                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 02/28/23  13:37:29                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 01/20/2023  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 97785  LETTING ITEM NUMBER: 137
 RESPONSIBLE DISTRICT: 08                                                                                  BIDS LOCKED: Y
 SECTION: 17-00110-00-RS                           COUNTY: MADISON                                         ESTIMATE:
 STATE JOB NUMBER:   C-98-012-21                   MUNICIPALITY: EDWARDSVILLE
 PROJECT NUMBER: 3FR5-267 /   /
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 3108  Keller Construction, Inc.
                          NO ALT                            1,656,607.00     1,656,607.00   1,656,607.00

 5802  Stutz Excavating, Inc.
                          NO ALT                            1,291,558.35 *   1,291,558.35   1,291,558.35    *

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =      87
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    X0323389  STORM SEW CONNECTION                         5.000     EACH
 3108      Keller Construction, Inc.                                      277.0000        1,385.00        1,385.00
 5802      Stutz Excavating, Inc.                                         250.0000        1,250.00        1,250.00

    X1200108  INLET BOX SPL                                3.000     EACH
 3108      Keller Construction, Inc.                                    2,900.0000        8,700.00        8,700.00
 5802      Stutz Excavating, Inc.                                       2,345.0000        7,035.00        7,035.00

    X1500004  BIT SURF TREATMNT A1                        47.000    SQ YD
 3108      Keller Construction, Inc.                                       42.5500        1,999.85        1,999.85
 5802      Stutz Excavating, Inc.                                          60.0000        2,820.00        2,820.00

    X1700128  STAMPED CLRDPCCPVT8J                       229.000    SQ YD
 3108      Keller Construction, Inc.                                      362.0000       82,898.00       82,898.00
 5802      Stutz Excavating, Inc.                                         175.0000       40,075.00       40,075.00

    X2600012  REM & REL SN P&P ASSY                        5.000     EACH
 3108      Keller Construction, Inc.                                      500.0000        2,500.00        2,500.00
 5802      Stutz Excavating, Inc.                                         250.0000        1,250.00        1,250.00

    X4401198  HMA SURF REM VAR DP                      4,075.000    SQ YD
 3108      Keller Construction, Inc.                                        6.1100       24,898.25       24,898.25
 5802      Stutz Excavating, Inc.                                           7.2000       29,340.00       29,340.00

    X6010302  TRENCH DRAIN                                35.000     FOOT
 3108      Keller Construction, Inc.                                      712.0000       24,920.00       24,920.00
 5802      Stutz Excavating, Inc.                                         545.0000       19,075.00       19,075.00

    X6026634  METER VAULTS ADJ                             7.000     EACH
 3108      Keller Construction, Inc.                                      776.7500        5,437.25        5,437.25
 5802      Stutz Excavating, Inc.                                         250.0000        1,750.00        1,750.00

    X6061005  CONC CURB TB SPL                         2,969.000     FOOT
 3108      Keller Construction, Inc.                                       46.4500      137,910.05      137,910.05
 5802      Stutz Excavating, Inc.                                          38.0000      112,822.00      112,822.00

    X7010216  TRAF CONT & PROT SPL                         1.000    L SUM
 3108      Keller Construction, Inc.                                   58,550.0000       58,550.00       58,550.00
 5802      Stutz Excavating, Inc.                                       9,750.0000        9,750.00        9,750.00

    X7240300  SIGN REMOVAL                                30.000     EACH
 3108      Keller Construction, Inc.                                      266.0000        7,980.00        7,980.00
 5802      Stutz Excavating, Inc.                                         155.0000        4,650.00        4,650.00

    Z0013798  CONSTRUCTION LAYOUT                          1.000    L SUM
 3108      Keller Construction, Inc.                                   15,454.0000       15,454.00       15,454.00
 5802      Stutz Excavating, Inc.                                      13,000.0000       13,000.00       13,000.00

    Z0056668  SS 2 WAT MN   12                           152.000     FOOT
 3108      Keller Construction, Inc.                                      127.5000       19,380.00       19,380.00
 5802      Stutz Excavating, Inc.                                         121.0000       18,392.00       18,392.00

    Z0056669  SS 2 WAT MN   15                            52.000     FOOT
 3108      Keller Construction, Inc.                                      244.5000       12,714.00       12,714.00
 5802      Stutz Excavating, Inc.                                         232.0000       12,064.00       12,064.00

    Z0076600  TRAINEES                                   500.000     HOUR
 3108      Keller Construction, Inc.                                        0.8000          400.00          400.00
 5802      Stutz Excavating, Inc.                                           0.8000          400.00          400.00

