552      Dunnet Bay Construction Company                                 60.0000       23,100.00       23,100.00
 2520      Herlihy Mid-Continent Company                                   60.0000       23,100.00       23,100.00
 3127      Kenny Construction Company                                      60.0000       23,100.00       23,100.00
 3505      Lorig Construction Company                                      60.0000       23,100.00       23,100.00
 3702      Martam Construction Incorporated                                65.4000       25,179.00       25,179.00

    C2012424  S-VIBURN LENT      2'                       16.000     EACH
 1552      Dunnet Bay Construction Company                                 35.0000          560.00          560.00
 2520      Herlihy Mid-Continent Company                                   35.0000          560.00          560.00
 3127      Kenny Construction Company                                      35.0000          560.00          560.00
 3505      Lorig Construction Company                                      35.0000          560.00          560.00
 3702      Martam Construction Incorporated                                38.1500          610.40          610.40

    C3005924  S-RHUS GLABRA    2'BR                      150.000     EACH
 1552      Dunnet Bay Construction Company                                 25.0000        3,750.00        3,750.00
 2520      Herlihy Mid-Continent Company                                   25.0000        3,750.00        3,750.00
 3127      Kenny Construction Company                                      25.0000        3,750.00        3,750.00
 3505      Lorig Construction Company                                      25.0000        3,750.00        3,750.00
 3702      Martam Construction Incorporated                                27.2500        4,087.50        4,087.50

    C3006024  S-RHUS TYPHINA   2'BR                      432.000     EACH
 1552      Dunnet Bay Construction Company                                 25.0000       10,800.00       10,800.00
 2520      Herlihy Mid-Continent Company                                   25.0000       10,800.00       10,800.00
 3127      Kenny Construction Company                                      25.0000       10,800.00       10,800.00
 3505      Lorig Construction Company                                      25.0000       10,800.00       10,800.00
 3702      Martam Construction Incorporated                                27.2500       11,772.00       11,772.00

    D2001660  E-JUNIP VIRG CAN   5'                       26.000     EACH
 1552      Dunnet Bay Construction Company                                280.0000        7,280.00        7,280.00
 2520      Herlihy Mid-Continent Company                                  280.0000        7,280.00        7,280.00
 3127      Kenny Construction Company                                     280.0000        7,280.00        7,280.00
 3505      Lorig Construction Company                                     280.0000        7,280.00        7,280.00
 3702      Martam Construction Incorporated                               305.2000        7,935.20        7,935.20

    D2001960  E-PICEA GLAU DEN   5'                       14.000     EACH
 1552      Dunnet Bay Construction Company                                400.0000        5,600.00        5,600.00
 2520      Herlihy Mid-Continent Company                                  400.0000        5,600.00        5,600.00
 3127      Kenny Construction Company                                     400.0000        5,600.00        5,600.00
 3505      Lorig Construction Company                                     400.0000        5,600.00        5,600.00
 3702      Martam Construction Incorporated                               436.0000        6,104.00        6,104.00

    D2001972  E-PICEA GLAU DEN   6'                       13.000     EACH
 1552      Dunnet Bay Construction Company                                450.0000        5,850.00        5,850.00
 2520      Herlihy Mid-Continent Company                                  450.0000        5,850.00        5,850.00
 3127      Kenny Construction Company                                     450.0000        5,850.00        5,850.00
 3505      Lorig Construction Company                                     450.0000        5,850.00        5,850.00
 3702      Martam Construction Incorporated                               490.5000        6,376.50        6,376.50

    D2002160  E-PICEA PUNGENS    5'                        5.000     EACH
 1552      Dunnet Bay Construction Company                                400.0000        2,000.00        2,000.00
 2520      Herlihy Mid-Continent Company                                  400.0000        2,000.00        2,000.00
 3127      Kenny Construction Company                                     400.0000        2,000.00        2,000.00
 3505      Lorig Construction Company                                     400.0000        2,000.00        2,000.00
 3702      Martam Construction Incorporated                               436.0000        2,180.00        2,180.00

    D2002172  E-PICEA PUNGENS    6'                       12.000     EACH
 1552      Dunnet Bay Construction Company                                450.0000        5,400.00        5,400.00
 2520      Herlihy Mid-Continent Company                                  450.0000        5,400.00        5,400.00
 3127      Kenny Construction Company                                     450.0000        5,400.00        5,400.00
 3505      Lorig Construction Company                                     450.0000        5,400.00        5,400.00
 3702      Martam Construction Incorporated                               490.5000        5,886.00        5,886.00

    D2002184  E-PICEA PUNGENS    7'                        5.000     EACH
 1552      Dunnet Bay Construction Company                                510.0000        2,550.00        2,550.00
 2520      Herlihy Mid-Continent Company                                  510.0000        2,550.00        2,550.00
 3127      Kenny Construction Company                                     510.0000        2,550.00        2,550.00
 3505      Lorig Construction Company                                     510.0000        2,550.00        2,550.00
 3702      Martam Construction Incorporated                               555.9000        2,779.50        2,779.50

    D2002760  E-PINUS NIGRA      5'                       13.000     EACH
 1552      Dunnet Bay Construction Company                                365.0000        4,745.00        4,745.00
 2520      Herlihy Mid-Continent Company                                  365.0000        4,745.00        4,745.00
 3127      Kenny Construction Company                                     365.0000        4,745.00        4,745.00
 3505      Lorig Construction Company                                     365.0000        4,745.00        4,745.00
 3702      Martam Construction Incorporated                               397.8500        5,172.05        5,172.05

    D2002772  E-PINUS NIGRA      6'                       10.000     EACH
 1552      Dunnet Bay Construction Company                                420.0000        4,200.00        4,200.00
 2520      Herlihy Mid-Continent Company                                  420.0000        4,200.00        4,200.00
 3127      Kenny Construction Company                                     420.0000        4,200.00        4,200.00
 3505      Lorig Construction Company                                     420.0000        4,200.00        4,200.00
 3702      Martam Construction Incorporated                               457.8000        4,578.00        4,578.00

    D2002784  E-PINUS NIGRA      7'                        6.000     EACH
 1552      Dunnet Bay Construction Company                                475.0000        2,850.00        2,850.00
 2520      Herlihy Mid-Continent Company                                  475.0000        2,850.00        2,850.00
 3127      Kenny Construction Company                                     475.0000        2,850.00        2,850.00
 3505      Lorig Construction Company                                     475.0000        2,850.00        2,850.00
 3702      Martam Construction Incorporated                               517.7500        3,106.50        3,106.50

    E20200G1  V-PARTHEN QUINQ    1G                    2,302.000     EACH
 1552      Dunnet Bay Construction Company                                 15.0000       34,530.00       34,530.00
 2520      Herlihy Mid-Continent Company                                   15.0000       34,530.00       34,530.00
 3127      Kenny Construction Company                                      15.0000       34,530.00       34,530.00
 3505      Lorig Construction Company                                      15.0000       34,530.00       34,530.00
 3702      Martam Construction Incorporated                                16.3500       37,637.70       37,637.70

    E20210G1  V-PARTHEN QUIN EM  1G                      577.000     EACH
 1552      Dunnet Bay Construction Company                                 15.0000        8,655.00        8,655.00
 2520      Herlihy Mid-Continent Company                                   15.0000        8,655.00        8,655.00
 3127      Kenny Construction Company                                      15.0000        8,655.00        8,655.00
 3505      Lorig Construction Company                                      15.0000        8,655.00        8,655.00
 3702      Martam Construction Incorporated                                16.3500        9,433.95        9,433.95

    K0029624  WEED CONTROL TEASEL                          1.000   GALLON
 1552      Dunnet Bay Construction Company                              1,500.0000        1,500.00        1,500.00
 2520      Herlihy Mid-Continent Company                                1,500.0000        1,500.00        1,500.00
 3127      Kenny Construction Company                                   1,500.0000        1,500.00        1,500.00
 3505      Lorig Construction Company                                   1,500.0000        1,500.00        1,500.00
 3702      Martam Construction Incorporated                             1,635.0000        1,635.00        1,635.00

    K0029634  WEED CONTR PRE-EM GRN                       28.000    POUND
 1552      Dunnet Bay Construction Company                                 30.0000          840.00          840.00
 2520      Herlihy Mid-Continent Company                                   30.0000          840.00          840.00
 3127      Kenny Construction Company                                      30.0000          840.00          840.00
 3505      Lorig Construction Company                                      30.0000          840.00          840.00
 3702      Martam Construction Incorporated                                32.7000          915.60          915.60

    X0301423  NOISE AB WALL GRD MT                    67,107.000    SQ FT
 1552      Dunnet Bay Construction Company                                 27.0000    1,811,889.00    1,811,889.00
 2520      Herlihy Mid-Continent Company                                   24.3000    1,630,700.10    1,630,700.10
 3127      Kenny Construction Company                                      32.0000    2,147,424.00    2,147,424.00
 3505      Lorig Construction Company                                      22.0000    1,476,354.00    1,476,354.00
 3702      Martam Construction Incorporated                                29.9000    2,006,499.30    2,006,499.30

    X0324013  NOISE AB WALL STR MT                    82,677.000    SQ FT
 1552      Dunnet Bay Construction Company                                 22.0000    1,818,894.00    1,818,894.00
 2520      Herlihy Mid-Continent Company                                   21.5300    1,780,035.81    1,780,035.81
 3127      Kenny Construction Company                                      25.0000    2,066,925.00    2,066,925.00
 3505      Lorig Construction Company                                      20.0000    1,653,540.00    1,653,540.00
 3702      Martam Construction Incorporated                                28.0000    2,314,956.00    2,314,956.00

    X0324587  NOIS AB WAL A-ROD ASY                      262.000     EACH
 1552      Dunnet Bay Construction Company                                445.0000      116,590.00      116,590.00
 2520      Herlihy Mid-Continent Company                                   95.0000       24,890.00       24,890.00
 3127      Kenny Construction Company                                   1,000.0000      262,000.00      262,000.00
 3505      Lorig Construction Company                                     550.0000      144,100.00      144,100.00
 3702      Martam Construction Incorporated                                44.2200       11,585.64       11,585.64

    X0325318  LT WT CELL CONC FILL                       181.000    CU YD
 1552      Dunnet Bay Construction Company                                135.0000       24,435.00       24,435.00
 2520      Herlihy Mid-Continent Company                                  200.0000       36,200.00       36,200.00
 3127      Kenny Construction Company                                      98.3400       17,799.54       17,799.54
 3505      Lorig Construction Company                                     193.0000       34,933.00       34,933.00
 3702      Martam Construction Incorporated                               151.1500       27,358.15       27,358.15

    X0327979  PAVMT MRKG REM GRIND                     5,634.000    SQ FT
 1552      Dunnet Bay Construction Company                                  0.9500        5,352.30        5,352.30
 2520      Herlihy Mid-Continent Company                                    1.1000        6,197.40        6,197.40
 3127      Kenny Construction Company                                       0.9500        5,352.30        5,352.30
 3505      Lorig Construction Company                                       0.9500        5,352.30        5,352.30
 3702      Martam Construction Incorporated                                 1.0400        5,859.36        5,859.36

