August 05, 2022 Letting 12:00 PM
Notice of Letting
Volume 025, No. 026

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-46576 Withdrawn 08/04/2022 1 1 Various The work consists of Pavement Marking on various routes in various counties in District 1.
002-46602 Executed 09/06/2022 1 0 0 Various Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in Regions Two and Three.
003-46603 Executed 09/06/2022 0 0 Various Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in regions four and five.
004-61A96 Executed 09/30/2022 9 / 9 1 1 Will Pavement reconstruction, storm sewer, curb and gutter, sidewalks, retaining wall, traffic signal modernization and lighting on Bell Road from 151st Street to 159th Street in Homer Glen.
005-61H86 Executed 10/07/2022 1 1 DuPage Resurfacing Devon Avenue/Ontarioville Road from 0.5 mile west of Church Road to US 20 (Lake Street) in Hanover Park..
006-61H87 Executed 09/30/2022 9 / 9 1 1 1 Cook Construction of an aggregate and HMA shared-use path to include a boardwalk structure, pedestrian truss stucture and traffic signal modernization. Project is Segment 3 of the Des Plaines River Trail from south of Lawrence Avenue to the Bryn Mawr Bike Bridge over the Des Plaines River in Chicago.
007-62F75 Executed 10/21/2022 5 / 5 3 1 1 Cook, Will (1.24-Mile) Standard Overlay, ADA, Culvert Repairs in Orland Park and Mokena.
008-62N27 Executed 10/21/2022 1 1 1 Will This is a various locations drainage and grading improvements project along IL 1 (Exchange St to Kentucky Rd) and IL 394 (0.2 miles S/O Exchange St) located in the Village of Crete and Unincorporated areas.
009-62N42 Executed 09/06/2022 1 1 Various (76,700-Ft) Crack and Joint Sealing. Project located along I-55 from Weber Rd to Willow Springs Rd in Will, DuPage and Cook Counties.
010-62N54 Executed 09/27/2022 1 1 Kane (1.710-Mile) This is a SMART resurfacing project consisting of pavement patching, hot-mix asphalt surface removal, resurfacing with surface course, detector loop replacement, curb and gutter replacement in the city of Elgin and Village of East Dundee.
011-62N66 Executed 09/20/2022 1 1 1 Lake (3,294-Ft) Smart Overlay and ADA improvements located in Village of Buffalo Grove
012-62N68 Executed 08/30/2022 1 1 Cook (9.21-Mile) Crack and joint sealing; Palos Heights, Palos Hills, Palos Park and Alsip.
013-62N81 Executed 09/23/2022 1 / 1 1 1 Cook (22,113-Ft) Designed Overlay, ADA Improvements and Rumble Strip located on Willow Springs Road from IL. 171 (Archer Ave) to North of 55th St. in Cook County.
014-62P04 Executed 08/30/2022 3 / 3 1 1 Lake (410-Ft) Wingwall replacement and culvert repairs for the culvert carrying Peterson Road over Ditch (0.4 Miles East of US 45) located in the Village of Libertyville in Lake County.
015-62P70 Executed 09/20/2022 1 1 1 Will (2,657-Ft) Weigh Station Repairs. I-80 EB Frankfort Weigh Station (East of Townline Rd), Will County.
016-64R13 Executed 09/23/2022 1 / 1 1 2 2 Stephenson Bridge deck overlay, expansion joint replacement and miscellaneous repairs on SN 089-0066 carrying IL 73 over Cedar Creek at the South edge of Winslow.
017-64R50 Executed 09/06/2022 1 / 1 1 2 2 Boone Deck repair, microsilica overlay and miscellaneous repair on SN 004-0017 carrying US 20 over Coon Creek, 2 miles East of Belvidere.
018-64R77 Executed 09/06/2022 2 2 Winnebago Milling and resurfacing on US 20 from 0.4 mile West of Keith Road to 0.5 mile East of Keith Road.
