                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 09/25/20  11:24:16                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 04/24/2020  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 97725  LETTING ITEM NUMBER: 191
 RESPONSIBLE DISTRICT: 08                                                                                  BIDS LOCKED: Y
 SECTION: 16-00238-00-RS                           COUNTY: MADISON                                         ESTIMATE:
 STATE JOB NUMBER:   C-98-330-16                   MUNICIPALITY: ALTON
 PROJECT NUMBER: Q09H-382 /   /
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 3649  Charles E. Mahoney Co.
                          NO ALT                              707,203.10 *     707,203.10     707,203.10    *

 5802  Stutz Excavating, Inc.
                          NO ALT                              832,597.39       832,597.39     832,597.39

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =      95
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    XZ127902  RETAINING WALL SPL                          47.000    SQ FT
 3649      Charles E. Mahoney Co.                                          68.0000        3,196.00        3,196.00
 5802      Stutz Excavating, Inc.                                          67.0000        3,149.00        3,149.00

    X0323389  STORM SEW CONNECTION                         1.000     EACH
 3649      Charles E. Mahoney Co.                                         797.0000          797.00          797.00
 5802      Stutz Excavating, Inc.                                         710.0000          710.00          710.00

    X0326458  PAVEMENT REPL SPL                          120.000    SQ YD
 3649      Charles E. Mahoney Co.                                         276.3500       33,162.00       33,162.00
 5802      Stutz Excavating, Inc.                                         303.0000       36,360.00       36,360.00

    X0931400  INLET BOX ADJ SPL                            1.000     EACH
 3649      Charles E. Mahoney Co.                                       3,100.0000        3,100.00        3,100.00
 5802      Stutz Excavating, Inc.                                         565.0000          565.00          565.00

    X1400031  REM PED PUSH-BUTTON                         14.000     EACH
 3649      Charles E. Mahoney Co.                                         375.0000        5,250.00        5,250.00
 5802      Stutz Excavating, Inc.                                         395.0000        5,530.00        5,530.00

    X4400196  HMA SURF REM SPL                           110.000    SQ YD
 3649      Charles E. Mahoney Co.                                          12.0000        1,320.00        1,320.00
 5802      Stutz Excavating, Inc.                                           9.4500        1,039.50        1,039.50

    X5510100  STORM SEWER REMOVAL                          5.000     FOOT
 3649      Charles E. Mahoney Co.                                         107.0000          535.00          535.00
 5802      Stutz Excavating, Inc.                                          60.0000          300.00          300.00

    X6025600  MAN ADJUST SPL                              11.000     EACH
 3649      Charles E. Mahoney Co.                                       1,947.0000       21,417.00       21,417.00
 5802      Stutz Excavating, Inc.                                       2,800.0000       30,800.00       30,800.00

    X6062400  CONC GUTTER SPL                             58.000     FOOT
 3649      Charles E. Mahoney Co.                                          53.0000        3,074.00        3,074.00
 5802      Stutz Excavating, Inc.                                          39.3000        2,279.40        2,279.40

    X7010216  TRAF CONT & PROT SPL                         1.000    L SUM
 3649      Charles E. Mahoney Co.                                      22,210.0000       22,210.00       22,210.00
 5802      Stutz Excavating, Inc.                                      12,785.0000       12,785.00       12,785.00

    X7030005  TEMP PAVT MKING REMOV                    5,097.000    SQ FT
 3649      Charles E. Mahoney Co.                                           0.0000            0.00            0.00
 5802      Stutz Excavating, Inc.                                           2.2000       11,213.40       11,213.40

    X8130125  REM EX JUNCTION BOX                          1.000     EACH
 3649      Charles E. Mahoney Co.                                         300.0000          300.00          300.00
 5802      Stutz Excavating, Inc.                                         315.0000          315.00          315.00

    X8140230  HANDHOLE C CONC SPL                          6.000     EACH
 3649      Charles E. Mahoney Co.                                         500.0000        3,000.00        3,000.00
 5802      Stutz Excavating, Inc.                                         525.0000        3,150.00        3,150.00

