001-46576
|
Withdrawn
|
08/04/2022
|
|
|
1
|
1
|
Various
|
|
The work consists of Pavement Marking on various routes in various counties in District 1.
|
002-46602
|
Executed
|
09/06/2022
|
|
1 |
0
|
0
|
Various
|
|
Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in Regions Two and Three.
|
003-46603
|
Executed
|
09/06/2022
|
|
|
0
|
0
|
Various
|
|
Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in regions four and five.
|
004-61A96
|
Executed
|
09/30/2022
|
9 / 9 |
|
1
|
1
|
Will
|
|
Pavement reconstruction, storm sewer, curb and gutter, sidewalks, retaining wall, traffic signal modernization and lighting on Bell Road from 151st Street to 159th Street in Homer Glen.
|
005-61H86
|
Executed
|
10/07/2022
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Devon Avenue/Ontarioville Road from 0.5 mile west of Church Road to US 20 (Lake Street) in Hanover Park..
|
006-61H87
|
Executed
|
09/30/2022
|
9 / 9 |
1 |
1
|
1
|
Cook
|
|
Construction of an aggregate and HMA shared-use path to include a boardwalk structure, pedestrian truss stucture and traffic signal modernization. Project is Segment 3 of the Des Plaines River Trail from south of Lawrence Avenue to the Bryn Mawr Bike Bridge over the Des Plaines River in Chicago.
|
007-62F75
|
Executed
|
10/21/2022
|
5 / 5 |
3 |
1
|
1
|
Cook, Will
|
|
(1.24-Mile) Standard Overlay, ADA, Culvert Repairs in Orland Park and Mokena.
|
008-62N27
|
Executed
|
10/21/2022
|
|
1 |
1
|
1
|
Will
|
|
This is a various locations drainage and grading improvements project along IL 1 (Exchange St to Kentucky Rd) and IL 394 (0.2 miles S/O Exchange St) located in the Village of Crete and Unincorporated areas.
|
009-62N42
|
Executed
|
09/06/2022
|
|
|
1
|
1
|
Various
|
|
(76,700-Ft) Crack and Joint Sealing. Project located along I-55 from Weber Rd to Willow Springs Rd in Will, DuPage and Cook Counties.
|
010-62N54
|
Executed
|
09/27/2022
|
|
|
1
|
1
|
Kane
|
|
(1.710-Mile) This is a SMART resurfacing project consisting of pavement patching, hot-mix asphalt surface removal, resurfacing with surface course, detector loop replacement, curb and gutter replacement in the city of Elgin and Village of East Dundee.
|
011-62N66
|
Executed
|
09/20/2022
|
|
1 |
1
|
1
|
Lake
|
|
(3,294-Ft) Smart Overlay and ADA improvements located in Village of Buffalo Grove
|
012-62N68
|
Executed
|
08/30/2022
|
|
|
1
|
1
|
Cook
|
|
(9.21-Mile) Crack and joint sealing; Palos Heights, Palos Hills, Palos Park and Alsip.
|
013-62N81
|
Executed
|
09/23/2022
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(22,113-Ft) Designed Overlay, ADA Improvements and Rumble Strip located on Willow Springs Road from IL. 171 (Archer Ave) to North of 55th St. in Cook County.
|
014-62P04
|
Executed
|
08/30/2022
|
3 / 3 |
|
1
|
1
|
Lake
|
|
(410-Ft) Wingwall replacement and culvert repairs for the culvert carrying Peterson Road over Ditch (0.4 Miles East of US 45) located in the Village of Libertyville in Lake County.
|
015-62P70
|
Executed
|
09/20/2022
|
|
1 |
1
|
1
|
Will
|
|
(2,657-Ft) Weigh Station Repairs. I-80 EB Frankfort Weigh Station (East of Townline Rd), Will County.
|
016-64R13
|
Executed
|
09/23/2022
|
1 / 1 |
1 |
2
|
2
|
Stephenson
|
|
Bridge deck overlay, expansion joint replacement and miscellaneous repairs on SN 089-0066 carrying IL 73 over Cedar Creek at the South edge of Winslow.
|
017-64R50
|
Executed
|
09/06/2022
|
1 / 1 |
1 |
2
|
2
|
Boone
|
|
Deck repair, microsilica overlay and miscellaneous repair on SN 004-0017 carrying US 20 over Coon Creek, 2 miles East of Belvidere.
|
018-64R77
|
Executed
|
09/06/2022
|
|
|
2
|
2
|
Winnebago
|
|
Milling and resurfacing on US 20 from 0.4 mile West of Keith Road to 0.5 mile East of Keith Road.
|
019-68H09
|
Executed
|
09/13/2022
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
Mill and resurface parking area and install parking striping at the Peoria West storage yard (6500 W. Highway 150, Edwards, IL., 2.5 Miles west of Peoria ou US 150).
