001-64P11
|
Executed
|
02/13/2024
|
2 / 2 |
|
2
|
2
|
Jo Daviess
|
|
Patching,Resurf. and ADA improvements on IL 84 from Duke Creek North of Hanover to Southeast of Garfield Street in Hanover.
|
01X-78057
|
Active
|
12/06/2023
|
|
|
5
|
9
|
White
|
|
Removal and replacement of SN 097-0003 and SN 097-0004 carrying I-64 over the Wabash River.
|
002-64R56
|
Executed
|
02/27/2024
|
|
|
2
|
2
|
Ogle
|
|
Lighting at I-88 SE of Rochelle.
|
003-64S42
|
Executed
|
02/20/2024
|
|
|
2
|
2
|
Various
|
|
Bridge washing of 6 structures over the Rock River in various Counties.
|
004-64S46
|
Executed
|
02/20/2024
|
|
|
2
|
2
|
Henry, Rock Island
|
|
Bridge washing of 5 structures over the Rock River in Henry and Rock Island Counties.
|
005-64S47
|
Executed
|
02/20/2024
|
|
|
2
|
2
|
Various
|
|
Bridge washing of 8 structures in various counties.
|
006-64S52
|
Executed
|
02/20/2024
|
|
|
2
|
2
|
Various
|
|
Bridge deck sealer applied to 36 structures in various Counties.
|
007-64S57
|
Executed
|
02/20/2024
|
|
|
2
|
2
|
Stephenson
|
|
1.5 Miles of inlet repairs along IL 26 in Freeport.
|
008-64S91
|
Executed
|
03/08/2024
|
|
1 |
2
|
2
|
Rock Island
|
|
Cleaning and painting of structural steel on 3 structures, SN 081-0125 carrying IL 92 over I-88, 8.0 miles east of Silvis, SN 081-0131 carrying 94th Avenue over I-88, 0.1 mile west of Hillsdale and SN 098-0065 carrying IL 78 over I-88, 2.0 miles west of Lyndon.
|
009-64S96
|
Executed
|
03/19/2024
|
|
|
2
|
2
|
Various
|
|
Various routes on-call guardrail.
|
010-64S97
|
Executed
|
02/13/2024
|
|
|
2
|
2
|
Boone
|
|
4 Miles of aggregate shoulder improvement.
|
011-64S98
|
Executed
|
02/20/2024
|
|
|
2
|
2
|
Various
|
|
Various routes, turf repair.
|
012-66967
|
Executed
|
02/20/2024
|
|
|
2
|
3
|
Bureau
|
|
This job is located on FAP 587 (IL 92) from 0.1 mile east of IL 40 to WCL Walnut City, for a length of 4.36 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors.
|
013-66E40
|
Executed
|
03/05/2024
|
1 / 1 |
1 |
2
|
3
|
Iroquois
|
|
This project is located on FAI 57 (I-57) at SN 038-0076 (Onarga Interchange). The work consists of replacing the bridge deck on SN 038-0076, HMA milling and resurfacing, interchange lighting replacement, pavement marking, and raised reflective markers.
|
014-66L53
|
Executed
|
02/20/2024
|
9 / 9 |
1 |
2
|
3
|
DeKalb
|
|
This project is located on FAP 68 (IL 23) 0.6 mile south of US 30 at SN 019-2538. The work consists of removing and replacing SN 019-2538 with SN 019-2562, HMA milling and resurfacing, pavement marking, and raised reflective markers.
|
015-66N34
|
Executed
|
02/20/2024
|
|
|
2
|
3
|
LaSalle, Livingston
|
|
This project consists of 5.8 miles of shoulder widening and rumble strip installation on IL 17 from E 11th Rd in LaSalle County to IL 23 in Livingston County.
|
016-66N48
|
Executed
|
02/20/2024
|
|
|
2
|
3
|
Grundy
|
|
This work is located on the I-80 and IL 47 Interchange Ramps in Morris. This work consists of pavement patching and related construction work.
|
017-66N59
|
Executed
|
02/20/2024
|
|
|
2
|
3
|
LaSalle
|
|
This work is located on the I-80 and IL 178 interchange Structure No. 050-0248 at the north abutment bridge approach pavement connectors, northbound and southbound lanes. This work consists of pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replacement, concrete median removal and replacement, approach slab repair and other related construction work.
|
018-66N94
|
Executed
|
02/20/2024
|
1 / 1 |
|
2
|
3
|
Ford
|
|
This work is located on US Route 45 beginning at the Champaign County Line (L.M. 0.00) and ending at Green Street in Paxton (L.M. 3.28). This project consists of Class B pavement Patching and other related work.
|
019-66P05
|
Executed
|
02/20/2024
|
|
|
2
|
3
|
Various
|
|
This project is located along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford counties. The work consists of weed spraying to aid in weed control.
|
020-70871
|
Executed
|
02/20/2024
|
4 / 4 |
1 |
3
|
5
|
McLean
|
|
0.17 Mi Complete structure replacement over Intermittent stream 0.5 miles East of Chenoa.
|
021-70G87
|
Executed
|
02/20/2024
|
|
|
3
|
5
|
Champaign
|
|
Patching on US 136-At I 57 and ICRR for net length 171 ft.
|
022-70H00
|
Executed
|
04/12/2024
|
|
|
3
|
5
|
Champaign
|
|
The project is to replace Millerbernd light poles with new aluminum poles and LED lights on existing foundations at the interchanges of 1-74 with Lincoln Ave and US 45 (Cunningham Ave) in Champaign, IL in Champaign County.
|
023-70H03
|
Executed
|
02/20/2024
|
|
|
3
|
5
|
Various
|
|
567.5 miles of spraying, approx. 2004 acres on state ROW along US 51 and interstate routes including interchanges in Champaign, Dewitt, McLean, Piatt, and Vermilion Counties.