019-68H09 Executed 09/13/2022 1 / 1 3 4 Peoria Mill and resurface parking area and install parking striping at the Peoria West storage yard (6500 W. Highway 150, Edwards, IL., 2.5 Miles west of Peoria ou US 150).
020-68H12 Executed 09/27/2022 3 4 Tazewell This profect consists of the installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstruction, and all related collateral work necessary to complete the improvements on this project. Located at the intersection of VFW Rd. and 14th St. in Pekin, Tazewell Co.
021-70C07 Executed 09/20/2022 3 5 Champaign Drainage improvements on FAS 1512 (US 150) from CR2650 to Market St. and on FAP 836 (IL 49) from US 150 to Prairie Ave. in Ogden.
022-72011 Executed 09/06/2022 4 6 Schuyler Substructure and erosion repairs on SN 085-0030 and SN 085-0031 carrying IL 99 over Missouri Creek and Little Missouri Creek in southern Schuyler County.
023-72012 Executed 09/13/2022 4 6 Macoupin Deck patching on SN 059-0042 carrying TR 457 over I-55, 2 miles south of IL 138.
024-72016 Executed 09/06/2022 2 / 2 4 6 Sangamon Bridge bearing replacements on two I-72 overhead structures at Waverly Road / New Berlin Interchange and Oak Crest Road.
025-72201 Executed 09/13/2022 4 6 Morgan Patching on I-72 from the Scott County line to the US 67 interchange.
026-72205 Executed 09/09/2022 4 6 Adams, Pike This project consists of Class A Patches from 1.5 mile north of the Adams/Pike County line 101 mile east of IL 96.
027-72898 Executed 09/09/2022 4 6 Various On-call repair of guardrail, cable median barrier, impact attenuators and fence at various locations throughout District 6 as needed.
028-74998 Executed 10/04/2022 1 / 1 4 7 Fayette Bridge deck overlay, bridge joint repair and replacement, bridge deck repairs over Camp Creek, 2-miles East of Vandalia.
029-76K46 Rejected 08/22/2022 5 8 Bond 8.1 miles of resurfacing, patching, ADA improvements, guardrail improvements, detector loop replacement and earth excavation on US 40 from 0.3 miles west of IL 127 in Greenville to the Fayette County line. Includes bridge overlay and structural repairs on SN 003-0018 and SN 003-0019 in Smithboro.
030-76M77 Executed 09/16/2022 5 8 St. Clair 4.6 miles of new shoulders on IL 163 from IL 157 to South Prairie DuPont Creek.
031-76P12 Executed 09/20/2022 1 / 1 5 8 Madison Bridge painting on I-255 southbound Ramp 1 and Roadway B, just north of I-55/70 (SN 060-0253 and SN 060-0214).
032-76P66 Executed 09/30/2022 2 5 8 Madison Installation of dynamic message signs on I-270 at the Chain of Rocks Canal Bridge and on IL 255 north of I-270.
033-76P95 Executed 09/09/2022 1 5 8 Various Maintain and service all ITS equipment at various locations throughout District 8 and replacement of the dynamic message board on westbound I-70 at mile marker 16.8.
034-78700 Executed 09/20/2022 5 9 Jackson Resurfacing, patching, sidewalks and ADA upgrades at the District 9 headquarters parking lot.
035-78892 Executed 09/09/2022 5 9 Various Repairing or fixing guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a workorder basis throughout District 9.
036-78913 Executed 09/06/2022 2 / 2 5 9 Jackson Bridge joint reconstruction, strip seals, bridge deck scarification and bridge deck microsilica concrete overlay on SN 039-0056 on IL 149 over Kinkaid Creek, 0.9 miles east of IL 3.
037-78956 Executed 09/06/2022 5 9 Franklin, Jefferson Patching, milling and resurfacing on I-57 from 1.5 miles south of IL 154 to 1.25 miles north of the Campground Road overpass bridge.
