001-60M68
|
Executed
|
02/20/2020
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
Bridge deck and approach overlay, bridge deck and approach repairs, reconstruction of deck joints, substructure repairs and pavement patching and overlay on existing structure no. 016-0811.
|
002-60Y74
|
Executed
|
03/02/2020
|
|
|
1
|
1
|
Cook
|
|
Intersection improvement, channelization, and traffic signal modernization project on Golf Rd from Overlook Dr to Harms Rd in Morton Grove and Cook County Forest Preserve.
|
003-62G17
|
Executed
|
02/18/2020
|
|
1 |
1
|
1
|
Cook
|
|
3.1 miles of designed overlay and ADA ramp improvements on Northwest Highway from US 14 (Miner Street) to Merrill Street in Maine Township.
|
004-62G27
|
Executed
|
02/18/2020
|
4 / 4 |
1 |
1
|
1
|
McHenry
|
|
2 miles of standard overlay and ADA ramp improvements on US 12 (Main Street) IL 173 (Kenosha Street) to Tryon Grove Road in the Village of Richmond.
|
005-62H96
|
Rejected
|
01/29/2020
|
|
|
1
|
1
|
Cook
|
|
Overlay and pedestrian ramps on US 41; bridge deck repair on the I-94 off ramp to US 41 from I-94 to North of Old Orchard Rd. in Willmette and Skokie.
|
006-62J05
|
Executed
|
02/18/2020
|
|
|
1
|
1
|
Lake
|
|
Traffic signal modernization that includes going protected on for the NB/SB left turns and pedestrian improvements at the intersection of Il Rte 131 at IL Rte 120 in Waukegan.
|
007-62J33
|
Executed
|
02/14/2020
|
|
|
1
|
1
|
Cook
|
|
Bridge overlay and joint repair on SN 016-2036 carrying Halsted Street over I-57 in Bellwood.
|
008-62J42
|
Executed
|
02/14/2020
|
1 / 1 |
|
1
|
1
|
Will
|
|
Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. , Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10.
|
009-62J45
|
Executed
|
02/14/2020
|
1 / 1 |
|
1
|
1
|
Cook
|
|
0.48 miles of designed overlay and pedestrian ramp improvements on Avondale Avenue from Pulaski Road to Addison Street in the City of Chicago.
|
010-62J46
|
Executed
|
03/02/2020
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Designed overlay and pedestrian ramp project begins at the intersection of West Westgate Rd and I-55 South Frontage Rd and proceeds East for 2.44 miles to the West leg of the intersection of I-55 South Frontage Rd and Cass Ave.
|
011-62J48
|
Executed
|
02/14/2020
|
|
|
1
|
1
|
Cook
|
|
Resurfacing (3R) ADA improvements on OR 309a (Old Western Ave) from Broadway Street to Western Avenue.
|
012-62J49
|
Executed
|
02/18/2020
|
1 / 1 |
|
1
|
1
|
Kane
|
|
Standard overlay, pedestrian ramps on IL 25/Liberty St from Page Ave to Dwight St in Elgin.
|
013-62J51
|
Executed
|
02/25/2020
|
|
1 |
1
|
1
|
Cook
|
|
Cleaning and painting designated steel surfaces of bridge structures carrying 1) Chicago Heights Glenwood Road over Butterfield Creek; 2) 183rd Street over I-57; 3) IL 50 over I-57; in the City of Country Club Hills and the Village of Glenwood. (SN 016-0793, 016-0583, 016-1014)
|
014-62J52
|
Executed
|
02/18/2020
|
|
|
1
|
1
|
Cook
|
|
Cleaning and painting designated steel surfaces of bridge structures carrying Touhy Ave over Des Plaines River, and Wolf Rd over Weller Ditch in Des Plaines.
|
015-62J53
|
Executed
|
02/25/2020
|
|
1 |
1
|
1
|
Cook
|
|
Cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping with modified urethane pavement marking in Ford Heights, Lynwood, and Sauk Village.
|
016-62J54
|
Executed
|
03/16/2020
|
|
|
1
|
1
|
Cook
|
|
4.6 miles of designed overlay and ADA pedestrian ramp improvements on Golf road from IL 43 (Waukegan Road) to McCormick Boulevard in the Villages of Glenview, Golf, Morton Grove, Skokie and City of Evanston.
|
017-62J57
|
Executed
|
02/21/2020
|
|
1 |
1
|
1
|
Cook
|
|
0.8 miles of standard overlay and ADA improvements on Butterfield Road in the Village of Bellwood.
|
018-62J60
|
Executed
|
02/27/2020
|
|
1 |
1
|
1
|
Will
|
|
Bridge deck overlay and joint repairs on IL 113 over I-55 in the City of Braidwood. (SN 099-0151)
|
019-62K07
|
Rejected
|
01/29/2020
|
|
|
1
|
1
|
Various
|
|
Expressway mowing North.
|
020-62K08
|
Rejected
|
01/29/2020
|
|
|
1
|
1
|
Various
|
|
Expressway mowing South.