    X0327980  PAVMT MRKG REM WTR BL                      206.000    SQ FT
 1552      Dunnet Bay Construction Company                                  7.0000        1,442.00        1,442.00
 2520      Herlihy Mid-Continent Company                                    7.0000        1,442.00        1,442.00
 3127      Kenny Construction Company                                       7.0000        1,442.00        1,442.00
 3505      Lorig Construction Company                                       7.0000        1,442.00        1,442.00
 3702      Martam Construction Incorporated                                 7.6300        1,571.78        1,571.78

    X1200204  PART REM S PILE WALL                     2,076.000    SQ FT
 1552      Dunnet Bay Construction Company                                 16.0000       33,216.00       33,216.00
 2520      Herlihy Mid-Continent Company                                   39.0900       81,150.84       81,150.84
 3127      Kenny Construction Company                                      18.7700       38,966.52       38,966.52
 3505      Lorig Construction Company                                      23.0000       47,748.00       47,748.00
 3702      Martam Construction Incorporated                                18.5200       38,447.52       38,447.52

    X1800019  EVRGN PINUS CEMBRA 5'                        1.000     EACH
 1552      Dunnet Bay Construction Company                                475.0000          475.00          475.00
 2520      Herlihy Mid-Continent Company                                  475.0000          475.00          475.00
 3127      Kenny Construction Company                                     475.0000          475.00          475.00
 3505      Lorig Construction Company                                     475.0000          475.00          475.00
 3702      Martam Construction Incorporated                               517.7500          517.75          517.75

    X1800020  EVRGN PINUS CEMBRA 7'                        2.000     EACH
 1552      Dunnet Bay Construction Company                                675.0000        1,350.00        1,350.00
 2520      Herlihy Mid-Continent Company                                  675.0000        1,350.00        1,350.00
 3127      Kenny Construction Company                                     675.0000        1,350.00        1,350.00
 3505      Lorig Construction Company                                     675.0000        1,350.00        1,350.00
 3702      Martam Construction Incorporated                               735.7500        1,471.50        1,471.50

    X1800021  T-VIB PRUN BH VIB 2"                         9.000     EACH
 1552      Dunnet Bay Construction Company                                500.0000        4,500.00        4,500.00
 2520      Herlihy Mid-Continent Company                                  500.0000        4,500.00        4,500.00
 3127      Kenny Construction Company                                     500.0000        4,500.00        4,500.00
 3505      Lorig Construction Company                                     500.0000        4,500.00        4,500.00
 3702      Martam Construction Incorporated                               545.0000        4,905.00        4,905.00

    X1800022  V-PRTH Q TROKI GP                          200.000     EACH
 1552      Dunnet Bay Construction Company                                 35.0000        7,000.00        7,000.00
 2520      Herlihy Mid-Continent Company                                   35.0000        7,000.00        7,000.00
 3127      Kenny Construction Company                                      35.0000        7,000.00        7,000.00
 3505      Lorig Construction Company                                      35.0000        7,000.00        7,000.00
 3702      Martam Construction Incorporated                                38.1500        7,630.00        7,630.00

    X1800023  V-PRTH Q YW GP                             200.000     EACH
 1552      Dunnet Bay Construction Company                                 35.0000        7,000.00        7,000.00
 2520      Herlihy Mid-Continent Company                                   35.0000        7,000.00        7,000.00
 3127      Kenny Construction Company                                      35.0000        7,000.00        7,000.00
 3505      Lorig Construction Company                                      35.0000        7,000.00        7,000.00
 3702      Martam Construction Incorporated                                38.1500        7,630.00        7,630.00

    X2501800  SEEDING CL  4 MOD                            1.400     ACRE
 1552      Dunnet Bay Construction Company                              7,000.0000        9,800.00        9,800.00
 2520      Herlihy Mid-Continent Company                                7,000.0000        9,800.00        9,800.00
 3127      Kenny Construction Company                                   7,000.0000        9,800.00        9,800.00
 3505      Lorig Construction Company                                   7,000.0000        9,800.00        9,800.00
 3702      Martam Construction Incorporated                             7,630.0000       10,682.00       10,682.00

    X2501820  SEEDING CL  5 MOD                            1.400     ACRE
 1552      Dunnet Bay Construction Company                             10,200.0000       14,280.00       14,280.00
 2520      Herlihy Mid-Continent Company                               10,200.0000       14,280.00       14,280.00
 3127      Kenny Construction Company                                  10,200.0000       14,280.00       14,280.00
 3505      Lorig Construction Company                                  10,200.0000       14,280.00       14,280.00
 3702      Martam Construction Incorporated                            11,118.0000       15,565.20       15,565.20

    X2503000  MAINTENANCE MOWING                          30.000     ACRE
 1552      Dunnet Bay Construction Company                                600.0000       18,000.00       18,000.00
 2520      Herlihy Mid-Continent Company                                  600.0000       18,000.00       18,000.00
 3127      Kenny Construction Company                                      60.0000        1,800.00        1,800.00
 3505      Lorig Construction Company                                     600.0000       18,000.00       18,000.00
 3702      Martam Construction Incorporated                               654.0000       19,620.00       19,620.00

    X2503315  INTERSEED CL  4A MOD                          .200     ACRE
 1552      Dunnet Bay Construction Company                              8,000.0000        1,600.00        1,600.00
 2520      Herlihy Mid-Continent Company                                8,000.0000        1,600.00        1,600.00
 3127      Kenny Construction Company                                   8,000.0000        1,600.00        1,600.00
 3505      Lorig Construction Company                                   8,000.0000        1,600.00        1,600.00
 3702      Martam Construction Incorporated                             8,720.0000        1,744.00        1,744.00

    X2511630  EROS CONT BLANKET SPL                   11,988.000    SQ YD
 1552      Dunnet Bay Construction Company                                  1.5000       17,982.00       17,982.00
 2520      Herlihy Mid-Continent Company                                    1.5000       17,982.00       17,982.00
 3127      Kenny Construction Company                                       1.5000       17,982.00       17,982.00
 3505      Lorig Construction Company                                       1.5000       17,982.00       17,982.00
 3702      Martam Construction Incorporated                                 1.6400       19,660.32       19,660.32

    X4240800  DETECTABLE WARN SPL                        471.000    SQ FT
 1552      Dunnet Bay Construction Company                                 45.0000       21,195.00       21,195.00
 2520      Herlihy Mid-Continent Company                                   45.0000       21,195.00       21,195.00
 3127      Kenny Construction Company                                      48.0000       22,608.00       22,608.00
 3505      Lorig Construction Company                                      48.0000       22,608.00       22,608.00
 3702      Martam Construction Incorporated                                52.3200       24,642.72       24,642.72

    X5537700  SS CLEANED 10                              479.000     FOOT
 1552      Dunnet Bay Construction Company                                 13.0000        6,227.00        6,227.00
 2520      Herlihy Mid-Continent Company                                   13.0000        6,227.00        6,227.00
 3127      Kenny Construction Company                                       5.2000        2,490.80        2,490.80
 3505      Lorig Construction Company                                      13.0000        6,227.00        6,227.00
 3702      Martam Construction Incorporated                                 9.2700        4,440.33        4,440.33

    X5860110  GRANULAR BACKFILL STR                      930.000    CU YD
 1552      Dunnet Bay Construction Company                                 54.0000       50,220.00       50,220.00
 2520      Herlihy Mid-Continent Company                                   50.0000       46,500.00       46,500.00
 3127      Kenny Construction Company                                      83.0300       77,217.90       77,217.90
 3505      Lorig Construction Company                                      82.0000       76,260.00       76,260.00
 3702      Martam Construction Incorporated                                72.4700       67,397.10       67,397.10

    X6030310  FR & LIDS ADJUST SPL                        95.000     EACH
 1552      Dunnet Bay Construction Company                                831.0000       78,945.00       78,945.00
 2520      Herlihy Mid-Continent Company                                  831.0000       78,945.00       78,945.00
 3127      Kenny Construction Company                                     831.0000       78,945.00       78,945.00
 3505      Lorig Construction Company                                     850.0000       80,750.00       80,750.00
 3702      Martam Construction Incorporated                               869.3000       82,583.50       82,583.50

    X6700410  ENGR FLD OFF A  SPL                         17.000   CAL MO
 1552      Dunnet Bay Construction Company                              6,000.0000      102,000.00      102,000.00
 2520      Herlihy Mid-Continent Company                                6,670.0000      113,390.00      113,390.00
 3127      Kenny Construction Company                                   6,320.0000      107,440.00      107,440.00
 3505      Lorig Construction Company                                   5,000.0000       85,000.00       85,000.00
 3702      Martam Construction Incorporated                             3,919.7400       66,635.58       66,635.58

    X7010216  TRAF CONT & PROT SPL                         1.000    L SUM
 1552      Dunnet Bay Construction Company                             75,000.0000       75,000.00       75,000.00
 2520      Herlihy Mid-Continent Company                                5,000.0000        5,000.00        5,000.00
 3127      Kenny Construction Company                                  58,000.0000       58,000.00       58,000.00
 3505      Lorig Construction Company                                 490,000.0000      490,000.00      490,000.00
 3702      Martam Construction Incorporated                           457,976.8800      457,976.88      457,976.88

    X7011015  TR C-PROT EXPRESSWAYS                        1.000    L SUM
 1552      Dunnet Bay Construction Company                             75,000.0000       75,000.00       75,000.00
 2520      Herlihy Mid-Continent Company                               58,000.0000       58,000.00       58,000.00
 3127      Kenny Construction Company                                   5,000.0000        5,000.00        5,000.00
 3505      Lorig Construction Company                                 400,000.0000      400,000.00      400,000.00
 3702      Martam Construction Incorporated                           184,545.2400      184,545.24      184,545.24

    X7013820  TR CONT SURVEIL EXPWY                       30.000   CAL DA
 1552      Dunnet Bay Construction Company                                600.0000       18,000.00       18,000.00
 2520      Herlihy Mid-Continent Company                                  600.0000       18,000.00       18,000.00
 3127      Kenny Construction Company                                     600.0000       18,000.00       18,000.00
 3505      Lorig Construction Company                                     600.0000       18,000.00       18,000.00
 3702      Martam Construction Incorporated                               654.0000       19,620.00       19,620.00

    X7015005  CHANGEABLE MESSAGE SN                    1,020.000   CAL DA
 1552      Dunnet Bay Construction Company                                 25.0000       25,500.00       25,500.00
 2520      Herlihy Mid-Continent Company                                   25.0000       25,500.00       25,500.00
 3127      Kenny Construction Company                                      25.0000       25,500.00       25,500.00
 3505      Lorig Construction Company                                      25.0000       25,500.00       25,500.00
 3702      Martam Construction Incorporated                                27.2500       27,795.00       27,795.00

    X7030005  TEMP PAVT MKING REMOV                    2,615.000    SQ FT
 1552      Dunnet Bay Construction Company                                  0.3000          784.50          784.50
 2520      Herlihy Mid-Continent Company                                    0.3000          784.50          784.50
 3127      Kenny Construction Company                                       0.3000          784.50          784.50
 3505      Lorig Construction Company                                       0.3000          784.50          784.50
 3702      Martam Construction Incorporated                                 0.3300          862.95          862.95

