001-62A80
|
Executed
|
01/11/2021
|
6 / 6 |
2 |
1
|
1
|
McHenry
|
|
(0.45 miles) the type of work is Bridge Replacement in McHenry County, over Kishwaukee River: SN 056-0025.
|
002-62J35
|
Executed
|
01/26/2021
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
(0.09-Mile) Improvement of US 14 over Fox River consists of bridge deck overlay and joint repairs, located in the Village of Fox River Grove and Village of Cary.
|
003-62K81
|
Executed
|
01/06/2021
|
|
1 |
1
|
1
|
Cook
|
|
ADA Improvements to sidewalk curb ramps to make compliant with PROWAG. Located at 26th Street and Ridgeland Avenue in the City of Berwyn, all in Berwyn Township.
|
004-62K82
|
Executed
|
01/06/2021
|
|
2 |
1
|
1
|
Cook
|
|
ADA Improvements to sidewalk curb ramps to make compliant with PROWAG. Located at 26th Street and Ridgeland Avenue in the City of Berwyn, all in Berwyn Township.
|
005-62K83
|
Executed
|
01/06/2021
|
|
2 |
1
|
1
|
Cook
|
|
ADA improvement project located along various State maintained routes within Bloom Township. Located in the City of Chicago Heights and Villages of Glenwood, Homewood, Lansing and Lynwood.
|
006-62K85
|
Executed
|
12/09/2020
|
|
2 |
1
|
1
|
Cook
|
|
ADA Improvements to sidewalk curb ramps to compliant with PROWAG. Located at Vermont St, Vincennes St, Ashland Ave and 1271th St. in the Villages of Calumet Park, Blue Island and Riverdale, all in Calumet Township.
|
007-62K89
|
Executed
|
12/09/2020
|
|
1 |
1
|
1
|
Cook
|
|
ADA Improvements to sidewalk curb ramps to make compliant with PROWAG. Located at 131st St, Kean Ave, US 12/20 (95th St), IL 7 (Southwest Hwy), IL 43 (Harlem Ave) in Bridgeview, Chicago Ridge, Hickory Hills, Palos Heights, Palos Hills, Palos Park and Worth, all in Palos Twp.
|
008-62L22
|
Executed
|
12/09/2020
|
|
1 |
1
|
1
|
Kane
|
|
(4.0-Mile) SMART overlay, ADA improvements and milled rumble strips on IL. 31 from 1-88 to Rathbone Ave. located in the City of Aurora in Kane County.
|
009-62L24
|
Executed
|
12/09/2020
|
2 / 2 |
2 |
1
|
1
|
Lake
|
|
(4.12-Mile) SMART overlay and ADA improvements on US 12 from north of Old Rand Rd. to south of IL 22 located in the Villages of Lake Zurich and North Barrington.
|
010-62L40
|
Rejected
|
11/23/2020
|
|
|
1
|
1
|
Cook
|
|
(2788 Ft.) Crack and Joint Sealing project from Western Ave to Carrol Ave. in the Village of Harvey, in Thornton Township.
|
011-62L41
|
Rejected
|
11/23/2020
|
6 / 6 |
1 |
1
|
1
|
Cook
|
|
(6.2-Mile) Cleaning and Sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping pavement marking from Balbo Dr to 57th Dr in City of Chicago.
|
012-62L43
|
Rejected
|
11/23/2020
|
|
|
1
|
1
|
Cook
|
|
(1.74-Mile) Improvement on IL 38 from Harrison St to Manheim Rd consists of cleaning and sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages Hillside and Westchester, Proviso Township.
|
013-62L44
|
Deleted
|
09/24/2020
|
|
|
1
|
1
|
Lake
|
|
Cleaning and sealing longitudinal joints and cracks of the existing concrete pavement from Riverwoods Blvd to US 41 (Skokie Hwy) pavement markings restriping in the Villages of Mettawa and Lake Forest, Libertyville, Shields, Vernon and Deerfield Townships. , Cleaning and sealing longitudinal joints and cracks of the existing concrete pavement from Riverwoods Blvd to US 41 (Skokie Hwy) pavement markings restriping in the Villages of Mettawa and Lake Forest, Libertyville, Shields, Vernon and Deerfield Townships.