|
021-62K10
|
Withdrawn
|
01/14/2020
|
|
1 |
1
|
1
|
Various
|
|
Dead tree removal along expressway and arterial routes of District One. , Dead tree removal along expressway and arterial routes of District One. , Dead tree removal along expressway and arterial routes of District One.
|
022-62K14
|
Executed
|
03/04/2020
|
4 / 4 |
1 |
1
|
1
|
McHenry
|
|
Bridge deck overlay and joint repairs of IL 62 (Algonquin Rd) over the Fox River in Algonquin. , Bridge deck overlay and joint repairs to IL 62 (Algonquin Rd) over the Fox River in Algonquin.
|
023-64M43
|
Executed
|
02/27/2020
|
1 / 1 |
|
2
|
2
|
Lee, Ogle
|
|
Cold milling, patching, and resurfacing from Wilson St in Polo to 0.1 mile N of Liberty Ct in Dixon.
|
024-64M46
|
Executed
|
02/25/2020
|
|
|
2
|
2
|
Henry
|
|
7.94 miles of routing, cleaning, and sealing the centerline and shoulder joints on I-80 from 0.5 miles E of the I-74/I-80 interchange to 0.5 miles W of IL 82.
|
025-64N10
|
Executed
|
02/18/2020
|
1 / 1 |
1 |
2
|
2
|
Rock Island
|
|
Deck patching, expansion joint replacement, concrete overlay and painting structural steel on SN 081-0036 carrying IL 5/IL 92 over the IAIS RR, 0.2 miles NE of IL 84.
|
026-64N33
|
Executed
|
02/18/2020
|
|
|
2
|
2
|
Boone
|
|
Expansion joint replaement, minor deck repairs and painting beam ends on SN 004-0015 carrying Poplar Grove Rd over business route US 20 (James Gang Parkway).
|
027-64N75
|
Executed
|
02/18/2020
|
|
|
2
|
2
|
Stephenson
|
|
Deck patching, expansion joint replacement, HMA overlay, and miscellaneous other repairs on SN 089-0051, carrying IL 26 over the Pecatonica River in Freeport.
|
028-64P08
|
Executed
|
03/05/2020
|
2 / 2 |
|
2
|
2
|
Rock Island
|
|
Cold milling and HMA resurfacing on US 67 from Second Ave to Fifth Ave in Rock Island.
|
029-66A51
|
Executed
|
02/27/2020
|
1 / 1 |
1 |
2
|
3
|
Grundy
|
|
Milling and resurfacing shoulders and 8.5" of HMA mainline pavement, replacing cable median barrier, and structural repairs with scarification on some. The project will be staged using crossovers. It is located on I-55 from 0.39 miles S of Gardner Rd to 0.83 miles S of Reed Rd interchange.
|
030-66C59
|
Executed
|
02/14/2020
|
|
|
2
|
3
|
LaSalle
|
|
Replacing the existing structure carrying CH 9 over I-80 including a new embankment and CH 9 realignment and reconstruction. Resurfacing of the IDOT buildings is also proposed under CI funds.
|
031-66E68
|
Executed
|
02/21/2020
|
|
|
2
|
3
|
Livingston
|
|
Removing SN 053-0065 and replacing it with SN 053-0192. The work also includes guardrail removal and replacement, channel excavation, rip rap placement, milling and resurfacing of adjacent pavement, pavement marking, and pavement markers.
|
032-66F08
|
Executed
|
02/18/2020
|
5 / 5 |
|
2
|
3
|
Bureau, Putnam
|
|
Complete deck replacement of the I-180 bridge over the Illinois River and pavement resurfacing and replacement on the approach to the bridge.
|
033-66H21
|
Executed
|
02/14/2020
|
|
|
2
|
3
|
LaSalle
|
|
1.279 miles of superstructure replacements and bridge repairs from LaSalle Rd to Little Vermilion River.
|
034-66H52
|
Executed
|
03/06/2020
|
1 / 1 |
|
2
|
3
|
DeKalb
|
|
Bridge replacement (Ex:019-0021, Prop:019-0050) over a tributary to the Kishwaukee River and associated approach roadway work.
|
035-66J57
|
Executed
|
02/18/2020
|
|
|
2
|
3
|
LaSalle
|
|
Class A patching on the on/off ramp terminals and Class B patching on the on/off ramp pavements and US 52 mainline pavements at the interchanges of FAI 39 and US 52.
|
036-66K36
|
Executed
|
03/05/2020
|
|
|
2
|
3
|
Bureau
|
|
Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components on SN's 006-0125 and 006-0126.
|
037-66K37
|
Executed
|
02/18/2020
|
|
|
2
|
3
|
DeKalb
|
|
Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN's 019-0036 and 019-0037.
|
038-66K38
|
Executed
|
02/18/2020
|
|
|
2
|
3
|
LaSalle
|
|
Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 050-0165 carrying US Rte 34 over FAI 39 interchange of US 34 and I-39.