|
020-68H12
|
Executed
|
09/27/2022
|
|
|
3
|
4
|
Tazewell
|
|
This profect consists of the installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstruction, and all related collateral work necessary to complete the improvements on this project. Located at the intersection of VFW Rd. and 14th St. in Pekin, Tazewell Co.
|
021-70C07
|
Executed
|
09/20/2022
|
|
|
3
|
5
|
Champaign
|
|
Drainage improvements on FAS 1512 (US 150) from CR2650 to Market St. and on FAP 836 (IL 49) from US 150 to Prairie Ave. in Ogden.
|
022-72011
|
Executed
|
09/06/2022
|
|
|
4
|
6
|
Schuyler
|
|
Substructure and erosion repairs on SN 085-0030 and SN 085-0031 carrying IL 99 over Missouri Creek and Little Missouri Creek in southern Schuyler County.
|
023-72012
|
Executed
|
09/13/2022
|
|
|
4
|
6
|
Macoupin
|
|
Deck patching on SN 059-0042 carrying TR 457 over I-55, 2 miles south of IL 138.
|
024-72016
|
Executed
|
09/06/2022
|
2 / 2 |
|
4
|
6
|
Sangamon
|
|
Bridge bearing replacements on two I-72 overhead structures at Waverly Road / New Berlin Interchange and Oak Crest Road.
|
025-72201
|
Executed
|
09/13/2022
|
|
|
4
|
6
|
Morgan
|
|
Patching on I-72 from the Scott County line to the US 67 interchange.
|
026-72205
|
Executed
|
09/09/2022
|
|
|
4
|
6
|
Adams, Pike
|
|
This project consists of Class A Patches from 1.5 mile north of the Adams/Pike County line 101 mile east of IL 96.
|
027-72898
|
Executed
|
09/09/2022
|
|
|
4
|
6
|
Various
|
|
On-call repair of guardrail, cable median barrier, impact attenuators and fence at various locations throughout District 6 as needed.
|
028-74998
|
Executed
|
10/04/2022
|
1 / 1 |
|
4
|
7
|
Fayette
|
|
Bridge deck overlay, bridge joint repair and replacement, bridge deck repairs over Camp Creek, 2-miles East of Vandalia.
|
029-76K46
|
Rejected
|
08/22/2022
|
|
|
5
|
8
|
Bond
|
|
8.1 miles of resurfacing, patching, ADA improvements, guardrail improvements, detector loop replacement and earth excavation on US 40 from 0.3 miles west of IL 127 in Greenville to the Fayette County line. Includes bridge overlay and structural repairs on SN 003-0018 and SN 003-0019 in Smithboro.
|
030-76M77
|
Executed
|
09/16/2022
|
|
|
5
|
8
|
St. Clair
|
|
4.6 miles of new shoulders on IL 163 from IL 157 to South Prairie DuPont Creek.
|
031-76P12
|
Executed
|
09/20/2022
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Bridge painting on I-255 southbound Ramp 1 and Roadway B, just north of I-55/70 (SN 060-0253 and SN 060-0214).
|
032-76P66
|
Executed
|
09/30/2022
|
|
2 |
5
|
8
|
Madison
|
|
Installation of dynamic message signs on I-270 at the Chain of Rocks Canal Bridge and on IL 255 north of I-270.
|
033-76P95
|
Executed
|
09/09/2022
|
|
1 |
5
|
8
|
Various
|
|
Maintain and service all ITS equipment at various locations throughout District 8 and replacement of the dynamic message board on westbound I-70 at mile marker 16.8.
|
034-78700
|
Executed
|
09/20/2022
|
|
|
5
|
9
|
Jackson
|
|
Resurfacing, patching, sidewalks and ADA upgrades at the District 9 headquarters parking lot.
|
035-78892
|
Executed
|
09/09/2022
|
|
|
5
|
9
|
Various
|
|
Repairing or fixing guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a workorder basis throughout District 9.
|
036-78913
|
Executed
|
09/06/2022
|
2 / 2 |
|
5
|
9
|
Jackson
|
|
Bridge joint reconstruction, strip seals, bridge deck scarification and bridge deck microsilica concrete overlay on SN 039-0056 on IL 149 over Kinkaid Creek, 0.9 miles east of IL 3.
|
037-78956
|
Executed
|
09/06/2022
|
|
|
5
|
9
|
Franklin, Jefferson
|
|
Patching, milling and resurfacing on I-57 from 1.5 miles south of IL 154 to 1.25 miles north of the Campground Road overpass bridge.
|
038-87810
|
Withdrawn
|
07/19/2022
|
|
|
2
|
3
|
LaSalle
|
|
Construction of a soldier pile wall and slope stabilization along North 2550th Road from North 2551st Road to a point approximently 0.25 mile east along 2550th Road in the Peru Road District.