|
024-72036
|
Executed
|
02/20/2024
|
|
|
4
|
6
|
Sangamon
|
|
6.7 miles of crack and joint sealing on I-55 / I-72 from 0.2 miles north of Southwind Road to 0.6 miles north of I-72, east of Springfield.
|
025-72122
|
Withdrawn
|
01/17/2024
|
2 / 2 |
1 |
4
|
6
|
Sangamon
|
|
1.7 miles of pavement reconstruction, milling and resurfacing, sidewalk ramp improvements and accessible pedestrian traffic signals on Dirksen Parkway from 0.1 miles south of Peoria Road to north of Northfield Drive in Springfield.
|
026-72272
|
Executed
|
02/20/2024
|
|
|
4
|
6
|
Mason
|
|
11.5 miles of cape seal on pavement, fog seal on shoulders, grinding, pavement markers and striping on US 136 from County Road 2800 East to 6th Street in San Jose.
|
027-72283
|
Executed
|
02/27/2024
|
|
|
4
|
6
|
Schuyler
|
|
0.14 miles of landscaping on US 67 / Bluff Road northwest of Bluffs Ditch, 1.8 miles northwest of IL 100.
|
028-72289
|
Executed
|
02/20/2024
|
|
|
4
|
6
|
Adams
|
|
8.6 miles of microsurfacing with fog sealing of shoulders on I-172 from 0.2 miles north of the Pike County line to 0.4 miles north of the IL 96 interchange.
|
029-72293
|
Executed
|
02/20/2024
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
4.7 miles of cape seal with fog seal on shoulders on IL 124 from IL 123 to Andrew Road Junction, west of Sherman.
|
030-72715
|
Deleted
|
12/06/2023
|
|
|
4
|
6
|
Sangamon
|
|
Substructure repairs on SN 084-0073 and 084-0178 carrying Dirksen Parkway over NSRR and ICRR in Springfield.
|
031-72720
|
Executed
|
03/22/2024
|
|
|
4
|
6
|
Logan
|
|
Painting two bridges: 1) Emden Road over I-155, 1 mile south of US 136; 2) US 136 over West Fork of Sugar Creek, 6.5 miles east of I-155. (SN 054-0078 and SN 054-0026)
|
032-72723
|
Executed
|
02/20/2024
|
|
|
4
|
6
|
Macoupin, Montgomery
|
|
Patching at various location on I-55 in Macoupin and Montgomery Counties.
|
033-72728
|
Executed
|
02/20/2024
|
|
1 |
4
|
6
|
Various
|
|
Concrete beam end repairs and other miscellaneous bridge repairs on 8 bridges on various routes in various counties of District 6.
|
034-74A09
|
Executed
|
02/20/2024
|
1 / 1 |
1 |
4
|
7
|
Lawrence
|
|
Superstructure and abutment replacement on SN 051-0022 and SN 051-0023 carrying US 50 over Township Road 262, 2.4 miles east of Airport Interchange.
|
035-74B27
|
Executed
|
02/20/2024
|
|
|
4
|
7
|
Cumberland
|
|
Bridge joint repairs, concrete deck overlay, HMA shoulders and resurfacing at SN 018-0058 carrying IL 130 over Hurricane Creek, approximately 3.5 miles north of Greenup.
|
036-74B28
|
Executed
|
02/20/2024
|
|
|
4
|
7
|
Macon
|
|
Bridge deck overlay, bridge joint replacement / repair and bridge approach work on SN 058-0113 and 058-0114 carrying US 51 over Stevens Creek, 0.2 miles north of Emery Road.
|
037-74B40
|
Executed
|
02/20/2024
|
|
|
4
|
7
|
Wayne
|
|
Bridge deck overlay and bridge joint replacement/repairs on SN 096-0011 carrying IL 15 over a stream, 1 mile west of County Highway 3.
|
038-76H49
|
Active
|
11/08/2023
|
|
1 |
5
|
8
|
Madison
|
|
Replacement of SN 060-0347 carrying IL 111 southbound over Cahokia Canal, 0.24 miles north of I-55/70. Project also includes maintenance of the northbound structure, SN 060-0244.
|
039-76P16
|
Deleted
|
11/30/2023
|
|
|
5
|
8
|
Jersey
|
|
Widening and resurfacing of IL 16 at the Otterville Road/Grafton Lane intersection to provide dedicated left turn lanes and improved turning radii.
|
040-76R91
|
Executed
|
03/19/2024
|
|
1 |
5
|
8
|
Madison
|
|
New platform scales and patching at the Maryville Weight Station on westbound I-55 / I-70 approximately 1 mile west of Maryville.
|
041-76T25
|
Executed
|
03/01/2024
|
3 / 3 |
1 |
5
|
8
|
Marion
|
|
24.2 miles of patching on I-57 / US 50 from 0.7 miles north of IL 161 to the Fayette County line.
|
042-76T30
|
Executed
|
03/05/2024
|
|
|
5
|
8
|
Greene
|
|
1.7 miles of patching on US 67 from Ponderosa Lane to 6th Street in Carrollton.
|
043-78830
|
Executed
|
02/20/2024
|
1 / 1 |
|
5
|
9
|
Hamilton
|
|
Replacement of SN 033-0004 with a triple reinforced concrete box culvert on IL 14 over Bear Creek, 9 miles east of the Franklin County line.
|
044-78916
|
Deleted
|
11/17/2023
|
|
|
5
|
9
|
Williamson
|
|
Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boulevard Street in Marion.
|
045-78A18
|
Executed
|
02/20/2024
|
|
|
5
|
9
|
Williamson
|
|
10.2 miles of resurfacing on IL 13 westbound lanes from the Saline County line to Crab Orchard Creek in Marion.
