001-61K00
|
Executed
|
06/04/2024
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
Resurfacing Lombard Road from Army Trial Boulevard to Fullerton Avenue in the Village of Addison.
|
002-61K13
|
Executed
|
05/31/2024
|
|
1 |
1
|
1
|
DuPage
|
|
Sidewalk construction along Armitage Avenue from Ardmore Avenue to Ellsworth Avenue in Addison.
|
003-61K15
|
Executed
|
06/14/2024
|
1 / 1 |
|
1
|
1
|
Kane
|
|
Construct an HMA Shared-Use path with a prefabricated steel truss pedestrian bridge over Blackberry Creek. Includes drainage improvements and landscaping. Project is located between Bell Vue Lane and the Virgil Gilman Nature Trail in Sugar Grove.
|
004-61K29
|
Executed
|
05/31/2024
|
|
1 |
1
|
1
|
Cook
|
|
HMA Resurfacing, curb and gutter, driveways, sidewalks, pavement patching, pavement markings, restoring Parkways on 25th Avenue from Lawrence Avenue to Waveland Avenue in Schiller Park
|
005-61K30
|
Executed
|
06/07/2024
|
|
|
1
|
1
|
Cook
|
|
Extend a multi-use path from 84th Avenue to 179th Street in Tinley Park.
|
006-61K31
|
Executed
|
06/11/2024
|
|
|
1
|
1
|
Cook
|
|
Sidewalk construction on various routes within Alsip.
|
007-61K32
|
Executed
|
05/31/2024
|
2 / 2 |
3 |
1
|
1
|
DuPage
|
|
Pavement reconstruction with an HMA multi-use path, curb and gutter, HMA shoulders, sidewalks, ADA ramps, traffic signals, culvert extension, and storm sewer on Gary Avenue from Jewell Road to Harrison Avenue in Wheaton.
|
008-61K33
|
Executed
|
06/04/2024
|
|
|
1
|
1
|
DuPage
|
|
HMA Resurfacing, sidewalks, traffic signal modifications, and pavement markings on Main Street from Sherman Road to Franklin Street in Downers Grove.
|
009-61K36
|
Withdrawn
|
04/17/2024
|
|
|
1
|
1
|
Cook
|
|
Sidewalk construction on 91st Street from 0.1 mile east of California Avenue to Western Avenue at the CSX Railroad in Evergreen Park.
|
010-61K39
|
Executed
|
06/04/2024
|
|
1 |
1
|
1
|
Kane
|
|
Resurface Baseline Road from US 30 to IL 31 in Montgomery.
|
011-61K41
|
Executed
|
06/07/2024
|
1 / 0 |
|
1
|
1
|
Cook
|
|
Construct a concrete paver parking lot, retention basin, drainage improvements, and other work on the Cal-Sag Trial at the Lake Katherine Nature Center in Palos Heights.
|
012-61K42
|
Executed
|
06/04/2024
|
|
|
1
|
1
|
McHenry
|
|
Traffic signal replacement on Virginia Road from Teckler Boulevard to James R. Rekow Road, and at the intersection of Pyott Road and James R. Rekow Road in Crystal Lake and Lake of the Hills.
|
013-62P34
|
Executed
|
05/31/2024
|
|
2 |
1
|
1
|
Cook
|
|
(6,564-Ft) Standard Overlay project located on Cumberland Avenue from Belle Plaine Avenue to I-90 within the Village of Park Ridge and the City of Chicago in Cook County.
|
014-62P69
|
Executed
|
06/21/2024
|
1 / 1 |
2 |
1
|
1
|
Cook
|
|
The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Foster Avenue over North branch Chicago River in the of Chicago, Cook County. Gross and Net length: 2639 Ft (0.50 Mi), 1088 Ft (0.21 Mi)
|
015-62P76
|
Executed
|
05/31/2024
|
6 / 6 |
2 |
1
|
1
|
Cook
|
|
Replace wooden noise abatement walls along IL 53 from Dundee Road to Lake Cook Road with precast concrete walls on both east and west sides for a total length of 2.1 miles. Located within Platine, Arlington Heights and Palatine Township.
|
016-62R43
|
Executed
|
06/11/2024
|
|
2 |
1
|
1
|
Cook
|
|
(4,090-Ft) Standard Overlay, ADA Improvements. Project located on Kedzie Ave. from 71st St to 77th St within the City of Chicago in Cook County.
|
017-62R53
|
Executed
|
06/21/2024
|
|
1 |
1
|
1
|
Cook
|
|
This improvement consists of a standard overlay of the existing FAU 2691 (Wolf Road) from IL 58 (Golf Road) to North of Touhy Avenue in the City of DES Plaines in Cook County approximately 13,627 ft in length.
|
018-62R75
|
Executed
|
06/14/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(1,770-Ft) Improvement consists of bridge deck overlay and joint replacement of IL 83/Sibley Blvd located over UPRR (0.2-mile east of the State Street/Indiana Avenue). The project is in the Village of Dolton, Cook County.
|
019-62R91
|
Executed
|
06/07/2024
|
5 / 3 |
3 |
1
|
1
|
DuPage
|
|
Bridge Deck Overlay, Bridge Joint Replacement / Repair at US 20 (Lake Street) over IL 390 (Elgin O'Hare Expressway). This project is located in the Village of Hanover Park in DuPage County.
|
020-62T00
|
Executed
|
05/31/2024
|
|
2 |
1
|
1
|
McHenry
|
|
(200-Ft) Bridge Preservation project including bridge deck overlay, bridge joint replace/repair of SN 056-0052 carrying US 14 (Division Street) over Rush Creek, 0.1-miles North of IL 23 located within the City of Harvard in McHenry County.
|
021-62T33
|
Executed
|
06/07/2024
|
|
1 |
1
|
1
|
Will
|
|
This is a bridge preservation project of SN 099-0282; US 6 (Maple Road) over CN Railroad. Scope of work includes bridge deck scarification and overlay, joint repair, approach slab repair and sidewalk and guardrail replacement. The project is located within the City of Joliet in Will County.
|
022-62T42
|
Executed
|
06/21/2024
|
|
1 |
1
|
1
|
Cook
|
|
(5.626-Mile) Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Oak Brook, Westchester, Broadview, North Riverside, and Forest Park in Cook County.
|
023-62T69
|
Executed
|
07/16/2024
|
|
1 |
1
|
1
|
Lake
|
|
(4.65-Mile) SMART Resurfacing and ADA Ramp improvements from County Line Road to West of US 12 and includes road surface removal, HMA paving, sidewalk removal, installation of PCC sidewalk, detectable warnings, and placement of pavement markings. Improvements is in the Villages of Lake Zurich, North Barrington, Lake Barrington, and in Cuba and ELA Townships in Lake County.
|
024-62T85
|
Executed
|
05/31/2024
|
|
1 |
1
|
1
|
Cook
|
|
The proposed improvement consists of bridge deck overlay and joint repair of the structure located at the Dundee Road Bridge (SN 016-0940) on FAU 1273 (IL- 68 Dundee Road) 0.2 miles east of I-94 in Northfield Township and New Trier Township in Cook County.
|
025-62U84
|
Executed
|
06/11/2024
|
1 / 1 |
2 |
1
|
1
|
Kane
|
|
(4,485-Ft) Pavement rehabilitation and widening, drainage, intersection channelization, signing, lighting, traffic signals and safety improvements of US 20 from west of Nesler Road to east of Weld Road/Longcommon Parkway in the City of Elgin within Kane County.
|
026-62U87
|
Executed
|
06/11/2024
|
2 / 2 |
2 |
1
|
1
|
Cook
|
|
Scope of work includes pavement removal, Drainage Improvement, Concrete Barrier removal and construction of new Concrete Barrier, retaining wall repair, placement of subbase granular material, HMA asphalt pavement and thermoplastic pavement markings. Located at the IDOT Northbrook Maintenance yard at 1916 Techny Rd., Northbrook, IL.
|
027-62V18
|
Executed
|
05/28/2024
|
1 / 1 |
2 |
1
|
1
|
Various
|
|
This improvement consists of repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in various Counties throughout District 1.