    X8950305  REMOV EX SIG HEAD                            4.000     EACH
 3649      Charles E. Mahoney Co.                                         225.0000          900.00          900.00
 5802      Stutz Excavating, Inc.                                         235.0000          940.00          940.00

    Z0012450  CONCRETE STEPS                                .330    CU YD
 3649      Charles E. Mahoney Co.                                       1,627.0000          536.91          536.91
 5802      Stutz Excavating, Inc.                                       3,800.0000        1,254.00        1,254.00

    Z0019307  HOLES DRILLED                                8.000     EACH
 3649      Charles E. Mahoney Co.                                          54.0000          432.00          432.00
 5802      Stutz Excavating, Inc.                                          56.7000          453.60          453.60

    Z0036200  PAINT CURB                                 246.000     FOOT
 3649      Charles E. Mahoney Co.                                           3.5000          861.00          861.00
 5802      Stutz Excavating, Inc.                                           4.2000        1,033.20        1,033.20

    20201200  REM & DISP UNS MATL                         20.000    CU YD
 3649      Charles E. Mahoney Co.                                          45.0000          900.00          900.00
 5802      Stutz Excavating, Inc.                                          35.0000          700.00          700.00

    20800150  TRENCH BACKFILL                              1.000    CU YD
 3649      Charles E. Mahoney Co.                                          44.0000           44.00           44.00
 5802      Stutz Excavating, Inc.                                         110.0000          110.00          110.00

    31101000  SUB GRAN MAT B                              40.000      TON
 3649      Charles E. Mahoney Co.                                          44.0000        1,760.00        1,760.00
 5802      Stutz Excavating, Inc.                                          27.5000        1,100.00        1,100.00

    40600290  BIT MATLS TACK CT                        2,674.000    POUND
 3649      Charles E. Mahoney Co.                                           4.0000       10,696.00       10,696.00
 5802      Stutz Excavating, Inc.                                           3.5000        9,359.00        9,359.00

    40600990  TEMPORARY RAMP                             466.000    SQ YD
 3649      Charles E. Mahoney Co.                                          15.0000        6,990.00        6,990.00
 5802      Stutz Excavating, Inc.                                          11.0000        5,126.00        5,126.00

    40603215  P HMA BC IL-9.5FG N50                      999.000      TON
 3649      Charles E. Mahoney Co.                                         101.4700      101,368.53      101,368.53
 5802      Stutz Excavating, Inc.                                         127.5000      127,372.50      127,372.50

    40604110  P HMA SC 9.5FG D N50                       999.000      TON
 3649      Charles E. Mahoney Co.                                         113.8300      113,716.17      113,716.17
 5802      Stutz Excavating, Inc.                                         132.5000      132,367.50      132,367.50

    40800029  BIT MATLS TACK CT                          113.000    POUND
 3649      Charles E. Mahoney Co.                                           1.5900          179.67          179.67
 5802      Stutz Excavating, Inc.                                          15.0000        1,695.00        1,695.00

    40800050  INCIDENTAL HMA SURF                         23.000      TON
 3649      Charles E. Mahoney Co.                                         195.1000        4,487.30        4,487.30
 5802      Stutz Excavating, Inc.                                         265.0000        6,095.00        6,095.00

    42300400  PCC DRIVEWAY PAVT  8                        55.000    SQ YD
 3649      Charles E. Mahoney Co.                                          86.0000        4,730.00        4,730.00
 5802      Stutz Excavating, Inc.                                          74.0000        4,070.00        4,070.00

    42400100  PC CONC SIDEWALK 4                       4,228.000    SQ FT
 3649      Charles E. Mahoney Co.                                           9.7500       41,223.00       41,223.00
 5802      Stutz Excavating, Inc.                                          10.4000       43,971.20       43,971.20

    42400800  DETECTABLE WARNINGS                        272.000    SQ FT
 3649      Charles E. Mahoney Co.                                          46.0000       12,512.00       12,512.00
 5802      Stutz Excavating, Inc.                                          21.0000        5,712.00        5,712.00

    44000100  PAVEMENT REM                               204.000    SQ YD
 3649      Charles E. Mahoney Co.                                          26.0000        5,304.00        5,304.00
 5802      Stutz Excavating, Inc.                                          64.0000       13,056.00       13,056.00