    Z0076604  TRAINEES TPG                               500.000     HOUR
 3108      Keller Construction, Inc.                                       15.0000        7,500.00        7,500.00
 5802      Stutz Excavating, Inc.                                          15.0000        7,500.00        7,500.00

    20100110  TREE REMOV 6-15                             14.000     UNIT
 3108      Keller Construction, Inc.                                      258.0000        3,612.00        3,612.00
 5802      Stutz Excavating, Inc.                                          56.0000          784.00          784.00

    20200100  EARTH EXCAVATION                           520.000    CU YD
 3108      Keller Construction, Inc.                                      266.1500      138,398.00      138,398.00
 5802      Stutz Excavating, Inc.                                         135.0000       70,200.00       70,200.00

    20800150  TRENCH BACKFILL                            358.000    CU YD
 3108      Keller Construction, Inc.                                       63.3000       22,661.40       22,661.40
 5802      Stutz Excavating, Inc.                                          43.5000       15,573.00       15,573.00

    21101610  TOPSOIL F & P  3                         1,237.000    SQ YD
 3108      Keller Construction, Inc.                                        9.3000       11,504.10       11,504.10
 5802      Stutz Excavating, Inc.                                          10.0000       12,370.00       12,370.00

    25000400  NITROGEN FERT NUTR                          23.000    POUND
 3108      Keller Construction, Inc.                                       13.5000          310.50          310.50
 5802      Stutz Excavating, Inc.                                          14.4500          332.35          332.35

    25000500  PHOSPHORUS FERT NUTR                        23.000    POUND
 3108      Keller Construction, Inc.                                       13.5000          310.50          310.50
 5802      Stutz Excavating, Inc.                                          14.4500          332.35          332.35

    25000600  POTASSIUM FERT NUTR                         23.000    POUND
 3108      Keller Construction, Inc.                                       13.5000          310.50          310.50
 5802      Stutz Excavating, Inc.                                          14.4500          332.35          332.35

    25200100  SODDING                                  1,237.000    SQ YD
 3108      Keller Construction, Inc.                                       18.5500       22,946.35       22,946.35
 5802      Stutz Excavating, Inc.                                          19.8500       24,554.45       24,554.45

    25200200  SUPPLE WATERING                             55.000     UNIT
 3108      Keller Construction, Inc.                                      375.0000       20,625.00       20,625.00
 5802      Stutz Excavating, Inc.                                         400.0000       22,000.00       22,000.00

    28000250  TEMP EROS CONTR SEED                        25.000    POUND
 3108      Keller Construction, Inc.                                        5.0000          125.00          125.00
 5802      Stutz Excavating, Inc.                                           6.0000          150.00          150.00

    28000500  INLET & PIPE PROTECT                        18.000     EACH
 3108      Keller Construction, Inc.                                      197.0000        3,546.00        3,546.00
 5802      Stutz Excavating, Inc.                                          75.0000        1,350.00        1,350.00

    31100100  SUB GRAN MAT A                             701.000      TON
 3108      Keller Construction, Inc.                                       74.5500       52,259.55       52,259.55
 5802      Stutz Excavating, Inc.                                          40.3000       28,250.30       28,250.30

    35100300  AGG BASE CSE A  4                          518.000    SQ YD
 3108      Keller Construction, Inc.                                       40.2500       20,849.50       20,849.50
 5802      Stutz Excavating, Inc.                                          21.0000       10,878.00       10,878.00

    40201000  AGGREGATE-TEMP ACCESS                      121.000      TON
 3108      Keller Construction, Inc.                                      114.2000       13,818.20       13,818.20
 5802      Stutz Excavating, Inc.                                          45.0000        5,445.00        5,445.00

    40600275  BIT MATLS PR CT                          2,862.000    POUND
 3108      Keller Construction, Inc.                                        2.6200        7,498.44        7,498.44
 5802      Stutz Excavating, Inc.                                           1.3000        3,720.60        3,720.60

    40600290  BIT MATLS TACK CT                        3,017.000    POUND
 3108      Keller Construction, Inc.                                        2.6200        7,904.54        7,904.54
 5802      Stutz Excavating, Inc.                                           1.5000        4,525.50        4,525.50

    40600370  LONG JOINT SEALANT                       1,874.000     FOOT
 3108      Keller Construction, Inc.                                        5.7700       10,812.98       10,812.98
 5802      Stutz Excavating, Inc.                                           6.3500       11,899.90       11,899.90