|
039-66K48
|
Executed
|
02/14/2020
|
|
|
2
|
3
|
Livingston
|
|
Various bridge repairs to SN's 053-0139(SB) and 053-0140(NB) carrying FAI 55 over the west fork of Mazon River 3.0 miles southwest of IL Rte 17.
|
040-66K74
|
Executed
|
02/18/2020
|
|
|
2
|
3
|
Bureau
|
|
Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 006-0123 carrying TR 148 over I-80.
|
041-66K75
|
Executed
|
02/18/2020
|
|
|
2
|
3
|
Grundy, Iroquois
|
|
Weed spraying on various routes in Grundy and Livingston counties.
|
042-68E34
|
Executed
|
02/14/2020
|
|
|
3
|
4
|
Woodford
|
|
Resurfacing I-39 from 3.1 miles S of IL 116 to 1.0 mile N of IL 116.
|
043-70B92
|
Executed
|
03/04/2020
|
8 / 8 |
1 |
3
|
5
|
Champaign
|
|
Bridge deck repairs to SN(s) 010-0031,010-0032,010-0089, and 010-0175.
|
044-70E44
|
Executed
|
02/18/2020
|
|
|
3
|
5
|
Various
|
|
506.1 miles of spraying, approximately 1405 acres of state right of way along all interstate routes including interchanges in Champaign, Dewitt, Douglas, McLean, Piatt and Vermilion Counties.
|
045-72G01
|
Executed
|
02/20/2020
|
|
|
4
|
6
|
Hancock
|
|
4 miles of resurfacing on IL 94 from Powellton Road to 1.1 miles north of CH 29 (Ferris Road).
|
046-72L26
|
Executed
|
03/02/2020
|
|
|
4
|
6
|
Morgan
|
|
5.1 miles of pavement patching, 4- overlay (southbound lane) and guardrail removal and replacement on US 67, I-72 BUS from Markham Road (TR 78) to 1.1 miles north of I-72.
|
047-72L28
|
Executed
|
04/16/2020
|
1 / 1 |
|
4
|
6
|
Hancock
|
|
7.2 miles of pavement preservation with Cape Seal of mainline, Fog Seal of shoulders and micro surfacing of medians and intersecting sideroads on IL 110/ 336 from 0.8 miles north of West Point Road to 3.1 miles south of the US 136 overpass in Carthage.
|
048-72L30
|
Executed
|
02/20/2020
|
|
|
4
|
6
|
Macoupin, Montgomery
|
|
14.3 miles of crack and joint sealing on I-55 from the Madison County line to north of IL 16.
|
049-72L41
|
Executed
|
02/18/2020
|
|
|
4
|
6
|
Macoupin
|
|
Painting portions of 2 bridges on IL 111 in Macoupin County. (SN 059-0016 and 059-0013).
|
050-72L42
|
Executed
|
02/18/2020
|
|
|
4
|
6
|
Various
|
|
Painting portions of 5 bridges on various routes in the western part of District 6. (SN 034-0066, 034-0063, 075-0130, 075-0131, 086-0045)
|
051-72L47
|
Executed
|
02/18/2020
|
|
|
4
|
6
|
Adams
|
|
Replacing expansion joints and performing beam end repairs on SN 001-0054 carrying IL 96 over Mill Creek in Adams County.
|
052-72L48
|
Executed
|
02/18/2020
|
1 / 1 |
1 |
4
|
6
|
Menard
|
|
Replacing damaged parapet walls on SN 065-0002 carrying IL 97 over the Sangamon River in Menard County.
|
053-74260
|
Executed
|
02/14/2020
|
5 / 5 |
1 |
4
|
7
|
Coles, Moultrie
|
|
13.1 miles of patching, milling, resurfacing and guardrail updates on IL 121 from the east city limits of Sullivan to 0.2 miles west of 300E in Mattoon.
|
054-74325
|
Executed
|
02/14/2020
|
7 / 7 |
1 |
4
|
7
|
Cumberland
|
|
Superstructure replacement for SN 018-0057 carrying the Montrose Blacktop over Spring Point Creek, 0.5 miles north of the Effingham County line.
|
055-74407
|
Executed
|
02/14/2020
|
2 / 2 |
1 |
4
|
7
|
Jasper
|
|
6.3 miles of patching, milling, resurfacing, longitudinal joint sealant and shoulder work on IL 33 from IL 130 to IL 49.
|
056-74932
|
Executed
|
02/20/2020
|
|
|
4
|
7
|
Macon
|
|
10 miles of pavement patching and detector loops on US 51 from I-72 to the Dewitt County line.
|
057-74933
|
Executed
|
02/18/2020
|
|
|
4
|
7
|
Macon
|
|
2.4 miles of pavement patching on IL 121 from University Avenue in Decatur to Bearsdale Road.
|
058-74951
|
Executed
|
02/20/2020
|
2 / 2 |
1 |
4
|
7
|
Wayne
|
|
5.7 miles of patching, cape seal and raised reflective pavement markers on IL 242 from south of Section Line Road in Wayne City to north of I-64.