|
028-62W01
|
Executed
|
06/14/2024
|
3 / 3 |
2 |
1
|
1
|
Cook
|
|
This is a parking lot improvement project for the District 1 Landscape Maintenance Yard. The Yard consists of 2 lots, adjacent to each other. Both lots are located at 1260 West Augusta Boulevard within the City of Chicago.
|
029-62W09
|
Executed
|
05/31/2024
|
1 / 1 |
1 |
1
|
1
|
Cook, DuPage
|
|
This project consists of debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in Cook and DuPage Co.
|
030-62W10
|
Executed
|
05/31/2024
|
|
1 |
1
|
1
|
Will
|
|
This work is located on I-55 expressway from I-355 to Reed Rd in Will County. It consists of debris cleaning and litter picking.
|
031-62W42
|
Executed
|
05/28/2024
|
|
1 |
1
|
1
|
Will
|
|
(231.5-Ft) This project includes overlay of Gougar Road Bridge over I-80 (SN 099-0 203) and replacement of permanent protective shield, in the Village of New Lenox within Will County.
|
032-62W46
|
Executed
|
05/17/2024
|
|
1 |
1
|
1
|
Various
|
|
The work to be completed under this contract consist of impact attenuators removal and replacement, sand modules replacement and any collateral work necessary to complete the improvement as shown on the plans and as described herein on a work order basis and per the Department-s request.
|
033-64L95
|
Executed
|
06/07/2024
|
6 / 6 |
3 |
2
|
2
|
Winnebago
|
|
Patching, milling, and resurfacing on IL 75 from 0.2 mile East of Moate Rd to 0.4 mile East of Meridian Rd.
|
034-64N90
|
Executed
|
06/11/2024
|
|
1 |
2
|
2
|
Rock Island
|
|
5.98 mile, HMA resurfacing on IL 92 from 115th St West in Andalusia to 0.4 mile East of IL 92 (N).
|
035-64P27
|
Executed
|
05/24/2024
|
1 / 1 |
1 |
2
|
2
|
Winnebago
|
|
0.55 miles of cold milling, patching, and HMA resurfacing from 0.4 miles East of Lyford Rd to 0.1 mile West of Winnebago County Line.
|
036-64P58
|
Executed
|
05/28/2024
|
|
1 |
2
|
2
|
Ogle
|
|
1.08 miles of cold milling, pavement patching, hot-mix asphalt resurfacing from West of Illinois St to 1st St in Oregon.
|
037-64S27
|
Executed
|
05/28/2024
|
1 / 1 |
2 |
2
|
2
|
Whiteside
|
|
Deck repair, joint replacement, deck overlay and other miscellaneous repairs on the existing bridges carrying I-88 over Rock Creek, BNSF RR Barstow Sub., Henry Road and Deer Creek.
|
038-64S29
|
Withdrawn
|
04/02/2024
|
2 / 2 |
|
2
|
2
|
Lee
|
|
Deck repair, joint replacement, deck overlay and other miscellaneous repairs on SN 052-0062 over UP RR at the the south edge of Dixon.
|
039-64S30
|
Executed
|
05/28/2024
|
2 / 2 |
1 |
2
|
2
|
Lee
|
|
Deck repair, joint replacement, deck overlay, and other miscellaneous repairs on SN 052-0061 over Coon Creek, 3.2 miles South of Amboy.
|
040-64S38
|
Executed
|
05/31/2024
|
|
1 |
2
|
2
|
Ogle
|
|
0.15 mile milling and standard overlay; tollway ramp (EB) to Steward Rd south of Rochelle.
|
041-64S55
|
Executed
|
05/28/2024
|
1 / 1 |
2 |
2
|
2
|
Jo Daviess
|
|
1.3 miles of patching through Elizabeth.
|
042-64S61
|
Executed
|
06/18/2024
|
2 / 2 |
1 |
2
|
2
|
Stephenson
|
|
Bridge deck repair on SN's 089-0058 and 089-0059, carrying US 20 over Silver Creek, 0.5 miles east of Springfield Rd.
|
043-64S68
|
Executed
|
05/31/2024
|
|
1 |
2
|
2
|
Henry
|
|
3.39 miles of HMA resurfacing and pavement patching, IL 82 frokm IL 81 in Camridge to N 70th Ave.
|
044-64S90
|
Withdrawn
|
04/02/2024
|
|
|
2
|
2
|
Lee
|
|
Partial cleaning and painting of structural steel on SN 052-0031 carrying US 30 over UPRR, 0.9 miles east of Whiteside County line.
|
045-64S95
|
Executed
|
05/28/2024
|
|
1 |
2
|
2
|
Henry
|
|
Pavement patching on I-74 from the I-74/I-80/I-280 interchange to IL 81.
|
046-64T03
|
Executed
|
07/16/2024
|
|
1 |
2
|
2
|
Various
|
|
Various routes on-call guardrail.
|
047-64T08
|
Rejected
|
05/10/2024
|
1 / 1 |
1 |
2
|
2
|
Various
|
|
Maintain and service all Intelligent Transportation System equipment located in the Department's Districts 2 and 3 to ensure the safety of the motoring public.
|
048-64T14
|
Executed
|
05/31/2024
|
|
1 |
2
|
2
|
Rock Island
|
|
7.26 miles of patching, milling, widening, and resurfacing along 104th St from US 150 south of Coal Valley to Mercer County Line north of Sherrard.
|
049-64T22
|
Executed
|
06/04/2024
|
|
1 |
2
|
2
|
Rock Island
|
|
31.1 miles of aggregate shoulder improvement.
|
050-66C45
|
Executed
|
06/14/2024
|
|
2 |
2
|
3
|
Iroquois
|
|
Work beings at the Iroquois/Ford county line on IL 116 extending 8.22 miles, ending at the interchange limits of IL 116 and I 57. The project is a milling and resurfacing designed overlay of IL 116 including drainage improvements.
|
051-66M43
|
Executed
|
05/24/2024
|
1 / 1 |
1 |
2
|
3
|
Iroquois
|
|
Class B Patching beginning at the Intersection of IL Route 49 (in Cresent City) and ending at the west abutment of Structure No. 038-0179 east of IL Route 1 in Watseka.
|
052-66M98
|
Executed
|
06/04/2024
|
|
1 |
2
|
3
|
Iroquois, Kankakee
|
|
Work beings at 0.1 Mi N of Ambrose St in St Anne to 1.8 Mi S of Papineau Rd. 6.22 Miles of smart overlay with ADA and drainage repairs.
|
053-66N40
|
Executed
|
05/24/2024
|
|
1 |
2
|
3
|
Livingston
|
|
Micro surfacing Joint Repair, Located on FAI 55 in Livingston County, from McLean County Line to 1.7 miles South of IL 116.
|
054-66N44
|
Executed
|
06/21/2024
|
1 / 1 |
2 |
2
|
3
|
Iroquois
|
|
Milling and resurfacing the Illinois Department of Transportation Ashkum Maintenance facility.
|
055-66N50
|
Executed
|
05/28/2024
|
|
1 |
2
|
3
|
Grundy
|
|
IL 47 at the north abutment, southbound lanes of structure No. 032-0099; the work consists of raising existing concrete pavement adjacent to approach pavement.
|
056-66N53
|
Executed
|
05/31/2024
|
1 / 1 |
1 |
2
|
3
|
Bureau
|
|
Bridge repairs at Structure No. 006-0083 carrying FAS 1252 (IL 26/29) over Bureau Creek Overflow, 0.3 mi. northeast of IL 26 and IL 29 junction.
|
057-66N54
|
Executed
|
05/24/2024
|
|
1 |
2
|
3
|
Iroquois
|
|
Remove concrete slope wall, install stone riprap, filter fabric, stone bedding, replace expansion joint seal, and structural repair of concrete (pier) on SN 038-0174.
|
058-66N92
|
Executed
|
05/31/2024
|
1 / 1 |
1 |
2
|
3
|
LaSalle
|
|
Cleaning and painting all structural steel on Structure No. 050-0019 carrying IL 351 over the Lone Star Cement Railroad, 2.0 miles south of US Route 6 (Oglesby).