|
046-78A23
|
Executed
|
02/20/2024
|
1 / 1 |
1 |
5
|
9
|
Alexander, Pulaski
|
|
20.2 miles of centerline joint repair and microsurfacing of a 2- wide strip along the centerline on the northbound and southbound lanes of I-57 from Perks Road, 1.2 miles south of the Union County line, to the Mississippi River.
|
047-78A48
|
Executed
|
02/23/2024
|
|
|
5
|
9
|
Various
|
|
Weed spraying for broadleaf weeds along I-57 and I-24 at various locations in various counties.
|
048-61J70
|
Executed
|
03/05/2024
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing, patching, driveway replacement, curb and gutter, sidewalks, drainage and utility structure adjustments, pavement markings, signage, traffic signal ADA improvements and all other necessary work on Bernice Road from Torrence Avenue to Wentwork Avenue in the Village of Lansing.
|
049-61J82
|
Executed
|
03/15/2024
|
|
|
1
|
1
|
Lake
|
|
Sidewalk reconstruction and traffic signal modifications at the intersection of Central Avenue and Hickory Street in Highland Park.
|
050-61J95
|
Executed
|
02/20/2024
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Central Avenue from Thomdale Avenue to Foster Avenue in Wood Dale.
|
051-61J96
|
Executed
|
03/12/2024
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
Resurfacing Bull Valley Road from Curran Road to Crystal Lake Road in McHenry.
|
052-61J97
|
Executed
|
02/20/2024
|
2 / 0 |
|
1
|
1
|
Will
|
|
Resurfacing on St. Francis Road from US 45 to 88th Avenue in Frankfort
|
053-61J98
|
Executed
|
03/08/2024
|
|
|
1
|
1
|
McHenry
|
|
HMA resurfacing with aggregate shoulders on Winn Road from IL 173 to Main Street in Spring Grove.
|
054-61K02
|
Executed
|
03/19/2024
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Roadway reconstruction on Janes Avenue from 7th Street to Spring Street in Woodridge.
|
055-61K05
|
Executed
|
04/16/2024
|
|
|
1
|
1
|
Lake
|
|
HMA resurfacing, widening, storm sewers, drainage structures, PCC sidewalks, HMA multi-use patch, and traffic signal improvements at the intersection of Wadsworth Road and Lewis Avenue in Waukegan and Beach Park.
|
056-62H58
|
Executed
|
03/01/2024
|
1 / 1 |
|
1
|
1
|
Will
|
|
Parking lot improvement. Full depth removal and replacement of existing pavement. Location: Movable Bridge Maintenance Yard (105 Bridge Street) in the City of Joliet, Will County.
|
057-62K60
|
Executed
|
03/01/2024
|
5 / 5 |
|
1
|
1
|
Cook
|
|
2,408 feet (0.456 mile) bridge replacement of US 12/20/45 (La Grange Road) at IL 171 (Archer Ave/19th Street), SN 016-0518, in the Village of Willow Springs, Cook County.
|
058-62M52
|
Executed
|
02/20/2024
|
|
|
1
|
1
|
Cook
|
|
1,185-feet (0.22-mile) Bridge rehabilitation project includes deck scarification, latex concrete overlay, joint replacement and approach slab repairs on Roosevelt Road over I-90/94 (Dan Ryan Expressway) (SN 016-0478) within the City of Chicago in Cook County.
|
059-68H68
|
Executed
|
02/20/2024
|
|
|
3
|
4
|
Peoria
|
|
2.8 Miles of resurfacing and chip seal on Lincoln Ave. and Howett St. from Griswold St. to Adams St. in Peoria.
|
060-68H94
|
Executed
|
02/20/2024
|
1 / 1 |
1 |
3
|
4
|
Fulton
|
|
Bridge expansion joint replacement and installation of new steel diaphragms. IL 100; 0.1 mile south of Enion.
|
061-72H58
|
Executed
|
02/23/2024
|
|
|
4
|
6
|
Schuyler
|
|
5.7 miles of standard overlay and ADA improvements on IL 101 from 0.2 miles west of Freeman Mine Road to US 67.
|
062-85746
|
Executed
|
03/08/2024
|
|
|
2
|
2
|
Rock Island
|
|
HMA resurfacing with aggregate and HMA shoulders on CH 14 from 99th Street to 190th Avenue.
|
063-85748
|
Executed
|
02/23/2024
|
2 / 2 |
1 |
2
|
2
|
Stephenson
|
|
Replace existing structure with single span PPC deck beam structure on concrete abutments, with reconstuction of aggregate approaches and riprap placement on Babler Road over a tributary to Brush Creek, 2 miles southeast of Orangeville.
|
064-85749
|
Executed
|
02/27/2024
|
|
1 |
2
|
2
|
Stephenson
|
|
Cold-In-Place Recycling on River Road from IL 75 to Rock City Road.
|
065-91626
|
Executed
|
03/08/2024
|
|
|
3
|
5
|
DeWitt
|
|
PCC pavement removal and HMA resurfacing with HMA shoulders, aggregate shoulders, and driveway replacment on Revere Road from Madison Street to south of IL 10.
|
066-93750
|
Executed
|
02/27/2024
|
1 / 1 |
|
4
|
6
|
Christian
|
|
Removal of existing timber bridge carrying Lincoln Prairie Trail over Flat Branch and construction of a prefabricated pedestrian truss superstructure.
|
067-93813
|
Executed
|
02/23/2024
|
|
|
4
|
6
|
Logan
|
|
Removal and replacement of PPC deck beams of four span structure with stone riprap, and guardrail replacement on CH 20 over Sugar Creek, 2 miles east of Union.
|
068-97803
|
Executed
|
03/19/2024
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing Market Place from east of Commerce Drive to west of Lanaghan Drive in Fairview Heights.
|
069-97808
|
Rejected
|
02/02/2024
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing on Longacre Drive from Union Hill Road to IL 159 in Fairview Heights.