038-87810 Withdrawn 07/19/2022 2 3 LaSalle Construction of a soldier pile wall and slope stabilization along North 2550th Road from North 2551st Road to a point approximently 0.25 mile east along 2550th Road in the Peru Road District.
039-93737 Executed 09/20/2022 4 6 Mason 0.56 miles of sidewalk along US Route 136 (Laurel Street) from Charlotte Avenue to William Boulevard in Havana.
040-93792 Executed 09/20/2022 1 / 1 4 6 Sangamon 7.38 miles of shoulder removal and replacement with 3' wide HMA Shoulders and aggregate base along Waverly Road from Gibson Road to Old Route 54.
041-95925 Executed 09/30/2022 1 4 7 Richland Construction of a Soil-Cement base course with a HMA overlay and aggregate shoulders on Dundas Lane from IL 130 to East Road.
042-97784 Executed 09/16/2022 5 8 Clinton Hot-Mix asphalt resurfacing and shoulder widening on Germantown Road from the Breese city limits to the Germantown city limits, and Hot-Mix asphalt removal and resurfacting within the city limits of each municpality.
043-97786 Executed 09/16/2022 2 / 2 1 5 8 Madison 6.35 miles of bituminous pavement surface removal and Hot-Mix asphalt pavement and shoulder resurfacting on Renken Road from Washington Street in Prairietown to the Macoupin County line.
044-99675 Executed 09/20/2022 1 5 9 Jackson Hot-Mix Asphalt Surface Removal and Resurfacing with HMA shoulders on Elkville Road from Haulage Road in Elkville to US 51.
045-99693 Executed 09/20/2022 1 / 1 5 9 Massac Resurfacing New Columbia Road from Teague Hill Road to Benton Road.
046-78952 Executed 09/06/2022 1 / 1 1 5 9 Various Replace batteries in uninterruptable power supplies at various locations throughout District 9.
047-62R49 Withdrawn 09/23/2022 1 1 Various (116.5-Mile) Improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties.
01A-LK015 Executed 04/20/2023 2 / 2 1 1 1 McHenry Rehabilitate Runway 8/26 Electrical
02A-LW031 Rejected 02/07/2023 4 7 Lawrence Replace Omni-Directional Approach Lights (ODALs) on Runway 27
03A-TR012 Executed 09/08/2023 1 2 2 Carroll Replace Existing Airport Rotating Beacon
04A-RA018 Rejected 09/21/2022 1 3 5 Champaign Rehabilitate Runway 18-36
05A-JA040 Rejected 11/21/2022 1 4 6 Morgan Replace Medium Intensity Lights on Runway 13/31 and 4/22, All Taxiways, and Apron
06A-JA041 Executed 07/11/2023 1 4 6 Morgan Resurface Runway 13-31 and Remark Runway 13-31, Runway 4-22, and associated Taxiways
07A-ED020 Rejected 09/21/2022 1 / 1 2 3 5 Edgar Rehabilitate Runway 9/27
08A-LA045 Executed 08/16/2023 1 1 1 Cook Rehabilitate Runway 18/36, Taxiway B and Taxiway G
09A-DI033 Executed 01/31/2023 1 2 2 Lee Rehabilitate Taxiways A, B, C and D and T-Hangar Taxiway
10A-UN062 Rejected 09/21/2022 1 / 1 1 3 5 Champaign Voluntary Midfield Intersection Reconfiguration
11A-WA077 Executed 01/06/2023 1 1 1 Lake Remove Trees in Existing Approach and Transitional Zones for Runway 5-23, Phase 3
12A-MV067 Rejected 09/21/2022 1 5 9 Jefferson Replace Medium Intensity Taxiway Lights (MITL) on all taxiways on the airfield
13A-MV068 Rejected 09/21/2022 1 5 9 Jefferson Replace High Intensity Runway Lights (HIRL) on primary runway and replace Medium Intensity Runway Lights (MIRL) on crosswind runway