062-70E71
|
Executed
|
07/27/2020
|
|
|
3
|
5
|
Champaign, DeWitt, Douglas
|
|
13.8 miles of Pollinator Habitat signs along US 45 from Douglas/Coles County line to Windsor Rd in Champaign. Tree removal, weed control, and seeding are included.
|
075-72M04
|
Executed
|
07/23/2020
|
|
|
4
|
6
|
Various
|
|
Weed spraying on various routes in various counties of District 6.
|
097-76N51
|
Executed
|
07/23/2020
|
|
|
5
|
8
|
Clinton
|
|
4.1 miles of patching on US 50 from St. Rose Road to Frogtown Road.
|
099-76N56
|
Executed
|
07/23/2020
|
|
|
5
|
8
|
Clinton
|
|
2 miles of pavement patching on IL 161 from Church Steeple Road to Slant Road near Bartelso.
|
158-66K08
|
Executed
|
07/27/2020
|
|
|
2
|
3
|
Iroquois
|
|
Class B pavement patching from N 2950 East Rd to US 24.
|
169-62J28
|
Executed
|
07/27/2020
|
|
1 |
1
|
1
|
Cook
|
|
Removal and replacement of an existing 32-foot long 18" x 24" culvert with a proposed 48-foot long 36" x 72" cast in place culvert (Proposed SN 016-2272) on 147th Street over Tributary C. of Cal-Sag Channel in the city of Oak Forest and The Forest Preserve District of Cook County. , (LT 351 Ft.) Improve 147th Street over Tributary C. of Cal-Sag Channel
|
219-66J73
|
Executed
|
08/03/2020
|
|
|
2
|
3
|
DeKalb
|
|
3P milling and resurfacing (Standard Overlay) on SBI 23 from Coltonville Rd to Highland Dr in Sycamore.
|