|
014-62L70
|
Rejected
|
11/23/2020
|
|
|
1
|
1
|
Will
|
|
(2.87-Mile) Crack and joint sealing improvements on US 30 from Larkin Ave. to US 30 (Center St. SB), located within the Cities of Joliet and Crest Hill.
|
015-62L71
|
Rejected
|
11/23/2020
|
|
|
1
|
1
|
Cook
|
|
1.69 miles of cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter on IL 43 from IL 72 to south of Collum Ave. in Norridge and the City of Chicago.
|
016-62L72
|
Rejected
|
11/23/2020
|
|
|
1
|
1
|
Cook
|
|
(3.49-Mile) Crack and Joint sealing on PCC pavement. Location: IL 62 (Algonquin Rd) from Penny Rd to Center Port Dr. in the Village of South Barrington, Palatine and Hoffman Estates.
|
017-62M00
|
Rejected
|
11/23/2020
|
|
|
1
|
1
|
Will
|
|
(6.395-Mile) Crack and Joint Sealing of PCC Pavement; Location: FAP 338: IL 59 from DuPage County Line to North of Pheasant Chase Drive in the City of Naperville and Village of Plainfield in Will County.
|
018-62M67
|
Executed
|
12/14/2020
|
5 / 5 |
1 |
1
|
1
|
Cook, DuPage
|
|
Installation of ramp speed advisory radar signs and curve warning signs, at various locations in Cook and DuPage counties.
|
019-62M74
|
Executed
|
01/05/2021
|
2 / 2 |
|
1
|
1
|
Cook
|
|
Cleaning and painting the steel structure carrying IL 43 (Harlem Ave) over Calumet Sag Channel in the Village of Worth and the City of Palos Heights, SN 016-0323
|
020-64P04
|
Executed
|
12/08/2020
|
3 / 3 |
|
2
|
2
|
Ogle
|
|
Deck patching, expansion joint replacement, concrete overlay, substructure and other miscellaneous repairs on SN's 071-0052 and 071-0053 over Kilbuck Creek.
|
021-64P17
|
Executed
|
12/07/2020
|
|
1 |
2
|
2
|
Various
|
|
Washing twelve (12) bridges at various locations within District 2.
|
022-64P18
|
Executed
|
12/07/2020
|
|
|
2
|
2
|
Winnebago
|
|
Washing eight (8) bridges at various locations.
|
023-64P19
|
Executed
|
12/07/2020
|
|
|
2
|
2
|
Various
|
|
Washing nineteen (19) bridges at various locations within District 2.
|
024-64P24
|
Executed
|
12/07/2020
|
|
|
2
|
2
|
Various
|
|
Washing eight (8) bridges at various locations.
|
025-64P50
|
Executed
|
12/07/2020
|
|
|
2
|
2
|
Henry
|
|
Concrete overlays on the structures (037-0009 and 037-0010) carrying 1-74 over the Osco-Orion Road (FAS 2224A).
|
026-66959
|
Executed
|
12/07/2020
|
1 / 1 |
2 |
2
|
3
|
Iroquois
|
|
This project is located on FAP 332 (IL 1) 0.15 mile north of US 52 in lroquois County. The work consists of the removal and replacement of the existing structure, guardrail and terminal removal and replacement, HMA milling and resurfacing, pavement marking, and reflectors.
|
027-68897
|
Executed
|
12/07/2020
|
1 / 1 |
|
3
|
4
|
Stark
|
|
Replacement of structure carrying IL 78 over Walnut Creek (S.N. 088-0012 existing, S.N. 088-2503 proposed) 0.8 miles North of West Jersey in Stark County.
|
028-68D95
|
Executed
|
12/14/2020
|
|
1 |
3
|
4
|
Warren
|
|
Replacement of Structure Nos. 094-0025 (New S.N. 094-0053) and 094-0026 (New Structure No. 094-0054) carrying US 34/1 L 110 over 120 Street (TR 162) in Warren County.
|
029-68F98
|
Executed
|
12/07/2020
|
|
|
3
|
4
|
Tazewell, Woodford
|
|
Culvert lining at various locations along US 24 in Tazewell and Woodford Counties.