|
070-97818
|
Executed
|
02/23/2024
|
|
|
5
|
8
|
Clinton
|
|
HMA resurfacing with patching, incedental resurfacing at sideroads and entrances, and aggregate shoulders on CH 8 from IL 161 to 0.30 mile north of I-64.
|
071-99723
|
Executed
|
03/08/2024
|
|
|
5
|
9
|
Johnson
|
|
HMA overlay with aggregate wedge shoulders, entrance and sideroad improvements, guardrail replacement, patching, and pavement marking on Belknap Road, from East Main Street to US 45.
|
072-62T87
|
Executed
|
03/26/2024
|
|
1 |
1
|
1
|
Cook
|
|
(1.03-Mile) SMART Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramp improvements, pavement markings, installation of APS FAP 368: Pulaski Rd, from Columbus Ave to US 12 (95th St) in the cities of Hometown and Chicago, and the Villages of Evergreen Park and Oaklawn in Cook Co
|
073-62U80
|
Executed
|
02/23/2024
|
|
|
1
|
1
|
Cook
|
|
This project consists of a standard overlay includes pavement resurfacing, Class D patching, pavement marking installation, and ADA improvements on Central St. from Ashland Ave. to Asbury Ave. in the City of Evanston in Cook County.
|
074-62V01
|
Executed
|
03/01/2024
|
6 / 5 |
|
1
|
1
|
Cook
|
|
This contract consists of debris and litter cleaning along I-190/90/94 (Kennedy Expwy) from US-12/45 (Mannheim Rd) to Congress Parkway in Cook County.
|
075-62V04
|
Executed
|
03/01/2024
|
|
|
1
|
1
|
Will
|
|
The work to be completed under this contract consists of the pickup, removal and disposal of debris/litter on a work order basis on I-80 from I-355 to the Kendall County Line.
|
076-62V05
|
Executed
|
03/01/2024
|
|
|
1
|
1
|
Cook
|
|
This contract consists of debris and litter cleaning along I-90/94 (Dan Ryan Expwy) from Congress Pkwy to I-57/I-94 (Bishop Ford Expwy).
|
077-62V11
|
Withdrawn
|
01/17/2024
|
|
|
1
|
1
|
Will
|
|
The proposed improvement consists of deck overlay and joint repair of structure carrying 1-55 At Des Plaines River in Channahon Township in Will County. Total gross length and net length= 2810 Feet (0.532 Mile). , The proposed improvement consists of deck overlay and joint repair of structures carrying I-55 At Des Plaines River in Channahon Township in Will County. Total gross length and net length= 2810 Feet (0.532 Mile).
|
078-62W08
|
Executed
|
03/01/2024
|
|
|
1
|
1
|
Cook
|
|
This contract consists of debris and litter cleaning along I-55 (Stevenson Expwy) from Lake Shore Dr to IL-43 (Harlem Ave)
|
079-62W43
|
Executed
|
02/23/2024
|
|
|
1
|
1
|
Various
|
|
The work to be completed under this contract consists of installing signs at new locations and repairing existing damaged signs on a work order basis throughout District 1.
|
080-72722
|
Executed
|
02/23/2024
|
|
|
4
|
6
|
Sangamon
|
|
Patching at various locations on I-55 and I-72 in Sangamon County.
|
081-76L82
|
Executed
|
02/23/2024
|
|
|
5
|
8
|
Madison
|
|
Bridge deck sealing on SN 060-0345 carrying I-270 over Chain of Rocks Canal.
|
082-62U69
|
Executed
|
02/23/2024
|
|
1 |
1
|
1
|
Lake
|
|
This contract consists of arterial routes sweeping in Lake County.
|
083-61J67
|
Executed
|
03/01/2024
|
7 / 6 |
1 |
1
|
1
|
Cook
|
|
Construction of prefabricated steel truss pedestrian bridge over IL 59 in Streamwood with HMA multi use path, elevated boardwalk and lighting.
|
084-61J68
|
Executed
|
03/15/2024
|
|
|
1
|
1
|
McHenry
|
|
HMA Resurfacing with culvert replacement and aggregate shoulders on Riverside Drive from Johnsburg Road to Running Brook Farm Boulevard in Johnsburg.
|
085-61J73
|
Executed
|
02/23/2024
|
4 / 3 |
|
1
|
1
|
Cook
|
|
HMA resurfacing with patching, bike path, pedestrian push buttons, ADA ramps, and landscaping on Wilke Road from US 14 to IL 62 in Arlington Heights.
|
086-61K08
|
Executed
|
04/16/2024
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing with ADA improvements, curb and gutter, multi-use path, landscaping, patching drainage adjustments, and striping on Illinois Avenue from Quentin Road to Plum Grove Road in Palatine.
|
087-61K09
|
Executed
|
03/22/2024
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Central Road from Westgate Road to Wolf Road in Mount Prospect.
|
088-66K67
|
Executed
|
03/12/2024
|
3 / 3 |
2 |
2
|
3
|
Grundy
|
|
This project includes milling and resurfacing (design overlay), structure repairs, pavement marking and minor drainage improvements on I-55 from 1.2 miles northeast of IL 47 near Dwight to the Gardner interchange.
|
089-66M09
|
Executed
|
02/23/2024
|
1 / 1 |
|
2
|
3
|
Ford
|
|
This job is located on FAP 798 (IL-115), approximately 5.6 miles south of US-24 in Ford County, (SN 027-2507); box culvert replacement.
|
090-66N91
|
Executed
|
02/23/2024
|
2 / 2 |
|
2
|
3
|
Livingston
|
|
This project is located at 3 structures; SN 053-0119 carrying CH 26 over I-55, 0.5 miles north of Chenoa, SN's 053-0128 and 053-0129 carrying NB and SB I-55 over the Vermillion River 1.5 miles north of IL 116. This work consists of cleaning and painting all structural steel components of the bridges.