    40600982  HMA SURF REM BUTT JT                        67.000    SQ YD
 3108      Keller Construction, Inc.                                        6.1100          409.37          409.37
 5802      Stutz Excavating, Inc.                                          14.7000          984.90          984.90

    40600990  TEMPORARY RAMP                             164.000    SQ YD
 3108      Keller Construction, Inc.                                        0.0100            1.64            1.64
 5802      Stutz Excavating, Inc.                                          27.0000        4,428.00        4,428.00

    40602970  HMA BC IL-9.5FG N70                          6.000      TON
 3108      Keller Construction, Inc.                                      421.0500        2,526.30        2,526.30
 5802      Stutz Excavating, Inc.                                         590.0000        3,540.00        3,540.00

    40603085  HMA BC IL-19.0  N70                        408.000      TON
 3108      Keller Construction, Inc.                                      144.1800       58,825.44       58,825.44
 5802      Stutz Excavating, Inc.                                         150.0000       61,200.00       61,200.00

    40604052  HMA SC IL-9.5 C N70                        938.000      TON
 3108      Keller Construction, Inc.                                      144.1800      135,240.84      135,240.84
 5802      Stutz Excavating, Inc.                                         155.0000      145,390.00      145,390.00

    42001300  PROTECTIVE COAT                            229.000    SQ YD
 3108      Keller Construction, Inc.                                        0.0100            2.29            2.29
 5802      Stutz Excavating, Inc.                                           3.0000          687.00          687.00

    42300200  PCC DRIVEWAY PAVT  6                       518.000    SQ YD
 3108      Keller Construction, Inc.                                       97.8500       50,686.30       50,686.30
 5802      Stutz Excavating, Inc.                                         122.0000       63,196.00       63,196.00

    42400100  PC CONC SIDEWALK 4                      14,974.000    SQ FT
 3108      Keller Construction, Inc.                                        7.5500      113,053.70      113,053.70
 5802      Stutz Excavating, Inc.                                           9.1000      136,263.40      136,263.40

    42400800  DETECTABLE WARNINGS                        255.000    SQ FT
 3108      Keller Construction, Inc.                                       77.4500       19,749.75       19,749.75
 5802      Stutz Excavating, Inc.                                          32.0000        8,160.00        8,160.00

    44000100  PAVEMENT REM                             1,557.000    SQ YD
 3108      Keller Construction, Inc.                                       25.1500       39,158.55       39,158.55
 5802      Stutz Excavating, Inc.                                          16.1500       25,145.55       25,145.55

    44000155  HMA SURF REM    1 1/2                    1,505.000    SQ YD
 3108      Keller Construction, Inc.                                        6.1100        9,195.55        9,195.55
 5802      Stutz Excavating, Inc.                                           3.0000        4,515.00        4,515.00

    44000200  DRIVE PAVEMENT REM                         240.000    SQ YD
 3108      Keller Construction, Inc.                                       15.9000        3,816.00        3,816.00
 5802      Stutz Excavating, Inc.                                          23.6000        5,664.00        5,664.00

    44000300  CURB REM                                 3,147.000     FOOT
 3108      Keller Construction, Inc.                                        5.5000       17,308.50       17,308.50
 5802      Stutz Excavating, Inc.                                          13.2000       41,540.40       41,540.40

    44000500  COMB CURB GUTTER REM                       488.000     FOOT
 3108      Keller Construction, Inc.                                       14.1000        6,880.80        6,880.80
 5802      Stutz Excavating, Inc.                                          18.0000        8,784.00        8,784.00

    44000600  SIDEWALK REM                            13,310.000    SQ FT
 3108      Keller Construction, Inc.                                        1.2500       16,637.50       16,637.50
 5802      Stutz Excavating, Inc.                                           1.5000       19,965.00       19,965.00

    44201749  CL D PATCH T1  9                            75.000    SQ YD
 3108      Keller Construction, Inc.                                      138.9200       10,419.00       10,419.00
 5802      Stutz Excavating, Inc.                                         180.0000       13,500.00       13,500.00

    44201753  CL D PATCH T2  9                            75.000    SQ YD
 3108      Keller Construction, Inc.                                      138.9200       10,419.00       10,419.00
 5802      Stutz Excavating, Inc.                                         155.0000       11,625.00       11,625.00

    44201757  CL D PATCH T3  9                            75.000    SQ YD
 3108      Keller Construction, Inc.                                      138.9200       10,419.00       10,419.00
 5802      Stutz Excavating, Inc.                                         140.0000       10,500.00       10,500.00