|
030-68G04
|
Executed
|
12/07/2020
|
1 / 1 |
|
3
|
4
|
Various
|
|
Replacement of existing CCTV cameras with high definition CCTV cameras at various locations in District Four.
|
031-68G05
|
Executed
|
12/14/2020
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
Replacement of existing video detection systems at various locations in Peoria various locations in Peoria and Tazewell Counties in District Four.
|
032-70616
|
Executed
|
12/23/2020
|
4 / 4 |
|
3
|
5
|
Champaign
|
|
Bridge replacement, 0.16 miles road reconstruction and widening over the Salt Fork Vermilion River 0.50 miles NE of Sidney.
|
033-70A65
|
Deleted
|
09/26/2020
|
|
|
3
|
5
|
McLean
|
|
3P Policy Standard Overlay ADA Improvements from W of Commerce Pkwy to 0.1 Mi N of E Washington St Gross Length = Net Length = 13,054.36 FT= 2.472 Mile. , 3P Policy Standard Overlay ADA Improvements from W of Commerce Pkwy to 0.1 Mi N of E Washington St Gross Length = Net Length = 13,054.36 FT= 2.472 Mile.
|
034-70F16
|
Executed
|
01/11/2021
|
1 / 1 |
|
3
|
5
|
Various
|
|
Maintenance and Lighting Repair at District 5 Facilities.
|
035-72F27
|
Executed
|
01/05/2021
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
Culvert replacement and resurfacing on IL 123 just east of IL 29 and Old IL 29 just south of IL 123.
|
036-72H82
|
Executed
|
01/05/2021
|
1 / 1 |
1 |
4
|
6
|
Menard
|
|
5.9 miles of resurfacing on IL 97 from 0.3 miles north of Boy Scout Road to the Sangamon County line.
|
037-72L58
|
Executed
|
01/20/2021
|
7 / 7 |
2 |
4
|
6
|
Adams
|
|
2.172 miles Bridge Deck Overlay, Bridge Joint Replace/Repair, Bridge Painting, Lighting, and Navigational Lighting on the Quincy Memorial Bridge over the Mississippi River in Quincy.
|
038-72L85
|
Executed
|
01/05/2021
|
|
|
4
|
6
|
Sangamon
|
|
Painting three bridges on I-72 near the I-72/6th Street interchange south of Springfield. (SN 084-0076, 084-0077, 084-0104)
|
039-72L86
|
Executed
|
01/05/2021
|
|
|
4
|
6
|
Logan, Sangamon
|
|
Painting three bridges on I-55 between Sherman and Williamsville and painting portions of one bridge on IL 121, 4 miles east of Mt. Pulaski. (SN 084-0171, 084-0022, 084-0023, 054-0022)
|
040-72L97
|
Executed
|
12/09/2020
|
2 / 2 |
|
4
|
6
|
Schuyler
|
|
Microsilica overlay of SN 085-0025 carrying IL 101 over Williams Creek, 0.4 miles east of the Hancock County line.
|
041-72M43
|
Executed
|
12/07/2020
|
|
|
4
|
6
|
Adams
|
|
Patching on IL 104 from east of I-172 to just east of the airport.
|
042-72M44
|
Executed
|
12/07/2020
|
|
|
4
|
6
|
Pike
|
|
Patching on I-72 from east of the Trumpet Interchange to west of Hull.
|
043-72M47
|
Executed
|
12/09/2020
|
|
|
4
|
6
|
Morgan
|
|
Bridge superstructure, substructure, and expansion joint repairs on various I-72 bridges near Jacksonville. (SN 069-0056, 0055, 0054, 0036, 0035, and 0034)
|
044-74326
|
Executed
|
01/05/2021
|
1 / 1 |
|
4
|
7
|
Moultrie
|
|
Superstructure replacement on IL 128 over Wilborn Creek, 1.3 miles south of Bethany Road. (SN 070-0036)
|
045-74364
|
Withdrawn
|
10/07/2020
|
|
|
4
|
7
|
Cumberland
|
|
Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road. , Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road.