|
059-76J85
|
Executed
|
03/04/2020
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
ADA improvements on US 50 from 3rd Street to Seven Hills Road in O-Fallon.
|
060-76K36
|
Executed
|
03/02/2020
|
|
|
5
|
8
|
Calhoun
|
|
7.1 miles of overlay resurfacing and ADA improvements on IL 100 from IL 96 to the Pike County line.
|
061-76K43
|
Executed
|
03/09/2020
|
|
1 |
5
|
8
|
Madison
|
|
2.5 miles of resurfacing on IL 162 from IL 157 to just east of IL 159.
|
062-76K65
|
Executed
|
02/27/2020
|
2 / 2 |
1 |
5
|
8
|
Randolph
|
|
Bridge joint repairs and HMA overlay with Bridge repairs on IL 3 at Mary's River, 1.3 miles south of Chester. (SN 079-0011)
|
063-76L31
|
Executed
|
03/02/2020
|
|
|
5
|
8
|
Clinton
|
|
ADA improvements along IL 161 from Clinton Street to 11th Street in New Baden.
|
064-76L91
|
Executed
|
03/04/2020
|
|
|
5
|
8
|
Madison
|
|
ADA improvements and traffic signal replacement on IL 3 from south of 20th Street to Niedringhaus Avenue in Granite City.
|
065-76N08
|
Executed
|
03/05/2020
|
|
|
5
|
8
|
Clinton
|
|
Ultra-thin bonded wearing course on I-64 from 0.3 miles east of the St. Clair County line to the Washington County line.
|
066-76N23
|
Executed
|
03/17/2020
|
|
|
5
|
8
|
Madison, St. Clair
|
|
2.1 miles of patching along IL 203 from Eagle Park Road to Collinsville Road and along Collinsville Road / 9th Street from Lake Avenue to 0.1 miles east of IL 203.
|
067-76N24
|
Rejected
|
03/23/2020
|
|
|
5
|
8
|
St. Clair
|
|
2.4 miles of patching on 6th Street from IL 177 to IL 161.
|
068-78504
|
Executed
|
02/27/2020
|
|
1 |
5
|
9
|
Union
|
|
Replacement of 2 three-span bridges with new three-span integral abutment bridges on I-57 over Big Creek, 3 miles north of the Dongola Interchange. (SN 091-0005 and 091-0006)
|
069-78506
|
Executed
|
02/27/2020
|
1 / 1 |
|
5
|
9
|
Williamson
|
|
Replacement of a three-span bridge with a two-span integral abutment bridge carrying IL 148 over Wolf Creek, 1 mile south of the I-57 interchange. (SN 100-0038)
|
070-78551
|
Executed
|
02/18/2020
|
|
|
5
|
9
|
Jackson
|
|
1.5 miles of patching, surface removal, resurfacing, shoulders, pavement markings and raised reflective pavement markers on Gorham Spur Road from Lake Street to IL 3.
|
071-78611
|
Withdrawn
|
01/10/2020
|
4 / 4 |
1 |
5
|
9
|
Union
|
|
Construction of structural retaining wall, new PCC pavement, PCC shoulders, guardrail, earthwork and removal of existing runaround road on IL 127 south of Alto Pass. , Construction of structural retaining wall, new PCC pavement, PCC shoulders, guardrail, earthwork and removal of existing runaround road on IL 127 south of Alto Pass.
|
072-78726
|
Withdrawn
|
01/08/2020
|
5 / 0 |
|
5
|
9
|
Jefferson
|
|
Patching SN 041-0016 and 041-0017 carrying I-57 over Southern Railroad, 0.25 miles north of Dix Exit 103. , Patching SN 041-0016 and 041-0017 carrying I-57 over Southern Railroad, 0.25 miles north of Dix Exit 103.
|
073-78735
|
Withdrawn
|
12/10/2019
|
|
|
5
|
9
|
Various
|
|
Crack sealing throughout various counties and routes in District 9.
|
074-78751
|
Executed
|
03/16/2020
|
|
|
5
|
9
|
Williamson
|
|
Resurfacing ramps, shoulders and gore areas on I-57 northbound ramps at Exit 53.
|
075-78755
|
Executed
|
02/20/2020
|
|
|
5
|
9
|
Various
|
|
Weed spraying for broadleaf weeds along I-24 and I-57 at various locations in various counties in District 9.
|
076-78756
|
Executed
|
02/18/2020
|
|
|
5
|
9
|
Various
|
|
Weed spraying for Johnson Grass along I-24 and I-57 at various locations in various counties in District 9.
|
077-78757
|
Executed
|
02/18/2020
|
|
|
5
|
9
|
Jefferson
|
|
4 miles of resurfacing, partial depth patching and raised reflective pavement markers on I-64 from the Washington County line (MP 62) to MP 66.
|
078-46532
|
Rejected
|
01/29/2020
|
|
|
4
|
7
|
Various
|
|
Replacement of various lengths of guardrail reflectors and delineation panel replacement on various routes in various counties of District 7.