    44201759  CL D PATCH T4  9                            75.000    SQ YD
 3108      Keller Construction, Inc.                                      138.9200       10,419.00       10,419.00
 5802      Stutz Excavating, Inc.                                         120.0000        9,000.00        9,000.00

    54216185  R C PIPE TEE 15P 12R                         1.000     EACH
 3108      Keller Construction, Inc.                                    2,600.0000        2,600.00        2,600.00
 5802      Stutz Excavating, Inc.                                       1,800.0000        1,800.00        1,800.00

    54248510  CONCRETE COLLAR                              1.200    CU YD
 3108      Keller Construction, Inc.                                    4,900.0000        5,880.00        5,880.00
 5802      Stutz Excavating, Inc.                                       1,125.0000        1,350.00        1,350.00

    550A0340  STORM SEW CL A 2  12                       116.000     FOOT
 3108      Keller Construction, Inc.                                      110.0000       12,760.00       12,760.00
 5802      Stutz Excavating, Inc.                                         101.0000       11,716.00       11,716.00

    550A0380  STORM SEW CL A 2  18                         5.000     FOOT
 3108      Keller Construction, Inc.                                      240.5000        1,202.50        1,202.50
 5802      Stutz Excavating, Inc.                                         247.5000        1,237.50        1,237.50

    55100500  STORM SEWER REM  12                        161.000     FOOT
 3108      Keller Construction, Inc.                                       38.2500        6,158.25        6,158.25
 5802      Stutz Excavating, Inc.                                          29.7500        4,789.75        4,789.75

    55100700  STORM SEWER REM  15                         52.000     FOOT
 3108      Keller Construction, Inc.                                       41.4000        2,152.80        2,152.80
 5802      Stutz Excavating, Inc.                                          45.2500        2,353.00        2,353.00

    55100900  STORM SEWER REM  18                          2.000     FOOT
 3108      Keller Construction, Inc.                                      171.2000          342.40          342.40
 5802      Stutz Excavating, Inc.                                          65.0000          130.00          130.00

    60218400  MAN TA 4 DIA T1F CL                          1.000     EACH
 3108      Keller Construction, Inc.                                    3,012.0000        3,012.00        3,012.00
 5802      Stutz Excavating, Inc.                                       2,920.0000        2,920.00        2,920.00

    60218500  MAN TA 4 DIA T3F&G                           2.000     EACH
 3108      Keller Construction, Inc.                                    3,012.0000        6,024.00        6,024.00
 5802      Stutz Excavating, Inc.                                       2,920.0000        5,840.00        5,840.00

    60224030  MAN TA 6 DIA T15F&L                          1.000     EACH
 3108      Keller Construction, Inc.                                    4,670.0000        4,670.00        4,670.00
 5802      Stutz Excavating, Inc.                                       4,650.0000        4,650.00        4,650.00

    60235700  INLETS TA T3F&G                              1.000     EACH
 3108      Keller Construction, Inc.                                    2,054.0000        2,054.00        2,054.00
 5802      Stutz Excavating, Inc.                                       1,955.0000        1,955.00        1,955.00

    60237000  INLETS TA T15F&L                             4.000     EACH
 3108      Keller Construction, Inc.                                    2,054.0000        8,216.00        8,216.00
 5802      Stutz Excavating, Inc.                                       1,915.0000        7,660.00        7,660.00

    60237470  INLETS TA T24F&G                             1.000     EACH
 3108      Keller Construction, Inc.                                    2,054.0000        2,054.00        2,054.00
 5802      Stutz Excavating, Inc.                                       1,955.0000        1,955.00        1,955.00

    60240210  INLETS TB T1F OL                             1.000     EACH
 3108      Keller Construction, Inc.                                    2,392.0000        2,392.00        2,392.00
 5802      Stutz Excavating, Inc.                                       2,420.0000        2,420.00        2,420.00

    60240215  INLETS TB T1F CL                             1.000     EACH
 3108      Keller Construction, Inc.                                    2,392.0000        2,392.00        2,392.00
 5802      Stutz Excavating, Inc.                                       2,095.0000        2,095.00        2,095.00

    60240320  INLETS TB T15F&L                             1.000     EACH
 3108      Keller Construction, Inc.                                    2,392.0000        2,392.00        2,392.00
 5802      Stutz Excavating, Inc.                                       2,420.0000        2,420.00        2,420.00

    60255500  MAN ADJUST                                   4.000     EACH
 3108      Keller Construction, Inc.                                    2,168.0000        8,672.00        8,672.00
 5802      Stutz Excavating, Inc.                                         400.0000        1,600.00        1,600.00

