007-62G07
|
Executed
|
02/20/2019
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Removal and replacement of headwalls and wingwalls on either side of the existing double cell box culvert crossing Burnham Ave., 40 ft north of 202nd St. in Lynwood.
|
011-64N24
|
Executed
|
02/14/2019
|
|
|
2
|
2
|
Lee
|
|
Removal and replacement of culvert in the south leg of the intersection of IL 251 and US 30.
|
035-78617
|
Executed
|
02/20/2019
|
|
|
5
|
9
|
Union
|
|
Scour repair below SN 091-0068 carrying IL 127 over Clear Creek south of Alto Pass.
|
041-68E76
|
Executed
|
03/05/2019
|
3 / 3 |
|
3
|
4
|
Tazewell
|
|
Installation and removal of guardrail, inlet adjustments and miscellaneous concrete work to separate US 150 (West Jackson Street) from the adjacent multi-use trial from Beverly Avenue to Cedar Avenue, on the northwest side of Morton
|
051-66J42
|
Executed
|
03/05/2019
|
1 / 1 |
|
2
|
3
|
Ford
|
|
removal and replacement of a 3'x 2' concrete box culvert with 30' ERS RCCP culv ert located on IL 115, 0.7 mile south of Main Street in Cabery.
|
054-68E69
|
Executed
|
02/14/2019
|
1 / 1 |
|
3
|
4
|
Various
|
|
Dead tree removal throughout District 4.
|
056-62H65
|
Executed
|
03/29/2019
|
|
|
1
|
1
|
Various
|
|
Expressway mowing south.
|
057-62H66
|
Executed
|
02/14/2019
|
|
|
1
|
1
|
Various
|
|
Expressway mowing north.
|
063-72K69
|
Executed
|
02/14/2019
|
|
|
4
|
6
|
Schuyler
|
|
Installing cross road pipe culver, existing pipe culvert removal and fill, and related ditch improvements on IL 99 just south of Vaughn Lane, south of Camden.
|
098-62G95
|
Executed
|
03/05/2019
|
|
|
1
|
1
|
DuPage
|
|
Drainage improvement project in the median of IL 83 from 67th Street to Plainfield Road.
|