033-62K26
|
Executed
|
04/21/2020
|
3 / 3 |
|
1
|
1
|
Cook
|
|
Weep hole coring, cleaning drainage structure, reconstructing drainage structure, gutter removal and replacement, debris removal, and selective clearing in the village of McCook and Lyons Township.
|
045-64P12
|
Rejected
|
03/18/2020
|
|
|
2
|
2
|
Various
|
|
Removal of dead trees along state maintained routes.
|
061-68F00
|
Executed
|
04/17/2020
|
|
|
3
|
4
|
Various
|
|
Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high tension cable barrier) at various locations.
|
062-68F05
|
Executed
|
04/14/2020
|
|
|
3
|
4
|
Peoria
|
|
Landscaping along I-74 from Ellis St in Peoria to the Illinois River.
|
067-70E32
|
Executed
|
05/19/2020
|
2 / 2 |
|
3
|
5
|
McLean
|
|
8.390 miles of patching from W of I-55 to the Livingston County Line.
|
068-70E33
|
Executed
|
04/16/2020
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
1.18 miles of class B patching on FAS 533 (Market St) from Harris Rd to Hensley Rd N of Champaign.
|
117-76N34
|
Executed
|
04/08/2020
|
1 / 1 |
|
5
|
8
|
Various
|
|
Weed spraying for Johnson Grass along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8.
|
190-62K37
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook, DuPage
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd. 135 miles in length.
|
191-62K38
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St. 253 miles in length.
|
192-62K46
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave). 250 miles of total length.
|
193-62K47
|
Executed
|
04/21/2020
|
|
|
1
|
1
|
Cook, DuPage
|
|
Litter/debris removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expressway from IL 43 (Harlem Ave) to I-355._150 miles in length.
|
194-62K48
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd. 180 miles in length.
|