    60265700  VV ADJUST                                   21.000     EACH
 3108      Keller Construction, Inc.                                    1,275.5000       26,785.50       26,785.50
 5802      Stutz Excavating, Inc.                                         285.0000        5,985.00        5,985.00

    60500040  REMOV MANHOLES                               1.000     EACH
 3108      Keller Construction, Inc.                                      614.0000          614.00          614.00
 5802      Stutz Excavating, Inc.                                         250.0000          250.00          250.00

    60500060  REMOV INLETS                                 9.000     EACH
 3108      Keller Construction, Inc.                                      410.0000        3,690.00        3,690.00
 5802      Stutz Excavating, Inc.                                         175.0000        1,575.00        1,575.00

    60600605  CONC CURB TB                               740.000     FOOT
 3108      Keller Construction, Inc.                                       54.5000       40,330.00       40,330.00
 5802      Stutz Excavating, Inc.                                          59.4000       43,956.00       43,956.00

    60605000  COMB CC&G TB6.24                           256.000     FOOT
 3108      Keller Construction, Inc.                                       63.0500       16,140.80       16,140.80
 5802      Stutz Excavating, Inc.                                          83.5000       21,376.00       21,376.00

    67100100  MOBILIZATION                                 1.000    L SUM
 3108      Keller Construction, Inc.                                  188,242.0000      188,242.00      188,242.00
 5802      Stutz Excavating, Inc.                                      50,000.0000       50,000.00       50,000.00

    70300100  SHORT TERM PAVT MKING                      212.000     FOOT
 3108      Keller Construction, Inc.                                        5.0000        1,060.00        1,060.00
 5802      Stutz Excavating, Inc.                                           4.0000          848.00          848.00

    70300150  SHRT TRM PAVT MK REM                        73.000    SQ FT
 3108      Keller Construction, Inc.                                        7.1500          521.95          521.95
 5802      Stutz Excavating, Inc.                                           8.0000          584.00          584.00

    70300221  TEMP PVT MK LINE 4 - PAINT               4,567.000     FOOT
 3108      Keller Construction, Inc.                                        0.0100           45.67           45.67
 5802      Stutz Excavating, Inc.                                           0.5000        2,283.50        2,283.50

    70300261  TEMP PVT MK LINE 12 - PAINT                688.000     FOOT
 3108      Keller Construction, Inc.                                        0.0100            6.88            6.88
 5802      Stutz Excavating, Inc.                                           8.8000        6,054.40        6,054.40

    70300281  TEMP PVT MK LINE 24 - PAINT                110.000     FOOT
 3108      Keller Construction, Inc.                                        0.0100            1.10            1.10
 5802      Stutz Excavating, Inc.                                          16.5000        1,815.00        1,815.00

    72000100  SIGN PANEL T1                              105.000    SQ FT
 3108      Keller Construction, Inc.                                       66.0500        6,935.25        6,935.25
 5802      Stutz Excavating, Inc.                                          41.3000        4,336.50        4,336.50

    72400100  REMOV SIN PAN ASSY TA                        8.000     EACH
 3108      Keller Construction, Inc.                                      250.0000        2,000.00        2,000.00
 5802      Stutz Excavating, Inc.                                          75.0000          600.00          600.00

    72800100  TELES STL SIN SUPPORT                      295.000     FOOT
 3108      Keller Construction, Inc.                                       46.5000       13,717.50       13,717.50
 5802      Stutz Excavating, Inc.                                          17.0000        5,015.00        5,015.00

    78000200  THPL PVT MK LINE  4                      4,567.000     FOOT
 3108      Keller Construction, Inc.                                        1.4700        6,713.49        6,713.49
 5802      Stutz Excavating, Inc.                                           1.4500        6,622.15        6,622.15

    78000600  THPL PVT MK LINE 12                        688.000     FOOT
 3108      Keller Construction, Inc.                                        7.0400        4,843.52        4,843.52
 5802      Stutz Excavating, Inc.                                          11.2500        7,740.00        7,740.00

    78000650  THPL PVT MK LINE 24                        110.000     FOOT
 3108      Keller Construction, Inc.                                       17.1500        1,886.50        1,886.50
 5802      Stutz Excavating, Inc.                                          20.0000        2,200.00        2,200.00

    78300201  PAVMT MRKG REM GRIND                     2,430.000    SQ FT
 3108      Keller Construction, Inc.                                        1.9800        4,811.40        4,811.40
 5802      Stutz Excavating, Inc.                                           2.2500        5,467.50        5,467.50