|
091-66P07
|
Executed
|
02/23/2024
|
|
|
2
|
3
|
Grundy, Kankakee
|
|
Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas hereinafter described as the areas to be cleaned in Grundy and Kankakee Counties.
|
092-78A04
|
Executed
|
03/05/2024
|
3 / 3 |
|
5
|
9
|
Various
|
|
Painting of 10 bridges in various counties of District 9.
|
093-78A49
|
Executed
|
02/23/2024
|
|
|
5
|
9
|
Various
|
|
Weed spraying along I-57 and I-24 for Johnson Grass in various counties within District 9.
|
094-85747
|
Executed
|
03/05/2024
|
|
|
2
|
2
|
Rock Island
|
|
Resurfacing 31st Avenue from IL 92 to US 67 in Rock Island.
|
095-87822
|
Executed
|
02/27/2024
|
1 / 1 |
1 |
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 24 over Mole Creek, 4 miles southeast of Long Point.
|
096-89828
|
Executed
|
02/27/2024
|
|
|
3
|
4
|
Mercer
|
|
Construction of a shared-use path on SE 6th Street from SE 6th Avenue to SE 8th Avenue, and on SE 8th Avenue from SE 3rd Street to SE 6th Street in Aledo.
|
097-95933
|
Rejected
|
02/02/2024
|
|
|
4
|
7
|
Crawford
|
|
Replace the bridge carrying TR 93 over Business Creek, 4 miles north of Oblong.
|
098-99725
|
Executed
|
03/01/2024
|
|
|
5
|
9
|
White
|
|
HMA resurfacing with HMA shoulders, aggregate wedge shoulders, shoulder rumble strips, pavement markings, and raised pavement markings on Epworth Road from the east corporate limits of Carmi to 1300 W. Road.
|
099-62T58
|
Executed
|
03/05/2024
|
|
|
1
|
1
|
Cook
|
|
(3.0-Mile) SMART Overlay and ADA Improvements on US 6 / IL 83 Torrence Ave. This project is located in Calumet City and Lansing in Cook County.
|
100-62U68
|
Rejected
|
02/02/2024
|
|
1 |
1
|
1
|
Kane, McHenry
|
|
This contract consists of arterial routes sweeping in McHenry and Kane counties
|
101-62U70
|
Rejected
|
02/02/2024
|
|
1 |
1
|
1
|
Various
|
|
This contract consists of nighttime sweeping along various expressways in District 1.
|
102-62U75
|
Active
|
11/27/2023
|
|
1 |
1
|
1
|
Various
|
|
The work to be completed under this contract consists of expressway daytime sweeping throughout District 1.
|
103-62W19
|
Rejected
|
02/02/2024
|
|
|
1
|
1
|
DuPage
|
|
This contract consists of arterial road sweeping in DuPage County.
|
104-62W35
|
Active
|
11/27/2023
|
|
|
1
|
1
|
Will
|
|
This contract consists of arterial road sweeping in Will County.
|
105-62W36
|
Executed
|
03/08/2024
|
|
|
1
|
1
|
Cook
|
|
This contract consists of arterial road sweeping in north Cook County.
|
106-62W37
|
Executed
|
03/08/2024
|
|
|
1
|
1
|
Cook
|
|
This contract consists of arterial road sweeping in south Cook County.
|
107-72616
|
Executed
|
02/23/2024
|
|
|
4
|
6
|
Various
|
|
Washing six major river bridges on various routes in various counties in District 6.
|
108-74761
|
Executed
|
02/23/2024
|
1 / 1 |
1 |
4
|
7
|
Clay
|
|
6.8 miles of resurfacing, ADA upgrades, culvert replacement, aggregate shoulders and patching on US 45 from 0.1 miles north of Vandalia Road in Louisville to 0.3 miles south of US 50.
|
109-74B32
|
Executed
|
02/23/2024
|
|
|
4
|
7
|
Wabash
|
|
Installation of strip seal expansion joints, bridge deck scarification, deck patching, bridge deck fly ash or ground granulated blast furnace slag concrete overlay and diamond grinding on SN 093-0001 carrying IL 1 over Raccoon Creek, south of the Lawrence County line.
|
110-74B65
|
Executed
|
02/23/2024
|
1 / 1 |
|
4
|
7
|
Richland
|
|
Centerline milled rumble strips and pavement marking on IL 250 from US 50, west of Noble, to North Avenue in Olney.
|
111-76H41
|
Withdrawn
|
01/17/2024
|
4 / 4 |
3 |
5
|
8
|
St. Clair
|
|
2 miles of new construction on IL 158 from IL 161 to IL 177, including new SN 082-0276.
|
112-60R49
|
Deleted
|
12/04/2023
|
|
|
1
|
1
|
Cook
|
|
3,360 ft. (0.64 mi.) along IL 43, and 2,970 ft. (0.5 6 mi.) along 95th Street, interchange reconstruction and bridge rehabilitation and repair, in Bridgeview, Oak Lawn, and Chicago Ridge, Cook County, IL.
|
113-61J53
|
Executed
|
03/08/2024
|
|
|
1
|
1
|
Cook
|
|
Sidewalk construction, drainage improvements, and traffic signal modifications on Wolf Road from Palatine Frontage Road to Edward Road/Metra Station in Prospect Heights.
|
114-64S84
|
Executed
|
02/23/2024
|
2 / 2 |
|
2
|
2
|
Winnebago
|
|
270' OF CULVERT LINING. US 20 UNDER MERIDIAN RD.
|
115-68D83
|
Executed
|
02/23/2024
|
|
|
3
|
4
|
Knox
|
|
Bridge Preservation to Structure Nos. 048-0007 and 048-0008 carrying 1-74 over the BNSF RR in Galesburg.