    44000161  HMA SURF REM    3                       11,884.000    SQ YD
 3649      Charles E. Mahoney Co.                                           3.1000       36,840.40       36,840.40
 5802      Stutz Excavating, Inc.                                           3.7500       44,565.00       44,565.00

    44000300  CURB REM                                   327.000     FOOT
 3649      Charles E. Mahoney Co.                                          18.0000        5,886.00        5,886.00
 5802      Stutz Excavating, Inc.                                           7.8500        2,566.95        2,566.95

    44000500  COMB CURB GUTTER REM                       126.000     FOOT
 3649      Charles E. Mahoney Co.                                          18.0000        2,268.00        2,268.00
 5802      Stutz Excavating, Inc.                                           8.6000        1,083.60        1,083.60

    44000600  SIDEWALK REM                             3,746.000    SQ FT
 3649      Charles E. Mahoney Co.                                           4.0000       14,984.00       14,984.00
 5802      Stutz Excavating, Inc.                                           2.2000        8,241.20        8,241.20

    44200140  PAVT PATCH T1 12                            17.000    SQ YD
 3649      Charles E. Mahoney Co.                                         184.1500        3,130.55        3,130.55
 5802      Stutz Excavating, Inc.                                         245.0000        4,165.00        4,165.00

    44200144  PAVT PATCH T2 12                           112.000    SQ YD
 3649      Charles E. Mahoney Co.                                         178.1500       19,952.80       19,952.80
 5802      Stutz Excavating, Inc.                                         245.0000       27,440.00       27,440.00

    44200148  PAVT PATCH T3 12                            46.000    SQ YD
 3649      Charles E. Mahoney Co.                                         178.1500        8,194.90        8,194.90
 5802      Stutz Excavating, Inc.                                         245.0000       11,270.00       11,270.00

    44200150  PAVT PATCH T4 12                           165.000    SQ YD
 3649      Charles E. Mahoney Co.                                         178.1500       29,394.75       29,394.75
 5802      Stutz Excavating, Inc.                                         245.0000       40,425.00       40,425.00

    44300200  STRIP REF CR CON TR                        323.000     FOOT
 3649      Charles E. Mahoney Co.                                           3.5900        1,159.57        1,159.57
 5802      Stutz Excavating, Inc.                                           3.6500        1,178.95        1,178.95

    50901760  PIPE HANDRAIL                               54.700     FOOT
 3649      Charles E. Mahoney Co.                                         129.7500        7,097.33        7,097.33
 5802      Stutz Excavating, Inc.                                         136.5000        7,466.55        7,466.55

    550A0050  STORM SEW CL A 1  12                         7.000     FOOT
 3649      Charles E. Mahoney Co.                                         144.0000        1,008.00        1,008.00
 5802      Stutz Excavating, Inc.                                          90.0000          630.00          630.00

    59300100  CONTR LOW-STRENG MATL                       10.000    CU YD
 3649      Charles E. Mahoney Co.                                         123.0000        1,230.00        1,230.00
 5802      Stutz Excavating, Inc.                                         140.0000        1,400.00        1,400.00

    60235700  INLETS TA T3F&G                              1.000     EACH
 3649      Charles E. Mahoney Co.                                       1,692.0000        1,692.00        1,692.00
 5802      Stutz Excavating, Inc.                                       1,435.0000        1,435.00        1,435.00

    60255500  MAN ADJUST                                   1.000     EACH
 3649      Charles E. Mahoney Co.                                         838.0000          838.00          838.00
 5802      Stutz Excavating, Inc.                                         250.0000          250.00          250.00

    60255800  MAN ADJ NEW T1F CL                           1.000     EACH
 3649      Charles E. Mahoney Co.                                         838.0000          838.00          838.00
 5802      Stutz Excavating, Inc.                                         675.0000          675.00          675.00

    60500060  REMOV INLETS                                 1.000     EACH
 3649      Charles E. Mahoney Co.                                         458.0000          458.00          458.00
 5802      Stutz Excavating, Inc.                                         125.0000          125.00          125.00