|
079-46533
|
Executed
|
02/14/2020
|
|
|
2
|
3
|
Various
|
|
"On-Call" pavement marking with various materials including thermoplastic, paint, preformed plastic, polyurea, modified urethane, pavement marking removal , hot-spray thermoplastic, grooving for pavement marking, and aerial markings.
|
080-46534
|
Executed
|
02/20/2020
|
|
|
3
|
5
|
Various
|
|
Pavement marking repair at various locations in DeWitt, McLean, and Piatt Counties.
|
081-60L88
|
Executed
|
03/02/2020
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Designed overlay and ADA pedestrian ramps on Bryn Mawr Avenue beginning just east of IL 43 and extending 2.14 miles to the east, in the City of Chicago.
|
082-62A26
|
Executed
|
03/02/2020
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Pavement widening on IL 53 / IL 68 to provide a new southbound right turn lane at the intersection of Rand Road and Dundee Road; includes new median, patching, resurfacing, traffic and lighting modifications and sewer installation.
|
083-64L57
|
Executed
|
02/27/2020
|
5 / 5 |
1 |
2
|
2
|
Winnebago
|
|
Pavement patching and HMA resurfacing on IL 251 Wisconsin State Line to S of Forest Hills Rd in Machesney Park.
|
084-64L72
|
Executed
|
02/27/2020
|
10 / 10 |
3 |
2
|
2
|
Winnebago
|
|
HMA resurfacing on I-39 from 0.4 mile N of Baxter Rd to 0.3 mile N of Harrison Ave Interchange, US 20 0.7 mile W of Alpine Rd to I-39, and Baxter Rd from 0.1 mile W to 0.2 mile E of I-39.
|
085-64N95
|
Executed
|
02/18/2020
|
|
|
2
|
2
|
Various
|
|
"On-Call" guardrail and fence repairs along State maintained routes in Boone, Carroll, JoDaviess, Ogle, Stephenson, and Winnebago Counties.
|
086-64N96
|
Executed
|
02/18/2020
|
|
|
2
|
2
|
Various
|
|
"On-Call" guardrail and fence repairs along State maintained routes in Henry, Lee, Rock Island, Whiteside, and portions of LaSalle Counties.
|
087-64N97
|
Executed
|
02/24/2020
|
|
|
2
|
2
|
Various
|
|
Roadside restoration of Right-Of-Way turf damage caused by motorists along State maintained routes within District 2.
|
088-64P01
|
Executed
|
02/11/2020
|
1 / 1 |
|
2
|
2
|
Jo Daviess, Ogle
|
|
Cold milling and HMA resurfacing of the Stockton maintenance yard and the Creston maintenance yard.
|
089-66K43
|
Executed
|
02/18/2020
|
|
|
2
|
3
|
Various
|
|
District wide tree removal on state maintained routes as needed.
|
090-68C64
|
Rejected
|
01/29/2020
|
1 / 1 |
|
3
|
4
|
Fulton
|
|
0.535 mile of milling and resurfacing and replacement of culvert on IL Rte 41 over Gallett Creek 1.0 mile E of Prairie City.
|
091-68D86
|
Executed
|
03/02/2020
|
|
|
3
|
4
|
Warren
|
|
Rehabilitation to SN 094-0041 carrying US 34 over US 67 and SN 094-0033 carrying US 34 over the BNSF Railroad, Southwest of Monmouth.
|
092-68F13
|
Executed
|
02/24/2020
|
|
|
3
|
4
|
Various
|
|
District-wide weed spraying (off road).
|
093-68F14
|
Executed
|
03/31/2020
|
|
|
3
|
4
|
Various
|
|
Dead tree removal at various locations within District 4.
|
094-68F18
|
Executed
|
02/24/2020
|
|
|
3
|
4
|
Marshall, Mason
|
|
Bridge washing of 3 bridges over the Illinois River.
|
095-70912
|
Executed
|
03/02/2020
|
1 / 1 |
1 |
3
|
5
|
McLean
|
|
Interstate resurfacing and ramp repair S of Lexington to Livingston Co Line 9.67 miles.
|
096-70B38
|
Withdrawn
|
01/02/2020
|
3 / 3 |
|
3
|
5
|
Champaign
|
|
Bridge replacements under mattis ave. NW of Champaign.
|
097-70B98
|
Withdrawn
|
01/02/2020
|
3 / 3 |
|
3
|
5
|
Champaign
|
|
Bridge replacement under US 150 NW of Champaign. , Bridge replacement under US 150 NW of Champaign.
|
098-70E37
|
Executed
|
03/02/2020
|
1 / 1 |
1 |
3
|
5
|
Champaign, Vermilion
|
|
Standard overlay and cold milling at I-57 at I-74 ramps; I-74 at Oakwood ramps; Oakwood Rd S of I-74 interchange; I-74 W of I-57/I-74 interchange.