|
059-66N93
|
Executed
|
05/31/2024
|
|
1 |
2
|
3
|
Bureau
|
|
Cleaning and painting all structural steel on Structure No. 006-0083 carrying IL 29/26 over Big Bureau Creek Overflow, 0.3 mi. north of the south junction of IL 26 and Structure No. 006-0084 carrying IL 29 over over Big Bureau Creek, 0.3 mi. south of the south junction of IL 26.
|
060-66N96
|
Executed
|
05/24/2024
|
|
1 |
2
|
3
|
Kankakee
|
|
SN 046-0108, riprap replacement, controlled low-strength material, riprap removal, grout for use with riprap.
|
061-66N97
|
Executed
|
05/24/2024
|
|
1 |
2
|
3
|
Iroquois
|
|
Traffic Signal Mast Arm Replacement. This project is located in Iroquois County, at the west intersection of US-24 and IL-1 in Watseka.
|
062-68880
|
Executed
|
07/16/2024
|
14 / 14 |
2 |
3
|
4
|
Peoria
|
|
Bridge deck replacement and rehabilitation on SN 072-0114 and SN 072-0115 over Kickapoo Creek/BNSF RR.
|
063-68F84
|
Executed
|
06/04/2024
|
|
1 |
3
|
4
|
Henderson
|
|
Bridge preservation to SN 036-0036 including: bridge joint replacement, hydroscarification, and MSC overlay on the bridge deck and roadway aproaches, slope wall repair, plating a beam end and other related collateral work to complete the work.
|
064-68H22
|
Active
|
03/11/2024
|
|
1 |
3
|
4
|
Marshall
|
|
NB and SN I-39 over TR 39, Sandy Creek and North Fork Sandy Creek in Marshall County.
|
065-68H27
|
Executed
|
05/31/2024
|
|
1 |
3
|
4
|
Various
|
|
D4 bridge deck sealing 2024 at various locations within District 4.
|
066-68H71
|
Active
|
03/11/2024
|
1 / 1 |
1 |
3
|
4
|
Tazewell
|
|
D4 Bridge Joint Repair 2024 at SN's 090-0130, 090-0132, 090-0133, 090-0137, 090-0138 and 090-0139 in Tazewell County.
|
067-68H81
|
Executed
|
05/24/2024
|
4 / 3 |
1 |
3
|
4
|
Tazewell
|
|
Bridge deck patching on SN 090-0141 on Morton Ave (FAU 6729) over I-74 in Morton in Tazewell County.
|
068-68H83
|
Executed
|
06/04/2024
|
2 / 2 |
1 |
3
|
4
|
Peoria
|
|
Paving the invert of the culvert under IL Rt 6 between Knoxville Ave and Allen Rd.
|
069-68H84
|
Executed
|
05/28/2024
|
1 / 1 |
1 |
3
|
4
|
Mercer
|
|
Culvert wingwall and slope repairs along IL 17, 3.8 miles east of US 67 in Mercer County.
|
070-68H85
|
Executed
|
05/31/2024
|
1 / 1 |
1 |
3
|
4
|
Peoria
|
|
Culvert wing wall repair (remove and replace) along IL 78, north of IL 116 near Farmington in Peoria County.
|
071-68H86
|
Executed
|
06/14/2024
|
|
1 |
3
|
4
|
Knox, Peoria
|
|
Pavement and drainage under RR viaducts on IL 90 and IL 78 in Peoria and Knox Counties.
|
072-68H91
|
Executed
|
06/04/2024
|
|
1 |
3
|
4
|
Various
|
|
D4 District-wide pavement markings.
|
073-68I01
|
Executed
|
06/14/2024
|
11 / 10 |
2 |
3
|
4
|
Woodford
|
|
Rehabilitation to existing lagoon at the eastbound I-74 Mackinaw Dells Rest Area.
|
074-68I05
|
Executed
|
05/24/2024
|
|
2 |
3
|
4
|
Tazewell
|
|
Traffic signal mast arm replacement at IL 98 (Birchwood St.) and I-155 NB ramps in Morton.
|
075-68J05
|
Executed
|
06/04/2024
|
|
2 |
3
|
4
|
Peoria
|
|
Traffic signal mast arm replacement at IL 29/Cedar Hills Drive in Peoria County.
|
076-70254
|
Executed
|
06/07/2024
|
6 / 6 |
3 |
3
|
5
|
Champaign
|
|
0.34 mi Bridge Replacement over I-57 west of Champaign.
|
077-70753
|
Executed
|
05/31/2024
|
1 / 1 |
2 |
3
|
5
|
Champaign
|
|
165' culvert replacement at ditch 0.6 and 2.2 miles east of Gifford ECL.
|
078-70C24
|
Executed
|
05/31/2024
|
6 / 6 |
3 |
3
|
5
|
Douglas
|
|
Designed Overlay Resurfacing from Coles Co Line to 0.3 mi north of US 36.
|
079-70D26
|
Executed
|
06/04/2024
|
|
1 |
3
|
5
|
Edgar
|
|
Culvert replacement field entrance east of Hume Station 1185+00.
|
080-70E12
|
Executed
|
06/11/2024
|
|
2 |
3
|
5
|
McLean
|
|
14.93 miles of SMART Overlay - Standard Overlay ADA Improvements.
|
081-70G75
|
Executed
|
06/11/2024
|
|
1 |
3
|
5
|
McLean
|
|
7.544 miles of SMART resurfacing form West of Cooksville to East of Colfax.
|
082-70G81
|
Executed
|
06/04/2024
|
|
1 |
3
|
5
|
Vermilion
|
|
Bridge repair structure 092-0050 bearing replacement at piers.
|
083-70H06
|
Executed
|
06/11/2024
|
|
1 |
3
|
5
|
Champaign, Piatt
|
|
Piatt/Champaign Co Line to I-57 west of Champaign and Dewitt/Piatt Co Line to 1 mi east of 900E Rd west of Mansfield.
|
084-70H14
|
Executed
|
06/14/2024
|
|
1 |
3
|
5
|
McLean
|
|
Bridge painting of 6 structures on various routes in McLean County.
|
085-72189
|
Executed
|
06/04/2024
|
2 / 2 |
1 |
4
|
6
|
Sangamon
|
|
Bridge deck overlay, bridge joint repair/replacement, bridge deck painting and bridge repairs on SN 084-0109 and SN 084-0110 carrying I-55 over IL 104 at the Auburn interchange.
|
086-72219
|
Executed
|
06/04/2024
|
|
1 |
4
|
6
|
Christian
|
|
1.2 miles of overlay and bridge deck overlay on IL 48 from 0.9 miles southwest of Old IL 48 (Spresser Street), southwest of Taylorville, to 0.4 miles southwest of the South Fork Sangamon River.
|
087-72223
|
Executed
|
06/18/2024
|
|
1 |
4
|
6
|
Pike
|
|
Bridge deck overlay, deck repairs, and joint replacement on SN 075-0036 carrying IL 96 over Hadley Creek, 0.7 miles south of the IL 106 Junction in Kinderhook.
|
088-72230
|
Executed
|
06/04/2024
|
|
1 |
4
|
6
|
Macoupin
|
|
1.1 miles of patching, resurfacing, adding parking lanes and sidewalk ramp improvements on IL 4 from south of North Street in Girard to north of Cambridge Road, south of Girard.
|
089-72265
|
Executed
|
05/31/2024
|
1 / 1 |
1 |
4
|
6
|
Macoupin
|
|
8.7 miles of cape seal and grinding on IL 108 and 111 from west of Carlinville to the northern IL 108 and111 intersection.
|
090-72282
|
Executed
|
05/31/2024
|
|
1 |
4
|
6
|
Sangamon
|
|
5 miles of resurfacing, curb and gutter replacement, guardrail replacement and bridge deck preservation (over Richland Creek) on IL 97 from the Menard County line to IL 125. SN 084-0068
|
091-72304
|
Executed
|
06/07/2024
|
|
1 |
4
|
6
|
Montgomery
|
|
7.6 miles of resurfacing including interchange ramps on I-55 from 0.4 miles south of CH 17 (Mine Avenue) at the Farmersville interchange to just south of the Sangamon County line. Also includes fog seal of shoulders and culvert repairs.