|
046-74940
|
Executed
|
01/11/2021
|
|
|
4
|
7
|
Moultrie
|
|
1.6 miles of patching, milling and resurfacing on Bruce/Findlay Road from 4.3 miles east of IL 32 to 1.5 miles west of IL 121.
|
047-74982
|
Executed
|
12/07/2020
|
|
|
4
|
7
|
Wayne
|
|
12.2 miles of patching, milling and resurfacing on I-64 from 7 miles west of US 45 to the White County line.
|
048-74992
|
Executed
|
01/20/2021
|
2 / 2 |
2 |
4
|
7
|
Fayette
|
|
Bridge joint replacement/repair, bridge deck overlay, bridge deck repairs on SN 026-0021 carrying I-70 over CSXT Railroad, 1.5 miles west of US 40 (Brownstown Interchange).
|
049-74993
|
Executed
|
12/07/2020
|
2 / 2 |
1 |
4
|
7
|
Jasper
|
|
Bridge deck repairs and overlay, bridge joint replacement and repairs on SN 040-0017 on IL 33 at the North Fork of the Embarras River, at the Crawford County line.
|
050-76N13
|
Executed
|
12/14/2020
|
|
|
5
|
8
|
Clinton
|
|
Ultra-thin bonded wearing course on US 50 from 0.3 miles west of St, Rose Road to 0.3 miles west of Frogtown Road.
|
051-76N93
|
Executed
|
01/26/2021
|
|
|
5
|
8
|
Clinton
|
|
Patching of Old US 50 (Franklin Street) from 13th Street in Carlyle to Carter Street in Beckemeyer.
|
052-76N97
|
Executed
|
01/13/2021
|
|
|
5
|
8
|
Washington
|
|
4.5 miles of patching on I-64 from 2.5 miles east of CH 11 to the Jefferson County line.
|
053-78481
|
Executed
|
12/07/2020
|
6 / 6 |
3 |
5
|
9
|
Franklin
|
|
0.64 miles of PCC replacement, HMA resurfacing, new curb and gutter and inlets; sidewalk and multi-use path will be replaced and/or constructed the length of the project on IL 149 in West Frankfort.
|
054-78547
|
Executed
|
12/07/2020
|
9 / 9 |
2 |
5
|
9
|
Jackson
|
|
Complete replacement of SN 039-0046 on Bluegrass Lane (off IL 151 south of Ava) over Spring Creek.
|
055-78768
|
Executed
|
12/07/2020
|
|
|
5
|
9
|
Williamson
|
|
Substructure repairs, joint reconstruction, parapet repairs and bridge deck microsilica concrete overlay on SN 100-0039 carrying IL 148 over I-57, 0.6 miles west of IL 37.
|
056-78780
|
Executed
|
12/09/2020
|
|
|
5
|
9
|
Jackson
|
|
4.2 miles of resurfacing, excavating and patching on US 51 from US 51 south of Carbondale to west of Makanda.
|
057-78803
|
Executed
|
12/23/2020
|
|
|
5
|
9
|
Union
|
|
Demolition of buildings off of IL 146, 3 miles east of Ware near SN 091-0056.
|
058-78806
|
Executed
|
12/14/2020
|
|
|
5
|
9
|
Jackson
|
|
Pavement patching at the intersection of IL 13 and Watson Road.
|
059-78816
|
Executed
|
12/07/2020
|
|
|
5
|
9
|
Jackson, Perry
|
|
Parapet repairs on SN 039-0069 on Old IL 13 over Mud Creek, 2 miles east of IL 127 and on SN 073-0033 on US 51 over ICG Railroad in DuQuoin.
|
060-90922
|
Executed
|
01/05/2021
|
7 / 7 |
2 |
3
|
5
|
Vermilion
|
|
Bridge Replacement under Tilton Rd. in Tilton.
|
061-76P07
|
Executed
|
12/23/2020
|
|
|
5
|
8
|
Various
|
|
Weed spraying along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties in District 8.
|
062-60T06
|
Deleted
|
09/24/2020
|
|
|
1
|
1
|
Cook
|
|
Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 , Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314
|
063-60T17
|
Deleted
|
09/23/2020
|
|
|
1
|
1
|
Cook
|
|
Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson.