|
099-72G57
|
Executed
|
02/11/2020
|
1 / 1 |
|
4
|
6
|
Logan
|
|
Patching, HMA surface removal to bare concrete, SMA binder and surface courses, HMA shoulders, aggregate shoulders, shoulder rumble strips, guardrail replacement and structure repairs on I-55 from 1.3 miles south of I-55 BUS to 0.6 miles north of IL 10 west of Lincoln and on I-55 BUS from east of Old Route 66 to south of 1056th Avenue south of Lincoln.
|
100-72G99
|
Executed
|
03/02/2020
|
4 / 4 |
1 |
4
|
6
|
Macoupin
|
|
0.7 miles of resurfacing on IL 138 from IL 4 to 8th Street in Benld.
|
101-72L25
|
Executed
|
02/20/2020
|
|
|
4
|
6
|
Sangamon
|
|
26.4 miles of routing and sealing of longitudinal joints along with transverse cracks in the pavement on I-55, 72, and 72A in Sangamon County.
|
102-72L50
|
Executed
|
02/20/2020
|
|
|
4
|
6
|
Sangamon
|
|
Patching on I-72 from Wabash Avenue to east of the MacArthur Boulevard interchange.
|
103-74935
|
Executed
|
03/05/2020
|
|
|
4
|
7
|
Clay, Lawrence, Richland
|
|
Patching on US 45 from Finch Lane to US 50 and from U.S. 50 to the Wayne County line. Also includes patching along US 50, Xenia Road, west of Flora to Sumner.
|
104-76M71
|
Executed
|
02/27/2020
|
1 / 1 |
1 |
5
|
8
|
Randolph
|
|
3.5 miles of patching on IL 150 from IL 3 to the Perry County line and on IL 3 from IL 150 to the Jackson County line.
|
105-78678
|
Executed
|
02/18/2020
|
|
|
5
|
9
|
Alexander, Johnson
|
|
Cleaning and painting 3 portions of 3 structures, 2 in Alexander County and 1 in Johnson County. (SN 002-0023, 002,0024, 044-0035)
|
106-78738
|
Executed
|
02/18/2020
|
1 / 1 |
1 |
5
|
9
|
Various
|
|
Bridge deck thin polymer overlays and approach patching on IL 154 in Franklin and Perry Counties, and IL 13 in Williamson County. (SN 028-0068, 028-0071, 028-0072, 100-0068, 100-0071, 073-0035)
|
107-61F32
|
Executed
|
03/12/2020
|
2 / 2 |
|
1
|
1
|
Kane
|
|
Reconstruction of Main Street from Van Nortwick Avenue to Water Street and IL 31 from Elm Street to First Street in the City of Batavia.
|
108-61F81
|
Executed
|
03/06/2020
|
|
|
1
|
1
|
Will
|
|
Resurfacing Corning avenue from Rathje Road to IL 50 in the Village of Peotone.
|
109-61F91
|
Executed
|
03/09/2020
|
|
|
1
|
1
|
Cook
|
|
Resurfacing 175th Street from Ashland Avenue to Halsted Avenue in the Village of Homewood.
|
110-61G13
|
Executed
|
03/11/2020
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Joliet Avenue from 47th Street to 39th Street in the Village of Lyons.
|
111-61G14
|
Executed
|
03/09/2020
|
|
|
1
|
1
|
DuPage
|
|
Sidewalk construction and the construction of multi-use paths at various locations in the Village of Itasca.
|
112-61G17
|
Deleted
|
11/26/2019
|
|
|
1
|
1
|
Kane
|
|
Resurfacing Bolcum Road from Burlington Road to Fairwy Drive in the Village of Campton Hills. , Resurfacing Bolcum Road from Burlington Road to Fairwy Drive in the Village of Campton Hills.
|
113-61G21
|
Executed
|
03/06/2020
|
2 / 1 |
|
1
|
1
|
Will
|
|
Replace the bridge carrying Essington Road over Rock Run Creek between Pandola Avenue and Citadel Drive in the City of Joliet.
|
114-66961
|
Executed
|
03/04/2020
|
|
1 |
2
|
3
|
Kankakee
|
|
Removal and replacement of SN 046-0087, Larry Power Rd over I-57.
|
115-70C64
|
Withdrawn
|
01/13/2020
|
5 / 5 |
1 |
3
|
5
|
Champaign
|
|
Bridge superstrucure replacements over ICRR/TR 158 (Oak St) and over FAU 7169 Market St in Champaign.
|
116-87548
|
Executed
|
03/11/2020
|
|
|
2
|
3
|
Iroquois
|
|
Replace the deck on a three span, non-continuous composite steel wide flange bridge carrying CH 40 over Sugar Creek, located 2.7 miles east of IL 1.
|
117-87688
|
Executed
|
03/11/2020
|
6 / 6 |
1 |
2
|
3
|
DeKalb
|
|
Replace the bridge carrying TR11 (McNeal Road) over South Branch Kishwaukee River, located east of County Line Road.
|
118-89708
|
Executed
|
03/09/2020
|
4 / 3 |
1 |
3
|
4
|
Putnam
|
|
Replace the bridge carrying CH16 over Illinois River tributary, includes roadway and channel realignment. Project is located 3.0 miles northeast of Granville.