|
092-72498
|
Executed
|
08/16/2024
|
|
1 |
4
|
6
|
Sangamon
|
|
Resurfacing on Old US 66 from 0.1 miles south of New City Road to 0.19 miles east of Burttle Lane, east of I-55.
|
093-72620
|
Executed
|
05/31/2024
|
2 / 2 |
1 |
4
|
6
|
Schuyler
|
|
Painting portions of SN 085-0029 carrying IL 99 over Cedar Creek, 0.65 miles north of Camden.
|
094-72725
|
Executed
|
06/04/2024
|
1 / 1 |
1 |
4
|
6
|
Montgomery
|
|
Pipe culvert removal and replacement on Nokomis Blacktop, 0.08 miles east of E 15th Road.
|
095-72732
|
Deleted
|
03/19/2024
|
|
|
4
|
6
|
Morgan
|
|
Deck patching on 4 bridges carrying US 67 over IL 104 ramps and NSRR northwest of Jacksonville. (SN 069-0073, 0074, 0075, 0076)
|
096-72735
|
Executed
|
05/28/2024
|
|
1 |
4
|
6
|
Various
|
|
Maintenance and repair of surveillance cameras, vehicle detectors, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet networks and peripheral equipment throughout District 6.
|
097-72E35
|
Executed
|
06/04/2024
|
|
1 |
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6.
|
098-72E36
|
Executed
|
05/28/2024
|
1 / 1 |
1 |
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6.
|
099-74443
|
Executed
|
06/04/2024
|
2 / 2 |
3 |
4
|
7
|
Lawrence
|
|
Replacement of SN 051-0009 carrying US 50 over Muddy Creek, 0.5 miles east of Summer Road.
|
100-74458
|
Executed
|
05/31/2024
|
2 / 2 |
2 |
4
|
7
|
Fayette
|
|
5.8 miles of resurfacing and ADA improvements on US 51 in the Village of Ramsey.
|
101-74564
|
Deleted
|
03/21/2024
|
|
|
4
|
7
|
Coles
|
|
Superstructure and substructure replacement of SN 015-0068 carrying 900N over Riley Creek, 0.3 miles west of Charleston.
|
102-74857
|
Executed
|
05/31/2024
|
|
1 |
4
|
7
|
Wayne
|
|
Bridge superstructure replacement on SN 096-0064 carrying IL 15 over Pond Creek, 0.4 miles west of 2095E, east of Fairfield.
|
103-74986
|
Executed
|
06/04/2024
|
7 / 7 |
3 |
4
|
7
|
Coles
|
|
8 miles of patching, HMA surface removal, HMA resurfacing, aggregate shoulders and guardrail replacement on Lake Paradise Road from IL 16 to the Cumberland County line.
|
104-74A08
|
Executed
|
06/07/2024
|
|
1 |
4
|
7
|
Lawrence, Richland
|
|
6.4 miles of resurfacing on US 50 from 4 miles west of the Lawrence County line to 0.2 miles east of IL 250.
|
105-74A85
|
Executed
|
05/31/2024
|
|
1 |
4
|
7
|
Crawford
|
|
Culvert removal and precast concrete culvert placement at 5 entrance locations on TR 183A (East 1000th Avenue) in Palestine.
|
106-74B18
|
Executed
|
05/28/2024
|
1 / 1 |
2 |
4
|
7
|
Macon
|
|
HMA resurfacing over bare concrete with geometric improvements on IL 48 from 0.5 miles north of US 51 to south of Bowman Road.
|
107-74B42
|
Executed
|
06/11/2024
|
|
1 |
4
|
7
|
Effingham
|
|
5.5 miles of crack and joint sealing on US 40 from East Division Street in Altamont to 0.3 miles west of Lake Sara Road.
|
108-74B47
|
Executed
|
05/24/2024
|
|
1 |
4
|
7
|
Clark
|
|
Removal and replacement of PCC sidewalks and ADA ramps at the Cumberland Rest Area on I-70.
|
109-74C41
|
Executed
|
06/04/2024
|
|
1 |
4
|
7
|
Coles
|
|
3.8 miles of patching, milling and resurfacing on IL 16 from just east of 36th Street in Mattoon to the Moultrie County line.
|
110-74C43
|
Executed
|
05/24/2024
|
1 / 1 |
|
4
|
7
|
Effingham, Fayette
|
|
2.4 miles of cape seal on IL 128 from the Shelby County line to IL 33.
|
111-74C67
|
Executed
|
06/14/2024
|
|
1 |
4
|
7
|
Wayne
|
|
Bridge painting at various locations in Wayne County.
|
112-74C71
|
Executed
|
06/07/2024
|
1 / 1 |
1 |
4
|
7
|
Crawford
|
|
Partial width resurfacing on IL 33 from 0.7 miles west of 1300th Street to 0.1 miles west of 1300th Street in Robinson.
|
113-74C72
|
Executed
|
06/04/2024
|
|
1 |
4
|
7
|
Wayne
|
|
Patching at the intersection of US 45 and IL 15 in Fairfield.
|
114-74C73
|
Executed
|
06/04/2024
|
|
1 |
4
|
7
|
Macon
|
|
3.6 miles of patching on IL 48, IL 121 from 0.5 miles north of I-72 to 0.3 miles south of Pershing Road in Decatur.
|
115-74C74
|
Executed
|
05/31/2024
|
|
1 |
4
|
7
|
Macon
|
|
Patching on IL 121 from Garfield Avenue to Locust Street and on IL 105 from 0.1 miles north of Cantrell to 0.1 miles south of Cantrell.
|
116-74C80
|
Executed
|
05/24/2024
|
|
|
4
|
7
|
Coles, Effingham
|
|
Parking lot improvements at the Effingham District Office and the Mattoon Yard.
|
117-74C82
|
Executed
|
06/04/2024
|
|
1 |
4
|
7
|
Macon
|
|
Remove and replace light poles, light pole foundations, wiring, electric service, and lighting controller at the Niantic Intechange on I-72, Exit 128.
|
118-74C86
|
Executed
|
06/04/2024
|
1 / 1 |
1 |
4
|
7
|
Clark
|
|
2.9 miles of pothole patching and seal coat for bituminous surface treatment at 12 locations in Clark County.
|
119-74C88
|
Executed
|
06/04/2024
|
|
1 |
4
|
7
|
Various
|
|
Repairing, replacing, servicing, and maintaining the electrical systems throughout District 7.
|
120-76L34
|
Executed
|
06/11/2024
|
|
1 |
5
|
8
|
Washington
|
|
8.5 miles of crack and joint sealing on I-64 from the Clinton County line to 1.1 miles west of Covington Road.
|
121-76M86
|
Executed
|
06/04/2024
|
2 / 2 |
|
5
|
8
|
St. Clair
|
|
Lighting on I-55/70/64 from the Mississippi River to east of the I-64 (Tri-Level) Interchange.
|
122-76P46
|
Withdrawn
|
04/26/2024
|
|
1 |
5
|
8
|
Madison
|
|
Bridge repair on SN 060-0124, HMA overlay and joint repair on IL 111 over NW and CNW and MCT Bike Trail, 0.2 miles north of IL 162 in Pontoon Beach.
|
123-76R12
|
Executed
|
05/31/2024
|
|
1 |
5
|
8
|
Madison
|
|
Bridge deck sealing on US 67 at the Clark Bridge (SN 0606-0255) over the Mississippi River in Alton.
|
124-76R37
|
Executed
|
06/04/2024
|
|
1 |
5
|
8
|
St. Clair
|
|
4.8 miles of fog seal on IL 156 from IL 159 to IL 13.
|
125-76R39
|
Executed
|
06/11/2024
|
|
1 |
5
|
8
|
Madison
|
|
6.3 miles of crack and joint sealing on I-70 from 0.1 miles west of Prairie Road to the Bond County line.