|
116-68H90
|
Executed
|
03/19/2024
|
|
|
3
|
4
|
Various
|
|
REMOVAL AND REPLACEMENT OF GUARDRAION DAMAGED BY MOTORISTS THOUGHOUT DISTRICT 4. (MCHD)
|
117-68I04
|
Executed
|
02/23/2024
|
|
|
3
|
4
|
Various
|
|
TREE REMOVAL AS REQUIRED IN VARIOUS LOCATIONS THROUGHOUT DISTRICT 4.
|
118-70B89
|
Executed
|
03/15/2024
|
3 / 3 |
1 |
3
|
5
|
Edgar
|
|
5.174 MI, 3P Policy-Designed Overlay, New Shoulders Milled Rumble Strip, 1800th St. E of Paris to Indiana State Line / Culvert Replacement, at Vermilion Rd. INT 3.9 MI E of Paris ECL.
|
119-74A85
|
Withdrawn
|
01/03/2024
|
4 / 0 |
|
4
|
7
|
Crawford
|
|
Culvert removal and precast concrete culvert placement at 5 entrance locations on TR 183A (East 1000th Avenue) in Palestine.
|
120-89809
|
Executed
|
02/23/2024
|
4 / 3 |
1 |
3
|
4
|
McDonough
|
|
HMA resurfacing with storm sewers, driveway and sidewalk improvements, utility adjustments and seeding along Johnson Street to Harmony Lane and on Grant Street at the intersection with Harmony Lane in Macomb.
|
121-89829
|
Executed
|
03/01/2024
|
1 / 1 |
1 |
3
|
4
|
McDonough
|
|
Replace existing pavement with PCC pavement, curb and gutter, sidewalks, ADA Ramps, storm sewer, step replacement, and concrete retaining walls on Adams Street from Charles Street to Johnson Street in Macomb.
|
122-95936
|
Executed
|
03/08/2024
|
1 / 1 |
1 |
4
|
7
|
Richland
|
|
replace the bridge carrying TR 35A over West Fork of Coon Creek, 3 miles southwest of Dundas.
|
123-97820
|
Executed
|
02/23/2024
|
5 / 5 |
2 |
5
|
8
|
Marion
|
|
HMA Asphalt shoulders with rumble strips, guardrail and terminals, pipe culvets and ditch grading on Green Street Road from Brewery Hill Road to Farthing Rd. Project includes the replacement of the outside deck beam on the structure over Crooked Creek.
|
124-97824
|
Executed
|
03/12/2024
|
2 / 2 |
|
5
|
8
|
Madison
|
|
Resurfacing Johnson Road from Wabash Avenue to Edgewood Avenue in Granite City.
|
125-97826
|
Rejected
|
02/26/2024
|
|
|
5
|
8
|
Madison
|
|
HMA resurfacing with sidewalks, driveways, curb and gutter on Keebler Road from Sher Nan Drive to West Main Street in Maryville
|
126-99715
|
Executed
|
02/23/2024
|
|
|
5
|
9
|
Hardin
|
|
Resurfacing on Bassett Road from Peters Creek Road to IL 146
|
127-99719
|
Executed
|
03/15/2024
|
1 / 1 |
1 |
5
|
9
|
Hardin
|
|
Replace a concrete ford low water crossing with a bridge to carry TR 52 over an unnamed stream located 2.4 miles south of Karbers Ridge.
|
128-99721
|
Executed
|
02/23/2024
|
1 / 1 |
2 |
5
|
9
|
Hamilton
|
|
35.36 miles of bituminous surface treatment on various routes.
|
129-99722
|
Executed
|
03/08/2024
|
|
|
5
|
9
|
Saline
|
|
HMA Resurfacing with aggregate shoulders on Galatia Road from Cedar Point Road to IL 34
|
130-62T14
|
Executed
|
03/05/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(1300-Ft) Bridge deck overlay and joint repairs of Roosevelt Road at IHB Railroad and Gardner Road and resurfacing of Roosevelt Road from W. of 25th Avenue to E. of IHB Railroad located in the Village of Broadview and the Village of Westchester, Cook County.
|
131-68H78
|
Executed
|
03/05/2024
|
|
|
3
|
4
|
Various
|
|
Bridge washing of nine (9) bridges in District 4.
|
132-46638
|
Active
|
12/04/2023
|
|
|
5
|
8
|
St. Clair
|
|
Pavement marking replacement at various locations in St. Clair County.
|
133-46933
|
Executed
|
03/05/2024
|
1 / 1 |
1 |
5
|
8
|
Marion
|
|
Resurfacing main and secondary park roads and parking lots, as well as culvert and bridge replacement, signage and lighting at the Stephen A. Forbes Recreation Area in Marion County.
|
134-62R40
|
Executed
|
02/23/2024
|
|
|
1
|
1
|
DuPage
|
|
(803-Ft) Curve correction project consists of earth excavation, removal and construction of a pipe culvert and drainages structure, pavement removal and full-depth HMA pavement, located along I-55 North Frontage Road at Cass Avenue in the City of Darien in DuPage County.
|
135-62R89
|
Executed
|
03/19/2024
|
5 / 5 |
2 |
1
|
1
|
Will
|
|
The project consists of the reconstruction of I-80 mainline pavement from west of Joliet Junction Trail to Wheeler Avenue. The work also includes reconstruction of the I-80 EB Bridge over Joliet Junction Trail, the l-80 WB Bridge over Joliet Junction Trail, I-80 EB Bridge over Midland Avenue, and the I-80 WB Bridge over Midland Avenue. Other work includes drainage system improvements, signing, lighting, temporary traffic signals, ITS improvements, and noise abatement walls. The project is in the Village of Rockdale, City of Joliet, Troy Township, and Joliet Township in Will County. Gross and Net Length 11,650 ft (2.206 Mi.).