|
119-89748
|
Rejected
|
01/29/2020
|
|
1 |
3
|
4
|
Peoria
|
|
Replace bridge carrying Kickapoo Creek Road over an unnamed tributary to Kickapoo Creek, located 0.10 miles north of Adams Street.
|
120-91583
|
Executed
|
02/27/2020
|
|
|
3
|
5
|
McLean
|
|
Replace the bridg ecarrying TR94 over Kings Mill Creek located 4.5 miles Northwest of Shirley.
|
121-91755
|
Executed
|
03/02/2020
|
1 / 0 |
|
3
|
5
|
McLean
|
|
Contruction of a bikeway along Old US 66, 1.1 miles South of E 850 North Road to E 550 North Road.
|
122-72A91
|
Withdrawn
|
01/14/2020
|
2 / 2 |
1 |
4
|
6
|
Adams
|
|
7.1 miles of milling and resurfacing, ADA ramps, bridge deck replacements on SN 001-0012 and 001-0013, traffic signal improvements and shoulder installation on IL 57 from south of Maine Street in Quincy to the south corporate limits of Marblehead. , 7.1 miles of milling and resurfacing, ADA ramps, bridge deck replacements on SN 001-0012 and 001-0013, traffic signal improvements and shoulder installation on IL 57 from south of Maine Street in Quincy to the south corporate limits of Marblehead.
|
123-72F27
|
Deleted
|
12/03/2019
|
|
|
4
|
6
|
Sangamon
|
|
Culvert replacement and resurfacing on IL 123 just east of IL 29 and Old IL 29 just south of IL 123. , Culvert replacement and resurfacing on IL 123 just east of IL 29 and Old IL 29 just south of IL 123.
|
124-72H83
|
Withdrawn
|
01/14/2020
|
|
1 |
4
|
6
|
Pike
|
|
Resurfacing, ADA ramp improvements, signal improvements and geometric design improvements on US 54 / IL 106 through Pittsfield. Also includes pavement patching at the Pittsfield Weigh Station. , Resurfacing, ADA ramp improvements, signal improvements and geometric design improvements on US 54 / IL 106 through Pittsfield. Also includes pavement patching at the Pittsfield Weigh Station.
|
125-72K09
|
Executed
|
02/24/2020
|
|
|
4
|
6
|
Various
|
|
Bridge washing on various major river bridges over the Illinois River and the Mississippi River in District 6.
|
126-74694
|
Executed
|
03/09/2020
|
3 / 3 |
|
4
|
7
|
Coles
|
|
3.9 miles of resurfacing, ADA improvements and traffic signals on IL 16 from west of Douglas Drive in Charleston to east of Madison Street.
|
127-61E86
|
Executed
|
03/16/2020
|
|
1 |
1
|
1
|
Cook
|
|
Reconstruct the intersection of US 12/US 45 at Forest Avenue in Des Plaines.
|
128-61F36
|
Executed
|
03/16/2020
|
|
|
1
|
1
|
Cook
|
|
Reconstruction of Lake Street from Harlan Avenue to Euclid Avenue in Oak Park.
|
129-61F74
|
Executed
|
03/16/2020
|
2 / 2 |
1 |
1
|
1
|
DuPage
|
|
Construction of a shared use path adjacent to Gary Avenue from Great Western Trail (St. charles Road) to Army Trail Road in Carol Stream.
|
130-61F86
|
Executed
|
03/02/2020
|
|
|
1
|
1
|
Cook
|
|
Reconstruction of 151st Street from West Avenue to Ravinia Avenue and the contruction of a roundabout at West Avenue in Orland Park.
|
131-61F88
|
Deleted
|
12/04/2019
|
|
|
1
|
1
|
DuPage
|
|
Sidewalk improvements on IL 53 from Hobson Road to Mulligan Drive in Woodridge.
|
132-61F94
|
Executed
|
03/02/2020
|
1 / 1 |
|
1
|
1
|
Will
|
|
Reconstruct and realign the intersection of St. Louis Street at IL 53 in the Village of Elwood.
|
133-61G08
|
Executed
|
03/05/2020
|
2 / 2 |
|
1
|
1
|
Cook
|
|
Resurfacing, bike path contruction and traffic signal improvment on Howard Street from Milwaukee Avenue to Lehigh Avenue in Niles.
|
134-62K36
|
Rejected
|
03/23/2020
|
|
|
1
|
1
|
Cook, DuPage
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway. 200 miles in length.
|
135-62K37
|
Rejected
|
02/11/2020
|
4 / 4 |
|
1
|
1
|
Cook, DuPage
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd. 135 miles in length.
|
136-62K38
|
Rejected
|
02/11/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St. 253 miles in length.
|
137-62K39
|
Rejected
|
03/23/2020
|
|
|
1
|
1
|
Cook, Lake
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). 147 miles in length.
|
138-62K40
|
Rejected
|
03/23/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy. 185 miles in length.