|
126-76R59
|
Executed
|
06/04/2024
|
|
|
5
|
8
|
Madison
|
|
Milling and resurfacing of the District 8 office parking area (west, southwest parking area and loading docks).
|
127-76R94
|
Executed
|
06/04/2024
|
2 / 2 |
2 |
5
|
8
|
St. Clair
|
|
Replacing high mast, roadway and underpass luminaires along I-55/70/64 near East St. Louis.
|
128-76T20
|
Executed
|
05/31/2024
|
|
1 |
5
|
8
|
St. Clair
|
|
0.5 miles of resurfacing on Boul Avenue from IL 161 to IL 159 in Swansea.
|
129-76T29
|
Executed
|
06/04/2024
|
|
1 |
5
|
8
|
St. Clair
|
|
1 mile of patching and resurfacing on IL 111 from the CSX Railroad bridge to Collinsville Road.
|
130-76T32
|
Executed
|
06/04/2024
|
2 / 2 |
2 |
5
|
8
|
Clinton
|
|
0.7 miles of patching and resurfacing on IL 161 from 0.3 miles west of Red Fox Road to 0.1 miles east of Church Steeple Road.
|
131-76T34
|
Executed
|
06/04/2024
|
|
1 |
5
|
8
|
St. Clair
|
|
Patching and resurfacing on Collinsville Road/9th Street/Fairmont Avenue from 0.1 miles west of Rose Lake Road in East St. Louis to east of Exchange Avenue.
|
132-76T40
|
Executed
|
06/07/2024
|
2 / 2 |
1 |
5
|
8
|
Clinton
|
|
Bridge painting on US 50 under Schumacher Road, 5 miles east of Trenton (SN 014-0050), and on IL 127 over Flat Branch Creek, 8.1 miles north of Carlyle (SN 014 0063).
|
133-76T41
|
Executed
|
05/31/2024
|
3 / 3 |
1 |
5
|
8
|
St. Clair, Washington
|
|
Bridge painting on the structure carrying I-64 westbound over NS Railroad, 0.3 miles east of IL 161 and on the structure carrying IL 127 over Locust Creek, 5.5 miles south of Nashville. (SN 082-0195 and SN 095-0065)
|
134-76T42
|
Executed
|
06/07/2024
|
2 / 2 |
1 |
5
|
8
|
Greene
|
|
Bridge painting on the structure carrying IL 267 over Apple Creek, 8.6 miles north of Greenfield and the structure carrying IL 267 over Lick Creek, 6.6 miles north of Greenfield. (SN 031-0015 and SN 031-0016)
|
135-76T45
|
Executed
|
06/04/2024
|
|
1 |
5
|
8
|
Various
|
|
Video detection system replacement at various locations in District 8.
|
136-76T46
|
Executed
|
06/07/2024
|
|
1 |
5
|
8
|
Randolph
|
|
Bridge repair on Little Mary-s Covered Bridge (SN 079-9000) on IL 150, 4 miles northeast of Chester.
|
137-76T51
|
Executed
|
06/04/2024
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Demolition of buildings along Old IL 3 (South Main Street) near Imbs Station Road in Dupo.
|
138-76T53
|
Executed
|
05/31/2024
|
|
1 |
5
|
8
|
Madison, St. Clair
|
|
Traffic signal modernization at various locations: St. Clair Ave. and 37th/38th Street; Foley Drive/70th Street and W. Main Street; 74th Street and Foley Drive; IL 159 and IL 13/158; IL 15 and 74th Street; IL 161 and Frank Scott Parkway in Belleville; IL 3 and Pontoon Road in Granite City.
|
139-76T54
|
Executed
|
05/31/2024
|
|
1 |
5
|
8
|
Jersey, Madison
|
|
Bridge approach roadway on IL 255 and US 67 at various locations: IL 255 over Humbert Road (SN 060-0309), UP and KCS Railroad (SN 060-0311), and over IL 111/IL 267 (SN 060-0331); US 67 over IL 255 (SN 060-0332) and over Piasa Creek (SN 042-0027).
|
140-76T55
|
Executed
|
05/31/2024
|
|
1 |
5
|
8
|
Various
|
|
Lighting and traffic signal repair and maintenance at various locations throughout District 8.
|
141-76T59
|
Executed
|
05/31/2024
|
1 / 1 |
1 |
5
|
8
|
Washington
|
|
8.1 miles of resurfacing on IL 15 from 0.1 miles east of Gardner Street in Nashville to the US 51 West Junction.
|
142-76T60
|
Executed
|
05/31/2024
|
1 / 1 |
1 |
5
|
8
|
Randolph
|
|
8 miles of ultra-thin bonded wearing surface on IL 3 from 0.1 miles north of Roots Road to 0.1 miles south of Elmer and Edna Kipp Lane.
|
143-76T61
|
Executed
|
06/07/2024
|
3 / 3 |
3 |
5
|
8
|
Washington
|
|
3.4 miles of resurfacing on IL 127 from Masonic Drive to Conservation Drive, south of Nashville.
|
144-76T64
|
Executed
|
06/04/2024
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Pump replacement at the Bowman Pump Station in East St. Louis.
|
145-76T65
|
Executed
|
05/31/2024
|
|
1 |
5
|
8
|
Madison
|
|
6.6 miles of overlay on IL 140 from 0.2 miles west of IL 159 to 0.1 miles west of Park Avenue.
|
146-78825
|
Executed
|
06/07/2024
|
2 / 2 |
2 |
5
|
9
|
Jackson
|
|
Slope stabilization and resurfacing on IL 127 approximately 0.5 miles south of Tomcat Hill Lane, south of Murphysboro.
|
147-78920
|
Executed
|
05/31/2024
|
|
1 |
5
|
9
|
Gallatin
|
|
Joint reconstruction with strip seals, base course widening, bridge deck, approach slab and structure repair, deck scarification and microsilica overlay on SN 030-0020 carrying IL 1 over Lawler Ditch and SN 030-0021 carrying IL 1 over Saline River southeast of Equality.
|
148-78999
|
Executed
|
05/31/2024
|
|
1 |
5
|
9
|
Hamilton, White
|
|
Removal and replacement of 2 box culverts: SN 097-7066 carrying US45 over an unnamed ditch, north of Norris City and SN 033-7020 carrying IL242 over an unnamed ditch, south of Belle Prairie City.
|
149-78A06
|
Executed
|
06/07/2024
|
|
1 |
5
|
9
|
Williamson
|
|
Microsilica deck overlay, joint replacement and bridge deck patching on SN 100-0037 carrying IL 148 over Middle Wolf Creek, 1 mile north of I-57.
|
150-78A08
|
Executed
|
05/31/2024
|
1 / 1 |
2 |
5
|
9
|
Hamilton, Jefferson
|
|
Bridge repairs of SN 041-0062 on IL 142 over I-64, 1.5 miles southeast of Mt. Vernon and bridge repairs of SN 033-0038 on IL 14 over Sullivan Creek, 1.5 miles northeast of Macedonia.
|
151-78A10
|
Executed
|
05/31/2024
|
|
1 |
5
|
9
|
Jefferson
|
|
Bridge deck overlay on SN 041-0099 carrying IL 142 over Rock Branch, 1.4 miles southeast of Belle Rive; and bridge deck overlay on SN 041-0048 carrying IL 142 over Rocky Branch Tributary, 1.4 miles southeast of Belle Rive.
|
152-78A19
|
Executed
|
06/14/2024
|
|
1 |
5
|
9
|
Williamson
|
|
2.2 miles of resurfacing on IL 13 from Sinclair Street to IL 37.
|
153-78A21
|
Executed
|
05/31/2024
|
2 / 2 |
3 |
5
|
9
|
Jackson, Perry
|
|
10.9 miles of HMA surface removal, resurfacing, HMA shoulders, patching, rumble strips and guardrail improvements on IL 4 from IL 150 to Keller Street, west of the Ava.