|
039-93737
|
Executed
|
09/20/2022
|
|
|
4
|
6
|
Mason
|
|
0.56 miles of sidewalk along US Route 136 (Laurel Street) from Charlotte Avenue to William Boulevard in Havana.
|
040-93792
|
Executed
|
09/20/2022
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
7.38 miles of shoulder removal and replacement with 3' wide HMA Shoulders and aggregate base along Waverly Road from Gibson Road to Old Route 54.
|
041-95925
|
Executed
|
09/30/2022
|
|
1 |
4
|
7
|
Richland
|
|
Construction of a Soil-Cement base course with a HMA overlay and aggregate shoulders on Dundas Lane from IL 130 to East Road.
|
042-97784
|
Executed
|
09/16/2022
|
|
|
5
|
8
|
Clinton
|
|
Hot-Mix asphalt resurfacing and shoulder widening on Germantown Road from the Breese city limits to the Germantown city limits, and Hot-Mix asphalt removal and resurfacting within the city limits of each municpality.
|
043-97786
|
Executed
|
09/16/2022
|
2 / 2 |
1 |
5
|
8
|
Madison
|
|
6.35 miles of bituminous pavement surface removal and Hot-Mix asphalt pavement and shoulder resurfacting on Renken Road from Washington Street in Prairietown to the Macoupin County line.
|
044-99675
|
Executed
|
09/20/2022
|
|
1 |
5
|
9
|
Jackson
|
|
Hot-Mix Asphalt Surface Removal and Resurfacing with HMA shoulders on Elkville Road from Haulage Road in Elkville to US 51.
|
045-99693
|
Executed
|
09/20/2022
|
1 / 1 |
|
5
|
9
|
Massac
|
|
Resurfacing New Columbia Road from Teague Hill Road to Benton Road.
|
046-78952
|
Executed
|
09/06/2022
|
1 / 1 |
1 |
5
|
9
|
Various
|
|
Replace batteries in uninterruptable power supplies at various locations throughout District 9.
|
047-62R49
|
Withdrawn
|
09/23/2022
|
|
|
1
|
1
|
Various
|
|
(116.5-Mile) Improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties.
|
01A-LK015
|
Executed
|
04/20/2023
|
2 / 2 |
1 |
1
|
1
|
McHenry
|
|
Rehabilitate Runway 8/26 Electrical
|
02A-LW031
|
Rejected
|
02/07/2023
|
|
|
4
|
7
|
Lawrence
|
|
Replace Omni-Directional Approach Lights (ODALs) on Runway 27
|
03A-TR012
|
Executed
|
09/08/2023
|
|
1 |
2
|
2
|
Carroll
|
|
Replace Existing Airport Rotating Beacon
|
04A-RA018
|
Rejected
|
09/21/2022
|
|
1 |
3
|
5
|
Champaign
|
|
Rehabilitate Runway 18-36
|
05A-JA040
|
Rejected
|
11/21/2022
|
|
1 |
4
|
6
|
Morgan
|
|
Replace Medium Intensity Lights on Runway 13/31 and 4/22, All Taxiways, and Apron
|
06A-JA041
|
Executed
|
07/11/2023
|
|
1 |
4
|
6
|
Morgan
|
|
Resurface Runway 13-31 and Remark Runway 13-31, Runway 4-22, and associated Taxiways
|
07A-ED020
|
Rejected
|
09/21/2022
|
1 / 1 |
2 |
3
|
5
|
Edgar
|
|
Rehabilitate Runway 9/27
|
08A-LA045
|
Executed
|
08/16/2023
|
|
1 |
1
|
1
|
Cook
|
|
Rehabilitate Runway 18/36, Taxiway B and Taxiway G
|
09A-DI033
|
Executed
|
01/31/2023
|
|
1 |
2
|
2
|
Lee
|
|
Rehabilitate Taxiways A, B, C and D and T-Hangar Taxiway
|
10A-UN062
|
Rejected
|
09/21/2022
|
1 / 1 |
1 |
3
|
5
|
Champaign
|
Voluntary
|
Midfield Intersection Reconfiguration
|
11A-WA077
|
Executed
|
01/06/2023
|
|
1 |
1
|
1
|
Lake
|
|
Remove Trees in Existing Approach and Transitional Zones for Runway 5-23, Phase 3
|
12A-MV067
|
Rejected
|
09/21/2022
|
|
1 |
5
|
9
|
Jefferson
|
|
Replace Medium Intensity Taxiway Lights (MITL) on all taxiways on the airfield
|
13A-MV068
|
Rejected
|
09/21/2022
|
|
1 |
5
|
9
|
Jefferson
|
|
Replace High Intensity Runway Lights (HIRL) on primary runway and replace Medium Intensity Runway Lights (MIRL) on crosswind runway
|