    X7330064  SIGN SUPPORT SPL                            21.000     EACH
 1552      Dunnet Bay Construction Company                                125.0000        2,625.00        2,625.00
 2520      Herlihy Mid-Continent Company                                  185.7000        3,899.70        3,899.70
 3127      Kenny Construction Company                                     190.0000        3,990.00        3,990.00
 3505      Lorig Construction Company                                     800.0000       16,800.00       16,800.00
 3702      Martam Construction Incorporated                               202.4100        4,250.61        4,250.61

    Z0001110  GAS VALVE ADJUSTED                           1.000     EACH
 1552      Dunnet Bay Construction Company                                557.5000          557.50          557.50
 2520      Herlihy Mid-Continent Company                                  557.5000          557.50          557.50
 3127      Kenny Construction Company                                     557.5000          557.50          557.50
 3505      Lorig Construction Company                                     500.0000          500.00          500.00
 3702      Martam Construction Incorporated                             3,500.0000        3,500.00        3,500.00

    Z0004530  HMA DRIVEWAY PAVT  8                       180.000    SQ YD
 1552      Dunnet Bay Construction Company                                 80.0000       14,400.00       14,400.00
 2520      Herlihy Mid-Continent Company                                   58.8000       10,584.00       10,584.00
 3127      Kenny Construction Company                                      57.0000       10,260.00       10,260.00
 3505      Lorig Construction Company                                      61.0000       10,980.00       10,980.00
 3702      Martam Construction Incorporated                                93.6300       16,853.40       16,853.40

    Z0005216  HMA STAB 6 AT SPBGR                        126.000    SQ YD
 1552      Dunnet Bay Construction Company                                 61.0000        7,686.00        7,686.00
 2520      Herlihy Mid-Continent Company                                   45.3500        5,714.10        5,714.10
 3127      Kenny Construction Company                                      88.0000       11,088.00       11,088.00
 3505      Lorig Construction Company                                      46.0000        5,796.00        5,796.00
 3702      Martam Construction Incorporated                                52.5200        6,617.52        6,617.52

    Z0013798  CONSTRUCTION LAYOUT                          1.000    L SUM
 1552      Dunnet Bay Construction Company                             56,000.0000       56,000.00       56,000.00
 2520      Herlihy Mid-Continent Company                               50,000.0000       50,000.00       50,000.00
 3127      Kenny Construction Company                                  50,639.1000       50,639.10       50,639.10
 3505      Lorig Construction Company                                 115,000.0000      115,000.00      115,000.00
 3702      Martam Construction Incorporated                            41,420.0000       41,420.00       41,420.00

    Z0022800  FENCE REMOVAL                            6,360.000     FOOT
 1552      Dunnet Bay Construction Company                                  4.9300       31,354.80       31,354.80
 2520      Herlihy Mid-Continent Company                                    4.9300       31,354.80       31,354.80
 3127      Kenny Construction Company                                       3.5000       22,260.00       22,260.00
 3505      Lorig Construction Company                                       5.0000       31,800.00       31,800.00
 3702      Martam Construction Incorporated                                 5.3700       34,153.20       34,153.20

    Z0030850  TEMP INFO SIGNING                          212.000    SQ FT
 1552      Dunnet Bay Construction Company                                 28.0000        5,936.00        5,936.00
 2520      Herlihy Mid-Continent Company                                   28.0000        5,936.00        5,936.00
 3127      Kenny Construction Company                                      28.0000        5,936.00        5,936.00
 3505      Lorig Construction Company                                      28.0000        5,936.00        5,936.00
 3702      Martam Construction Incorporated                                30.5200        6,470.24        6,470.24

    Z0056608  STORM SEW WM REQ   12                      196.000     FOOT
 1552      Dunnet Bay Construction Company                                134.0500       26,273.80       26,273.80
 2520      Herlihy Mid-Continent Company                                  134.0500       26,273.80       26,273.80
 3127      Kenny Construction Company                                     134.0500       26,273.80       26,273.80
 3505      Lorig Construction Company                                     135.0000       26,460.00       26,460.00
 3702      Martam Construction Incorporated                               213.2600       41,798.96       41,798.96

    Z0062456  TEMP PAVEMENT                               32.000    SQ YD
 1552      Dunnet Bay Construction Company                                114.0000        3,648.00        3,648.00
 2520      Herlihy Mid-Continent Company                                   72.0000        2,304.00        2,304.00
 3127      Kenny Construction Company                                     320.0000       10,240.00       10,240.00
 3505      Lorig Construction Company                                      80.0000        2,560.00        2,560.00
 3702      Martam Construction Incorporated                               348.8000       11,161.60       11,161.60

    Z0064800  SELECTIVE CLEARING                         125.000     UNIT
 1552      Dunnet Bay Construction Company                                288.0000       36,000.00       36,000.00
 2520      Herlihy Mid-Continent Company                                  288.0000       36,000.00       36,000.00
 3127      Kenny Construction Company                                     275.0000       34,375.00       34,375.00
 3505      Lorig Construction Company                                     288.0000       36,000.00       36,000.00
 3702      Martam Construction Incorporated                               313.9200       39,240.00       39,240.00

    Z0073510  TEMP TR SIGNAL TIMING                        1.000     EACH
 1552      Dunnet Bay Construction Company                              1,155.0000        1,155.00        1,155.00
 2520      Herlihy Mid-Continent Company                                1,155.0000        1,155.00        1,155.00
 3127      Kenny Construction Company                                   1,155.0000        1,155.00        1,155.00
 3505      Lorig Construction Company                                   1,200.0000        1,200.00        1,200.00
 3702      Martam Construction Incorporated                             1,258.9500        1,258.95        1,258.95

    Z0076600  TRAINEES                                 2,500.000     HOUR
 1552      Dunnet Bay Construction Company                                  0.8000        2,000.00        2,000.00
 2520      Herlihy Mid-Continent Company                                    0.8000        2,000.00        2,000.00
 3127      Kenny Construction Company                                       0.8000        2,000.00        2,000.00
 3505      Lorig Construction Company                                       0.8000        2,000.00        2,000.00
 3702      Martam Construction Incorporated                                 0.8000        2,000.00        2,000.00

    Z0076604  TRAINEES TPG                             2,500.000     HOUR
 1552      Dunnet Bay Construction Company                                 15.0000       37,500.00       37,500.00
 2520      Herlihy Mid-Continent Company                                   15.0000       37,500.00       37,500.00
 3127      Kenny Construction Company                                      15.0000       37,500.00       37,500.00
 3505      Lorig Construction Company                                      15.0000       37,500.00       37,500.00
 3702      Martam Construction Incorporated                                15.0000       37,500.00       37,500.00

    20100110  TREE REMOV 6-15                            266.000     UNIT
 1552      Dunnet Bay Construction Company                                 13.0000        3,458.00        3,458.00
 2520      Herlihy Mid-Continent Company                                   13.0000        3,458.00        3,458.00
 3127      Kenny Construction Company                                      27.0000        7,182.00        7,182.00
 3505      Lorig Construction Company                                      13.0000        3,458.00        3,458.00
 3702      Martam Construction Incorporated                                14.1700        3,769.22        3,769.22

    20100210  TREE REMOV OVER 15                          65.000     UNIT
 1552      Dunnet Bay Construction Company                                 32.0000        2,080.00        2,080.00
 2520      Herlihy Mid-Continent Company                                   32.0000        2,080.00        2,080.00
 3127      Kenny Construction Company                                      36.0000        2,340.00        2,340.00
 3505      Lorig Construction Company                                      32.0000        2,080.00        2,080.00
 3702      Martam Construction Incorporated                                34.8800        2,267.20        2,267.20

    20101100  TREE TRUNK PROTECTION                       12.000     EACH
 1552      Dunnet Bay Construction Company                                150.0000        1,800.00        1,800.00
 2520      Herlihy Mid-Continent Company                                  150.0000        1,800.00        1,800.00
 3127      Kenny Construction Company                                     200.0000        2,400.00        2,400.00
 3505      Lorig Construction Company                                     150.0000        1,800.00        1,800.00
 3702      Martam Construction Incorporated                               163.5000        1,962.00        1,962.00

    20101700  SUPPLE WATERING                          2,275.000     UNIT
 1552      Dunnet Bay Construction Company                                  1.0000        2,275.00        2,275.00
 2520      Herlihy Mid-Continent Company                                    1.0000        2,275.00        2,275.00
 3127      Kenny Construction Company                                       1.0000        2,275.00        2,275.00
 3505      Lorig Construction Company                                       1.0000        2,275.00        2,275.00
 3702      Martam Construction Incorporated                                 1.0900        2,479.75        2,479.75

    20200100  EARTH EXCAVATION                         1,100.000    CU YD
 1552      Dunnet Bay Construction Company                                 54.0000       59,400.00       59,400.00
 2520      Herlihy Mid-Continent Company                                   53.4500       58,795.00       58,795.00
 3127      Kenny Construction Company                                      27.0900       29,799.00       29,799.00
 3505      Lorig Construction Company                                      43.0000       47,300.00       47,300.00
 3702      Martam Construction Incorporated                               104.9100      115,401.00      115,401.00

    20700220  POROUS GRAN EMBANK                         500.000    CU YD
 1552      Dunnet Bay Construction Company                                 62.0000       31,000.00       31,000.00
 2520      Herlihy Mid-Continent Company                                   75.9500       37,975.00       37,975.00
 3127      Kenny Construction Company                                      46.5200       23,260.00       23,260.00
 3505      Lorig Construction Company                                      65.0000       32,500.00       32,500.00
 3702      Martam Construction Incorporated                                64.1600       32,080.00       32,080.00

    20800150  TRENCH BACKFILL                            111.000    CU YD
 1552      Dunnet Bay Construction Company                                 60.8000        6,748.80        6,748.80
 2520      Herlihy Mid-Continent Company                                   60.8000        6,748.80        6,748.80
 3127      Kenny Construction Company                                      60.8000        6,748.80        6,748.80
 3505      Lorig Construction Company                                      60.8000        6,748.80        6,748.80
 3702      Martam Construction Incorporated                                93.2800       10,354.08       10,354.08

    21101505  TOPSOIL EXC & PLAC                       2,170.000    CU YD
 1552      Dunnet Bay Construction Company                                 29.0000       62,930.00       62,930.00
 2520      Herlihy Mid-Continent Company                                   65.0000      141,050.00      141,050.00
 3127      Kenny Construction Company                                      45.7000       99,169.00       99,169.00
 3505      Lorig Construction Company                                      55.5000      120,435.00      120,435.00
 3702      Martam Construction Incorporated                                32.5000       70,525.00       70,525.00

    21101605  TOPSOIL F & P  2                           281.000    SQ YD
 1552      Dunnet Bay Construction Company                                  5.0000        1,405.00        1,405.00
 2520      Herlihy Mid-Continent Company                                    5.0000        1,405.00        1,405.00
 3127      Kenny Construction Company                                       5.0000        1,405.00        1,405.00
 3505      Lorig Construction Company                                       6.0000        1,686.00        1,686.00
 3702      Martam Construction Incorporated                                 5.4500        1,531.45        1,531.45