    60600605  CONC CURB TB                               334.000     FOOT
 3649      Charles E. Mahoney Co.                                          41.0000       13,694.00       13,694.00
 5802      Stutz Excavating, Inc.                                          57.0000       19,038.00       19,038.00

    60604400  COMB CC&G TB6.18                           124.000     FOOT
 3649      Charles E. Mahoney Co.                                          41.0000        5,084.00        5,084.00
 5802      Stutz Excavating, Inc.                                          58.0000        7,192.00        7,192.00

    60604900  COMB CC&G TB6.18 VWGF                       16.300     FOOT
 3649      Charles E. Mahoney Co.                                          41.0000          668.30          668.30
 5802      Stutz Excavating, Inc.                                          65.0000        1,059.50        1,059.50

    60605000  COMB CC&G TB6.24                            73.000     FOOT
 3649      Charles E. Mahoney Co.                                          41.0000        2,993.00        2,993.00
 5802      Stutz Excavating, Inc.                                          62.0000        4,526.00        4,526.00

    66900200  NON SPL WASTE DISPOSL                       55.000    CU YD
 3649      Charles E. Mahoney Co.                                          74.0000        4,070.00        4,070.00
 5802      Stutz Excavating, Inc.                                         160.0000        8,800.00        8,800.00

    66900530  SOIL DISPOSAL ANALY                          2.000     EACH
 3649      Charles E. Mahoney Co.                                         850.0000        1,700.00        1,700.00
 5802      Stutz Excavating, Inc.                                       2,100.0000        4,200.00        4,200.00

    66901001  REG SUB P-CONST PLAN                         1.000     LSUM
 3649      Charles E. Mahoney Co.                                       4,200.0000        4,200.00        4,200.00
 5802      Stutz Excavating, Inc.                                       3,045.0000        3,045.00        3,045.00

    66901003  REG SUB F CON REPORT                         1.000     LSUM
 3649      Charles E. Mahoney Co.                                         250.0000          250.00          250.00
 5802      Stutz Excavating, Inc.                                       2,100.0000        2,100.00        2,100.00

    66901006  REG SUB MON                                  3.000   CAL DA
 3649      Charles E. Mahoney Co.                                         800.0000        2,400.00        2,400.00
 5802      Stutz Excavating, Inc.                                       2,100.0000        6,300.00        6,300.00

    67000500  ENGR FIELD OFFICE B                          4.000   CAL MO
 3649      Charles E. Mahoney Co.                                       2,750.0000       11,000.00       11,000.00
 5802      Stutz Excavating, Inc.                                       2,000.0000        8,000.00        8,000.00

    67100100  MOBILIZATION                                 1.000    L SUM
 3649      Charles E. Mahoney Co.                                      38,553.7700       38,553.77       38,553.77
 5802      Stutz Excavating, Inc.                                      30,075.0000       30,075.00       30,075.00

    70300100  SHORT TERM PAVT MKING                    1,416.000     FOOT
 3649      Charles E. Mahoney Co.                                           1.4500        2,053.20        2,053.20
 5802      Stutz Excavating, Inc.                                           0.6500          920.40          920.40

    70300150  SHRT TRM PAVT MK REM                       472.000    SQ FT
 3649      Charles E. Mahoney Co.                                           3.1700        1,496.24        1,496.24
 5802      Stutz Excavating, Inc.                                          10.0000        4,720.00        4,720.00

    70300210  TEMP PVT MK LTR & SYM                      312.000    SQ FT
 3649      Charles E. Mahoney Co.                                           0.0000            0.00            0.00
 5802      Stutz Excavating, Inc.                                          10.8500        3,385.20        3,385.20

    70300220  TEMP PVT MK LINE 4                       6,989.000     FOOT
 3649      Charles E. Mahoney Co.                                           0.0000            0.00            0.00
 5802      Stutz Excavating, Inc.                                           0.9000        6,290.10        6,290.10

    70300240  TEMP PVT MK LINE 6                         303.000     FOOT
 3649      Charles E. Mahoney Co.                                           0.0000            0.00            0.00
 5802      Stutz Excavating, Inc.                                           5.6500        1,711.95        1,711.95