|
136-62T44
|
Executed
|
03/05/2024
|
|
1 |
1
|
1
|
Cook
|
|
The proposed improvement consists of bridge deck overlay and joint repairs of 31st Street over I-90/94 located in the City of Chicago, Cook County. Total gross length= 860 FT (0.16 Mile) and net length= 630 FT (0.11 Mile).
|
137-62U97
|
Rejected
|
02/02/2024
|
|
|
1
|
1
|
Cook
|
|
This contract consists of debris and litter cleaning along I-290 and IL-110 (Eisenhower Expwy) from Austin Blvd. to Wells Street.
|
138-62V26
|
Executed
|
03/05/2024
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of cleaning and painting existing steel structures (016-0364) at US 14 (Caldwell Ave.) Over I-94 (Edens Expwy) in the City of Chicago in Cook County.
|
139-62V27
|
Executed
|
03/05/2024
|
|
|
1
|
1
|
Will
|
|
This project consists of a full bridge painting of the structure (099-0139) carrying US 52 (Jefferson St.) over I-55 in the Village of Shorewood and City of Joliet in Will County and zone painting of structure (099-0274) carrying IL 7 (West 9th St.) over EJandE Railroad in the City of Lockport in Will County.
|
140-70855
|
Withdrawn
|
01/11/2024
|
2 / 2 |
|
3
|
5
|
McLean
|
|
3P Policy, Designed Overlay, ADA Improvements, Traffic Improvements and Traffic Signal Replacement in Bloomington.
|
141-72791
|
Executed
|
03/08/2024
|
|
|
4
|
6
|
Logan
|
|
6.6 miles of milling and resurfacing on I-55, from 1.7 miles north of Elkhart to 1.3 miles south of Business Loop 55. Also includes deck replacement of SN 054-0039 at Broadwell and resurfacing of 800th Avenue from Old US 66 to 1100th Street.
|
142-72B88
|
Executed
|
03/08/2024
|
|
1 |
4
|
6
|
Mason
|
|
1.9 miles of resurfacing, pavement replacement, ADA improvements, drainage improvements, culvert replacements, parking lot improvements, tree removal and storm sewer reconstruction on IL 10, in Mason City, from 0.1 miles east of IL IL 29 to west of Price Street, east of Mason City. , 1.9 miles of resurfacing, pavement replacement, ADA improvements, drainage improvements, culvert replacements, parking lot improvements, tree removal and storm sewer reconstruction on IL 10, in Mason City, from 0.1 miles east of IL 29 to west of Price Street, east of Mason City.
|
143-72M79
|
Withdrawn
|
01/11/2024
|
2 / 2 |
1 |
4
|
6
|
Menard
|
|
1.9 miles of resurfacing and culvert improvements on IL 97 south of Petersburg, from 0.1 miles north of North Shore Drive to 0.3 miles north of Boy Scout Road.
|
144-72M82
|
Withdrawn
|
01/11/2024
|
|
|
4
|
6
|
Sangamon
|
|
1 mile of standard overlay, concrete curb and gutter ADA improvements and traffic signal upgrades on Business 55 / 6th Street in Springfield from north of Myrtle Street to Stanford Avenue.
|
145-74562
|
Withdrawn
|
01/16/2024
|
|
1 |
4
|
7
|
Clark
|
|
Replacement of SN 012-0018 carrying US 40 over North Fork Embarras River, 0.6 miles west of Washington Street in Martinsville.
|
146-76F88
|
Rejected
|
02/02/2024
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Superstructure replacement on the north Southern Illinois University - Edwardsville entrance road over the Norfolk Southern Railroad (SN 060-0142 and SN 060-0143).
|
147-76M81
|
Executed
|
03/08/2024
|
6 / 6 |
|
5
|
8
|
Randolph
|
|
6.5 miles of designed overlay with ADA improvements on IL 13 / IL 153 from IL 4 to the Perry County line.
|
148-46640
|
Executed
|
02/27/2024
|
1 / 1 |
|
2
|
2
|
Various
|
|
This work consists of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on each individual work order.
|
149-61H98
|
Executed
|
03/01/2024
|
4 / 3 |
1 |
1
|
1
|
Will
|
|
Pavement widening and reconstruction, storm sewer, sidewalk replacment, curb and gutter replacement, concrete box culvert, pavement markings, traffic signals, and water main replacement on IL 7 from Lincoln Street to Summit Drive in Lockport.
|
150-61J74
|
Rejected
|
02/20/2024
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
Sidewalk replacement with curb and gutter, pavement marking, signage, and landscaping along various routes in the Village of Niles.
|
151-61K06
|
Rejected
|
02/02/2024
|
5 / 3 |
1 |
1
|
1
|
Cook
|
|
Pavement widening, full-depth HMA reconstruction, storm sewer, sidewalk replacement, curb and gutter Replacement, guardrail and roadway lighting on Irving Park Road from Schaumburg Road to IL 59 in Streamwood.
|
152-64P41
|
Rejected
|
02/02/2024
|
3 / 3 |
|
2
|
2
|
Bureau, Whiteside
|
|
Cold Milling, Pavement Patching, and Hot-Mix Asphalt Resurfacing on IL 40 from 0.4 mile north of I-88 to IL 92.
|
153-66N21
|
Active
|
12/05/2023
|
|
|
2
|
3
|
Grundy
|
|
This project consists of repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Grundy County.
|
154-68D48
|
Executed
|
02/23/2024
|
3 / 3 |
|
3
|
4
|
Knox, Peoria
|
|
New bridge deck on SN 072-0032 carrying IL 78 over I-74, 4.5 miles west of Brimfield, deck replacement and miscellaneous repairs to SN 048-0035 carrying CH 18 over I-74, 3 miles east of Spoon River.