    21101645  TOPSOIL F & P 12                         1,010.000    SQ YD
 1552      Dunnet Bay Construction Company                                 11.0000       11,110.00       11,110.00
 2520      Herlihy Mid-Continent Company                                   11.0000       11,110.00       11,110.00
 3127      Kenny Construction Company                                      11.0000       11,110.00       11,110.00
 3505      Lorig Construction Company                                      12.0000       12,120.00       12,120.00
 3702      Martam Construction Incorporated                                11.9900       12,109.90       12,109.90

    25000210  SEEDING CL  2A                                .600     ACRE
 1552      Dunnet Bay Construction Company                              3,000.0000        1,800.00        1,800.00
 2520      Herlihy Mid-Continent Company                                3,000.0000        1,800.00        1,800.00
 3127      Kenny Construction Company                                   3,000.0000        1,800.00        1,800.00
 3505      Lorig Construction Company                                   3,000.0000        1,800.00        1,800.00
 3702      Martam Construction Incorporated                             3,270.0000        1,962.00        1,962.00

    25000350  SEEDING CL  7                                1.800     ACRE
 1552      Dunnet Bay Construction Company                              1,200.0000        2,160.00        2,160.00
 2520      Herlihy Mid-Continent Company                                1,200.0000        2,160.00        2,160.00
 3127      Kenny Construction Company                                   1,200.0000        2,160.00        2,160.00
 3505      Lorig Construction Company                                   1,200.0000        2,160.00        2,160.00
 3702      Martam Construction Incorporated                             1,308.0000        2,354.40        2,354.40

    25000400  NITROGEN FERT NUTR                         402.000    POUND
 1552      Dunnet Bay Construction Company                                  3.0000        1,206.00        1,206.00
 2520      Herlihy Mid-Continent Company                                    3.0000        1,206.00        1,206.00
 3127      Kenny Construction Company                                       3.0000        1,206.00        1,206.00
 3505      Lorig Construction Company                                       3.0000        1,206.00        1,206.00
 3702      Martam Construction Incorporated                                 3.2700        1,314.54        1,314.54

    25000600  POTASSIUM FERT NUTR                        402.000    POUND
 1552      Dunnet Bay Construction Company                                  3.0000        1,206.00        1,206.00
 2520      Herlihy Mid-Continent Company                                    3.0000        1,206.00        1,206.00
 3127      Kenny Construction Company                                       3.0000        1,206.00        1,206.00
 3505      Lorig Construction Company                                       3.0000        1,206.00        1,206.00
 3702      Martam Construction Incorporated                                 3.2700        1,314.54        1,314.54

    25100630  EROSION CONTR BLANKET                   11,247.000    SQ YD
 1552      Dunnet Bay Construction Company                                  1.0000       11,247.00       11,247.00
 2520      Herlihy Mid-Continent Company                                    1.0000       11,247.00       11,247.00
 3127      Kenny Construction Company                                       1.0000       11,247.00       11,247.00
 3505      Lorig Construction Company                                       1.0000       11,247.00       11,247.00
 3702      Martam Construction Incorporated                                 1.0900       12,259.23       12,259.23

    25200110  SODDING SALT TOLERANT                      281.000    SQ YD
 1552      Dunnet Bay Construction Company                                 18.0000        5,058.00        5,058.00
 2520      Herlihy Mid-Continent Company                                   18.0000        5,058.00        5,058.00
 3127      Kenny Construction Company                                      18.0000        5,058.00        5,058.00
 3505      Lorig Construction Company                                      18.0000        5,058.00        5,058.00
 3702      Martam Construction Incorporated                                19.6200        5,513.22        5,513.22

    25200200  SUPPLE WATERING                             32.000     UNIT
 1552      Dunnet Bay Construction Company                                 10.0000          320.00          320.00
 2520      Herlihy Mid-Continent Company                                   10.0000          320.00          320.00
 3127      Kenny Construction Company                                      10.0000          320.00          320.00
 3505      Lorig Construction Company                                      10.0000          320.00          320.00
 3702      Martam Construction Incorporated                                10.9000          348.80          348.80

    28000305  TEMP DITCH CHECKS                           50.000     FOOT
 1552      Dunnet Bay Construction Company                                 15.0000          750.00          750.00
 2520      Herlihy Mid-Continent Company                                   15.0000          750.00          750.00
 3127      Kenny Construction Company                                      15.0000          750.00          750.00
 3505      Lorig Construction Company                                      15.0000          750.00          750.00
 3702      Martam Construction Incorporated                                16.3500          817.50          817.50

    28000400  PERIMETER EROS BAR                       9,296.000     FOOT
 1552      Dunnet Bay Construction Company                                  3.5000       32,536.00       32,536.00
 2520      Herlihy Mid-Continent Company                                    3.5000       32,536.00       32,536.00
 3127      Kenny Construction Company                                       3.5000       32,536.00       32,536.00
 3505      Lorig Construction Company                                       3.5000       32,536.00       32,536.00
 3702      Martam Construction Incorporated                                 3.8200       35,510.72       35,510.72

    28000510  INLET FILTERS                              113.000     EACH
 1552      Dunnet Bay Construction Company                                185.0000       20,905.00       20,905.00
 2520      Herlihy Mid-Continent Company                                  185.0000       20,905.00       20,905.00
 3127      Kenny Construction Company                                     185.0000       20,905.00       20,905.00
 3505      Lorig Construction Company                                     185.0000       20,905.00       20,905.00
 3702      Martam Construction Incorporated                               201.6500       22,786.45       22,786.45

    28100105  STONE RIPRAP CL A3                           1.000    SQ YD
 1552      Dunnet Bay Construction Company                              1,155.0000        1,155.00        1,155.00
 2520      Herlihy Mid-Continent Company                                  420.0000          420.00          420.00
 3127      Kenny Construction Company                                   1,000.0000        1,000.00        1,000.00
 3505      Lorig Construction Company                                     500.0000          500.00          500.00
 3702      Martam Construction Incorporated                             1,862.1600        1,862.16        1,862.16

    30300112  AGG SUBGRADE IMPR  12                      416.000    SQ YD
 1552      Dunnet Bay Construction Company                                 31.0000       12,896.00       12,896.00
 2520      Herlihy Mid-Continent Company                                   26.9000       11,190.40       11,190.40
 3127      Kenny Construction Company                                      27.5200       11,448.32       11,448.32
 3505      Lorig Construction Company                                      23.0000        9,568.00        9,568.00
 3702      Martam Construction Incorporated                                56.5900       23,541.44       23,541.44

    31101200  SUB GRAN MAT B  4                        3,492.000    SQ YD
 1552      Dunnet Bay Construction Company                                 18.0000       62,856.00       62,856.00
 2520      Herlihy Mid-Continent Company                                   11.9500       41,729.40       41,729.40
 3127      Kenny Construction Company                                       7.6300       26,643.96       26,643.96
 3505      Lorig Construction Company                                      10.0000       34,920.00       34,920.00
 3702      Martam Construction Incorporated                                14.5600       50,843.52       50,843.52

    35101600  AGG BASE CSE B  4                           73.000    SQ YD
 1552      Dunnet Bay Construction Company                                 25.0000        1,825.00        1,825.00
 2520      Herlihy Mid-Continent Company                                   20.0000        1,460.00        1,460.00
 3127      Kenny Construction Company                                      26.7600        1,953.48        1,953.48
 3505      Lorig Construction Company                                      14.5000        1,058.50        1,058.50
 3702      Martam Construction Incorporated                                26.4700        1,932.31        1,932.31

    35101800  AGG BASE CSE B  6                          171.000    SQ YD
 1552      Dunnet Bay Construction Company                                 27.0000        4,617.00        4,617.00
 2520      Herlihy Mid-Continent Company                                   18.2000        3,112.20        3,112.20
 3127      Kenny Construction Company                                      13.6600        2,335.86        2,335.86
 3505      Lorig Construction Company                                      17.0000        2,907.00        2,907.00
 3702      Martam Construction Incorporated                                33.9200        5,800.32        5,800.32

    35400500  PCC BASE CSE W 10                          338.000    SQ YD
 1552      Dunnet Bay Construction Company                                 76.0000       25,688.00       25,688.00
 2520      Herlihy Mid-Continent Company                                   82.0000       27,716.00       27,716.00
 3127      Kenny Construction Company                                      60.0000       20,280.00       20,280.00
 3505      Lorig Construction Company                                      60.0000       20,280.00       20,280.00
 3702      Martam Construction Incorporated                                63.2200       21,368.36       21,368.36

    40600290  BIT MATLS TACK CT                       26,083.000    POUND
 1552      Dunnet Bay Construction Company                                  0.0100          260.83          260.83
 2520      Herlihy Mid-Continent Company                                    0.3500        9,129.05        9,129.05
 3127      Kenny Construction Company                                       0.0100          260.83          260.83
 3505      Lorig Construction Company                                       0.3500        9,129.05        9,129.05
 3702      Martam Construction Incorporated                                 1.1000       28,691.30       28,691.30

    40600400  MIX CR JTS FLANGEWYS                        55.000      TON
 1552      Dunnet Bay Construction Company                                 75.0000        4,125.00        4,125.00
 2520      Herlihy Mid-Continent Company                                  100.0000        5,500.00        5,500.00
 3127      Kenny Construction Company                                      10.0000          550.00          550.00
 3505      Lorig Construction Company                                     100.0000        5,500.00        5,500.00
 3702      Martam Construction Incorporated                               383.9700       21,118.35       21,118.35

    40600827  P LB MM IL-4.75  N50                     1,519.000      TON
 1552      Dunnet Bay Construction Company                                 90.0000      136,710.00      136,710.00
 2520      Herlihy Mid-Continent Company                                  107.0000      162,533.00      162,533.00
 3127      Kenny Construction Company                                     103.0000      156,457.00      156,457.00
 3505      Lorig Construction Company                                     110.0000      167,090.00      167,090.00
 3702      Martam Construction Incorporated                               145.4300      220,908.17      220,908.17

    40600982  HMA SURF REM BUTT JT                       312.000    SQ YD
 1552      Dunnet Bay Construction Company                                 30.0000        9,360.00        9,360.00
 2520      Herlihy Mid-Continent Company                                   14.5000        4,524.00        4,524.00
 3127      Kenny Construction Company                                       1.2000          374.40          374.40
 3505      Lorig Construction Company                                      14.5000        4,524.00        4,524.00
 3702      Martam Construction Incorporated                                15.5900        4,864.08        4,864.08

    40603340  HMA SC "D"   N70                           717.000      TON
 1552      Dunnet Bay Construction Company                                 82.0000       58,794.00       58,794.00
 2520      Herlihy Mid-Continent Company                                   85.3000       61,160.10       61,160.10
 3127      Kenny Construction Company                                      90.0000       64,530.00       64,530.00
 3505      Lorig Construction Company                                      87.0000       62,379.00       62,379.00
 3702      Martam Construction Incorporated                                93.2400       66,853.08       66,853.08