|
154-78A22
|
Executed
|
06/07/2024
|
|
1 |
5
|
9
|
Pulaski
|
|
Structural repair of concrete, pier cap encasement and replacement of seismic restrainer cables on piers 7-15 on SN 077-0002 carrying I-57 over Old US 51.
|
155-78A36
|
Executed
|
05/31/2024
|
|
1 |
5
|
9
|
Jackson
|
|
0.94 miles of patching on IL 149 from Grimsby Road to 1 mile east of the truck climbing lane near Kinkaid Creek in Murphysboro.
|
156-78A60
|
Executed
|
06/04/2024
|
|
1 |
5
|
9
|
Jackson
|
|
Traffic signal detection at 2 intersection: 1) IL 13 at New Era; 2) IL 13 at Sycamore/Emerald.
|
157-78A61
|
Executed
|
05/31/2024
|
|
1 |
5
|
9
|
Jefferson
|
|
Patching of the ramps and parking lots at the eastbound and westbound Goshen Road Rest Areas on I-57.
|
158-78A62
|
Executed
|
05/31/2024
|
1 / 1 |
2 |
5
|
9
|
Franklin, Jefferson
|
|
9.8 miles of patching on I-57 from 2.5 miles south of IL 154 to Atchison Creek, south of Bonnie.
|
159-85757
|
Executed
|
05/28/2024
|
|
1 |
2
|
2
|
Lee
|
|
HMA resurfacing with aggregate shoulders on Indian Road from the Bureau County Line to Van Petten Road, and on Van Petten Road from the Whiteside County Line to Indian Head Road.
|
160-85759
|
Executed
|
05/31/2024
|
|
1 |
2
|
2
|
Whiteside
|
|
Resuracing Hahnaman Road from Yorktown Road to Tampico Village Limits, and Yorktown Road from Hahnaman Road to Osage Road, and Yorktown Road to 0.2 mile east of Yorktown Road.
|
161-87791
|
Executed
|
06/07/2024
|
1 / 1 |
1 |
2
|
3
|
Grundy
|
|
Rehabilitate the bridge carrying CH 34V over the Mazon Ricer, 0.7 mile north of I-55, and replace the bridge carrying FAS 272 over an Unnamed Creek 3 miles southwest of Mazon.
|
162-87792
|
Executed
|
06/07/2024
|
|
|
2
|
3
|
Grundy
|
|
Replace 3 structures on Grand Ridge Road over Hog Run, Bills Run and Waupecan Creek, located between LaSalle Road anc Verona Road.
|
163-87815
|
Executed
|
06/07/2024
|
|
|
2
|
3
|
Bureau
|
|
Replace the bridge carrying TR 312 over the Tributary to Masters Creek, 4 miles west of LaMolle.
|
164-87820
|
Executed
|
06/18/2024
|
|
|
2
|
3
|
Livingston
|
|
Replace existng structure with a three-span RC slab bridge with HMA approach, aggregate and HMA shoulders, and guardrail improvements on CH 3 over Broughton Creek, one mile north of Campus.
|
165-87824
|
Executed
|
05/31/2024
|
|
1 |
2
|
3
|
Bureau
|
|
Resurface CH 8 from east city limits of Walnut to 2600 Avenue/CH 22, and from the Lee County line to IL 92.
|
166-87826
|
Executed
|
06/04/2024
|
1 / 1 |
1 |
2
|
3
|
DeKalb
|
|
HMA resurfacing and shoulders on Chicago Road from the Lee County line to Shabbona Road, on Rollo Road from Chicago Road to Suydam Road, and on Suydam Road from Rool Road to the LaSalle County Line.
|
167-87829
|
Executed
|
06/04/2024
|
|
1 |
2
|
3
|
Kankakee
|
|
Resurfacing CH 3 from the Iroquois County line to CH 37.
|
168-87831
|
Executed
|
06/04/2024
|
2 / 2 |
1 |
2
|
3
|
Livingston
|
|
HMA Resurfacing with Cold-In-Place Recycling, aggregate base course widening, and aggregate shoulders on CH 6 rom 20000N Road to CH 8.
|
169-87847
|
Executed
|
06/07/2024
|
8 / 5 |
1 |
2
|
3
|
LaSalle
|
|
Resurfacing CH 2 from the Somonauk South City Limits to US 52.
|
170-89827
|
Executed
|
06/04/2024
|
|
1 |
3
|
4
|
Knox
|
|
HMA resurfacing with ADA improvements, drainage improvements and pavement markings on West Carl Sandburg Drive from Henderson Street to Broad Street in Galesburg.
|
171-89831
|
Executed
|
05/28/2024
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
Construct 4" wide HMA Shoulders with Rumble Strips and pavement markings on Smithville Road to Lancaster Road.
|
172-90392
|
Executed
|
06/21/2024
|
|
1 |
3
|
5
|
Vermilion
|
|
2.94 miles designed overlay from Catlin/Indianola Rd to 0.3 mile west of US 150 in Westville.
|
173-93818
|
Executed
|
06/11/2024
|
3 / 3 |
1 |
4
|
6
|
Morgan
|
|
HMA resurfacing with Curb and Gutter, sidewalks, storm sewers, lighting, signage and streetscape improvements on West State Street from Church Street to Sandy Street in Jacksonville.
|
174-95931
|
Executed
|
05/31/2024
|
|
|
4
|
7
|
Lawrence
|
|
Replace existing structure with a Three-Span PPC Deck Beam Bridge with HMA Approach on Applegate Road over Eagle Branch, 4 miles southeast of Chauncey.
|
175-95934
|
Executed
|
06/11/2024
|
2 / 2 |
1 |
4
|
7
|
Cumberland
|
|
Replace existing structure with a single-span PPC deck beam bridge with HMA approach and guardrails on Cumberland Road over Embarras River Overflow, 0.5 miles west of Greenup.
|
176-95949
|
Executed
|
06/07/2024
|
1 / 1 |
|
4
|
7
|
Richland
|
|
Reconstruction of Calhoun Lane from IL 130 to east city limits of Calhoun.
|
177-95954
|
Executed
|
06/07/2024
|
|
|
4
|
7
|
Lawrence
|
|
Sidewalk constrution on Christy Avenue from North Railroad Street to Cedar Street, and Locust Street from May Street to Christy Avenue in Sumner.
|
178-95955
|
Executed
|
07/16/2024
|
|
|
4
|
7
|
Shelby
|
|
HMA resurfacing with pavement patching, aggregate wedge shoulders and driveway improvements on North Broadway Street from North 12th Street to North 9th Street in Shelbyville.
|
179-97823
|
Executed
|
06/21/2024
|
|
|
5
|
8
|
Marion
|
|
Replace existing structure with a three-span PPC deck beam structure on H-Pile supported abutments, individual concrete encased H-pile piers with approach roadways on Kline Road over Flat Creek, one mile northwest of Vernon.
|
180-97828
|
Executed
|
06/04/2024
|
2 / 2 |
2 |
5
|
8
|
Bond
|
|
HMA resurfacing with sidewalk ramps on Beaumont Avenue from North 3rd Street to IL 140 in Greenville.
|
181-99717
|
Executed
|
06/14/2024
|
|
|
5
|
9
|
Jackson
|
|
PCC shared-use path with drainage improvements, signage and ADA ramps along IL 13 from West Murphysboro Road to Wood Road in Carbondale.
|
182-62380
|
Executed
|
06/14/2024
|
6 / 6 |
2 |
1
|
1
|
Will
|
|
Location 1: FAU 354 (Richards Street) at Hickory Creek North of I-80 (SN 099- 0123) 1,835 Feet (0.35 Mile) project which includes reconstruction and widening of the bridge bridge superstructure, pavement reconstruction, noise barriers, drainage, signing, lighting, and traffic signals in the City of Joliet and Joliet Township in Will County. Location feet 2: FAI 80 (I-80) over Des Plaine River (099-0056 EB and 099-0057 WB) 782 feet (0.15 Mile) project which includes structural steel repairs in the City of Joliet and Joliet Township in Will Co.