|
064-60W34
|
Executed
|
12/17/2020
|
13 / 13 |
4 |
1
|
1
|
Will
|
|
(1.27-miles) Pavement reconstruction along 1-80 EB from Gardner St to Rowell Ave. replacement and widening of the bridges carrying EB Hickory Creek, Rowell Ave and 1-80 EB and WB over Richards St., and lighting in the City of Joliet.
|
065-61G36
|
Executed
|
12/07/2020
|
7 / 7 |
1 |
1
|
1
|
Will
|
|
Traffic Signal modernization and construction of a fiber optic communication system on Black Road from US 30 to IL 59 in Joliet.
|
066-61G54
|
Executed
|
12/08/2020
|
3 / 3 |
1 |
1
|
1
|
DuPage
|
|
Replace a pedestrian bridge at the intersection of Eastern Avenue and Harris Avenue over Flagg Creek in Clarendon Hills.
|
067-61G70
|
Executed
|
12/08/2020
|
3 / 3 |
1 |
1
|
1
|
Lake
|
|
Reconstruction of Brandywyn Lane from Aptakisic Road to Prairie Road; and the reconstruction of Thompson Boulevard from Buffalo Grove Road to Welland Road in Buffalo Grove.
|
068-61G72
|
Executed
|
12/08/2020
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
Sidewalk improvements including ADA ramp installation along Chapel Hill Road from Reed Avenue to Fairview Avenue in Johnsburg.
|
069-61G75
|
Executed
|
01/05/2021
|
2 / 2 |
1 |
1
|
1
|
Kane
|
|
Replace the bridge superstructure carrying Montgomery Road over Waubonsie Creek, o.3 mile nortwest of US 34 in Aurora.
|
070-61G77
|
Executed
|
01/11/2021
|
|
1 |
1
|
1
|
Cook
|
|
Intersection improvements including curb "bump outs", bus shelters, covered bicycle parking, pavement markings, signage and a pedestrian activated cross- walk warning system on Broadway Avenue from Rice Street to Main Street in Melrose Park.
|
071-62L45
|
Withdrawn
|
11/02/2020
|
|
1 |
1
|
1
|
Cook
|
|
Smart Overlay, Class D patching and ADA improvement. Project begins 50 ft south of 31st St. and proceeds approximately 4637.9 ft in a northerly direction to 23rd St. in the Villages of Brookfield and Berwyn Township. , Smart Overlay, Class D patching and ADA improvement. Project begins 50 ft south of 31st St. and proceeds approximately 4637.9 ft in a northerly direction to 23rd St. in the Villages of Brookfield and Berwyn Township.
|
072-62M63
|
Executed
|
03/09/2021
|
7 / 7 |
2 |
1
|
1
|
Will
|
|
New bridge structure carrying the future north bound traffic IL 59 over 1-55 at the interchange of IL 59 and 1-55 located in the City of Joliet, Village of Shorewood, and Troy Township. SN 21029B
|
073-62M75
|
Executed
|
12/08/2020
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of bridge pier repair on pier 2 of SN 016-1100, located on 1-90 at Foster Avenue in the City of Chicago, Cook County.
|
074-62M78
|
Executed
|
12/08/2020
|
|
2 |
1
|
1
|
Cook
|
|
Installation of ramp speed advisory radar signs and curve warning signs, at various locations in Cook and DuPage counties.
|
075-62M88
|
Executed
|
01/05/2021
|
2 / 2 |
3 |
1
|
1
|
Cook
|
|
Cleaning and painting designated existing steel on the structures carrying Lake-Cook Road and Sheridan Road over various ravines, In the Village of Glencoe, in Moraine and New Trier Townships.
|
076-62M97
|
Active
|
09/17/2020
|
6 / 6 |
|
1
|
1
|
Cook
|
|
Cleaning(sweeping) various arterial highways in District One throughout (North) Cook county.
|
077-62M98
|
Active
|
09/17/2020
|
|
|
1
|
1
|
Cook
|
|
Cleaning(sweeping) various arterial highways in District One throughout (South) Cook county.