|
139-62K41
|
Rejected
|
03/23/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy). 360 miles in length.
|
140-62K42
|
Rejected
|
03/23/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Dan Ryan Expwy) to I-80. 275 miles in length.
|
141-62K43
|
Rejected
|
03/23/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island. 175 miles in length.
|
142-62K44
|
Rejected
|
03/23/2020
|
|
|
1
|
1
|
Cook, Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355. 325 miles in length.
|
143-62K45
|
Rejected
|
03/23/2020
|
|
|
1
|
1
|
Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line. 240 miles in length.
|
144-62K46
|
Rejected
|
02/11/2020
|
1 / 1 |
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave). 250 miles of total length.
|
145-62K47
|
Rejected
|
02/11/2020
|
|
|
1
|
1
|
Cook, DuPage
|
|
Litter/debris removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expressway from IL 43 (Harlem Ave) to I-355._150 miles in length.
|
146-62K48
|
Rejected
|
02/11/2020
|
1 / 1 |
|
1
|
1
|
Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd. 180 miles in length.
|
147-89753
|
Executed
|
02/18/2020
|
1 / 1 |
|
3
|
4
|
McDonough
|
|
Replace the bridge carrying CH 9 over Sugar Creek, 2 miles west of Vermont.
|
148-91571
|
Executed
|
02/27/2020
|
|
|
3
|
5
|
Vermilion
|
|
Replace the Bridge carrying TR 42A over an unnamed stream 0.50 miles south of Armstrong.
|
149-95863
|
Executed
|
03/04/2020
|
2 / 2 |
|
4
|
7
|
Clay
|
|
Replace the bridge carrying Sailor Springs Road over the Little Wabash River, 0.5 miles east of Louisville.
|
150-95864
|
Executed
|
03/05/2020
|
2 / 0 |
|
4
|
7
|
Shelby
|
|
Sidwalk removal and replacement, lighting and traffic signal modifications on Main Street from Broadway Street to Washington Street in Shelbyville.
|
151-97688
|
Executed
|
03/02/2020
|
5 / 4 |
1 |
5
|
8
|
Madison
|
|
Construction of a shared use path adjacent to IL 157 from Center Grove Road to MCT Nature Trail in Edwardsville.
|
152-97710
|
Executed
|
03/02/2020
|
3 / 3 |
2 |
5
|
8
|
St. Clair
|
|
Construction of a multi-use path on Boul Avenue from west of IL 159 to Morgan Street in Swansea.
|
153-46528
|
Executed
|
03/25/2020
|
|
|
4
|
6
|
Logan
|
|
Building rehabilitation on IL 121 at the Mount Pulaski Pump Station and Illinois Central Railroad. , Building rehabilitation on IL 121 at the Mount Pulaski Pump Station and Illinois Central Railroad.
|
154-46921
|
Executed
|
04/03/2020
|
|
|
4
|
6
|
Logan
|
|
New automatic transfer switch and miscellaneous improvements on IL 121 at the Mount Pulaski Pump Station and Illinois Central Railroad.
|
01A-LO033
|
Executed
|
09/08/2020
|
|
|
4
|
6
|
Logan
|
|
Rehabilitate Main Aircraft Parking Apron
|
02A-UN058
|
Executed
|
06/10/2020
|
4 / 4 |
3 |
3
|
5
|
Champaign
|
|
Construct Taxiway A5
|
03A-KE017
|
Executed
|
10/20/2020
|
1 / 1 |
1 |
2
|
2
|
Henry
|
|
Rehabilitate Parallel Taxiway to Runway 1/19
|
04A-GR010
|
Executed
|
08/20/2020
|
1 / 1 |
|
5
|
8
|
Bond
|
|
Rehabilitate Partial Parallel Taxiway B
|
05A-CO067
|
Rejected
|
02/24/2020
|
|
|
4
|
7
|
Coles
|
|
Phase 2: Reconstruct Taxiway B
|
06A-DU087
|
Rejected
|
02/05/2021
|
|
|
1
|
1
|
DuPage
|
|
Phase II - Upgrade Wildlife Hazard Fencing on Southern and Western Boundaries
|
07A-TR009
|
Rejected
|
02/24/2020
|
|
|
2
|
2
|
Carroll
|
|
Airfield Pavement Maintenance including Crack Sealing and Re-Marking
|
08A-ED019
|
Rejected
|
02/24/2020
|
|
|
3
|
5
|
Edgar
|
|
East Aircraft Parking Ramp Expansion and Rehabilitate Partial Parallel Taxiway to Runway 9/27
|
09A-CI007
|
Executed
|
09/29/2020
|
2 / 2 |
|
5
|
9
|
Alexander
|
|
Install Perimeter Fence, Phase 3: East and North Perimeter
|
1LR-M1903
|
Active
|
12/05/2019
|
3 / 3 |
|
4
|
6
|
Sangamon
|
|
Reclamation of the Union Fuel #5 abandoned mine site by the Department of Natural Resources using federal Abandoned Mined Lands Funds
|