    40603565  P HMA SC "E"   N70                       2,724.000      TON
 1552      Dunnet Bay Construction Company                                 92.0000      250,608.00      250,608.00
 2520      Herlihy Mid-Continent Company                                  101.6000      276,758.40      276,758.40
 3127      Kenny Construction Company                                     110.0000      299,640.00      299,640.00
 3505      Lorig Construction Company                                     105.0000      286,020.00      286,020.00
 3702      Martam Construction Incorporated                               113.3700      308,819.88      308,819.88

    42001300  PROTECTIVE COAT                            130.000    SQ YD
 1552      Dunnet Bay Construction Company                                  2.7500          357.50          357.50
 2520      Herlihy Mid-Continent Company                                    2.7500          357.50          357.50
 3127      Kenny Construction Company                                       1.0000          130.00          130.00
 3505      Lorig Construction Company                                       2.0000          260.00          260.00
 3702      Martam Construction Incorporated                                 1.0900          141.70          141.70

    42300400  PCC DRIVEWAY PAVT  8                       140.000    SQ YD
 1552      Dunnet Bay Construction Company                                 85.5000       11,970.00       11,970.00
 2520      Herlihy Mid-Continent Company                                   85.5000       11,970.00       11,970.00
 3127      Kenny Construction Company                                      53.8000        7,532.00        7,532.00
 3505      Lorig Construction Company                                      55.0000        7,700.00        7,700.00
 3702      Martam Construction Incorporated                                58.6400        8,209.60        8,209.60

    42400200  PC CONC SIDEWALK 5                       5,374.000    SQ FT
 1552      Dunnet Bay Construction Company                                  8.7500       47,022.50       47,022.50
 2520      Herlihy Mid-Continent Company                                    8.7500       47,022.50       47,022.50
 3127      Kenny Construction Company                                       6.5000       34,931.00       34,931.00
 3505      Lorig Construction Company                                       6.5000       34,931.00       34,931.00
 3702      Martam Construction Incorporated                                 7.0900       38,101.66       38,101.66

    42400410  PC CONC SIDEWALK 8                         341.000    SQ FT
 1552      Dunnet Bay Construction Company                                  9.5000        3,239.50        3,239.50
 2520      Herlihy Mid-Continent Company                                    9.5000        3,239.50        3,239.50
 3127      Kenny Construction Company                                       9.0000        3,069.00        3,069.00
 3505      Lorig Construction Company                                       9.0000        3,069.00        3,069.00
 3702      Martam Construction Incorporated                                 9.8100        3,345.21        3,345.21

    44000100  PAVEMENT REM                             2,494.000    SQ YD
 1552      Dunnet Bay Construction Company                                 24.0000       59,856.00       59,856.00
 2520      Herlihy Mid-Continent Company                                   25.5000       63,597.00       63,597.00
 3127      Kenny Construction Company                                      16.5500       41,275.70       41,275.70
 3505      Lorig Construction Company                                      16.0000       39,904.00       39,904.00
 3702      Martam Construction Incorporated                                32.8900       82,027.66       82,027.66

    44000158  HMA SURF REM    2 1/4                    6,460.000    SQ YD
 1552      Dunnet Bay Construction Company                                  4.1500       26,809.00       26,809.00
 2520      Herlihy Mid-Continent Company                                    3.6000       23,256.00       23,256.00
 3127      Kenny Construction Company                                       3.0600       19,767.60       19,767.60
 3505      Lorig Construction Company                                       3.6000       23,256.00       23,256.00
 3702      Martam Construction Incorporated                                 3.3400       21,576.40       21,576.40

    44000159  HMA SURF REM    2 1/2                   26,486.000    SQ YD
 1552      Dunnet Bay Construction Company                                  4.7500      125,808.50      125,808.50
 2520      Herlihy Mid-Continent Company                                    3.5000       92,701.00       92,701.00
 3127      Kenny Construction Company                                       3.3500       88,728.10       88,728.10
 3505      Lorig Construction Company                                       3.5000       92,701.00       92,701.00
 3702      Martam Construction Incorporated                                 3.6500       96,673.90       96,673.90

    44000200  DRIVE PAVEMENT REM                         320.000    SQ YD
 1552      Dunnet Bay Construction Company                                 27.0000        8,640.00        8,640.00
 2520      Herlihy Mid-Continent Company                                   18.5000        5,920.00        5,920.00
 3127      Kenny Construction Company                                       5.5800        1,785.60        1,785.60
 3505      Lorig Construction Company                                      12.0000        3,840.00        3,840.00
 3702      Martam Construction Incorporated                                12.9700        4,150.40        4,150.40

    44000500  COMB CURB GUTTER REM                     5,810.000     FOOT
 1552      Dunnet Bay Construction Company                                  8.5000       49,385.00       49,385.00
 2520      Herlihy Mid-Continent Company                                    6.4000       37,184.00       37,184.00
 3127      Kenny Construction Company                                       3.9200       22,775.20       22,775.20
 3505      Lorig Construction Company                                       7.0000       40,670.00       40,670.00
 3702      Martam Construction Incorporated                                 8.6700       50,372.70       50,372.70

    44000600  SIDEWALK REM                             8,044.000    SQ FT
 1552      Dunnet Bay Construction Company                                  3.0000       24,132.00       24,132.00
 2520      Herlihy Mid-Continent Company                                    1.6000       12,870.40       12,870.40
 3127      Kenny Construction Company                                       1.6200       13,031.28       13,031.28
 3505      Lorig Construction Company                                       2.0000       16,088.00       16,088.00
 3702      Martam Construction Incorporated                                 4.1700       33,543.48       33,543.48

    44201765  CL D PATCH T2 10                           102.000    SQ YD
 1552      Dunnet Bay Construction Company                                104.0000       10,608.00       10,608.00
 2520      Herlihy Mid-Continent Company                                  101.0000       10,302.00       10,302.00
 3127      Kenny Construction Company                                      70.0000        7,140.00        7,140.00
 3505      Lorig Construction Company                                     103.0000       10,506.00       10,506.00
 3702      Martam Construction Incorporated                                83.0100        8,467.02        8,467.02

    44201769  CL D PATCH T3 10                           145.000    SQ YD
 1552      Dunnet Bay Construction Company                                103.0000       14,935.00       14,935.00
 2520      Herlihy Mid-Continent Company                                   89.6000       12,992.00       12,992.00
 3127      Kenny Construction Company                                      70.0000       10,150.00       10,150.00
 3505      Lorig Construction Company                                      91.0000       13,195.00       13,195.00
 3702      Martam Construction Incorporated                                70.4800       10,219.60       10,219.60

    44201771  CL D PATCH T4 10                           567.000    SQ YD
 1552      Dunnet Bay Construction Company                                102.0000       57,834.00       57,834.00
 2520      Herlihy Mid-Continent Company                                   82.8500       46,975.95       46,975.95
 3127      Kenny Construction Company                                      70.0000       39,690.00       39,690.00
 3505      Lorig Construction Company                                      83.0000       47,061.00       47,061.00
 3702      Martam Construction Incorporated                                81.4900       46,204.83       46,204.83

    50102400  CONC REM                                   325.000    CU YD
 1552      Dunnet Bay Construction Company                                450.0000      146,250.00      146,250.00
 2520      Herlihy Mid-Continent Company                                  230.0000       74,750.00       74,750.00
 3127      Kenny Construction Company                                     425.0000      138,125.00      138,125.00
 3505      Lorig Construction Company                                     700.0000      227,500.00      227,500.00
 3702      Martam Construction Incorporated                               325.0400      105,638.00      105,638.00

    50200100  STRUCTURE EXCAVATION                     3,835.000    CU YD
 1552      Dunnet Bay Construction Company                                 40.0000      153,400.00      153,400.00
 2520      Herlihy Mid-Continent Company                                   40.0000      153,400.00      153,400.00
 3127      Kenny Construction Company                                      25.0000       95,875.00       95,875.00
 3505      Lorig Construction Company                                      40.0000      153,400.00      153,400.00
 3702      Martam Construction Incorporated                                49.9800      191,673.30      191,673.30

    50300225  CONC STRUCT                              3,145.000    CU YD
 1552      Dunnet Bay Construction Company                                500.0000    1,572,500.00    1,572,500.00
 2520      Herlihy Mid-Continent Company                                  490.0000    1,541,050.00    1,541,050.00
 3127      Kenny Construction Company                                     385.0000    1,210,825.00    1,210,825.00
 3505      Lorig Construction Company                                     425.0000    1,336,625.00    1,336,625.00
 3702      Martam Construction Incorporated                               731.7000    2,301,196.50    2,301,196.50

    50300255  CONC SUP-STR                               455.000    CU YD
 1552      Dunnet Bay Construction Company                              1,350.0000      614,250.00      614,250.00
 2520      Herlihy Mid-Continent Company                                1,262.0000      574,210.00      574,210.00
 3127      Kenny Construction Company                                     850.0000      386,750.00      386,750.00
 3505      Lorig Construction Company                                   1,150.0000      523,250.00      523,250.00
 3702      Martam Construction Incorporated                             1,416.6100      644,557.55      644,557.55

    50300300  PROTECTIVE COAT                          2,144.000    SQ YD
 1552      Dunnet Bay Construction Company                                  2.0000        4,288.00        4,288.00
 2520      Herlihy Mid-Continent Company                                    1.7500        3,752.00        3,752.00
 3127      Kenny Construction Company                                       3.7500        8,040.00        8,040.00
 3505      Lorig Construction Company                                       1.8000        3,859.20        3,859.20
 3702      Martam Construction Incorporated                                 4.8700       10,441.28       10,441.28

    50800205  REINF BARS, EPOXY CTD                  731,010.000    POUND
 1552      Dunnet Bay Construction Company                                  1.4100    1,030,724.10    1,030,724.10
 2520      Herlihy Mid-Continent Company                                    1.4000    1,023,414.00    1,023,414.00
 3127      Kenny Construction Company                                       1.2500      913,762.50      913,762.50
 3505      Lorig Construction Company                                       1.3000      950,313.00      950,313.00
 3702      Martam Construction Incorporated                                 1.6800    1,228,096.80    1,228,096.80

    51500100  NAME PLATES                                 19.000     EACH
 1552      Dunnet Bay Construction Company                                450.0000        8,550.00        8,550.00
 2520      Herlihy Mid-Continent Company                                  515.0000        9,785.00        9,785.00
 3127      Kenny Construction Company                                     925.0000       17,575.00       17,575.00
 3505      Lorig Construction Company                                     500.0000        9,500.00        9,500.00
 3702      Martam Construction Incorporated                             2,190.8000       41,625.20       41,625.20

    51603000  DRILLED SHAFT IN SOIL                      359.000    CU YD
 1552      Dunnet Bay Construction Company                                550.0000      197,450.00      197,450.00
 2520      Herlihy Mid-Continent Company                                  797.0500      286,140.95      286,140.95
 3127      Kenny Construction Company                                     780.0000      280,020.00      280,020.00
 3505      Lorig Construction Company                                     425.0000      152,575.00      152,575.00
 3702      Martam Construction Incorporated                               578.2200      207,580.98      207,580.98