|
183-62P50
|
Executed
|
06/07/2024
|
2 / 2 |
2 |
1
|
1
|
Cook
|
|
(4,470-Ft) Corridor improvement, traffic signal modernization/ replacement and ADA improvements project on IL Route 43 (Harlem Avenue) and includes the intersections of 78th St., 79th St., 83rd St., 84th St., 87th St., 88th St./ Southfield Shopping Center Dr., and 90th St. in the Village of Bridgeview in Cook County.
|
184-62R65
|
Executed
|
05/31/2024
|
|
1 |
1
|
1
|
Cook
|
|
The improvement consists of cleaning and painting existing steel on various structures located in Villages of Hodgkins and Summit in Cook County. Location 1 (SN: 016-0004, 0005, 0006, and 0007) in Village of Hodgkins, Location 2 (016-0012 and 0013) in Village of Summit, and Location 3 (SN: 016-0014 and 0015) Village of Summit.
|
185-62R69
|
Executed
|
06/11/2024
|
|
1 |
1
|
1
|
Cook
|
|
(2.07-Mile) SMART Overlay on 183rd Street from Oak Park Ave to IL 50 (Cicero Ave). This project is located in the City of Country Club Hills, the Village of Tinley Park and unincorporated Cook County.
|
186-62T45
|
Executed
|
05/31/2024
|
|
1 |
1
|
1
|
Kane
|
|
This is a bridge preservation project of (SN 045-2015); Galena Blvd. over Blackberry Creek. Scope of work includes bridge deck scarification and latex overlay, full depth deck patching, approach slab repair and drainage adjustments. The project is located within the City of Aurora in Kane County.
|
187-62U73
|
Active
|
03/15/2024
|
2 / 2 |
2 |
1
|
1
|
DuPage
|
|
(2,000-Ft) Traffic Signal Modernization and Intersection Improvements located at IL 83 (Kingery Highway) and Bluff Rd. in the Downers Grove Township, DuPage County.
|
188-72122
|
Withdrawn
|
04/25/2024
|
|
3 |
4
|
6
|
Sangamon
|
|
1.7 miles of pavement reconstruction, milling and resurfacing, sidewalk ramp improvements and accessible pedestrian traffic signals on Dirksen Parkway from 0.1 miles south of Peoria Road to north of Northfield Drive in Springfield.
|
189-72715
|
Deleted
|
03/19/2024
|
|
|
4
|
6
|
Sangamon
|
|
Substructure repairs on SN 084-0073 and 084-0178 carrying Dirksen Parkway over NSRR and ICRR in Springfield.
|
190-72M82
|
Executed
|
05/31/2024
|
|
1 |
4
|
6
|
Sangamon
|
|
1 mile of standard overlay, concrete curb and gutter ADA improvements and traffic signal upgrades on Business 55 / 6th Street in Springfield from north of Myrtle Street to Stanford Avenue.
|
191-76L11
|
Withdrawn
|
04/16/2024
|
|
1 |
5
|
8
|
Marion
|
|
11.5 miles of resurfacing and ADA improvements on IL 37 from Cherry Street in Kinmundy to Madison Street in Salem.
|
192-62L16
|
Executed
|
06/07/2024
|
7 / 7 |
2 |
1
|
1
|
McHenry
|
|
7.3 miles of Standard Overlay, Milled Rumble Strips and drainage improvements on IL 173 in the Villages of Hebron and Alden.
|
193-62L31
|
Executed
|
06/11/2024
|
19 / 19 |
2 |
1
|
1
|
Cook
|
Voluntary
|
(1,560-Ft) Bridge structural repairs, bridge deck overlay removal and replacement, joint replacement, and bridge drainage repairs, for the Ohio St. Bascule Bridge over the North Branch Chicago River, and the west and east approach bridges, in the City of Chicago, Cook County, IL.
|
194-62M25
|
Executed
|
06/25/2024
|
1 / 1 |
2 |
1
|
1
|
Lake, McHenry
|
|
(8.47-Mile) Standard Overlay, Milled Rumble Strips, Drainage Improvements on IL 173 (Kenosha St) from Greenwood Rd to Madison Ave. This project is in the Villages of Richmond, Spring Grove and in Unincorporated Hebron, Richmond and Burton Townships in McHenry and Lake Counties.
|
195-62M37
|
Executed
|
05/31/2024
|
|
2 |
1
|
1
|
DuPage
|
|
(1014-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage County.
|
196-62P05
|
Executed
|
06/14/2024
|
|
1 |
1
|
1
|
Cook
|
|
The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Forest Avenue over Des Plaines River in the Village of Riverside, Cook County.
|
197-62V97
|
Executed
|
05/31/2024
|
|
1 |
1
|
1
|
DuPage
|
|
This improvement is located at the IDOT Oakbrook Maintenance yard at 17W125 Butterfield Road, Villa Park, IL. Scope of work includes pavement removal, Catch Basins PCC reconstruction, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement marking.
|
198-72893
|
Executed
|
06/04/2024
|
2 / 2 |
1 |
4
|
6
|
Sangamon
|
|
Earthwork, drainage improvements, HMA shoulders, guardrail, high-tension cable median barrier, bridge deck repairs (SN 084-0018 and 084-0019), and bridge deck microsilica concrete overlay of SN 084-0019 on I-55 at the Sangamon River, 2.2 miles south of I-55 BUS at the Sherman Interchange.
|
199-76P58
|
Withdrawn
|
04/03/2024
|
|
|
5
|
8
|
Madison
|
|
2.2 miles of resurfacing and ADA improvements on Beltline Road from IL 157 to IL 159 in Collinsville.
|
200-46639
|
Executed
|
05/28/2024
|
|
1 |
2
|
2
|
Various
|
|
Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order.
|
201-46641
|
Executed
|
06/04/2024
|
|
1 |
4
|
6
|
Various
|
|
Removing and replacing damaged raised reflective pavement markers or lenses throughout District 6.
|
202-46642
|
Executed
|
06/07/2024
|
1 / 1 |
1 |
2
|
2
|
Various
|
|
Placing various widths of preformed plastic and modified urethane pavement marking lines, letters and symbols within the limits specified on each individual work order.
|
203-46645
|
Executed
|
06/07/2024
|
|
1 |
2
|
2
|
Various
|
|
Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on each individual work order.
|
204-61D34
|
Executed
|
06/25/2024
|
5 / 5 |
2 |
1
|
1
|
Will
|
|
Pavement widening and reconstrtution;includes resurfacing, traffic signals and lightings at the intersection of Bell Road and 143rd Street in Homer Glen.
|
205-61H34
|
Executed
|
06/25/2024
|
15 / 14 |
2 |
1
|
1
|
Will
|
|
New roadway construction to extend 143rd Street from IL 59 to IL 126. Includes; construction of a new bridge over the DuPage River, culvert exetensions, retaining walls, traffic signals and lighting in Plainfield.
|
206-61J08
|
Executed
|
06/25/2024
|
1 / 1 |
|
1
|
1
|
Will
|
|
Construct a single-lane eliptical roundabout at the intersection of Cedar Road and Haven Avenue in New Lenox. Includes full-depth HMA Pavement, curb and gutter, sidewalk, lighting, and landscaping.
|
207-61J14
|
Executed
|
08/30/2024
|
6 / 6 |
2 |
1
|
1
|
DuPage
|
|
Replace existing structure with a single-span PPC bulb t-beam superstructure with concrete deck, HMA pavement, retaining wall, HMA multi-use path, storm sewers, sidewalks, ADA improvements, Guardrail, curb and gutter, and signage on Warrenville Road over the East Branch of the DuPage River in Lisle.
|
208-61J93
|
Withdrawn
|
04/26/2024
|
16 / 16 |
2 |
1
|
1
|
McHenry
|
|
Pavement reconstruction, construction of a multi-use patch, replace two bridges , curb and gutter, storm sewer, traffic signals, lighting and landscaping on Randall Road from Acman Road to Acorn Lane/Polaris Drive in Lake in the Hills and Crystal Lake.