|
078-62M99
|
Rejected
|
11/23/2020
|
|
|
1
|
1
|
Will
|
|
Cleaning(sweeping) various arterial highways in District One throughout (South) Will county.
|
079-62N01
|
Active
|
09/17/2020
|
|
|
1
|
1
|
Lake
|
|
Cleaning(sweeping) various arterial highways in District One throughout Lake County.
|
080-62N02
|
Active
|
09/17/2020
|
|
|
1
|
1
|
Kane, McHenry
|
|
Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties.
|
081-64F78
|
Executed
|
12/23/2020
|
4 / 4 |
2 |
2
|
2
|
Rock Island
|
|
2.3 miles of removal and replacement of concrete bridge deck on SN 081-0106 carrying I-280 over the Mississippi River. Cold milling, pavement patching, and HMA resurfacing on I-280 from the Mississippi River Bridge to E of the IL 92 interchange.
|
082-66K54
|
Executed
|
12/09/2020
|
4 / 3 |
3 |
2
|
3
|
Iroquois
|
|
3P Milling and Resurfancing (Designed overlay) and ADA improvements on FAP 332 (IL 1) from 0.1 miles North of US 52 to US 24 in Watseka for a total length of 8.2 miles.
|
083-70D87
|
Executed
|
12/08/2020
|
|
|
3
|
5
|
McLean
|
|
Bridge Painting at 5 Structure Locations on 1-39 and 1-55 in Mclean County.
|
084-74915
|
Deleted
|
09/24/2020
|
|
|
4
|
7
|
Crawford
|
|
Bridge replacement (SN 017-8612) on IL 1 over Sugar Creek approximately 1 mile north of the Lawrence County line and realignment of TR 363.
|
085-76B55
|
Executed
|
01/05/2021
|
6 / 6 |
2 |
5
|
8
|
St. Clair
|
|
Concrete overlay, patching, deck replacement and expansion joints on the Poplar Street Collector distributor ramps (SN 082-0144, 0255, 0203, 0256, 0140 and 0005).
|
086-76K67
|
Executed
|
02/01/2021
|
|
|
5
|
8
|
Marion
|
|
Bridge replacement on Kinlou Road over the Tributary to Skillet Fork Creek located 0.1 miles west of the Clay County line.
|
087-76M33
|
Deleted
|
09/26/2020
|
|
|
5
|
8
|
St. Clair
|
|
Cleaning of the Missouri Avenue Pump Station on I-55/I-64. , Cleaning of the Missouri Avenue Pump Station on I-55/I-64. , Cleaning of the Missouri Avenue Pump Station on I-55/64.
|
088-76N12
|
Executed
|
02/01/2021
|
1 / 1 |
1 |
5
|
8
|
Clinton
|
|
Micro-surfacing on US 50 from 0.3 miles west of Frogtown Road to 0.1 miles west of IL 127.
|
089-76N19
|
Executed
|
01/05/2021
|
2 / 2 |
|
5
|
8
|
Madison
|
|
Bridge joint repairs, bridge repairs, new 4.5- concrete bridge deck, HMA mill and fill on approaches with a 2- grade rise on IL 140 / IL 111 over Abandoned Quarry Spur, 0.1 miles east of IL 3 (SN 060-0199).
|
090-76N55
|
Executed
|
01/05/2021
|
|
2 |
5
|
8
|
Madison
|
|
Pump station repairs at the Venice Deep Wells on IL 3.
|
091-76N88
|
Executed
|
01/05/2021
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Patching at 3 locations: US 67/IL 111 at Tolle Lane, IL 111 at Gateway Commerce Center, US 40 at IL 143 and South Morrison at Caseyville Road.
|
092-76N94
|
Executed
|
01/05/2021
|
|
|
5
|
8
|
Washington
|
|
11.6 miles of patching on I-64 from 0.5 miles west of Beaver Pond Creek to 1.4 miles east of CH 11.
|
093-76N95
|
Executed
|
01/05/2021
|
|
|
5
|
8
|
Randolph
|
|
2.9 miles of patching on IL 4 / IL 150 from IL 4 to the eastern city limits of Steeleville.