    542A0217  P CUL CL A 1    12                          21.000     FOOT
 1552      Dunnet Bay Construction Company                                152.1500        3,195.15        3,195.15
 2520      Herlihy Mid-Continent Company                                  152.1500        3,195.15        3,195.15
 3127      Kenny Construction Company                                     152.1500        3,195.15        3,195.15
 3505      Lorig Construction Company                                     155.0000        3,255.00        3,255.00
 3702      Martam Construction Incorporated                               133.6400        2,806.44        2,806.44

    54213657  PRC FLAR END SEC 12                          1.000     EACH
 1552      Dunnet Bay Construction Company                              4,169.0000        4,169.00        4,169.00
 2520      Herlihy Mid-Continent Company                                4,169.0000        4,169.00        4,169.00
 3127      Kenny Construction Company                                   4,169.0000        4,169.00        4,169.00
 3505      Lorig Construction Company                                   4,200.0000        4,200.00        4,200.00
 3702      Martam Construction Incorporated                             1,740.8500        1,740.85        1,740.85

    550A0050  STORM SEW CL A 1  12                       155.000     FOOT
 1552      Dunnet Bay Construction Company                                 99.8500       15,476.75       15,476.75
 2520      Herlihy Mid-Continent Company                                   99.8500       15,476.75       15,476.75
 3127      Kenny Construction Company                                      99.8500       15,476.75       15,476.75
 3505      Lorig Construction Company                                     100.0000       15,500.00       15,500.00
 3702      Martam Construction Incorporated                               133.6200       20,711.10       20,711.10

    56109210  WATER VALVES ADJUST                          1.000     EACH
 1552      Dunnet Bay Construction Company                                481.0000          481.00          481.00
 2520      Herlihy Mid-Continent Company                                  481.0000          481.00          481.00
 3127      Kenny Construction Company                                     481.0000          481.00          481.00
 3505      Lorig Construction Company                                     485.0000          485.00          485.00
 3702      Martam Construction Incorporated                             1,361.9200        1,361.92        1,361.92

    60200805  CB TA 4 DIA T8G                              2.000     EACH
 1552      Dunnet Bay Construction Company                              4,060.0000        8,120.00        8,120.00
 2520      Herlihy Mid-Continent Company                                4,060.0000        8,120.00        8,120.00
 3127      Kenny Construction Company                                   4,060.0000        8,120.00        8,120.00
 3505      Lorig Construction Company                                   4,100.0000        8,200.00        8,200.00
 3702      Martam Construction Incorporated                             3,443.2900        6,886.58        6,886.58

    60201310  CB TA 4 DIA T20F&G                          16.000     EACH
 1552      Dunnet Bay Construction Company                              3,219.0000       51,504.00       51,504.00
 2520      Herlihy Mid-Continent Company                                3,219.0000       51,504.00       51,504.00
 3127      Kenny Construction Company                                   3,219.0000       51,504.00       51,504.00
 3505      Lorig Construction Company                                   3,225.0000       51,600.00       51,600.00
 3702      Martam Construction Incorporated                             3,701.9400       59,231.04       59,231.04

    60250200  CB ADJUST                                    5.000     EACH
 1552      Dunnet Bay Construction Company                                605.0000        3,025.00        3,025.00
 2520      Herlihy Mid-Continent Company                                  605.0000        3,025.00        3,025.00
 3127      Kenny Construction Company                                     605.0000        3,025.00        3,025.00
 3505      Lorig Construction Company                                     605.0000        3,025.00        3,025.00
 3702      Martam Construction Incorporated                             1,702.4000        8,512.00        8,512.00

    60250500  CB ADJ NEW T1F CL                           14.000     EACH
 1552      Dunnet Bay Construction Company                                614.0000        8,596.00        8,596.00
 2520      Herlihy Mid-Continent Company                                  614.0000        8,596.00        8,596.00
 3127      Kenny Construction Company                                     614.0000        8,596.00        8,596.00
 3505      Lorig Construction Company                                     525.0000        7,350.00        7,350.00
 3702      Martam Construction Incorporated                             1,964.4300       27,502.02       27,502.02

    60255500  MAN ADJUST                                   4.000     EACH
 1552      Dunnet Bay Construction Company                                585.0000        2,340.00        2,340.00
 2520      Herlihy Mid-Continent Company                                  585.0000        2,340.00        2,340.00
 3127      Kenny Construction Company                                     585.0000        2,340.00        2,340.00
 3505      Lorig Construction Company                                     585.0000        2,340.00        2,340.00
 3702      Martam Construction Incorporated                             1,702.4000        6,809.60        6,809.60

    60260100  INLETS ADJUST                               14.000     EACH
 1552      Dunnet Bay Construction Company                                614.0000        8,596.00        8,596.00
 2520      Herlihy Mid-Continent Company                                  614.0000        8,596.00        8,596.00
 3127      Kenny Construction Company                                     614.0000        8,596.00        8,596.00
 3505      Lorig Construction Company                                     615.0000        8,610.00        8,610.00
 3702      Martam Construction Incorporated                             1,361.9200       19,066.88       19,066.88

    60300305  FR & LIDS ADJUST                            22.000     EACH
 1552      Dunnet Bay Construction Company                                614.0000       13,508.00       13,508.00
 2520      Herlihy Mid-Continent Company                                  614.0000       13,508.00       13,508.00
 3127      Kenny Construction Company                                     614.0000       13,508.00       13,508.00
 3505      Lorig Construction Company                                     615.0000       13,530.00       13,530.00
 3702      Martam Construction Incorporated                               522.1600       11,487.52       11,487.52

    60406000  FR & LIDS T1 OL                              5.000     EACH
 1552      Dunnet Bay Construction Company                                279.0000        1,395.00        1,395.00
 2520      Herlihy Mid-Continent Company                                  279.0000        1,395.00        1,395.00
 3127      Kenny Construction Company                                     279.0000        1,395.00        1,395.00
 3505      Lorig Construction Company                                     285.0000        1,425.00        1,425.00
 3702      Martam Construction Incorporated                               679.7600        3,398.80        3,398.80

    60406100  FR & LIDS T1 CL                             11.000     EACH
 1552      Dunnet Bay Construction Company                                279.0000        3,069.00        3,069.00
 2520      Herlihy Mid-Continent Company                                  279.0000        3,069.00        3,069.00
 3127      Kenny Construction Company                                     279.0000        3,069.00        3,069.00
 3505      Lorig Construction Company                                     285.0000        3,135.00        3,135.00
 3702      Martam Construction Incorporated                               679.7600        7,477.36        7,477.36

    60600605  CONC CURB TB                               478.000     FOOT
 1552      Dunnet Bay Construction Company                                 27.0000       12,906.00       12,906.00
 2520      Herlihy Mid-Continent Company                                   27.0000       12,906.00       12,906.00
 3127      Kenny Construction Company                                      26.0000       12,428.00       12,428.00
 3505      Lorig Construction Company                                      26.0000       12,428.00       12,428.00
 3702      Martam Construction Incorporated                                28.3400       13,546.52       13,546.52

    60603800  COMB CC&G TB6.12                         1,491.000     FOOT
 1552      Dunnet Bay Construction Company                                 35.0000       52,185.00       52,185.00
 2520      Herlihy Mid-Continent Company                                   35.0000       52,185.00       52,185.00
 3127      Kenny Construction Company                                      27.0000       40,257.00       40,257.00
 3505      Lorig Construction Company                                      27.0000       40,257.00       40,257.00
 3702      Martam Construction Incorporated                                29.4300       43,880.13       43,880.13

    60604100  COMB CC&G TB6.12 MOD                       440.000     FOOT
 1552      Dunnet Bay Construction Company                                 38.0000       16,720.00       16,720.00
 2520      Herlihy Mid-Continent Company                                   38.0000       16,720.00       16,720.00
 3127      Kenny Construction Company                                      28.0000       12,320.00       12,320.00
 3505      Lorig Construction Company                                      28.0000       12,320.00       12,320.00
 3702      Martam Construction Incorporated                                30.5200       13,428.80       13,428.80

    60604400  COMB CC&G TB6.18                           104.000     FOOT
 1552      Dunnet Bay Construction Company                                 37.0000        3,848.00        3,848.00
 2520      Herlihy Mid-Continent Company                                   37.0000        3,848.00        3,848.00
 3127      Kenny Construction Company                                      35.0000        3,640.00        3,640.00
 3505      Lorig Construction Company                                      35.0000        3,640.00        3,640.00
 3702      Martam Construction Incorporated                                38.1500        3,967.60        3,967.60

    60618320  CONC MEDIAN SURF 6                         517.000    SQ FT
 1552      Dunnet Bay Construction Company                                  6.5000        3,360.50        3,360.50
 2520      Herlihy Mid-Continent Company                                    6.5000        3,360.50        3,360.50
 3127      Kenny Construction Company                                       6.5000        3,360.50        3,360.50
 3505      Lorig Construction Company                                       6.5000        3,360.50        3,360.50
 3702      Martam Construction Incorporated                                 7.0900        3,665.53        3,665.53

    63000001  SPBGR TY A  6FT POSTS                      200.000     FOOT
 1552      Dunnet Bay Construction Company                                 34.0000        6,800.00        6,800.00
 2520      Herlihy Mid-Continent Company                                   25.0000        5,000.00        5,000.00
 3127      Kenny Construction Company                                      25.0000        5,000.00        5,000.00
 3505      Lorig Construction Company                                      25.0000        5,000.00        5,000.00
 3702      Martam Construction Incorporated                                27.2500        5,450.00        5,450.00

    63100045  TRAF BAR TERM T2                             6.000     EACH
 1552      Dunnet Bay Construction Company                              1,950.0000       11,700.00       11,700.00
 2520      Herlihy Mid-Continent Company                                1,146.6800        6,880.08        6,880.08
 3127      Kenny Construction Company                                   1,200.0000        7,200.00        7,200.00
 3505      Lorig Construction Company                                   1,200.0000        7,200.00        7,200.00
 3702      Martam Construction Incorporated                             1,249.8800        7,499.28        7,499.28

    63100167  TR BAR TRM T1 SPL TAN                        2.000     EACH
 1552      Dunnet Bay Construction Company                              3,750.0000        7,500.00        7,500.00
 2520      Herlihy Mid-Continent Company                                2,913.1900        5,826.38        5,826.38
 3127      Kenny Construction Company                                   3,000.0000        6,000.00        6,000.00
 3505      Lorig Construction Company                                   3,000.0000        6,000.00        6,000.00
 3702      Martam Construction Incorporated                             3,175.3800        6,350.76        6,350.76

    63200310  GUARDRAIL REMOV                            497.000     FOOT
 1552      Dunnet Bay Construction Company                                  7.0000        3,479.00        3,479.00
 2520      Herlihy Mid-Continent Company                                    6.6700        3,314.99        3,314.99
 3127      Kenny Construction Company                                       6.0000        2,982.00        2,982.00
 3505      Lorig Construction Company                                       6.7500        3,354.75        3,354.75
 3702      Martam Construction Incorporated                                 7.2700        3,613.19        3,613.19