    70300250  TEMP PVT MK LINE 8                         381.000     FOOT
 3649      Charles E. Mahoney Co.                                           0.0000            0.00            0.00
 5802      Stutz Excavating, Inc.                                           5.9500        2,266.95        2,266.95

    70300260  TEMP PVT MK LINE 12                        610.000     FOOT
 3649      Charles E. Mahoney Co.                                           0.0000            0.00            0.00
 5802      Stutz Excavating, Inc.                                           6.3000        3,843.00        3,843.00

    70300280  TEMP PVT MK LINE 24                        720.000     FOOT
 3649      Charles E. Mahoney Co.                                           0.0000            0.00            0.00
 5802      Stutz Excavating, Inc.                                           9.7500        7,020.00        7,020.00

    72000100  SIGN PANEL T1                              138.250    SQ FT
 3649      Charles E. Mahoney Co.                                          20.5000        2,834.13        2,834.13
 5802      Stutz Excavating, Inc.                                          21.5000        2,972.38        2,972.38

    72400310  REMOV SIGN PANEL T1                         10.000    SQ FT
 3649      Charles E. Mahoney Co.                                          15.0000          150.00          150.00
 5802      Stutz Excavating, Inc.                                          15.7500          157.50          157.50

    72800100  TELES STL SIN SUPPORT                      232.200     FOOT
 3649      Charles E. Mahoney Co.                                          12.8500        2,983.77        2,983.77
 5802      Stutz Excavating, Inc.                                          13.5000        3,134.70        3,134.70

    78000100  THPL PVT MK LTR & SYM                      312.000    SQ FT
 3649      Charles E. Mahoney Co.                                           7.0000        2,184.00        2,184.00
 5802      Stutz Excavating, Inc.                                          11.8000        3,681.60        3,681.60

    78000200  THPL PVT MK LINE  4                      6,989.000     FOOT
 3649      Charles E. Mahoney Co.                                           1.0000        6,989.00        6,989.00
 5802      Stutz Excavating, Inc.                                           1.1500        8,037.35        8,037.35

    78000400  THPL PVT MK LINE  6                        303.000     FOOT
 3649      Charles E. Mahoney Co.                                           1.2500          378.75          378.75
 5802      Stutz Excavating, Inc.                                           6.5500        1,984.65        1,984.65

    78000500  THPL PVT MK LINE  8                        381.000     FOOT
 3649      Charles E. Mahoney Co.                                           1.7500          666.75          666.75
 5802      Stutz Excavating, Inc.                                           6.9000        2,628.90        2,628.90

    78000600  THPL PVT MK LINE 12                        610.000     FOOT
 3649      Charles E. Mahoney Co.                                           7.0000        4,270.00        4,270.00
 5802      Stutz Excavating, Inc.                                           7.6000        4,636.00        4,636.00

    78000650  THPL PVT MK LINE 24                        720.000     FOOT
 3649      Charles E. Mahoney Co.                                           9.5000        6,840.00        6,840.00
 5802      Stutz Excavating, Inc.                                          14.7000       10,584.00       10,584.00

    78001110  PAINT PVT MK LINE  4                        56.000     FOOT
 3649      Charles E. Mahoney Co.                                           1.0000           56.00           56.00
 5802      Stutz Excavating, Inc.                                          12.8500          719.60          719.60

    78001130  PAINT PVT MK LINE  6                        66.000     FOOT
 3649      Charles E. Mahoney Co.                                           1.2500           82.50           82.50
 5802      Stutz Excavating, Inc.                                          12.3500          815.10          815.10

    78001150  PAINT PVT MK LINE 12                        15.000     FOOT
 3649      Charles E. Mahoney Co.                                           4.0000           60.00           60.00
 5802      Stutz Excavating, Inc.                                          17.6000          264.00          264.00

    78100100  RAISED REFL PAVT MKR                        41.000     EACH
 3649      Charles E. Mahoney Co.                                         110.7500        4,540.75        4,540.75
 5802      Stutz Excavating, Inc.                                          65.3500        2,679.35        2,679.35

    78200020  CURB REFLECTORS                             32.000     EACH
 3649      Charles E. Mahoney Co.                                          12.0000          384.00          384.00
 5802      Stutz Excavating, Inc.                                          12.1000          387.20          387.20