|
094-78505
|
Executed
|
02/01/2021
|
2 / 2 |
1 |
5
|
9
|
Union
|
|
Removal of SN 091-0047 and construction of a new west ramp to connect IL 127 with CH 8 (Chestnut Street) in Alto Pass.
|
095-85699
|
Executed
|
02/01/2021
|
1 / 1 |
|
2
|
2
|
Stephenson
|
|
Cold-In-Place Recycling on Walnut Road from South Street to Lamm Road.
|
096-85701
|
Executed
|
12/08/2020
|
2 / 2 |
|
2
|
2
|
Stephenson
|
|
Replace the bridge carrying TR 316 (Bolen Road) over Summer Creek, 0.5 miles north of US 20.
|
097-89745
|
Executed
|
12/23/2020
|
1 / 1 |
1 |
3
|
4
|
Peoria
|
|
Replace the bridge carrying CH 29D over Jubilee Creek, 2.7 miles east of Brimfield
|
098-89754
|
Executed
|
12/08/2020
|
1 / 1 |
|
3
|
4
|
Woodford
|
|
Remove and replace guardrail and terminals at various locations in Woodford County.
|
099-89766
|
Executed
|
01/05/2021
|
15 / 15 |
3 |
3
|
4
|
Peoria
|
|
Reconstruction of Western Ave, from Adams Street to Lincoln Avenue and a portion of IL 8, from Lincoln Avenue to Howett St in Peoria.
|
100-93751
|
Executed
|
01/05/2021
|
|
|
4
|
6
|
Sangamon
|
|
Replace the bridge carrying Drawbridge Road over Jacksonville Branch, 0.1 mile south of Wabash Avenue in Springfield.
|
101-62M23
|
Executed
|
01/11/2021
|
|
2 |
1
|
1
|
Cook
|
|
Traffic Signal Modernization and ADA curb ramp improvements at the intersection of IL Route 58 at Shady Oaks Drive in Elgin, Cook County.
|
102-62M89
|
Executed
|
01/05/2021
|
|
|
1
|
1
|
Cook
|
|
Bridge Painting project in Calumet City and Country Club Hills, in Thornton and Bremen Township. Location 1 (SN-016-0956): Il-83 Sibley Blvd. over 1-94 (Bishop Ford Expy.). Location 2 (SN-016-2125): 167th Street over 1-57;
|
103-62N00
|
Rejected
|
11/23/2020
|
|
|
1
|
1
|
DuPage
|
|
Cleaning (sweeping) various arterial highways in District One throughout DuPage County.
|
104-66K20
|
Executed
|
01/05/2021
|
2 / 2 |
3 |
2
|
3
|
Ford
|
|
The project is located on IL 9/IL 47/IL 54 from IL 47 (N) in Gibson City to Baltimore Drive in Paxton for length of 14.01 miles. Project includes 3 3/4" mill and resurface from beginning of project to IL 115 and 2" mill and RS to end of projects. Work includes guardrail updates, drainage work and ADA updates and patching in Gibson City.
|
105-68E60
|
Executed
|
12/14/2020
|
|
|
3
|
4
|
Peoria
|
|
Building Demo at 1229 Kickapoo Creek Road in Peoria.
|
106-61G12
|
Executed
|
12/23/2020
|
1 / 1 |
2 |
1
|
1
|
DuPage
|
|
Intersection Widening, milling and resurfacing, and the upgrade of existing signalized intersection on 31st Street from Meyers Road to York Road in Oak Brook.
|
107-61G28
|
Executed
|
12/23/2020
|
|
|
1
|
1
|
Will
|
|
Construction of a multi-use path along the ComEd right-of-way in Romeoville.
|
108-61G45
|
Executed
|
01/05/2021
|
1 / 0 |
1 |
1
|
1
|
Cook
|
|
Construction of a HMA multi-use path, sidewalks, curb and gutter, retaining wall, and pavement markings along Cicero Avenue from Meadow Lake Court (Poplar Ave) to Gateway Drive in Richton Park.
|
109-61G69
|
Executed
|
01/05/2021
|
|
2 |
1
|
1
|
Lake
|
|
Traffic signal replacement and installation of adaptive signal control with flashing yellow arrows on Butterfield Road from IL 137 to Allanson Road.