    64300240  IMP ATTEN FRD NAR TL2                        4.000     EACH
 1552      Dunnet Bay Construction Company                              9,950.0000       39,800.00       39,800.00
 2520      Herlihy Mid-Continent Company                                9,924.2900       39,697.16       39,697.16
 3127      Kenny Construction Company                                  12,000.0000       48,000.00       48,000.00
 3505      Lorig Construction Company                                  10,000.0000       40,000.00       40,000.00
 3702      Martam Construction Incorporated                            10,817.4800       43,269.92       43,269.92

    64300260  IMP ATTEN FRD NAR TL3                        1.000     EACH
 1552      Dunnet Bay Construction Company                             19,150.0000       19,150.00       19,150.00
 2520      Herlihy Mid-Continent Company                               18,255.1000       18,255.10       18,255.10
 3127      Kenny Construction Company                                  20,000.0000       20,000.00       20,000.00
 3505      Lorig Construction Company                                  18,500.0000       18,500.00       18,500.00
 3702      Martam Construction Incorporated                            19,898.0600       19,898.06       19,898.06

    66400105  CH LK FENCE   4                             70.000     FOOT
 1552      Dunnet Bay Construction Company                                 55.8200        3,907.40        3,907.40
 2520      Herlihy Mid-Continent Company                                   55.8200        3,907.40        3,907.40
 3127      Kenny Construction Company                                      60.0000        4,200.00        4,200.00
 3505      Lorig Construction Company                                      56.0000        3,920.00        3,920.00
 3702      Martam Construction Incorporated                                60.8400        4,258.80        4,258.80

    66400905  CH LK GATE 4X6  SINGL                        1.000     EACH
 1552      Dunnet Bay Construction Company                              2,185.1500        2,185.15        2,185.15
 2520      Herlihy Mid-Continent Company                                2,185.1500        2,185.15        2,185.15
 3127      Kenny Construction Company                                   1,500.0000        1,500.00        1,500.00
 3505      Lorig Construction Company                                   2,200.0000        2,200.00        2,200.00
 3702      Martam Construction Incorporated                             2,381.8100        2,381.81        2,381.81

    66900200  NON SPL WASTE DISPOSL                      550.000    CU YD
 1552      Dunnet Bay Construction Company                                 56.0000       30,800.00       30,800.00
 2520      Herlihy Mid-Continent Company                                   85.0000       46,750.00       46,750.00
 3127      Kenny Construction Company                                      67.0000       36,850.00       36,850.00
 3505      Lorig Construction Company                                      75.0000       41,250.00       41,250.00
 3702      Martam Construction Incorporated                                89.9300       49,461.50       49,461.50

    66900450  SPL WASTE PLNS/REPORT                        1.000    L SUM
 1552      Dunnet Bay Construction Company                              3,600.0000        3,600.00        3,600.00
 2520      Herlihy Mid-Continent Company                                1,500.0000        1,500.00        1,500.00
 3127      Kenny Construction Company                                   3,500.0000        3,500.00        3,500.00
 3505      Lorig Construction Company                                   4,500.0000        4,500.00        4,500.00
 3702      Martam Construction Incorporated                            10,682.0000       10,682.00       10,682.00

    66900530  SOIL DISPOSAL ANALY                          6.000     EACH
 1552      Dunnet Bay Construction Company                              1,750.0000       10,500.00       10,500.00
 2520      Herlihy Mid-Continent Company                                  900.0000        5,400.00        5,400.00
 3127      Kenny Construction Company                                   1,000.0000        6,000.00        6,000.00
 3505      Lorig Construction Company                                     950.0000        5,700.00        5,700.00
 3702      Martam Construction Incorporated                             1,417.0000        8,502.00        8,502.00

    67100100  MOBILIZATION                                 1.000    L SUM
 1552      Dunnet Bay Construction Company                            664,000.0000      664,000.00      664,000.00
 2520      Herlihy Mid-Continent Company                              657,000.0000      657,000.00      657,000.00
 3127      Kenny Construction Company                                 658,362.8600      658,362.86      658,362.86
 3505      Lorig Construction Company                                 600,000.0000      600,000.00      600,000.00
 3702      Martam Construction Incorporated                           800,000.0000      800,000.00      800,000.00

    70103815  TR CONT SURVEILLANCE                       355.000   CAL DA
 1552      Dunnet Bay Construction Company                                200.0000       71,000.00       71,000.00
 2520      Herlihy Mid-Continent Company                                  200.0000       71,000.00       71,000.00
 3127      Kenny Construction Company                                     200.0000       71,000.00       71,000.00
 3505      Lorig Construction Company                                     200.0000       71,000.00       71,000.00
 3702      Martam Construction Incorporated                               218.0000       77,390.00       77,390.00

    70300100  SHORT TERM PAVT MKING                      663.000     FOOT
 1552      Dunnet Bay Construction Company                                  1.5000          994.50          994.50
 2520      Herlihy Mid-Continent Company                                    0.5600          371.28          371.28
 3127      Kenny Construction Company                                       0.6000          397.80          397.80
 3505      Lorig Construction Company                                       1.2500          828.75          828.75
 3702      Martam Construction Incorporated                                 1.8000        1,193.40        1,193.40

    70300150  SHRT TRM PAVT MK REM                       221.000    SQ FT
 1552      Dunnet Bay Construction Company                                  2.5000          552.50          552.50
 2520      Herlihy Mid-Continent Company                                    0.8200          181.22          181.22
 3127      Kenny Construction Company                                       1.0000          221.00          221.00
 3505      Lorig Construction Company                                       1.2500          276.25          276.25
 3702      Martam Construction Incorporated                                 1.2000          265.20          265.20

    70300210  TEMP PVT MK LTR & SYM                      182.000    SQ FT
 1552      Dunnet Bay Construction Company                                  1.0000          182.00          182.00
 2520      Herlihy Mid-Continent Company                                    1.0000          182.00          182.00
 3127      Kenny Construction Company                                       1.0000          182.00          182.00
 3505      Lorig Construction Company                                       1.0000          182.00          182.00
 3702      Martam Construction Incorporated                                 1.0900          198.38          198.38

    70300220  TEMP PVT MK LINE 4                       4,403.000     FOOT
 1552      Dunnet Bay Construction Company                                  0.3200        1,408.96        1,408.96
 2520      Herlihy Mid-Continent Company                                    0.3200        1,408.96        1,408.96
 3127      Kenny Construction Company                                       0.3200        1,408.96        1,408.96
 3505      Lorig Construction Company                                       0.3200        1,408.96        1,408.96
 3702      Martam Construction Incorporated                                 0.3500        1,541.05        1,541.05

    70300250  TEMP PVT MK LINE 8                         515.000     FOOT
 1552      Dunnet Bay Construction Company                                  1.0000          515.00          515.00
 2520      Herlihy Mid-Continent Company                                    1.0000          515.00          515.00
 3127      Kenny Construction Company                                       1.0000          515.00          515.00
 3505      Lorig Construction Company                                       1.0000          515.00          515.00
 3702      Martam Construction Incorporated                                 1.0900          561.35          561.35

    70300260  TEMP PVT MK LINE 12                         80.000     FOOT
 1552      Dunnet Bay Construction Company                                  2.0000          160.00          160.00
 2520      Herlihy Mid-Continent Company                                    2.0000          160.00          160.00
 3127      Kenny Construction Company                                       2.0000          160.00          160.00
 3505      Lorig Construction Company                                       2.0000          160.00          160.00
 3702      Martam Construction Incorporated                                 2.1800          174.40          174.40

    70300280  TEMP PVT MK LINE 24                         54.000     FOOT
 1552      Dunnet Bay Construction Company                                  3.0000          162.00          162.00
 2520      Herlihy Mid-Continent Company                                    3.0000          162.00          162.00
 3127      Kenny Construction Company                                       3.0000          162.00          162.00
 3505      Lorig Construction Company                                       3.0000          162.00          162.00
 3702      Martam Construction Incorporated                                 3.2700          176.58          176.58

    70300900  PAVT MARK TAPE T4 L&S                       36.000    SQ FT
 1552      Dunnet Bay Construction Company                                  3.0000          108.00          108.00
 2520      Herlihy Mid-Continent Company                                    3.0000          108.00          108.00
 3127      Kenny Construction Company                                       3.0000          108.00          108.00
 3505      Lorig Construction Company                                       3.0000          108.00          108.00
 3702      Martam Construction Incorporated                                 3.2700          117.72          117.72

    70300904  PAVT MARK TAPE T4   4                      119.000     FOOT
 1552      Dunnet Bay Construction Company                                  2.5000          297.50          297.50
 2520      Herlihy Mid-Continent Company                                    2.5000          297.50          297.50
 3127      Kenny Construction Company                                       2.5000          297.50          297.50
 3505      Lorig Construction Company                                       2.5000          297.50          297.50
 3702      Martam Construction Incorporated                                 2.7300          324.87          324.87

    70300906  PAVT MARK TAPE T4   6                      135.000     FOOT
 1552      Dunnet Bay Construction Company                                  3.0000          405.00          405.00
 2520      Herlihy Mid-Continent Company                                    3.0000          405.00          405.00
 3127      Kenny Construction Company                                       3.0000          405.00          405.00
 3505      Lorig Construction Company                                       3.0000          405.00          405.00
 3702      Martam Construction Incorporated                                 3.2700          441.45          441.45

    70300908  PAVT MARK TAPE T4   8                      314.000     FOOT
 1552      Dunnet Bay Construction Company                                  3.1000          973.40          973.40
 2520      Herlihy Mid-Continent Company                                    3.1000          973.40          973.40
 3127      Kenny Construction Company                                       3.1000          973.40          973.40
 3505      Lorig Construction Company                                       3.1000          973.40          973.40
 3702      Martam Construction Incorporated                                 3.3800        1,061.32        1,061.32

    70300912  PAVT MARK TAPE T4  12                       81.000     FOOT
 1552      Dunnet Bay Construction Company                                  3.8000          307.80          307.80
 2520      Herlihy Mid-Continent Company                                    3.8000          307.80          307.80
 3127      Kenny Construction Company                                       3.8000          307.80          307.80
 3505      Lorig Construction Company                                       3.8000          307.80          307.80
 3702      Martam Construction Incorporated                                 4.1400          335.34          335.34

    70400100  TEMP CONC BARRIER                        4,488.000     FOOT
 1552      Dunnet Bay Construction Company                                 20.0000       89,760.00       89,760.00
 2520      Herlihy Mid-Continent Company                                   20.4000       91,555.20       91,555.20
 3127      Kenny Construction Company                                      32.1400      144,244.32      144,244.32
 3505      Lorig Construction Company                                      17.0000       76,296.00       76,296.00
 3702      Martam Construction Incorporated                                19.6200       88,054.56       88,054.56

    70600240  IMP ATTN TEMP NRD TL2                        2.000     EACH
 1552      Dunnet Bay Construction Company                              3,200.0000        6,400.00        6,400.00
 2520      Herlihy Mid-Continent Company                                3,200.0000        6,400.00        6,400.00
 3127      Kenny Construction Company                                   7,400.0000       14,800.00       14,800.00
 3505      Lorig Construction Company                                   3,200.0000        6,400.00        6,400.00
 3702      Martam Construction Incorporated                             3,488.0000        6,976.00        6,976.00