|
155-89756
|
Executed
|
02/23/2024
|
1 / 1 |
1 |
3
|
4
|
Mercer
|
|
Replace the superstructure for the bridge carrying CH6 over Henderson Creek, 3 miles north of Alexis.
|
156-91619
|
Active
|
12/05/2023
|
3 / 3 |
1 |
3
|
5
|
McLean
|
|
fulldepth pavement reconstruction, pipe underdrains, storm sewer, sidewalks, curb and gutter, signing, traffic signals, and lighting on West College Avenue from US 150/Rivian Motorway to west of the Norfolk Southern Railroad in Normal. Project includes reconstruction of the US 150, West College intersection to include a right turn lane onto West College Road.
|
157-62V10
|
Executed
|
03/01/2024
|
1 / 1 |
|
1
|
1
|
Will
|
|
(1.68-Mile) Designed Overlay consist of Hot-Mix Asphalt Resurfacing, Class D Pavement Patching, Grading and Shaping Ditches, Curb and Gutter Removal and Replacement on New Avenue from IL 171 (State Street) to Long Run Creek. This project is located in the City of Lockport in Will County.
|
158-97817
|
Executed
|
04/26/2024
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
PCC sidewalk from the Boul Avenue Trailhead Entrance to the intersection of Boul Avenue and IL 159 in Swansea.
|
159-97769
|
Executed
|
03/05/2024
|
|
|
5
|
8
|
Madison
|
|
HMA resurfacing with concrete curb and gutter, storm sewers, and signage on Sugar Loaf Road from west of Hone Lane to IL 157 in Collinsville.
|
160-64S31
|
Executed
|
02/23/2024
|
3 / 3 |
2 |
2
|
2
|
Whiteside
|
|
Deck repair, joint replacement, deck overlay and other miscellaneous repairs carrying SN's 098-0092, 098-0093 and 098-0094 over Elkhorn Creek, 0.3 mile south of Moline Road and SN's 098-0077 and 098-0078 over I-88, 5.1 miles west of IL 40.
|
161-64S53
|
Executed
|
02/23/2024
|
|
|
2
|
2
|
Rock Island
|
|
Bridge deck sealer applied to 18 structures in Rock Island County.
|
162-64S54
|
Executed
|
02/23/2024
|
|
|
2
|
2
|
Various
|
|
Bridge deck sealer applied to 45 structures in JoDaviess, Stephenson and Whiteside Counties.
|
163-76R56
|
Active
|
12/06/2023
|
|
|
5
|
8
|
Calhoun
|
|
Repair and maintenance of electrical equipment at the Joe Page Bridge in Hardin (SN 031-0001).
|
164-64R71
|
Executed
|
03/15/2024
|
27 / 27 |
3 |
2
|
2
|
Winnebago
|
|
2.504 Miles, Reconstruction, I-39: Harrison Ave to 0.4 miles north of Harrison Ave (Including interchange ramps) and US 20: I-39 to Mill Road; and Harrison Ave: Bell School Road to I-39.
|
01A-SA037
|
Executed
|
05/29/2024
|
|
|
5
|
8
|
Marion
|
|
Reconstruct North Airport Access Road and Install Gate
|
02A-MB035
|
Executed
|
05/13/2024
|
1 / 1 |
|
3
|
4
|
McDonough
|
|
Rehabilitate Entrance Road and Automobile Parking Lot; Replace Fence and Gates
|
03A-MB036
|
Executed
|
07/09/2024
|
|
1 |
3
|
4
|
McDonough
|
|
Rehabilitate Parallel Taxiway, Phase 2
|
04A-DI035
|
Active
|
11/28/2023
|
|
1 |
2
|
2
|
Lee
|
|
Rehabilitate Runway 12/30
|
05A-VA022
|
Rejected
|
12/02/2024
|
|
2 |
4
|
7
|
Fayette
|
|
Reconstruct Aircraft T-hangar Access Pavements
|
06A-EF010
|
Executed
|
07/26/2024
|
2 / 2 |
1 |
4
|
7
|
Effingham
|
|
Extend Runway 11-29 and Extend Taxiway A to Runway 29
|
07A-RB023
|
Executed
|
07/22/2024
|
3 / 3 |
1 |
4
|
7
|
Crawford
|
|
Construct Full Parallel Taxiway to Runway 9/27
|
08A-PL018
|
Executed
|
08/02/2024
|
|
1 |
5
|
9
|
Perry
|
|
Reconstruct T-Hangar Apron Area Designated TH/2
|
09A-DE084
|
Active
|
11/28/2023
|
|
1 |
4
|
7
|
Macon
|
|
Reconstruct select portions of the Airport Terminal Entrance Road
|
10A-HV008
|
Active
|
11/28/2023
|
|
1 |
4
|
6
|
Mason
|
|
Construct T-Hangar Pavements
|
11A-LE056
|
Executed
|
11/13/2024
|
|
1 |
1
|
1
|
Will
|
|
Install Airport Security Fencing
|
12A-VE057
|
Executed
|
08/20/2024
|
|
|
3
|
5
|
Vermilion
|
|
Upgrade Airport Perimeter Fence
|
13A-CA024
|
Executed
|
08/02/2024
|
|
1 |
4
|
6
|
Sangamon
|
|
Rehabilitate North Airport Public Parking Lot and North Airport Roadways
|
14A-WA076
|
Withdrawn
|
12/12/2023
|
|
|
1
|
1
|
|
|
Construct Wildlife Fencing - Phase 5 (Northwest Area)
|
15A-WA079
|
Executed
|
07/10/2024
|
|
2 |
1
|
1
|
Lake
|
|
Rehabilitate East Aircraft Parking Apron
|
16A-CO072
|
Rejected
|
06/07/2024
|
2 / 2 |
1 |
4
|
7
|
Coles
|
|
Reconstruct West Aircraft T-hangar Area Pavements
|