    78300200  RAISED REF PVT MK REM                        4.000     EACH
 3649      Charles E. Mahoney Co.                                          80.0000          320.00          320.00
 5802      Stutz Excavating, Inc.                                          50.0000          200.00          200.00

    80300100  LOCATE UNDERGR CABLE                       200.000     FOOT
 3649      Charles E. Mahoney Co.                                          10.0000        2,000.00        2,000.00
 5802      Stutz Excavating, Inc.                                          10.5000        2,100.00        2,100.00

    81028320  UNDRGRD C PVC       1                      184.000     FOOT
 3649      Charles E. Mahoney Co.                                          15.0000        2,760.00        2,760.00
 5802      Stutz Excavating, Inc.                                          15.7500        2,898.00        2,898.00

    81028340  UNDRGRD C PVC   1 1/2                       10.000     FOOT
 3649      Charles E. Mahoney Co.                                          50.0000          500.00          500.00
 5802      Stutz Excavating, Inc.                                          52.5000          525.00          525.00

    87301215  ELCBL C SIGNAL 14  2C                      552.000     FOOT
 3649      Charles E. Mahoney Co.                                           2.0000        1,104.00        1,104.00
 5802      Stutz Excavating, Inc.                                           2.1000        1,159.20        1,159.20

    87301225  ELCBL C SIGNAL 14  3C                      300.000     FOOT
 3649      Charles E. Mahoney Co.                                           2.0000          600.00          600.00
 5802      Stutz Excavating, Inc.                                           2.1000          630.00          630.00

    87601100  PED P-B POST GALVS T1                        1.000     EACH
 3649      Charles E. Mahoney Co.                                       4,500.0000        4,500.00        4,500.00
 5802      Stutz Excavating, Inc.                                       4,725.0000        4,725.00        4,725.00

    87900200  DRILL EX HANDHOLE                            6.000     EACH
 3649      Charles E. Mahoney Co.                                           0.0100            0.06            0.06
 5802      Stutz Excavating, Inc.                                           0.0100            0.06            0.06

    88040110  SH P LED 1F 4S BM                            2.000     EACH
 3649      Charles E. Mahoney Co.                                       1,200.0000        2,400.00        2,400.00
 5802      Stutz Excavating, Inc.                                       1,260.0000        2,520.00        2,520.00

    88040160  SH P LED 1F 5S MAM                           2.000     EACH
 3649      Charles E. Mahoney Co.                                       1,500.0000        3,000.00        3,000.00
 5802      Stutz Excavating, Inc.                                       1,575.0000        3,150.00        3,150.00

    88102825  PED SH P LED 1F BM CT                        2.000     EACH
 3649      Charles E. Mahoney Co.                                       1,000.0000        2,000.00        2,000.00
 5802      Stutz Excavating, Inc.                                       1,050.0000        2,100.00        2,100.00

    88200100  TS BACKPLATE                                 4.000     EACH
 3649      Charles E. Mahoney Co.                                           1.0000            4.00            4.00
 5802      Stutz Excavating, Inc.                                           1.0500            4.20            4.20

    88600600  DET LOOP REPL                            2,737.000     FOOT
 3649      Charles E. Mahoney Co.                                           7.0000       19,159.00       19,159.00
 5802      Stutz Excavating, Inc.                                           7.3500       20,116.95       20,116.95

    88800100  PED PUSH-BUTTON                             16.000     EACH
 3649      Charles E. Mahoney Co.                                         300.0000        4,800.00        4,800.00
 5802      Stutz Excavating, Inc.                                         315.0000        5,040.00        5,040.00

    89502200  MOD EX CONTR                                 1.000     EACH
 3649      Charles E. Mahoney Co.                                       1,500.0000        1,500.00        1,500.00
 5802      Stutz Excavating, Inc.                                       1,575.0000        1,575.00        1,575.00

    89502380  REMOV EX HANDHOLE                            6.000     EACH
 3649      Charles E. Mahoney Co.                                         500.0000        3,000.00        3,000.00
 5802      Stutz Excavating, Inc.                                         525.0000        3,150.00        3,150.00