|
209-61K34
|
Executed
|
07/31/2024
|
|
1 |
1
|
1
|
Lake
|
|
Pavement reconstruction on FAU 160 (Sprucewood Ln.) from Rolling Ridge Lane to Lake Shore Drive, continuing on Lake Shore from Sprucewood Lane to Beck Road in Lindenhurst.
|
210-61K35
|
Executed
|
11/01/2024
|
|
1 |
1
|
1
|
McHenry
|
|
Roadway widening, reconstruction, resurfacing and triffic signals at the intersectionof Three Oaks Road and Lutter Drive/Sands Road in Crystal Lake.
|
211-64S65
|
Executed
|
05/28/2024
|
|
1 |
2
|
2
|
Whiteside
|
|
Bridge repair, deck repair, joint replacement on SN 098-0033, carrying US 30 over Elkhorn Creek.
|
212-64T15
|
Executed
|
06/04/2024
|
|
1 |
2
|
2
|
Ogle, Whiteside
|
|
8.8 miles of patching, milling, and resurfacing on Freeport Rd from West Sterling Rd to East Lynn Blvd in Sterling.
|
213-70B07
|
Executed
|
08/30/2024
|
1 / 1 |
1 |
3
|
5
|
Vermilion
|
|
6.16 miles of designed overlay and culvert repair; Georgetown/Indianola Rd to south of Catlin.
|
214-72M79
|
Executed
|
06/07/2024
|
3 / 3 |
2 |
4
|
6
|
Menard
|
|
1.9 miles of resurfacing and culvert improvements on IL 97 south of Petersburg, from 0.1 miles north of North Shore Drive to 0.3 miles north of Boy Scout Road.
|
215-87794
|
Executed
|
05/24/2024
|
|
|
2
|
3
|
Iroquois
|
|
Replace the bridge carrying CH 40 over a tributary to Possum Trot Ditch, 3.5 miles south of Sheldon.
|
216-89835
|
Executed
|
06/21/2024
|
4 / 4 |
3 |
3
|
4
|
Peoria
|
|
Reconstruct the intersecton of Pioneer Parkway and University Street in Peoria.
|
217-95947
|
Executed
|
06/14/2024
|
|
|
4
|
7
|
Cumberland
|
|
Sidewalk construction on various routes within Neoga.
|
218-95951
|
Executed
|
06/04/2024
|
|
|
4
|
7
|
Moultrie
|
|
Replace an existing culvert with a trip-cell cast-in-place box culvert to carry CH 10 over Jonathan Creek, .3 mile east of Cadwell.
|
219-95956
|
Executed
|
05/31/2024
|
|
1 |
4
|
7
|
Wabash
|
|
Resurfacing on Poor Farm Road from Friendsville Avenue to IL 1, north of Mount Carmel.
|
220-95957
|
Executed
|
05/31/2024
|
3 / 3 |
1 |
4
|
7
|
Edwards
|
|
HMA Resurfacing with aggregate shoulders and pavement markings on CH 3 from the West Corporate Limits of West Salem to the Wabash County Line.
|
221-97807
|
Executed
|
06/11/2024
|
3 / 3 |
1 |
5
|
8
|
Madison
|
|
Construct a PCC Shared Use Path adjacent to IL 157 with concrete curb and gutter, driveway, drainage structures, retaining walls, traffic signal modifications, pavement markings and signage from the MCT Nature Trail to Levis Road in Edwardsville.
|
222-60P75
|
Executed
|
05/21/2024
|
13 / 13 |
1 |
1
|
1
|
DuPage
|
|
(1.62-Mile) Proposed improvement includes widening and reconstruction of IL Route 56 (Butterfield Road) from West of I-355 to Arboretum Drive including Bridge repairs, multi-use path, traffic signals and lighting.
|
223-62P06
|
Executed
|
05/31/2024
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
(1157-Ft) The proposed improvement consists of culvert repair of the structure located at I-55 at stream (0.9 Mi E. of Cass Ave) in Downers Grove Township, DuPage County.
|
224-62P12
|
Executed
|
06/14/2024
|
3 / 3 |
2 |
1
|
1
|
Cook
|
|
(2,500-FT) The proposed improvement consist of a bridge deck overlay and joint replacement of IL59/ Sutton Road located over I-90. The project is located in the Village of Hoffman Estates, Cook County.
|
225-62U81
|
Executed
|
07/16/2024
|
|
1 |
1
|
1
|
Cook
|
|
(1.14-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Winnetka in Cook County.
|
226-62W06
|
Executed
|
05/21/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Parking lot improvement project consists of full depth removal of existing HMA pavement and replacement, PCC pavement replacement/patching, drainage, lighting relocation. Location of Work: IDOT District 1 Emergency Traffic Patrol (ETP) facility at 3501 South Normal Avenue within the City of Chicago in Cook County.
|
227-68H26
|
Executed
|
06/04/2024
|
1 / 1 |
1 |
3
|
4
|
Various
|
|
Crack and joint sealing on various routes in various counties in District Four.
|
228-62U70
|
Rejected
|
05/10/2024
|
|
|
1
|
1
|
Various
|
|
This contract consists of nighttime sweeping along various expressways in District 1.
|
229-62W28
|
Active
|
03/21/2024
|
|
1 |
1
|
1
|
Cook
|
|
The improvement consists of the litter picking and debris removal, graffiti cleaning, and posting security at graffiti cleaning locations.
|
230-66P20
|
Active
|
03/21/2024
|
1 / 1 |
2 |
2
|
3
|
Kankakee
|
|
Repair and maintain traffic signal, flashing beacons, and roadway lighting in Kankakee County.
|
231-62T51
|
Active
|
03/21/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
This project consists of Traffic Signal Modernization and ADA Improvements of at the intersection of IL 1 (Halsted St.) and IL 83 (147th St.) in the city of Harvey in Cook County. Project length is 1,332 ft (0.25 mile)
|
232-62U75
|
Active
|
03/21/2024
|
|
|
1
|
1
|
Various
|
|
The work to be completed under this contract consists of expressway daytime sweeping throughout District 1.
|
233-62W17
|
Active
|
03/21/2024
|
|
1 |
1
|
1
|
Cook
|
|
The work to be completed under this contract consists of expressway daytime sweeping in Cook County.
|
234-74562
|
Deleted
|
03/22/2024
|
|
|
4
|
7
|
|
|
|
01A-DK065
|
Executed
|
12/12/2024
|
5 / 5 |
1 |
2
|
3
|
DeKalb
|
|
Replace Perimeter Fencing, Phase 1
|
02A-SC071
|
Active
|
03/12/2024
|
|
2 |
5
|
8
|
St. Clair
|
Voluntary
|
Terminal Apron Expansion - Project 1
|
03A-WI061
|
Rejected
|
07/01/2024
|
4 / 4 |
3 |
5
|
9
|
Williamson
|
Voluntary
|
Taxiway A and B Rehabilitation
|
04A-VE058
|
Executed
|
01/28/2025
|
|
1 |
3
|
5
|
Vermilion
|
|
Realign Taxiway A Phase 2: Taxiway A2 and the connecting Taxiway A to Runway 16/34
|
05A-FA009
|
Executed
|
12/26/2024
|
|
1 |
4
|
7
|
Wayne
|
|
Airfield Pavement Maintenance and Pavement Markings
|
06A-BN020
|
Rejected
|
05/17/2024
|
1 / 1 |
3 |
5
|
9
|
Franklin
|
|
Replace Runway and Taxiway Lights, Windcone, and REILS
|
07A-WA080
|
Active
|
03/12/2024
|
2 / 2 |
1 |
1
|
1
|
Lake
|
|
Rehabilitate Main Automobile Parking Lot
|
08A-MA034
|
Executed
|
12/02/2024
|
|
1 |
3
|
4
|
Marshall
|
|
Rehabilitate Runway 13/31
|
09A-WA076
|
Active
|
03/21/2024
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
Construct Wildlife Fencing - Phase 5 (Northwest Area)
|
10A-HA031
|
Active
|
03/21/2024
|
|
1 |
5
|
9
|
Saline
|
|
Remark Runway 6-24, Runway 14-32, Partial Parallel Taxiway and Taxiway Connectors
|