|
110-62L17
|
Executed
|
01/05/2021
|
3 / 3 |
2 |
1
|
1
|
Cook
|
|
(3.07 Mile) Resurfacing (Smart Overlay), milled rumble strips; Location: FAP 332: IL 394 from North of 186th Street to South of Joe Orr Road in the Villages of Lansing, Glenwood, Lynwood and Ford Heights.
|
111-87731
|
Executed
|
01/11/2021
|
15 / 14 |
1 |
2
|
3
|
Kendall
|
|
Extension of Eldamain Road on new alignment from River Road to West Highpoint Road (south of IL 71), includes a new bridge over Fox River and a roundabout at the new Eldamain and Fox Road. Project is 2.0 miles west of IL 47 between River Road and West Highpoint Road in Yorkville.
|
112-87737
|
Executed
|
02/09/2021
|
|
|
2
|
3
|
Bureau
|
|
Replace the bridge carrying CH 8 over Maple Creek, 2 miles north of Wyanet.
|
113-89769
|
Executed
|
12/08/2020
|
1 / 1 |
|
3
|
4
|
Tazewell
|
|
Sidewalk construction algon the north side of Bobolink Drive, from Elgin Street to Eagle Avenue, and along the east side of Eagle Avenue from Bobolink Drive to the north entrance to Central Intermediate School in Washington.
|
114-91588
|
Executed
|
12/23/2020
|
|
|
3
|
5
|
Champaign
|
|
Sidewalk removal and construction of new sidewalks and a multi-use path at the intersection of Sheldon Street and Campbell Avenue east of Northview Elementary in Rantoul.
|
115-97738
|
Executed
|
01/05/2021
|
2 / 2 |
1 |
5
|
8
|
St. Clair
|
|
Resurfacing, curb and gutter, and sidewalk replacement on Mousette Lane from Carol Street to Jerome Lane in Cahokia.
|
116-61G46
|
Executed
|
01/13/2021
|
3 / 3 |
2 |
1
|
1
|
Lake
|
|
Reconstruction of Nippersink Boulevard from Oak Street to Grand Avenue in Fox Lake.
|
117-62H63
|
Withdrawn
|
10/06/2020
|
|
|
1
|
1
|
Will
|
|
Parking lot and drainage improvement. Full-depth removal and replacement of existing pavement. Location: 1-55 Maintenance Yard, Bolingbrook.
|
118-85689
|
Executed
|
01/13/2021
|
2 / 2 |
|
2
|
2
|
Carroll
|
|
Replace the bridge carrying TR 46 over Plum River, 5 miles northwest of Mt. Carroll.
|
119-85702
|
Executed
|
01/06/2021
|
|
1 |
2
|
2
|
Ogle
|
|
Sidewalk Replacement, pavement markings and the installation of a solar powered pedestrian crossing signal system on IL 26 adjacent to Forreston Grade School, and on IL 72 adjacent to Forreston Junior High School in Forreston.
|
120-87717
|
Executed
|
01/11/2021
|
|
|
2
|
3
|
LaSalle
|
|
Sidewalk replacement, paving brick sidewalk, traffic signals and street lighting on IL 18 from the Vermilion River to Wasson Street in Streator.
|
121-89674
|
Rejected
|
12/23/2020
|
|
|
3
|
4
|
McDonough
|
|
Streetscape project including curb and gutter, sidewalks, lighting, and resurfacing on various street in and around the downtown square in Macomb.
|
01A-CA021
|
Executed
|
09/09/2021
|
8 / 8 |
1 |
4
|
6
|
Sangamon
|
Voluntary
|
Runway 18/36 Removal and Associated Improvements, Phase 1
|
02A-LE055
|
Executed
|
05/04/2021
|
3 / 3 |
1 |
1
|
1
|
Will
|
|
Construct ATCT Access Road w/Utilities
|
03A-AU069
|
Executed
|
07/28/2021
|
|
|
1
|
1
|
Kane
|
|
Phase 2: Airfield Pavement Rehabilitation Including General Aviation Apron and Taxiway P
|