    70600250  IMP ATTN TEMP NRD TL3                        1.000     EACH
 1552      Dunnet Bay Construction Company                              4,000.0000        4,000.00        4,000.00
 2520      Herlihy Mid-Continent Company                                4,000.0000        4,000.00        4,000.00
 3127      Kenny Construction Company                                   3,100.0000        3,100.00        3,100.00
 3505      Lorig Construction Company                                   4,000.0000        4,000.00        4,000.00
 3702      Martam Construction Incorporated                             4,360.0000        4,360.00        4,360.00

    70600255  IMP ATTN TEMP FRN TL2                        2.000     EACH
 1552      Dunnet Bay Construction Company                              7,813.9800       15,627.96       15,627.96
 2520      Herlihy Mid-Continent Company                                7,813.9800       15,627.96       15,627.96
 3127      Kenny Construction Company                                   6,200.0000       12,400.00       12,400.00
 3505      Lorig Construction Company                                   8,000.0000       16,000.00       16,000.00
 3702      Martam Construction Incorporated                             8,517.2400       17,034.48       17,034.48

    72000100  SIGN PANEL T1                              114.000    SQ FT
 1552      Dunnet Bay Construction Company                                 22.0000        2,508.00        2,508.00
 2520      Herlihy Mid-Continent Company                                   22.0000        2,508.00        2,508.00
 3127      Kenny Construction Company                                      20.0000        2,280.00        2,280.00
 3505      Lorig Construction Company                                      22.0000        2,508.00        2,508.00
 3702      Martam Construction Incorporated                                23.9800        2,733.72        2,733.72

    72400310  REMOV SIGN PANEL T1                        136.000    SQ FT
 1552      Dunnet Bay Construction Company                                 10.0000        1,360.00        1,360.00
 2520      Herlihy Mid-Continent Company                                   10.0000        1,360.00        1,360.00
 3127      Kenny Construction Company                                      10.0000        1,360.00        1,360.00
 3505      Lorig Construction Company                                      10.0000        1,360.00        1,360.00
 3702      Martam Construction Incorporated                                10.9000        1,482.40        1,482.40

    72400710  RELOC SIGN PANEL T1                          9.000    SQ FT
 1552      Dunnet Bay Construction Company                                 35.0000          315.00          315.00
 2520      Herlihy Mid-Continent Company                                   35.0000          315.00          315.00
 3127      Kenny Construction Company                                      19.0000          171.00          171.00
 3505      Lorig Construction Company                                      35.0000          315.00          315.00
 3702      Martam Construction Incorporated                                38.1500          343.35          343.35

    72800100  TELES STL SIN SUPPORT                       85.000     FOOT
 1552      Dunnet Bay Construction Company                                 14.0000        1,190.00        1,190.00
 2520      Herlihy Mid-Continent Company                                   14.0000        1,190.00        1,190.00
 3127      Kenny Construction Company                                      11.0000          935.00          935.00
 3505      Lorig Construction Company                                      14.0000        1,190.00        1,190.00
 3702      Martam Construction Incorporated                                15.2600        1,297.10        1,297.10

    73700100  REM GR MT SIN SUPPORT                       16.000     EACH
 1552      Dunnet Bay Construction Company                                150.0000        2,400.00        2,400.00
 2520      Herlihy Mid-Continent Company                                   91.8000        1,468.80        1,468.80
 3127      Kenny Construction Company                                      97.0000        1,552.00        1,552.00
 3505      Lorig Construction Company                                     600.0000        9,600.00        9,600.00
 3702      Martam Construction Incorporated                               100.0600        1,600.96        1,600.96

    78000100  THPL PVT MK LTR & SYM                      411.000    SQ FT
 1552      Dunnet Bay Construction Company                                  5.0000        2,055.00        2,055.00
 2520      Herlihy Mid-Continent Company                                    3.9500        1,623.45        1,623.45
 3127      Kenny Construction Company                                       3.9500        1,623.45        1,623.45
 3505      Lorig Construction Company                                       4.0000        1,644.00        1,644.00
 3702      Martam Construction Incorporated                                 3.9800        1,635.78        1,635.78

    78000200  THPL PVT MK LINE  4                     11,694.000     FOOT
 1552      Dunnet Bay Construction Company                                  0.5500        6,431.70        6,431.70
 2520      Herlihy Mid-Continent Company                                    0.6900        8,068.86        8,068.86
 3127      Kenny Construction Company                                       0.6900        8,068.86        8,068.86
 3505      Lorig Construction Company                                       0.7000        8,185.80        8,185.80
 3702      Martam Construction Incorporated                                 1.1200       13,097.28       13,097.28

    78000400  THPL PVT MK LINE  6                      1,070.000     FOOT
 1552      Dunnet Bay Construction Company                                  1.0000        1,070.00        1,070.00
 2520      Herlihy Mid-Continent Company                                    1.1800        1,262.60        1,262.60
 3127      Kenny Construction Company                                       1.1800        1,262.60        1,262.60
 3505      Lorig Construction Company                                       1.2000        1,284.00        1,284.00
 3702      Martam Construction Incorporated                                 1.8200        1,947.40        1,947.40

    78000600  THPL PVT MK LINE 12                        259.000     FOOT
 1552      Dunnet Bay Construction Company                                  2.5000          647.50          647.50
 2520      Herlihy Mid-Continent Company                                    1.9500          505.05          505.05
 3127      Kenny Construction Company                                       1.9500          505.05          505.05
 3505      Lorig Construction Company                                       2.0000          518.00          518.00
 3702      Martam Construction Incorporated                                 3.6400          942.76          942.76

    78000650  THPL PVT MK LINE 24                      1,853.000     FOOT
 1552      Dunnet Bay Construction Company                                  5.0000        9,265.00        9,265.00
 2520      Herlihy Mid-Continent Company                                    3.9500        7,319.35        7,319.35
 3127      Kenny Construction Company                                       3.9500        7,319.35        7,319.35
 3505      Lorig Construction Company                                       4.0000        7,412.00        7,412.00
 3702      Martam Construction Incorporated                                 7.2800       13,489.84       13,489.84

    78100100  RAISED REFL PAVT MKR                       907.000     EACH
 1552      Dunnet Bay Construction Company                                 29.0000       26,303.00       26,303.00
 2520      Herlihy Mid-Continent Company                                   30.0000       27,210.00       27,210.00
 3127      Kenny Construction Company                                      30.0000       27,210.00       27,210.00
 3505      Lorig Construction Company                                      30.0000       27,210.00       27,210.00
 3702      Martam Construction Incorporated                                39.5700       35,889.99       35,889.99

    78200005  GRDRAIL REF TYPE A                          12.000     EACH
 1552      Dunnet Bay Construction Company                                  8.7000          104.40          104.40
 2520      Herlihy Mid-Continent Company                                    8.7000          104.40          104.40
 3127      Kenny Construction Company                                       8.0000           96.00           96.00
 3505      Lorig Construction Company                                       8.7000          104.40          104.40
 3702      Martam Construction Incorporated                                 9.4800          113.76          113.76

    78200011  BARR WALL REF TYPE C                       482.000     EACH
 1552      Dunnet Bay Construction Company                                  6.0000        2,892.00        2,892.00
 2520      Herlihy Mid-Continent Company                                    6.0000        2,892.00        2,892.00
 3127      Kenny Construction Company                                       7.5000        3,615.00        3,615.00
 3505      Lorig Construction Company                                       6.0000        2,892.00        2,892.00
 3702      Martam Construction Incorporated                                 6.5400        3,152.28        3,152.28

    78300200  RAISED REF PVT MK REM                      483.000     EACH
 1552      Dunnet Bay Construction Company                                 12.0000        5,796.00        5,796.00
 2520      Herlihy Mid-Continent Company                                   26.7300       12,910.59       12,910.59
 3127      Kenny Construction Company                                      10.0000        4,830.00        4,830.00
 3505      Lorig Construction Company                                       7.5000        3,622.50        3,622.50
 3702      Martam Construction Incorporated                                29.1400       14,074.62       14,074.62

    81028200  UNDRGRD C GALVS     2                      225.000     FOOT
 1552      Dunnet Bay Construction Company                                 34.4000        7,740.00        7,740.00
 2520      Herlihy Mid-Continent Company                                   34.4000        7,740.00        7,740.00
 3127      Kenny Construction Company                                      34.4000        7,740.00        7,740.00
 3505      Lorig Construction Company                                      35.0000        7,875.00        7,875.00
 3702      Martam Construction Incorporated                                37.5000        8,437.50        8,437.50

    81400100  HANDHOLE                                     1.000     EACH
 1552      Dunnet Bay Construction Company                              1,895.0000        1,895.00        1,895.00
 2520      Herlihy Mid-Continent Company                                1,895.0000        1,895.00        1,895.00
 3127      Kenny Construction Company                                   1,895.0000        1,895.00        1,895.00
 3505      Lorig Construction Company                                   1,900.0000        1,900.00        1,900.00
 3702      Martam Construction Incorporated                             2,065.5500        2,065.55        2,065.55

    81400200  HD HANDHOLE                                  1.000     EACH
 1552      Dunnet Bay Construction Company                              3,503.0000        3,503.00        3,503.00
 2520      Herlihy Mid-Continent Company                                3,503.0000        3,503.00        3,503.00
 3127      Kenny Construction Company                                   3,503.0000        3,503.00        3,503.00
 3505      Lorig Construction Company                                   3,600.0000        3,600.00        3,600.00
 3702      Martam Construction Incorporated                             3,818.2700        3,818.27        3,818.27

    85000200  MAIN EX TR SIG INSTAL                        5.000     EACH
 1552      Dunnet Bay Construction Company                                880.0000        4,400.00        4,400.00
 2520      Herlihy Mid-Continent Company                                  880.0000        4,400.00        4,400.00
 3127      Kenny Construction Company                                     880.0000        4,400.00        4,400.00
 3505      Lorig Construction Company                                     880.0000        4,400.00        4,400.00
 3702      Martam Construction Incorporated                               959.2000        4,796.00        4,796.00

    88600100  DET LOOP T1                                423.000     FOOT
 1552      Dunnet Bay Construction Company                                 16.5000        6,979.50        6,979.50
 2520      Herlihy Mid-Continent Company                                   16.5000        6,979.50        6,979.50
 3127      Kenny Construction Company                                      16.5000        6,979.50        6,979.50
 3505      Lorig Construction Company                                      16.5000        6,979.50        6,979.50
 3702      Martam Construction Incorporated                                17.9900        7,609.77        7,609.77

    89000100  TEMP TR SIG INSTALL                          1.000     EACH
 1552      Dunnet Bay Construction Company                             33,250.0000       33,250.00       33,250.00
 2520      Herlihy Mid-Continent Company                               33,250.0000       33,250.00       33,250.00
 3127      Kenny Construction Company                                  33,250.0000       33,250.00       33,250.00
 3505      Lorig Construction Company                                  33,600.0000       33,600.00       33,600.00
 3702      Martam Construction Incorporated                            36,242.5000       36,242.50       36,242.50